Traffic

TRAFFIC

News, updates, traffic map, travel times and info about driving in Toronto and Ontario.

The TTC's newest streetcar is shown while on its maiden voyage early on March 14, 2013. (Brad Ross/Twitter.com)

TRANSIT

News, updates and important information about transit systems for Toronto & the GTA.

In this June 1, 2009 file photo, a truck loaded with Ford and Lincoln vehicles travels from Canada to the U.S. Peace Bridge border crossing in Buffalo, N.Y. (AP / David Duprey)

BORDER CROSSINGS

News, updates, wait times and traveller information about Ontario border crossings.

Commuter Centre | Traffic, Transit, Air Travel, Border Crossings - Information for Toronto and GTA

Real-time traffic information for Toronto, GTA, and surrounding areas.



Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Traffic

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
BLACKTHORN AVE @ 432
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
SUN VALLEY DR
From ST MARKS RD to PASADENA GDNS
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
VALLEYMEDE RD
From ELLIS PARK RD to KENNEDY AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ISLINGTON AVE
From FORDWICH CRES to BARKER AVE
2019-06-17 07:00 2020-12-31 19:00 Daily
NB/SB left and right lane occupied due to repairing bridge.
EASTSIDE DR @ NORTH QUEEN ST
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Northbound lane closed.
VICKERS RD @ THE EAST MALL
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Southbound lane closed.
BROW DR
From EXMOOR DR to LAKE SHORE BLVD W
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of two ground water monitoring wells. Southbound shoulder closed.
BLUE GOOSE ST
From MANCHESTER AVE to CAVELL AVE
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of groundwater monitoring wells. Northbound curb lane closed.
LAKE SHORE BLVD W
From SIXTH ST to THIRD ST
2020-03-01 07:00 2020-08-20 19:00 Continuous
East-West bound all lanes Watermain and Water Service Installation
BOYD AVE
From RALPH ST to MERRILL AVE
2020-03-03 07:00 2020-08-31 19:00 Continuous
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
CHURCH ST
From JANE ST to ELM ST
2020-03-05 07:00 2020-09-30 18:00 Daily
Eastbound and westbound lane occupied one at a time for road resurfacing.
CARLINGVIEW DR
From RENFORTH DR to HWY 401 COLLECTOR EB
2020-03-16 00:01 2020-11-20 00:01 Daily
Southbounds all Lanes are occupied due to bridge Rehabilitation project.
WESTON RD
From WRIGHT AVE to CLOUSTON AVE
2020-03-02 07:00 2020-09-11 19:00 Daily
Upgrading the storm sewer system. 2 Southbound lanes closed.
KIPLING AVE
From WINGROVE HILL to RATHBURN RD
2020-03-17 07:00 2020-08-29 16:00 Daily
Northbound 2 lanes blocked due to basement flooding protection program.
CARLINGVIEW DR
From RENFORTH DR to CARLINGVIEW SB HWY 401 EXPRESS EB RAMP
2020-03-23 00:01 2020-11-20 00:01 Daily
MTO 2019-2001 Bridge Rehabilitation Project. All Southbound lanes closed.
EGLINTON AVE W @ BEMERSYDE DR
2020-03-30 07:00 2020-07-30 17:00 Daily
Trench excavation and duct bank installation for Toronto Hydro. Eastbound curb closed.
JOHN GARLAND BLVD
From KIPLING AVE to JAMESTOWN CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
Westbound and Eastbound curb lanes alternating, partially occupied due to trench excavation and duct bank installation. Weekend hours: 07:00am-07:00pm
KENDLETON DR
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
BURNHAMILL PL @ MILL RD
2020-04-04 07:00 2020-09-27 19:00 Daily
Eastbound curb lane occupied due to trench excavation and duct bank installation for Toronto Hydro.
STONEHAM RD
From MILL RD to OLD BURNHAMTHORPE RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Eastbound and Westbound lanes occupied alternatively due to trench excavation and duct bank installation for Toronto Hydro.
MILL RD @ STONEHAM RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Northbound lanes occupied due to trench excavation and duct bank installation for Toronto Hydro.
MARKBURN CRT
From STONEHAM RD to MARKBURN CRT
2020-04-13 07:00 2020-09-27 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
FIFTH ST @ ALEX FAULKNER LN
At BIRMINGHAM ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From NINTH ST to EIGHTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From SEVENTH ST to SIXTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From THIRD ST to FIFTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
KENDLETON DR @ JOHN GARLAND BLVD
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-20 07:00 2020-09-30 19:00 Daily
North and southbound curb lanes occupied due to Toronto Hydro trench excavation and duct installation work.
LAURA RD
From SHEPPARD AVE W to FRITH RD
2020-05-05 07:00 2020-10-15 19:00 Daily
Construction work to replace storm sewers. Southbound lane closed.
ALBION RD
From BENSTROW AVE to TODD BROOK DR
2020-05-21 07:00 2020-07-31 17:00 Continuous
Construction work. 1 Westbound and 1 Eastbound lane closed.
STANLEY RD
From JANE ST to LAURA RD
2020-05-25 07:00 2020-09-04 19:00 Daily
Construction of a sanitary sewer system. 1 Westbound lane closed.
GARDINER EXPY W LAKE SHORE BLVD W RAMP @ GARDINER EXPY
2020-06-06 06:00 2020-08-03 23:00 Weekends
Ramp fully closed from Saturday 6 AM to Sunday 11 PM due to City of Toronto's ActiveTO Initiative.
FIRST ST
From LAKE SHORE BLVD to LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From FIRST ST to SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From THIRD ST to FIFTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FIFTH ST @ Lake SHORE Dr
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From FIFTH ST to ELEVENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ELEVENTH ST @ LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From ELEVENTH ST to THIRTEENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE PROMENADE
From TWENTY THIRD ST to FORTY SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SIXTH ST @ LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SEVENTH ST
From LAKE SHORE BLVD to LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNDALK DR
From ELLESMERE RD to ANTRIM CRES
2020-05-26 00:01 2020-09-30 00:01 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SECORD AVE
From DAWES RD to EASTDALE AVE
2020-04-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JANE ST BLACK CREEK DR SB RAMP @ JANE ST
2020-06-05 00:01 2020-10-30 00:01 Daily
On-ramp from Jane St to Southbound Black Creek Dr closed for long-term construction.
THIRTY THIRD ST
From LAKE SHORE BLVD to PARK BLVD
2020-06-11 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement followed by road reconstruction.
THIRTY FIFTH ST
From LAKE SHORE BLVD W to LAKE PROMENADE
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement and road construction.
BRULE CRES @ BRULE GDNS
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound lane partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
SHAND AVE
From DUNEDIN DR to PRINCE EDWARD DR N
2020-06-08 07:00 2020-12-31 21:00 Daily
Eastbound and westbound lanes partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
SKYLARK RD
From VAN STASSEN BLVD to ALTHEA RD
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lane partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
THIRTY SECOND ST @ LAKE SHORE BLVD W
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
CHARTWELL RD
From ATHOL AVE to NORSEMAN ST
2020-06-03 00:01 2020-09-30 23:59 Daily
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EDGECROFT RD
From CHARTWELL RD to BENTLEY DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BENTLEY DR
From UNO CRT to YORKVIEW DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
YORKVIEW DR
From BENTLEY DR to ROYAL YORK RD
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DELROY DR @ Jeff Healey Park
From ROYAL YORK RD to DELROY DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BRANCH AVE @ FORTIETH ST
2020-06-08 07:00 2020-12-30 19:00 Daily
Westbound lane partially occupied due to water main service installation. Weekend hours: 9:00am-4:00pm
HUNTING RIDGE
From WINCOTT DR to KIPLING AVE
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
KINGSBOROUGH CRES
From HUNTING RIDGE to HUNTING RIDGE
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
REMINGTON DR @ GREAT OAK DR
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
SUNVALE DR
From KIPLING AVE to BRAMPTON RD
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
FINCH AVE W
From HWY 27 COLLECTOR N to DAMASCUS DR
2020-06-10 07:00 2020-09-30 19:00 Daily
Bell Relocation Works. Westbound and Eastbound curb lane occupied.
FINCH AVE W
From DRIFTWOOD AVE to SENTINEL RD
2020-06-10 07:00 2020-11-13 19:00 Daily
Bell Relocation Works. Westbound and Eastbound curb lane occupied.
HWY 27 NB
From REXDALE BLVD to BETHRIDGE RD
2020-06-12 07:00 2020-09-04 19:00 Daily
Southbound lane partially occupied due to Hydro trenching work.
HWY 27 NB
From HUMBER COLLEGE BLVD to FINCH AVE W
2020-06-18 07:00 2020-10-31 19:00 Daily
Southbound lane partially occupied due to temporary road widening.
OLDHAM RD
From BEMERSYDE DR to PRINCESS ANNE CRES
2020-06-22 07:00 2020-09-30 19:00 Daily
Alternating eastbound and westbound curb lanes occupied for trench excavation by Valard Construction.
PRINCESS ANNE CRES
From OLDHAM RD to BOURNEMOUTH RD
2020-06-22 07:00 2020-09-30 19:00 Daily
Alternating northbound and southbound curb lanes occupied for trench excavation by Valard Construction.
TETTENHALL RD
From BEMERSYDE DR to PRINCESS ANNE CRES
2020-06-22 07:00 2020-09-30 19:00 Daily
Westbound curb lane occupied for trench excavation and duct bank installation.
BLOOR ST E
From THOMPSON AVE to PRINCE EDWARD DR N
2020-07-20 07:00 2020-07-24 19:00 Daily
Removal and disposal of existing pedestrian light poles. Eastbound right lane and curb partially occupied.
MARTIN GROVE RD
From ALBION RD to FINCH AVE W
2020-06-22 07:00 2020-08-06 19:00 Daily
Northbound and southbound lanes partially occupied due to concrete removal. Weekend hours:7:00am-7:00pm
RIVERLEA DR
From WESTONA ST to FREEMONT AVE
2020-06-22 07:00 2020-12-31 19:00 Daily
Sewer Replacement and Water Service Installation.
NORANDA DR @ BROOKHAVEN DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Sewer Replacement and Water Service Installation.
LITTORAL PL
At SCARLETT RD
2020-07-09 07:00 2020-12-31 21:00 Daily
Watermain and water service replacement per contract
RENFORTH DR
From MATHESON BLVD to EGLINTON AVE W
2020-06-25 07:00 2020-08-31 19:00 Daily
Southbound two right lanes occupied for geotechnical investigation by 4Transit Joint Venture.
RENFORTH DR
From HWY 401 COLLECTOR EB to EGLINTON AVE W
2020-06-25 07:00 2020-08-31 19:00 Daily
Geotechnical and hydrogeological investigation. Southbound curb lane closed.
DRUMHELLER RD @ ELMHURST DR
From ELMHURST DR to CLEARBROOKE CRCL
2020-06-08 07:00 2020-10-15 17:00 Continuous
Road fully closed in both directions due to bridge rehabilitation work by Alliance Verdi Civil Inc.
EGLINTON AVE W
From WINCOTT DR to DRYDEN WAY
2020-06-29 07:00 2020-08-29 19:00 Daily
Geotechnical and environmental borehole investigation. Westbound curb lane closed.
IANHALL RD @ GADE DR
2020-06-25 07:00 2020-09-25 19:00 Continuous
Storm Sewer Installations. 1 lane closed, local traffic only.
GADE DR @ RODING ST
2020-06-25 07:00 2020-09-25 19:00 Continuous
Storm Sewer Installations. 1 lane closed, local traffic only.
BURNHAMTHORPE RD @ HWY 427 COLLECTOR N
From HWY 27 COLLECTOR N to THE WEST MALL
2020-07-02 19:00 2020-09-05 06:00 Daily
Two westbound lanes occupied due to watermain relining work by Robert B Somerville Co. Ltd.
BURNHAMTHORPE RD
From HWY 427 to THE WEST MALL
2020-07-02 19:00 2020-09-05 06:00 Daily
Watermain re-lining project. 2 Westbound lanes closed.
RATHBURN RD @ ELMCREST RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ALBION RD @ TODD BROOK DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
LONGBOURNE DR @ REDGRAVE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
BROWNS LINE @ WOODBURY RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
DUNDAS ST W @ PACIFIC AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ISLINGTON AVE @ BARKER AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
MARTIN GROVE RD @ THE WESTWAY
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
WATERBURY DR @ MARTIN GROVE RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ TREHORNE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ CELESTINE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ KIPLING AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ SANDWELL DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ SUN ROW DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
BROWNS LINE @ COULES CRT
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
BROWNS LINE @ FINSBURY CRES
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
BROWNS LINE @ VALERMO DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
REXDALE BLVD @ MARTIN GROVE RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
REXDALE BLVD @ TIDEMORE AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROYAL YORK RD @ SUMMITCREST DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
CARLINGVIEW DR @ METEOR DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBER COLLEGE BLVD @ WESTMORE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
WESTHUMBER BLVD @ ESTHER LORRIE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
WESTHUMBER BLVD @ IXWORTH RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
STEELES AVE W @ HWY 27 NB
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
CARRIER DR @ ALBION RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBER COLLEGE BLVD @ CARRIER DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBER COLLEGE BLVD @ ARBORWOOD DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROYALCREST RD @ MARTIN GROVE RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROYALCREST RD @ CABERNET CRCL
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROYALCREST RD @ LEADING RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROYALCREST RD @ BAYWOOD RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBERLINE DR @ HUMBER COLLEGE BLVD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBERWOOD BLVD @ TOPBANK DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
LAKE SHORE BLVD W @ FIRST ST
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
CLAIREVILLE DR @ HUMBERLINE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ TRIO AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
RATHBURN RD @ THE WEST MALL
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
THE WESTWAY @ CALLOWHILL DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
KIPLING AVE @ TABER RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
KIPLING AVE @ HENLEY CRES
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
JANE ST @ ALLIANCE AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
HUMBER COLLEGE BLVD @ WESTMORE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ALBION RD @ STEELES AVE W
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
EGLINTON AVE W
From WIDDICOMBE HILL BLVD to KIPLING AVE
2020-07-07 07:00 2020-08-29 19:00 Daily
Westbound curb lane blocked due to geotechnical and environmental borehole investigation.
THE EAST MALL @ 400
From BURNHAMTHORPE RD to MONTEBELLO GDNS
2020-07-13 07:00 2020-07-27 19:00 Daily
Sanitary, storm and water service installation. 1 Northbound and Southbound lane closed.
EGLINTON AVE W @ 4650
2020-07-13 07:00 2020-07-31 05:00 Continuous
Westbound 1 lane blocked due to 3 catch basins installation and asphalt paving.
KILBARRY RD
From DUNVEGAN RD to FOREST HILL RD
2020-07-01 07:00 2020-07-31 17:30 Daily
Storage of materials, loading trucks and concrete pump. Eastbound lane partially closed.
EGLINTON AVE W @ 4650
From WINCOTT DR to DRYDEN WAY
2020-07-13 07:00 2020-07-31 17:00 Daily
Westbound curb lane occupied for the widening of the road by Graham Bros. Construction.
ALDEN AVE
From OURLAND AVE to WILLOWBROOK RD
2020-07-10 07:00 2020-08-10 19:00 Daily
Alternating westbound and eastbound curb lanes occupied for Etobicoke General Maintenance contract by Sanscon Construction.
IRONWOOD RD
From STANWOOD CRES to LANYARD RD
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Lane restrictions in place.
VOYAGER CRT N @ INTERNATIONAL BLVD
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Lane restrictions in place.
VOYAGER CRT S @ INTERNATIONAL BLVD
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Lane restrictions in place.
YORK RD @ WESTHAMPTON DR
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Lane restrictions in place.
HADRIAN DR
From ALLENBY AVE to ESMOND CRES
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Lane restrictions in place.
KIPLING AVE
From HENLEY CRES to ALBION RD
2020-07-13 09:00 2020-07-24 17:00 Daily
Hydro vac and cable pulling. 1 Northbound lane closed.
CHAPLIN CRES
From EGLINTON AVE W to RUSSELL HILL DR
2020-06-08 00:01 2020-07-31 23:59 Continuous
Full road closure due to construction work. Local traffic only.
EGLINTON AVE W
From MUNICIPAL DR to KEELE ST
2020-07-14 09:00 2020-08-31 23:59 Continuous
2-3 lanes occupied for construction of the future Eglinton Crosstown LRT station by Crosslinx Transit Solutions. One lane in each direction will be maintained.
THE KINGSWAY
From DUNDAS ST W to LAMBETH RD
2020-07-16 07:00 2020-07-24 19:00 Daily
Northbound and southbound lanes partially occupied due to geotechnical investigation.
CEDARLAND DR @ 22-24
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
DONALBERT RD @ 20-35
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
GREAT OAK DR @ 19-27
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
ROCKINGHAM DR @ 22-35
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
SCARLETT RD @ 950-970
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
WIMBLETON CRES @ 10-16
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
WHITFIELD AVE @ 59
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Eastbound lane closed.
PARADELLE CRES @ 69-101
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
DELL PARK AVE @ 50
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
GLENGROVE AVE W @ 653
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Eastbound lane closed.
ST ALBANS RD @ KIPLING AVE
2020-07-22 07:00 2020-07-24 17:00 Continuous
Full depth concrete road base installation. Eastbound lane closed.
HWY 27 COLLECTOR N
From STEELES AVE W to FINCH AVE W
2020-07-20 09:00 2020-07-24 16:00 Continuous
City of Toronto Roadway Crack Filling. Lane restrictions in both directions.
MARTIN GROVE RD
From BELFIELD RD to FINCH AVE W
2020-07-20 09:00 2020-07-24 16:00 Continuous
City of Toronto Roadway Crack Filling. Lane restrictions in both directions.
CYNTHIA RD @ 50-31
2020-07-20 07:00 2020-08-03 19:00 Daily
Permanent surface reinstatement to Toronto Water Repairs. Westbound lane closed.
JANE ST @ 958
2020-07-20 07:00 2020-08-03 19:00 Daily
Permanent surface reinstatement to Toronto Water Repairs. Southbound lane closed.
CHRYESSA AVE @ 7
2020-07-20 07:00 2020-08-03 19:00 Daily
Permanent surface reinstatement to Toronto Water Repairs. Northbound lane closed.
ROYAL YORK RD
From JUDSON ST to CAVELL AVE
2020-07-11 07:00 2020-07-31 17:00 Continuous
Sidewalk work. 1 Northbound lane closed.
GREENDALE AVE @ 74
2020-07-20 07:00 2020-08-03 19:00 Daily
Permanent surface reinstatement to Toronto Water Repairs. Southbound lane closed.
TENTH ST @ LAKE SHORE BLVD W
From LAKE SHORE BLVD W to LAKE SHORE DR
2020-07-17 07:00 2020-08-17 19:00 Daily
One northbound and southbound curb lane occupied due to maintenance work by Sanscon Construction.
THE WEST MALL @ WAULRON ST
From WAULRON ST to WEST MALL CRES
2020-07-20 09:00 2020-07-31 16:00 Daily
Alternating eastbound and westbound lanes occupied due to a geotechnical investigation by GeoPro Consulting.
MAPLE LEAF DR @ 174
2020-07-22 07:00 2020-08-05 19:00 Daily
Westbound lane partially occupied due to permanent surface reinstatement.
SEABROOK AVE @ 9
2020-07-22 07:00 2020-08-05 19:00 Daily
Northbound lane partially occupied due to permanent surface reinstatement.
JANE ST @ 1850
2020-07-22 07:00 2020-08-05 19:00 Daily
Southbound lane partially occupied due to permanent reinstatement.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HILLHURST BLVD @ 236
2019-11-29 07:00 2020-11-27 19:00 Continuous
WB Sanitary & Storm Sewer upgrades as part of Basement Flooding Prevention Project Phase 4
JANE ST @ SHOREHAM DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SECROFT CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
HULLMAR DR
From GOSFORD BLVD to YORK GATE BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SHOREHAM DR
From GOSFORD BLVD to JANE ST
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
YORK GATE BLVD @ HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
ARTECH CRT @ GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
FLETCHERDON CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From SHOREHAM DR to FLETCHERDON CRES
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From ARTECH CRT to HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
CORTLEIGH BLVD @ 344-384
2019-10-02 07:00 2020-11-27 19:00 Continuous
All eastbound lanes closed due to sanitary & storm sewer upgrades as part of the Basement Flooding Prevention Project.
WILKINSON DR
From DOUBLETREE RD to PATRICK BLVD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
SNAPDRAGON DR @ CLEMATIS RD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
QUEENSLEA AVE
From WALWYN AVE to ROSEMOUNT AVE
2020-03-02 07:00 2020-08-31 18:00 Daily
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
LAWRENCE AVE W @ BOLINGBROKE RD
2020-03-17 09:30 2020-08-20 15:00 Daily
East bound 1 lane blocked due to unload material.
STEELES AVE W
From FENMAR DR to ROSSDEAN DR
2020-03-30 07:00 2020-08-01 19:00 Daily
One Eastbound lane occupied due to watermain work.
BETH NEALSON DR @ WICKSTEED AVE
2019-10-25 07:00 2020-07-31 19:00 Daily
Southbound lane occupied due to watermain work.
DANE AVE
From CONLAND AVE to DUFFERIN ST
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
MARLEE AVE
From GLENGROVE AVE to GLEN PARK AVE
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
HALLSPORT CRES @ 106-41
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
BUNNELL CRES
From HALLSPORT CRES to KEEFER RD
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
WENTWORTH AVE
From MYLESVIEW PL to EDDFIELD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BRENTWOOD AVE @ SHEPPARD AVE W
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BURNDALE AVE
From SENLAC RD to WELBECK RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
CAMERON AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FLORENCE AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FRANKLIN AVE
From BASSANO RD to GWENDOLEN AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
JOHNSTON AVE
From EASTON RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
PEWTER RD
From FLORENCE AVE to CAMERON AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
POYNTZ AVE
From BEAMAN RD to EASTON RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
RADINE RD
From POYNTZ AVE to STUART AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
ROYCREST AVE @ BRENTWOOD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
WILLOWDALE AVE
From FINCH AVE E to EMPRESS AVE
2020-04-27 07:00 2020-07-31 19:00 Daily
Construction work. Northbound and Southbound curb lanes closed.
WILSON HEIGHTS BLVD
From WATERLOO AVE to BRIGHTON AVE
2020-05-03 07:00 2020-08-03 19:00 Daily
Northbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
SEARLE AVE
From DUFFERIN ST to SHAFTESBURY AVE
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
CODSELL AVE
From MAXWELL ST to BATHURST ST
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
STEELES AVE E @ BIRCHMOUNT RD
2020-04-27 07:00 2020-07-31 19:00 Daily
Concrete, sidewalk and curb removal and replacement. One lane in each direction available at all times. Deleted By: pwu2; When: 04/28/2020 6:59:06 AM; Reason: dfuplicate
KENNETH AVE @ SPRING GARDEN AVE
2020-05-07 00:01 2020-07-31 23:59 Continuous
Southbound lane blocked due to rehabilitation of sanitary sewer.
WATERLOO AVE
From HOVE ST to TILLPLAIN RD
2020-05-11 07:00 2020-08-11 19:00 Continuous
East and westbound partially blocked due to Storm sewer re-construction
KENNETH AVE
From SPRING GARDEN AVE to SHEPPARD AVE E
2020-05-20 00:01 2020-08-28 00:01 Continuous
Southbound lane partially occupied due to sewer rehabilitation, temporary by-pass, and MH Emplacement.
KENNETH AVE @ SPRING GARDEN AVE
2020-05-20 00:01 2020-08-28 23:59 Continuous
All southbound lanes occupied due to sewer rehabilitation work by Capital Sewer Services Ltd.
MEDACA ST
From KINGSLAKE RD to BARONESS CRES
2020-05-25 07:00 2020-07-25 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to underground Hydro installation.
RIDGE RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
PRIVET RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-20 19:00 Continuous
Full road closure due to construction work. Local traffic only.
MONTANA AVE @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
LAURA RD @ 1-340
2020-06-01 07:00 2020-09-01 19:00 Continuous
One westbound lane occupied due to a sanitary sewer system installation by Varcon Construction.
WR ALLEN RD @ WILSON AVE
2020-06-01 23:00 2020-10-16 05:00 Daily
Replacement of barrier fencing. 1 Northbound lane closed.
HILLCREST AVE
From WILLOWDALE AVE to LONGMORE ST
2020-05-29 07:00 2020-11-30 19:00 Daily
Watermain rehabilitation. Westbound lane closed.
ALFRED AVE @ DUDLEY AVE
From KENNETH AVE to WILFRED AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Westbound lanes partially occupied due to water main rehabilitation.
GREENFIELD AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.
TORYORK DR
From WESTON RD to ORMONT DR
2020-06-15 09:30 2020-11-14 15:30 Daily
South bound 1 lane blocked due to installation of storm sewer.
BLUE HAVEN CRES @ ARDWICK BLVD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure from Ardwick Boulevard and Blue Haven Crescent to Bluehaven Park trailhead due to City of Toronto's Active TO Initiative. Local traffic only.
ARDWICK BLVD
From FINCH AVE W to BLUE HAVEN CRES
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNCANWOODS DR
From ISLINGTON AVE to FINCH AVE W
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ROWNTREE MILL RD
From EMILY AVE to ISLINGTON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EXBURY RD
From JANE ST to CAMBORNE AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
CHALKFARM DR
From GRAVENHURST AVE to JANE ST
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
GRAVENHURST AVE
From CHALKFARM DR to FOXRUN AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAYMARKET RD
From MAYALL AVE to WILSON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
NISKA RD
From DRIFTWOOD AVE to TOBERMORY DR
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
TOBERMORY DR
From FINCH AVE W to NISKA RD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
POTSDAM RD
From TOBERMORY DR to DRIFTWOOD AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FOREST HEIGHTS BLVD
From BAYVIEW AVE to WIMPOLE DR
2020-06-22 07:00 2020-09-09 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
BISHOP AVE
From KENNETH AVE to WILLOWDALE AVE
2020-06-29 07:00 2020-09-22 07:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
KILLAMARSH DR
From MADRON CRES to DERRYDOWN RD
2020-06-06 07:00 2020-09-08 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
ESTELLE AVE
From PRINCESS AVE to EMPRESS AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Northbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
EMPRESS AVE
From HIGHGATE AVE to BAYVIEW AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Westbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
ELMWOOD AVE
From BAYVIEW AVE to ESTELLE AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.
WILLOWDALE AVE
From EMPRESS AVE to FINCH AVE E
2020-06-06 07:00 2020-07-31 19:00 Weekdays
Northbound and southbound lanes partially occupied due to construction.
MAXWELL ST
From WILMINGTON AVE to SHEPPARD AVE W
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WILLOWDALE AVE @ EMPRESS AVE
2020-04-27 07:00 2020-07-31 19:00 Daily
Construction work. All Northbound and Southbound lanes closed.
WILLOWDALE AVE
From EMPRESS AVE to FINCH AVE E
2020-06-06 09:00 2020-07-31 21:00 Daily
All Northbound and Southbound lanes closed due to road surface cutting.
LOMAR DR @ SHEPPARD AVE E
2020-07-21 07:00 2020-10-15 19:00 Daily
Basement Flooding Protection Program. 1 Northbound lane closed.
SHEPPARD AVE W @ JANE ST
2020-06-15 07:00 2020-10-15 19:00 Daily
Basement Flooding Protection Program. 2 Westbound lanes closed.
KITCHENER AVE
From GILBERT AVE to MCROBERTS AVE
2020-06-22 07:00 2020-12-31 19:00 Daily
Full road closure due to sewer replacement and water service installation.
NORANDA DR
At BROOKHAVEN DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Full road closure due to watermain replacement. Weekend Timings (0900am-0700pm)
OAKDALE RD
From FINCH AVE W to SHEPPARD AVE W
2020-06-22 07:00 2020-09-30 19:00 Daily
Northbound and southbound lanes partially occupied due to concrete removal and replacement. Weekend hours: 12:00am-7:00pm
FAIRCHILD AVE @ TALBOT RD
2020-06-15 07:30 2020-07-31 15:30 Continuous
Installing new Feeder Cable. West along Fairchild Ave, west along Blake Ave, turning north up Grantbrook St, east along Drewry Ave, north up Cactus Ave to the north side of Steeles Ave.
YORK MILLS RD
From CEDARWOOD AVE to BAYVIEW AVE
2020-06-22 07:00 2020-12-31 22:00 Continuous
Watermain and water service installation. 2 Eastbound lanes closed.
ALDERSHOT CRES @ UPPER CANADA DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Watermain and water service installation.
FAIRMEADOW AVE
From LORD SEATON RD to UPPER CANADA DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Watermain and water service installation.
FINCH AVE W
From ARROW RD to NORFINCH DR
2020-06-23 07:00 2020-12-08 19:00 Daily
Westbound and eastbound curb lane blocked due to bell relocation works.
HOVE ST
From SEARLE AVE to COCKSFIELD AVE
2020-06-22 07:00 2020-09-22 19:00 Daily
Southbound lane partially occupied due to storm sewer re-construction.
BETH NEALSON DR
From PAT MOORE DR to WICKSTEED AVE
2020-06-29 00:01 2020-09-30 23:59 Continuous
Replacement of existing watermain and reconstruction of road. Northbound lane closed.
KESTELL LANE @ THREE VALLEYS DR
2020-06-29 07:00 2020-08-14 19:00 Daily
One lane partiallly occupied in both directions due to duct installation work by TRJ Telecom Inc.
MINORCA PL
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
LARABEE CRES
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
ALVARADO PL
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
BARNWOOD CRT
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
PARMBELLE CRES
From LAURENTIDE DR to BUSHBURY DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
BUSHBURY DR
From LAURENTIDE DR to PARMBELLE CRES
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
SILVERDALE CRES
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
SANDPIPER CRT
From LAURENTIDE DR to TETBURY CRES
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
TETBURY CRES
From SANDPIPER CRT to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
SPINNEY CRT
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
HAUTEVIEW CRT
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
THREE VALLEYS DR
From LAURENTIDE DR to LAURENTIDE DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
GROVELAND CRES
From THREE VALLEYS DR to THREE VALLEYS DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
TEAL CRT
From GROVELAND CRES to GROVELAND CRES
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
LACEWOOD CRES
From THREE VALLEYS DR to THREE VALLEYS DR
2020-06-29 07:00 2020-08-14 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions occupied.
ISLINGTON AVE @ MILADY RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ISLINGTON AVE @ MILLWICK DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ISLINGTON AVE @ AVIEMORE DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ISLINGTON AVE @ THOROLD GT
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ISLINGTON AVE @ VANHILL AVE
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
BRADSTOCK RD @ WESTON RD
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
SIGNET DR @ FENMAR DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
SIGNET DR @ HIGH MEADOW PL
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
WILSON AVE @ BEVERLY HILLS DR
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
MAYALL AVE
From HAYMARKET RD to DUNREO DR
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
WR ALLEN RD
From HWY 401 COLLECTOR WB WR ALLEN RD EXPRESS RAMP to WR ALLEN RD NB WILSON HEIGHTS BLVD SB RAMP
2020-07-01 23:00 2020-10-16 08:00 Daily
Northbound left lane occupied for replacement of barrier fencing by Toronto Transit Commission.
MENTOR BLVD @ 20
From MOGUL DR to PICOLA CRT
2020-07-09 09:00 2020-07-23 19:00 Daily
One southbound lane occupied due to Bell CBL pit work by Grimsby Utility Contractors Inc.
GREENFIELD AVE @ 368
2020-07-09 09:00 2020-07-23 19:00 Daily
Westbound curb lane occupied for emergency utility work by Grimsby Utility Contractors.
JANE ST
From WILSON AVE to SHEPPARD AVE W
2020-07-13 07:00 2020-07-29 17:00 Daily
Northbound and southbound curb lane occupied for sidewalk and road cuts by PTR Paving.
CUMMER AVE
From BAYVIEW AVE to LESLIE ST
2020-07-16 09:30 2020-08-16 15:30 Daily
Geotechnical investigation and borehole drilling. 1 Westbound or Eastbound lane closed.
RODING ST @ 611-557
2020-07-09 07:00 2020-10-09 19:00 Continuous
Storm sewer installations. Lane restrictions in place; local traffic only.
REIBER CRES
From PINEWAY BLVD to PINEWAY BLVD
2020-07-13 09:00 2020-07-24 19:00 Daily
Construction work on behalf of Bell. Southbound lane closed.
KEELE ST
From WILSON AVE to SHEPPARD AVE W
2020-07-13 07:00 2020-07-25 18:00 Daily
Northbound curb lane partially occupied due to sidewalk and road repairs.
GLENGROVE AVE @ 539-557
2020-07-13 07:00 2020-07-24 19:00 Daily
Eastbound lane partially occupied due to trenchless sewer rehabilitation.
BALES AVE
From GLENDORA AVE to SHEPPARD AVE E
2020-07-15 07:00 2020-07-29 19:00 Daily
Northbound lane blocked due to bell pit.
CUMMER AVE @ 597-609
2020-07-15 07:00 2020-08-15 19:00 Daily
Eastbound 1 lane blocked due to rehabilitation of various sewer lines
BALTRAY CRES @ 34-94
2020-07-17 09:00 2020-07-31 17:00 Daily
Eastbound and southbound lanes partially occupied due to roadwork.
BILLINGTON CRES @ 80-110
2020-07-17 09:00 2020-07-31 17:00 Daily
Westbound and southbound lanes partially occupied due to roadwork.
FORTROSE CRES @ 111
From FORTROSE CRES to ROYWOOD DR
2020-07-17 09:00 2020-07-31 17:00 Daily
Southbound lane partially occupied due to roadwork.
MARBURY CRES @ 82
From MARBURY CRES to ROYWOOD DR
2020-07-13 09:00 2020-07-31 17:00 Daily
Eastbound, southbound, and westbound lanes partially occupied due to roadwork.
ROYWOOD DR
From FORTROSE CRES to MARBURY CRES
2020-07-17 09:00 2020-07-31 17:00 Daily
Eastbound and westbound lanes partially occupied due to roadwork.
SKELMORE CRES
From KANTURK GT to BILLINGTON CRES
2020-07-17 09:00 2020-07-31 17:00 Daily
Northbound, eastbound, southbound, and eastbound lanes partially occupied due to roadwork.
O CONNOR DR @ 1674
From NORTHLINE RD to SUNRISE AVE
2020-07-15 09:00 2020-07-24 19:00 Daily
Construction work on behalf of Bell. 1 Southbound lane closed.
CATFORD RD
From KEELE ST to COUNCIL CRES
2020-07-16 07:00 2020-07-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to borehole investigations.
FINCH AVE W
From KEELE ST to SENTINEL RD
2020-07-16 07:00 2020-07-30 19:00 Daily
Eastbound shoulder partially occupied due to borehole investigation.
GRANDRAVINE DR
From KEELE ST to SHARPECROFT BLVD
2020-07-16 07:00 2020-07-30 19:00 Daily
Eastbound lane partially occupied due to borehole investigation.
ASPENWOOD DR @ 131
From CHERRYSTONE DR to CHERRYSTONE DR
2020-07-17 09:00 2020-07-31 19:00 Daily
Eastbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
FINCH AVE W
From NORFINCH DR to DRIFTWOOD AVE
2020-07-17 07:00 2020-10-23 19:00 Daily
Westbound and Eastbound curb lane occupied due to Bell relocation works.
RAITHERM RD
From GURNEY CRES to CALEDON RD
2020-07-20 07:00 2020-07-24 19:00 Daily
Eastbound and westbound lanes partially occupied due to borehole investigation.
WR ALLEN RD @ YORKDALE RD
2020-07-19 22:00 2020-07-24 05:30 Daily
Alternating southbound lanes partially occupied due to bridge work. Weekend hours: 10:00pm-5:30am
DUFFERIN ST @ HWY 401
2020-07-19 22:00 2020-07-25 05:30 Daily
Alternating northbound and southbound lanes partially occupied due to construction.
ALAMOSA DR
At APPIAN DR
2020-07-20 07:00 2020-07-25 19:00 Daily
Eastbound curb lane occupied due to restorations work.
APPIAN DR @ ALAMOSA DR
2020-07-20 07:00 2020-07-25 19:00 Daily
Northbound and southbound curb lanes occupied due to restorations work.
FINCH AVE E @ LESLIE ST
2020-07-20 07:00 2020-07-25 19:00 Daily
Eastbound and westbound curb lanes occupied due to restorations work.
DOLORES RD @ 47-75
2020-07-20 07:00 2020-07-29 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
DUFFERIN ST @ HWY 401
2020-07-19 22:00 2020-07-25 05:30 Daily
Construction on behalf of MTO. Alternating closure of 1-2 Northbound and Southbound lanes.
WR ALLEN RD SB YORKDALE RD RAMP @ WR ALLEN RD SB
2020-07-19 22:00 2020-07-24 05:30 Daily
Construction work on behalf of MTO. 1-2 Southbound lanes closed.
STEELES AVE W @ JANE ST
From JANE ST to PETER KAISER GT
2020-07-20 09:00 2020-07-30 16:00 Daily
One alternating eastbound and westbound lane occupied due to a geotechnical borehole investigation by GeoPro Consulting Ltd.
ALEXANDRA WOOD @ 770
From ALEXANDRA WOOD to GLENCAIRN AVE
2020-07-20 09:00 2020-07-25 00:01 Daily
Northbound and southbound lanes partially occupied due to emergency road work.
GRACEFIELD AVE @ 190
2020-07-22 07:00 2020-08-05 19:00 Daily
Westbound lane partially occupied due to permanent surface reinstatement.
BURR AVE @ 26
2020-07-22 07:00 2020-08-05 19:00 Daily
Westbound lane partially occupied due to permanent surface reinstatement.
ALNESS ST
From FINCH AVE W to STEELES AVE W
2020-07-22 23:00 2020-07-24 05:00 Daily
Alternating right or left lane closures in both northbound and southbound directions for roadway structural assessment by Applied Research Associates. This will be a moving lane closure.
CHISWICK AVE @ 4 CHISWICK AVE
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER REPAIRS SOUTHBOUND LANES
BROOKHAVEN DR @ 54 BROOKHAVEN DR
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER REPAIRS SOUTHBOUND LANES
LAWRENCE AVE W @ 1743 LAWRENCE AVE W
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER SIDEWALK REPAIRS EASTBOUND
CHISWICK AVE @ 29 CHISWICK AVE
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER SIDEWALK REPAIRS NORTHBOUND
DORSEY DR @ 33 DORSEY DR
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER REPAIRS EASTBOUND LANES
DONOFREE RD @ 49 DONOFREE RD
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER REPAIRS EASTBOUND LANES
BUSHBURY DR @ 12
2020-07-21 07:00 2020-07-28 19:00 Daily
Northbound curb lane to be occupied for gas service installation by NPL Canada.
LEACOCK CRES @ 14
From TEAKWOOD GRV to DENLOW BLVD
2020-07-22 09:00 2020-08-04 19:00 Daily
Northbound curb lane occupied for cable pit installation by Grimsby Utility Contractors.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
MOSSBANK DR
From SCARBOROUGH GOLF CLUB RD to LAWRENCE AVE E
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water service replacement. Westbound curb lane closed.
GREENHEDGES CRT
At APPLEMORE RD
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water services replacement on Green Hedges Ct from Applemore Rd to East end.
DANFORTH RD
From DANFORTH AVE to ST CLAIR AVE E
2020-03-30 07:00 2020-08-31 19:00 Daily
Road resurfacing and intersection improvements. Northbound and Southbound curb lanes closed.
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-04-06 07:00 2020-08-11 19:00 Daily
Sewer Rehabilitation Program. Eastbound curb lane closed.
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-04-06 07:00 2020-08-11 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Capital Sewer Services. Westbound traffic will be maintained.
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-04-06 07:00 2020-08-11 19:00 Daily
Southbound curb lane occupied for sewer rehabilitation by Capital Sewer Services.
NEILSON RD
From HWY 401 COLLECTOR EB NEILSON RD RAMP to HWY 401 COLLECTOR WB NEILSON RD RAMP
2020-04-13 07:00 2020-11-30 16:00 Daily
Northbound and southbound curb lane closures for bridge rehabilitation by Brennan Paving. Daytime at 7am, one lane in one direction will be occupied. Daytime at 9am one lane in both direction will be occupied. Lanes will reopen at 4pm and than close again for the night from 7pm to 6am.
LAKERIDGE DR
From BRIDGEPORT DR to FREEPORT DR
2020-04-14 00:01 2020-10-30 23:59 Continuous
Sanitary force main. Eastbound lane closed.
MCNAB BLVD
From KINGSTON RD to AYRE POINT RD
2020-04-22 07:00 2020-08-01 19:00 Daily
Alternating northbound and southbound curb lanes occupied for curb and sidewalk repairs by D. Crupi and Sons Limited.
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-01 07:00 2020-07-31 21:00 Continuous
1 Southbound lane occupied due to construction
MILNER AVE @ East of Neilson Road
2020-04-23 07:00 2020-12-31 16:00 Daily
Eastbound / Westbound alternating lanes occupied due to construction
MILNER AVE @ NEILSON RD
2020-04-22 00:01 2020-12-31 23:59 Continuous
Temporary street closure to complete road and bridge rehabilitation MTO contract # 2019-2011
BIRCHMOUNT RD @ Steeles AV E
2020-04-28 07:00 2020-07-31 19:00 Daily
Both directions blocked due to Concrete Sidewalk & Curbs Removal and Replacement
CASCADEN ST @ SCOVILLE SQ
From SCOVILLE SQ to ASHCOTT ST
2020-04-27 07:00 2020-07-30 19:00 Daily
Eastbound and westbound curb lanes occupied due to an underground hydro installation by Powerline Plus LTD.
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-05-03 19:00 2020-08-11 07:00 Daily
Southbound curb lane blocked due to Sewer Rehabilitation Program
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-11 07:00 2020-07-31 21:00 Continuous
Watermain and water service installation.
MARINE APPROACH DR
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORT UNION RD
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEPORT DR
From LAWRENCE AVE E to LAKERIDGE DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORTSMOUTH DR
From LAWRENCE AVE E to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 11:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From MARINE APPROACH DR to SHOALHAVEN DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From PORT UNION RD to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MILITARY TRL
From BONSPIEL DR to HIGHCASTLE RD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HIGHCASTLE RD
From MILITARY TRL to SEALSTONE TER
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
TRUDELLE ST
From DANFORTH RD to CEDAR BRAE BLVD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CEDAR BRAE BLVD
From TRUDELLE ST to BELLAMY RD N
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PHARMACY AVE
From ELLESMERE RD to HWY 401
2020-06-15 07:00 2020-08-03 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BROADBENT AVE
From MIDLAND AVE to CHILLERY AVE
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
MIDLAND AVE
From DANFORTH RD to LAWRENCE AVE E
2020-06-02 07:00 2020-12-31 21:00 Daily
Various multiple lane closures for water service replacement and full road reconstruction by Sanscon Construction. Two-way traffic will be maintained.
COMMONWEALTH AVE
From WOLFE AVE to EGLINTON AVE E
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
JOHN TABOR TRL
From BRENYON WAY to MCLEVIN AVE
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FAWCETT TRL
From MCLEVIN AVE to JOHN STONER DR
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JOHN STONER DR
From FAWCETT TRL to MORNINGSIDE AVE
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BERNER TRL
From WASHBURN WAY to NEILSON RD
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BLACKWELL AVE
From BERNER TRL to TAPSCOTT RD
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
KENNEDY RD
From PARK ST to DANFORTH RD
2020-06-15 07:00 2020-07-27 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to sidewalk, curb, and boulevard improvement and restoration. Weekend hours: 7:00am-7:00pm
MCCOWAN RD
From BUSHBY DR to PROGRESS AVE
2020-06-08 07:00 2020-08-05 19:00 Daily
Northbound lane partially occupied due to Scarborough Subway Extension Project.
WISHING WELL DR
From PHARMACY AVE to PHARMACY AVE
2020-06-11 07:00 2020-08-10 19:00 Daily
Alternating curb lanes occupied for milling and paving of road surface, removal & replacement of deficient sidewalk, curb & gutter, asphalt driveway and boulevard improvement and restoration as required by Sanscon Construction.
PHARMACY AVE
From ELLESMERE RD to HWY 401
2020-06-08 07:00 2020-08-03 19:00 Daily
Alternating northbound and southbound curb lanes occupied for milling and paving of road surface, removal & replacement of deficient sidewalk, curb & gutter, asphalt driveway and boulevard improvement and restoration as required by Sanscon Construction.
FORBES RD @ ELLENDALE DR
From ELLENDALE DR to KENNEDY RD
2020-04-06 19:00 2020-08-11 07:00 Daily
Eastbound curb lane occupied due to sewer rehabilitation work by Capital Sewer Services Inc.
KINGSTON RD
From OVERTURE RD to CELESTE DR
2020-06-17 07:00 2020-08-14 19:00 Daily
Westbound curb lane occupied for structural watermain rehabilitation by Fer-Pal Construction.
WEIR CRES
From GALLOWAY RD to SILVERTIP CRES
2020-02-03 07:00 2020-07-31 21:00 Daily
Northbound lane partially occupied due to water main and water service installation. Weekend hours: 9:00am-7:00pm
SHARBOT AVE @ South limit
From SHARBOT AVE to PAINTED POST DR
2020-02-03 07:00 2020-07-31 21:00 Daily
Southbound lane partially occupied due to water main and water service installation. Weekend hours: 9:00am-7:00pm
MAFEKING CRES
From CHANCELLOR DR to CHANCELLOR DR
2020-02-24 07:00 2020-08-31 21:00 Daily
Watermain and water service installation.
CHARLEMONT CRES
From WISHING WELL DR to WISHING WELL DR
2020-03-01 07:00 2020-08-31 21:00 Daily
Watermain and water service installation.
DANFORTH RD @ WARDEN AVE
2020-06-29 09:00 2020-07-31 19:00 Daily
Rehabilitation of various sewer lines. 2 Northbound/Southbound lanes closed.
EGLINTON AVE E
From MIDLAND AVE to COMMONWEALTH AVE
2020-07-02 07:00 2020-07-31 19:00 Daily
Geotechnical and environmental borehole investigation. Westbound and Eastbound curb lane closed.
SCARBORO CRES
From ROMANA DR to UNDERCLIFF DR
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
SCARBORO CRES
From HIGHCLIFF CRES to CLIFFCREST DR
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
SCARBORO CRES
From KELSONIA AVE to CLIFFCREST CRES
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
GANNET RD @ SEWELLS RD
From SEWELLS RD to GOODALL DR
2020-07-03 00:01 2020-08-05 23:59 Daily
Southbound lanes occupied due to sanitary foremain repairs by Drainstar Contracting Ltd.
HUNTINGTON AVE
From EGLINTON AVE E to DANFORTH RD
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
DUNDALK DR
From ELLESMERE RD to ANTRIM CRES
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
QUANTRELL TRL @ 80
From WICKSON TRL to BURKWOOD CRES
2020-07-09 07:00 2020-07-24 19:00 Daily
Construction work on behalf of Bell. Westbound lane closed.
SHERWOOD AVE @ 46
2020-07-13 07:00 2020-07-24 19:00 Daily
Construction work on behalf of Bell. Westbound lane closed.
GREENDOWNS DR @ 6
From CHATTERTON BLVD to RIANT ST
2020-07-09 07:00 2020-07-24 19:00 Daily
Westbound lane occupied due to construction.
MCCOWAN RD
From PITFIELD RD to SHEPPARD AVE E
2020-07-13 09:00 2020-07-30 19:00 Daily
Southbound curb lane blocked due to installation of new conduit for fiber optics.
MCCOWAN RD
From INVERGORDON AVE to SHEPPARD AVE E
2020-07-13 07:00 2020-08-24 19:00 Daily
Northbound curb lane occupied for borehole drilling and investigation by Golder Associates.
GULLY DR
From DEERFIELD RD to BRIMLEY RD
2020-07-20 07:00 2020-12-31 21:00 Daily
Full road closure due to water main installation.
WOODFERN DR
From CHELWOOD RD to CHELWOOD RD
2020-07-13 07:00 2020-12-31 19:00 Daily
Watermain and water service installation. Northbound and Southbound lane restrictions.
DIBGATE BLVD @ 41
From NORHEAD AVE to BLUEBERRY DR
2020-07-13 07:00 2020-07-31 19:00 Daily
Construction work on behalf of Bell. Northbound lane closed.
SHEPPARD AVE E @ BROWNSPRING RD
2020-07-14 09:30 2020-07-31 15:30 Daily
Geotechnical and environmental borehole investigation. Westbound boulevard closed.
MCCOWAN RD
From SHEPPARD AVE E to NUGGET AVE
2020-07-14 09:30 2020-07-31 15:30 Daily
Geotechnical and environmental borehole investigation. Northbound curb lane and boulevard closed.
NUGGET AVE
From MCCOWAN RD to SHORTING RD
2020-07-14 09:30 2020-07-31 15:30 Daily
Geotechnical and environmental borehole investigation. Eastbound and Westbound boulevard closed.
BIRCHMOUNT RD @ 570
From ST CLAIR AVE E to ZENITH DR
2020-07-09 00:01 2020-07-31 23:59 Continuous
Southbound curb lane occupied for construction by Toronto Water.
BIRCHMOUNT RD
From SHEPPARD AVE E to HUNTINGWOOD DR
2020-07-20 09:30 2020-08-31 15:30 Daily
North and southbound 1 lane blocked due to geotechnical investigation.
BELLAMY RD S
From KINGSTON RD to ADANAC DR
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lanes partially occupied due to construction.
PORTER CRES
From FLORA DR to RADNOR AVE
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lanes partially occupied due to construction.
HUNTINGWOOD DR
From BIRCHMOUNT RD to WARDEN AVE
2020-07-20 09:00 2020-07-26 16:00 Daily
Eastbound and westbound lanes partially occupied due to construction.
ROSALIND CRES
From KNIGHTSBRIDGE RD to DELWOOD DR
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lanes partially occupied due to construction.
KENNEDY RD
From MCNICOLL AVE to FINCH AVE E
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lane partially occupied due to construction.
STELLARTON RD
From PHARMACY AVE to STAMFORD SQ
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lanes partially occupied due to construction.
LITTLE ROCK DR
From BELLAMY RD S to COLONIAL AVE
2020-07-20 09:00 2020-07-26 16:00 Daily
Northbound and southbound lanes partially occupied due to construction.
MEDONTE AVE
From VICTORIA AVE E to DELWOOD DR
2020-07-20 09:00 2020-07-26 16:00 Daily
Eastbound and westbound lanes partially occupied due to construction.
VICTORIA PARK AVE @ KINGSTON RD
2020-07-16 07:00 2020-08-01 21:00 Daily
Eastbound Kingston Rd & Southbound Victoria Park Ave curb lanes occupied due to maintenance hole rebuild.
SHEPPARD AVE E
From JOHN GRAHAM CRT to VANDORF ST
2020-07-16 07:00 2020-07-31 19:00 Daily
Westbound curb lane occupied for anchor installation by Grimsby Utility Contractors.
MERKLEY SQ @ 135
From SPRAYWOOD GT to IVY GREEN CRES
2020-07-17 07:00 2020-07-31 19:00 Daily
Southbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
CLEETHORPES BLVD @ 31
From TERRYHILL CRES to PITFIELD RD
2020-07-17 07:00 2020-07-31 19:00 Daily
Northbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
TREASURE GRV @ 16
From FULBERT CRES to FULBERT CRES
2020-07-17 07:00 2020-07-31 19:00 Daily
Northbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
MINFORD AVE @ 26
At KILPATRICK DR
2020-07-20 07:00 2020-07-31 19:00 Daily
Westbound lanes blocked due to construction.
ROLARK DR @ 3
From ELLESMERE RD to RIDGETOP RD
2020-07-20 07:00 2020-07-31 19:00 Daily
Southbound lane occupied due to construction.
PRINCE WILLIAM CRT @ 43
At MASSIE ST
2020-07-20 07:00 2020-07-31 19:00 Daily
Northbound lane occupied due to construction.
PORT ROYAL TRL @ 363
From TRURO CRES to HIGHBRIDGE PL
2020-07-20 07:00 2020-07-31 19:00 Daily
Westbound lane occupied due to construction.
SHEPPARD AVE E
From VICTORIA PARK AVE to PHARMACY AVE
2020-07-20 07:00 2020-07-28 19:00 Daily
Northbound, eastbound, southbound, and westbound curb lanes partially occupied due to permanent repairs to utility cuts. Weekend hours: 7:00am-7:00pm
STEELES AVE E @ 6351
From TAPSCOTT RD to STAINES RD
2020-07-17 07:00 2020-07-24 19:00 Daily
One eastbound lane and shoulder occupied due to storm sewer work by Memme Infrastructure Contractors.
STEELES AVE E @ TAPSCOTT RD
2020-07-17 07:00 2020-07-24 19:00 Daily
Storm sewer works. 1 Eastbound lane closed.
WARDEN AVE
From BAMBLETT DR to CATARAQUI CRES
2020-07-20 07:00 2020-08-18 16:00 Daily
Remediation of planters in front of private property. Northbound curb lane closed.
EGLINTON AVE E
From PHARMACY AVE to MIDLAND AVE
2020-07-20 09:00 2020-08-07 20:00 Daily
Access to manholes - Curb and middle lane (one lane at a time)
PHARMACY AVE
From DOLPHIN DR to PENAIRE ST
2020-07-21 09:00 2020-07-31 16:00 Daily
Northbound curb lane occupied for directional drilling by Confra Global Solutions.
REESOR RD
From OLD FINCH AVE to STEELES AVE E
2020-07-22 00:01 2020-10-19 23:59 Continuous
Full closure of northbound and southbound lanes for replacement of culverts by Doug Dixon and Associates. Local traffic only.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ROSEHILL AVE @ AVOCA AVE
2018-05-09 07:00 2020-08-31 19:00 Daily
STRUCTURAL, CIVIL, ELECTRICAL AND MECHANICAL REHBILITATION WORKS AS PERT OF THE ROSEHILL RESERVOIR REHABILITATION WORKS PROJECT [ECS CONTRACT NO. 17ECS-MI-03WA].
ABBOTT AVE @ INDIAN RD
2019-09-17 07:00 2020-08-01 19:00 Daily
One Eastbound and Westbound lane occupied due to water main, water service and installation.
RIVERDALE AVE
From PAPE AVE to POUCHER ST
2019-09-23 09:00 2020-08-01 16:00 Daily
Watermain reconstruction, water service replacement and lane way reconstruction. Eastbound/Westbound lane on Riverdale Ave from Pape Ave to Poucher St.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-01 19:00 Daily
One Northbound and Southbound lane occupied due to water main reconstruction, water service replacement and road resurfacing,
VICTORIA PARK AVE
From DENTON AVE to CRESCENT TOWN RD
2019-09-23 07:00 2020-07-31 19:00 Daily
1 NB/SB lane occupied due to pedestrian bridge rehabilitation.
QUEENS QUAY E
From KNAPP LANE to DOCKSIDE DR
2019-09-26 07:00 2020-09-26 19:30 Continuous
Shaft and tunnel for Enwave western infrastructure expansion. (1) EB lane closed. Deleted By: pwu2; When: 09/27/2019 7:30:25 PM; Reason:
ROXBOROUGH DR
From MOUNT PLEASANT RD to HIGHLAND AVE
2019-10-01 00:01 2020-08-28 23:59 Continuous
EB/WB all lanes occupied due to sanitary force main.
AVENUE RD @ OXTON AVE
From HILLHOLM RD to CHAPLIN CRES
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
AVENUE RD @ CHAPLIN CRES
From TRANMER AVE to OXTON AVE
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CHESTNUT PK
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ABBOTT AVE
From INDIAN RD to INDIAN RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
AVENUE RD
From HILLHOLM RD to CHAPLIN CRES
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CARIBOO AVE
At OSLER ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
EUCLID PL @ EUCLID AVE
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
FRONT ST E
From EASTERN AVE to CHERRY ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MACPHERSON AVE @ AVENUE RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MANNING AVE
From QUEEN ST W to ROBINSON ST
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
ORMSKIRK CRT
At ORMSKIRK AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB/NB/SB 1 lane occupied due to water main reconstruction.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
GARDINER EXPY WB
From DON ROADWAY to YORK ST
2019-10-14 00:01 2021-01-31 23:59 Continuous
Westbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
LAKE SHORE BLVD E GARDINER EXPY RAMP
From DON ROADWAY to DON VALLEY PARKWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
1 lane closed at the top of the westbound Lake Shore on ramp to westbound Gardiner Expressway due to Gardiner Expressway Rehabilitation Project.
GARDINER EXPY EB
From YORK ST to DON ROADWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
Eastbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
JARVIS ST
From QUEEN ST E to FRONT ST E
2019-11-17 00:02 2020-08-22 23:59 Continuous
1 NB lane and 1 SB lane closed for Watermain and Water Service Installation.
COMMISSIONERS ST @ DON ROADWAY
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Westbound and Eastbound due to bridge construction.
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (Monday through Friday)
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON ROADWAY @ COMMISSIONERS ST
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Northbound and Southbound due to bridge construction.
COMMISSIONERS ST
From MUNITION ST to DON ROADWAY
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Commissioners St.
DON ROADWAY
From VILLIERS ST to COMMISSIONERS ST
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Don Roadway.
FRONT ST W
From BAY ST to YORK ST
2020-01-17 00:01 2020-07-31 23:59 Continuous
Hydro vault rehabilitation. Westbound drop off/pick-up parking zones closed.
WINDERMERE AVE
From LAKE SHORE BLVD W to GARDINER EXPY
2020-02-10 07:00 2020-12-31 16:00 Daily
Northbound intermittent lane closure due to staging of construction vehicles.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
BOND ST @ GOULD ST
2020-03-06 07:00 2020-08-28 19:00 Daily
Full road closure due to emergency steam line replacement.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
From COXWELL BLVD to COXWELL BLVD
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
GARDINER EXPY YONGE/BAY/YORK RAMP @ GARDINER EXPY WB
2020-04-19 00:01 2020-07-25 00:01 Continuous
Westbound Gardiner York-Bay-Yonge off ramp closed for the Gardiner Expressway Rehabilitation Project by Aecon Utilities.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON MILLS RD
From DON MILLS RD SB DVP NB RAMP to DON MILLS RD NB DVP SB RAMP
2020-04-27 00:01 2020-08-07 23:59 Continuous
Rehabilitation of the Don Mills Rd Bridge over the Don Valley Parkway. 1 Northbound and 1 Southbound lane closed on Don Mills Rd.
BLOOR ST W
From THOMPSON AVE to PRINCE EDWARD DR N
2020-05-11 10:00 2020-08-20 15:00 Daily
Removal and disposal of existing pedestrian light poles. Westbound and Eastbound curb lanes closed.
BOND ST @ DUNDAS ST E
From DUNDAS ST E to SHUTER ST
2020-05-04 07:00 2020-08-07 19:00 Daily
Northbound right lane and eastbound right lane blocked due to conduit and cable chamber work by Entera Utility Contractors.
DOVERCOURT RD @ NORTHUMBERLAND ST
2020-05-04 07:00 2020-09-05 19:00 Daily
Traffic Signals & Control Devices on all 4 corners of the intersection.
PICKERING ST
From KINGSTON RD to GERRARD ST E
2020-05-04 07:00 2020-08-15 19:00 Daily
Road re-constructions and paving. Alternating lane closures in both directions.
PAPE AVE
From GOWAN AVE to DANFORTH AVE
2020-05-11 07:00 2020-07-25 17:00 Continuous
Northbound and southbound lanes partially occupied due to trench restoration of concrete and line painting.
GERRARD ST E
From TED REEVE DR to LAWLOR AVE
2020-05-19 07:00 2020-07-31 19:00 Daily
Eastbound and westbound curb lanes occupied due to construction.
GREENWOOD AVE
From MORTIMER AVE to O CONNOR DR
2020-05-19 07:00 2020-07-31 19:00 Daily
Northbound and southbound curb lanes occupied due to construction.
LAKE SHORE BLVD W @ WINDERMERE AVE
From WINDERMERE AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
BAYVIEW AVE
From FRONT ST E to ROSEDALE VALLEY RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All lanes closed due to City of Toronto's ActiveTo Initiative, additionally River St west of Bayview Ave will be also be closed.
LAKE SHORE BLVD W @ ELLIS AVE
From ELLIS AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ COLBORNE LODGE DR
From COLBORNE LODGE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ PARKSIDE DR
From PARKSIDE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ BRITISH COLUMBIA DR
From BRITISH COLUMBIA DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ ONTARIO DR
From ONTARIO DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ NEW BRUNSWICK WAY
From NEW BRUNSWICK WAY to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ STRACHAN AVE
From STRACHAN AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
GARDINER EXPY E LOWER JARVIS ST RAMP @ JARVIS ST
2020-05-18 00:01 2021-02-26 23:59 Continuous
Eastbound Jarvis on-ramp to be closed to facilitate the rehabilitation of the Gardiner Expressway including removal and replacement of bridge deck section alongside corresponding construction areas.
LAKE SHORE BLVD W
From WINDERMERE AVE to STADIUM RD
2020-05-23 06:00 2020-08-03 23:00 Weekends
Full closure of eastbound lanes for ActiveTO initiative. Closure will be in effect every weekend. During long weekends, closure will end on Monday at 11 pm. Deleted By: mamutha; When: 05/20/2020 11:13:02 AM; Reason: duplicate
NASSAU ST
From LEONARD AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
AUGUSTA AVE
From COLLEGE ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only.
EMERSON AVE
From DUPONT ST to BLOOR ST W
2020-05-19 00:01 2020-09-30 15:29 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BALDWIN ST
From AUGUSTA AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only. Local taffic only
BROCK AVE
From BLOOR ST W to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
COWAN AVE
From SPRINGHURST AVE to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KENSINGTON AVE
From BALDWIN ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
WINONA DR
From EGLINTON AVE W to DAVENPORT RD
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CRAWFORD ST
From MONTROSE AVE to QUEEN ST W
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MONTROSE AVE
From BLOOR ST E to CRAWFORD ST
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
LANSDOWNE AVE @ BLOOR ST W
2020-06-01 07:00 2020-08-27 19:00 Daily
One northbound curb lane occupied due to TTC cable chamber rebuild work by Hastings Utilities Cotnracting Ltd.
BICKNELL AVE @ ROGERS RD
From ROGERS RD to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
LAUGHTON AVE
From DAVENPORT RD to HOUNSLOW AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BLACKTHORN AVE @ CAMERON AVE
From CAMERON AVE to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTo Quiet Streets initiative by the City of Toronto. Local traffic only.
HOUNSLOW HEATH RD
From LAUGHTON AVE to ST CLAIR AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HAVERSON BLVD @ DONALD AVE
From DONALD AVE to CAMERON AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
SILVERTHORN AVE
From ST CLAIR AVE W to DONALD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
DONALD AVE @ SILVERTHORN AVE
From SILVERTHORN AVE to HAVERSON BLVD
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MONARCH PARK AVE
From SAMMON AVE to FELSTEAD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BOULTBEE AVE
From KISWICK ST to JONES AVE
2020-06-15 07:00 2020-08-03 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HARRIET ST
From LESLIE ST to HASTINGS AVE
2020-06-12 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
SELKIRK ST @ WOODYCREST AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
BARTON AVE
From HOWLAND AVE to ALBANY AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
ALBANY AVE
From BARTON AVE to BLOOR ST W
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BATHURST ST
From FRONT ST W to FORT YORK BLVD
2020-05-25 00:01 2021-01-31 23:59 Continuous
Full closure of all northbound and southbound lanes for City of Toronto project No. 20ECS-TI-02BE by Grascan/Torbridge Construction.
LAIRD DR
From ESANDAR DR to CANVARCO RD
2020-05-29 08:00 2020-08-15 16:00 Daily
Southbound and westbound shoulder lanes partially occupied due to the construction of manholes and conduit.
LAIRD DR
From ESANDAR DR to CANADA BLVD
2020-05-29 07:00 2020-08-15 19:00 Continuous
Southbound and westbound curb lane partially occupied due to the construction of manholes and conduit.
ADELAIDE ST W
From JOHN ST to DUNCAN ST
2020-06-01 07:00 2020-07-31 17:00 Daily
Eastbound curb lane partially occupied due to construction.
LAKE SHORE BLVD E
From LESLIE ST to KEW BEACH CRES
2020-05-23 06:00 2020-08-03 23:00 Weekends
All eastbound lanes occupied for City of Toronto's ActiveTO initiative.
HAMMERSMITH AVE @ QUEEN ST E
2020-06-01 07:00 2020-07-24 07:00 Daily
Northbound all lanes blocked due to UNDERGROUND HYDRO INSTALLATION
EASTDALE AVE
From SECORD AVE to LUMSDEN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LUMSDEN AVE
From EASTDALE AVE to MAIN ST
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
RIDLEY BLVD
From DELORAINE AVE to YONGE BLVD
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
MAIN ST
From HAMSTEAD AVE to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAMSTEAD AVE
From MAIN ST to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JEDBURGH RD
From DELORAINE AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUPLEX AVE
From MONTGOMERY AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTVIEW BLVD
From HOLLAND AVE to ST CLAIR AVE E
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTLAKE AVE
From HAMSTEAD AVE to COSBURN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
COSBURN AVE
From WESTLAKE AVE to OAK PARK AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
AVENUE RD @ 455
From FOXBAR RD to LYNWOOD AVE
2020-06-03 07:00 2020-07-31 17:00 Daily
Northbound curb lane partially occupied due to sidewalk and road construction. Weekend hours: 9:00am-7:00pm
WELLINGTON ST W @ TECUMSETH ST
From TECUMSETH ST to BATHURST ST
2020-05-29 07:00 2020-08-30 19:00 Continuous
Left westbound lane occupied due to geotechnical work by Thurber Engineering Ltd for Metrolinx.
DUPONT ST @ 740
From SHAW ST to CHRISTIE ST
2020-06-08 07:00 2020-10-23 23:00 Continuous
One northbound curb lane occupied due to watermain and service connection replacement by R.V. Anderson Associated Ltd.
SCOTT ST
From COLBORNE ST to THE ESPLANADE
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THE ESPLANADE
From YONGE ST to PRINCESS ST
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
MILL ST
From PARLIAMENT ST to BAYVIEW AVE
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SACKVILLE ST
From QUEEN ST E to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SUMACH ST
From KING ST E to DUNDAS ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SUMACH ST
From GERRARD ST E to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SPRUCE ST
From SACKVILLE ST to RIVER ST
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WELLESLEY ST E
From PARLIAMENT ST to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BLEECKER ST
From HOWARD ST to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EARL ST
From SHERBOURNE ST to BLEECKER ST
2020-06-04 00:01 2020-09-30 23:59 Daily
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
YORK ST
From FRONT ST W to BREMNER BLVD
2020-06-10 00:01 2020-08-24 23:59 Continuous
Construction work. Center lane in both direction closed.
SUTHERLAND DR
From BESSBOROUGH DR to ASTOR AVE
2020-07-02 07:00 2020-08-17 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
ST CUTHBERTS RD
From BERNEY CRES to BESSBOROUGH DR
2020-06-24 07:00 2020-08-03 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
WHEELER AVE
From QUEEN ST E to NORWAY AVE
2020-06-15 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Westbound/Eastbound curb lanes closed alternately.
LEUTY AVE
From ALFRESCO LWN to QUEEN ST E
2020-06-10 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Westbound/Eastbound curb lanes closed alternately.
BELLEFAIR AVE
From QUEEN ST E to JUNIPER AVE
2020-06-10 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Northbound/Southbound curb lanes closed alternately.
COLGATE AVE
From LOGAN AVE to BUSY ST
2020-06-15 07:00 2020-07-30 07:00 Continuous
Northbound and southbound lanes partially occupied due to the construction of man holes and conduit.
YORK ST @ 15
2020-01-04 09:00 2020-08-14 17:00 Weekends
Two eastbound lanes partially occupied due to the construction of ICE-MLS path tunnel.
LAKE SHORE BLVD E
From LOWER SHERBOURNE ST to CHERRY ST
2020-06-16 07:00 2020-08-09 19:00 Daily
2 Eastbound lanes on Lake Shore Blvd E closed during night time and day time off-peak hours due to the Gardiner Expressway Rehabilitation Project.
LAKE SHORE BLVD E
From LOWER SHERBOURNE ST to CHERRY ST
2020-06-16 20:00 2020-08-09 06:00 Daily
2 Eastbound lanes on Lake Shore Blvd E closed during night time and day time off-peak hours due to the Gardiner Expressway Rehabilitation Project.
WAKUNDA PL @ O CONNOR DR
2020-06-29 07:00 2020-12-31 21:00 Continuous
Watermain and water service replacement
HOLLAND AVE
From VICTORIA PARK AVE to WESTVIEW BLVD
2020-06-29 07:00 2020-12-31 21:00 Continuous
Watermain and water service replacement
SPRINGDALE BLVD
From GLEBEMOUNT AVE to WOODBINE AVE
2020-06-22 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Westbound and Eastbound curb lanes closed alternately.
KINGSMOUNT PARK RD
From EASTWOOD RD to FAIRMOUNT CRES
2020-06-22 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Northbound and Southbound curb lanes closed alternately.
LONG CRES @ LEE AVE
2020-06-26 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Eastbound and Westbound curb lanes closed alternately.
COATSWORTH CRES @ HANSON ST
2020-06-25 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Northbound and Southbound curb lanes closed alternately.
MINTON PL @ PAPE AVE
2020-06-25 09:30 2020-07-24 15:30 Daily
Northbound and southbound lanes partially occupied due to geotechnical investigation.
PATON RD @ CAMPBELL AVE
2020-05-11 07:00 2020-07-31 19:00 Daily
Construction of access point. Lane restrictions in place.
ERSKINE AVE
From MOUNT PLEASANT RD to YONGE ST
2020-06-25 07:00 2020-07-24 18:00 Daily
Eastbound and westbound lanes partially occupied due to sidewalk and road repairs.
SHAW ST @ DUNDAS ST W
2020-07-14 12:00 2020-10-27 20:00 Daily
Occupying the curb lanes for the Trinity Bellwoods Farmers' Market. Closures will ONLY occur every Tuesday until October 27 2020.
EGLINTON AVE E
From LAIRD DR to DON AVON DR
2020-05-24 00:01 2020-07-31 23:59 Daily
Sidewalk closed due to construction.
WELLINGTON ST W
From BATHURST ST to TECUMSETH PL
2020-07-06 07:00 2020-07-24 19:00 Daily
Eastbound lane partially occupied due to geotechnical investigation.
MCCONNELL AVE
From FENWICK AVE to CARLAW AVE
2020-07-04 09:00 2020-10-17 13:00 Daily
Eastbound curb lane occupied for the parking of vendor vehicles for the Withrow Farmers' Market every Saturday.
WOODWARD AVE
From QUEEN ST E to EASTERN AVE
2020-06-28 08:00 2020-11-01 15:00 Daily
Southbound curb lane occupied for the parking of vendor vehicles for the Leslieville Farmers' Market every Sunday.
JORDAN ST @ MELINDA ST
From MELINDA ST to KING ST W
2020-07-06 07:00 2020-08-21 19:00 Continuous
Road fully closed due to manhole rebuilding work by Avertex Utility Solutions Inc.
BAY ST
From HAGERMAN ST to DUNDAS ST W
2020-07-03 07:00 2020-08-14 19:00 Continuous
Construction work. 1 Northbound lane and 1 Southbound lane closed.
COE HILL DR @ ELLIS GDNS
2020-07-09 09:00 2020-07-30 16:00 Daily
Right lane blocked due to electrical trenching.
ROGERS RD
From MCROBERTS AVE to NAIRN AVE
2020-07-06 09:00 2020-08-31 16:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
MCROBERTS AVE
From CALEDONIA RD to ROGERS RD
2020-07-06 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
HARVIE AVE
From ROGERS RD to HOPE ST
2020-07-06 07:00 2020-08-31 19:00 Daily
Southbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4L00pm
NAIRN AVE
From ROGERS RD to TEIGNMOUTH AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4L00pm
MORRISON AVE
From HARVIE AVE to BOON AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
HOPE ST
From BOON AVE to EARLSCOURT AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
EARLSCOURT AVE @ ROGERS RD
2020-07-06 07:00 2020-08-31 19:00 Daily
Southbound and westbound lanes partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
BOON AVE
From HOPE ST to MORRISON AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Northbound and southbound lane partially occupied due to duct installation. Weekend hours: 9:00am-4:00pm
QUEEN ST E
From BROADVIEW AVE to SAULTER ST
2020-06-30 00:01 2020-09-30 23:59 Continuous
Eastbound curb lane closed due to CafeTO Initiative.
QUEEN ST E
From BROADVIEW AVE to MUNRO BLVD
2020-06-30 00:01 2020-09-30 23:59 Continuous
Westbound curb lane closed due to CafeTO Initiative.
SPADINA RD
From THELMA AVE to LONSDALE RD
2020-06-30 00:01 2020-09-30 23:59 Continuous
Southbound curb lane closed due to CafeTO Initiative.
SPADINA RD
From MONTCLAIR AVE to THELMA AVE
2020-06-30 00:01 2020-09-30 23:59 Continuous
Northbound curb lane closed due to CafeTO Initiative.
BORDEN ST @ BLOOR ST W
2020-07-03 00:01 2020-09-30 23:59 Continuous
Southbound curb lane closed due to CafeTO Initiative.
CHURCH ST
From WELLESLEY ST E to ALEXANDER ST
2020-07-03 00:01 2020-09-30 23:59 Continuous
Northbound and Southbound curb lane closed due to CafeTO Initiative.
CHURCH ST
From MONTEITH ST to GLOUCESTER ST
2020-07-03 00:01 2020-09-30 23:59 Continuous
Northbound curb lane closed due to CafeTo Initiative.
CHURCH ST @ 592-582
2020-07-03 00:01 2020-09-30 23:59 Continuous
Southbound curb lane closed due to CafeTO Initiative.
CHURCH ST
From ALEXANDER ST to WOOD ST
2020-07-03 00:01 2020-09-30 23:59 Continuous
Northbound and Southbound curb lane closed due to CafeTO Initiative.
BELLAIR ST
From CUMBERLAND ST to YORKVILLE AVE
2020-07-03 00:01 2020-09-30 23:59 Continuous
Full road closure due to CafeTo Initiative. Access to emergency vehicles only.
CUMBERLAND ST @ 146-164
2020-07-03 00:01 2020-09-30 23:59 Continuous
Eastbound left curb lane closed due to CafeTO Initiative.
YORKVILLE AVE @ 94-118
2020-07-03 00:01 2020-09-30 23:59 Continuous
Westbound curb lane closed due to CafeTo Initiative.
YONGE ST
From BELSIZE DR to MANOR RD E
2020-07-03 00:01 2020-09-30 23:59 Continuous
Northbound curb lane closed due to CafeTo Initiative.
YONGE ST @ 2100-2028
2020-07-03 00:01 2020-09-30 23:59 Continuous
Southbound curb lane closed due to CafeTo Initiative.
KING ST E @ 417-360
2020-07-03 00:01 2020-09-30 23:59 Continuous
Westbound curb lane closed due to CafeTo Initiative.
LANSDOWNE AVE @ 825-827
2020-07-03 00:01 2020-09-30 23:59 Continuous
Northbound curb lane closed due to CafeTo Initiative.
GERRARD ST E @ 598-606
2020-07-03 00:01 2020-09-30 23:59 Continuous
Westbound curb lane closed due to CafeTo Initiative.
WABASH AVE
From SORAUREN AVE to MACDONELL AVE
2020-07-06 13:30 2020-10-26 19:30 Daily
Farmers Market at Sorauren Park. Westbound and Eastbound curb lanes closed on Mondays at the start of every week.
FULTON AVE
From BROADVIEW AVE to PAPE AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
SAMMON AVE
From PAPE AVE to MONARCH PARK AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
WOODFIELD RD
From WALPOLE AVE to EASTERN AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
LEE AVE
From KINGSTON RD to ALFRESCO LWN
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KIPPENDAVIE AVE
From QUEEN ST E to KEWBEACH AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KENILWORTH AVE
From QUEEN ST E to KEWBEACH AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
WAVERLEY RD
From QUEEN ST E to KEWBEACH AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KEWBEACH AVE
From WAVERLEY RD to WOODBINE AVE
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
WOODBINE AVE
From KEWBEACH AVE to LAKE SHORE BLVD E
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HIGH PARK AVE
From ANNETTE ST to BLOOR ST W
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
QUEEN ST E
From SAULTER ST to BROADVIEW AVE
2020-06-30 00:01 2020-09-30 23:59 Continuous
Westbound curb lane closed due to CafeTO Initiative by City of Toronto.
CALEDONIA RD
At SUMMIT AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Northbound and southbound lane one partially blocked due to duct installation.
CORBY AVE
From GILBERT AVE to MCROBERTS AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Both directions intermittently occupied due to duct installation.
GILBERT AVE
From SUMMIT AVE to INNES AVE
2020-07-06 07:00 2020-08-31 19:00 Daily
Northbound and southbound lanes intermittently occupied due to utility installation.
SUMMIT AVE
From CALEDONIA RD to GILBERT AVE
2020-07-07 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes intermittently occupied due to utility installation.
INNES AVE
From MCROBERTS AVE to CALEDONIA RD
2020-07-06 07:00 2020-08-31 19:00 Daily
Eastbound and westbound lanes intermittently occupied due to utility installation.
INNES AVE
From MCROBERTS AVE to CALEDONIA RD
2020-07-06 07:00 2020-08-31 19:00 Daily
Northbound and southbound lanes intermittently occupied due to utility installation.
EGLINTON AVE W
From DUPLEX AVE to EDITH DR
2020-07-08 00:01 2020-09-15 23:59 Daily
Two westbound right lanes and centre lane to be occupied for installation of new utilities, relocation of hydro poles, movement of existing curb and installation of new bike lanes by Crosslinx Transit Solutions. One lane in each direction will be maintained.
DEER PARK CRES
From ST CLAIR AVE W to HEATH ST W
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
DUNVEGAN RD
From ST CLAIR AVE W to LONSDALE RD
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
FOREST HILL RD
From RUSSELL HILL DR to LARRATT ST
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
LAWTON BLVD
From YONGE ST to LONSDALE RD
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
ORIOLE PKWY
From BURNABY BLVD to WILLOWBANK BLVD
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
ORIOLE RD
From ST CLAIR AVE W to LONSDALE RD
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
RUSSELL HILL DR
From CHAPLIN CRES to EGLINTON AVE W
2020-07-06 07:00 2020-09-11 19:00 Daily
Concrete sidewalk removal/replacement and asphalt milling. Lane restrictions in both directions.
DOVERCOURT RD @ QUEEN ST W
From QUEEN ST W to HUMBERT ST
2020-07-08 09:00 2020-08-01 16:00 Daily
Northbound and southbound lanes occupied due to directional bore & place conduit work by Azimuth Three Enterprises Inc.
EUCLID AVE
From COLLEGE ST to DUNDAS ST E
2020-07-20 09:00 2020-08-20 16:00 Daily
Directional bore and placement of conduit and fibre. Lane restrictions in place.
VILLIERS ST @ DON ROADWAY
2020-07-09 07:00 2020-07-24 19:00 Daily
Westbound 2 lanes blocked due to underground hydro installation.
CARLAW AVE
From GERRARD ST E to LAKE SHORE BLVD E
2020-07-13 07:00 2020-12-01 19:00 Continuous
Southbound curb lane occupied for watermain relining by Robert B. Somerville Co.
MARGUERETTA ST @ 321
2020-07-17 07:00 2020-07-31 19:00 Daily
Southbound right curb lane occupied for water service installation by Rabcon Contractors.
NORTHRIDGE AVE @ 20
From PLAINS RD to COSBURN AVE
2020-07-17 07:00 2020-07-31 19:00 Daily
Southbound curb lane occupied for water service installation by Rabcon Contractors.
GOUGH AVE @ 81
From DANFORTH AVE to CRUIKSHANK AVE
2020-07-17 07:00 2020-07-31 19:00 Daily
Alternating northbound left and right curb lanes occupied for water and sanitary service installation by Rabcon Contractors.
ALMA AVE
From DUFFERIN ST to GLADSTONE AVE
2020-07-13 07:00 2020-12-31 19:00 Daily
Full road closure due to water service installation.
MOUNT PLEASANT RD @ ERSKINE AVE
2020-07-13 07:00 2020-07-25 18:00 Daily
Sidewalk repair and road repairs 957 Mt Pleasant Rd , southbound shoulder occupied .
BLOOR ST E
From YONGE ST to CHURCH ST
2020-07-13 07:00 2020-07-31 19:00 Daily
Eastbound and westbound lanes partially occupied due to geotechnical investigation.
UNIVERSITY AVE @ RICHMOND ST W
2020-07-13 07:00 2020-07-27 19:00 Daily
Traffic installations at intersection. Curb lane closures in all directions.
BONNYCASTLE ST @ LAKE SHORE BLVD E
2020-07-13 00:01 2020-08-14 23:59 Continuous
Sidewalk reconstruction. Intermittent closure of southbound curb lane and south sidewalk.
MACHOCKIE RD
From PLAINS RD to O CONNOR DR
2020-07-14 09:30 2020-08-31 15:30 Daily
Southbound lane partially occupied due to the installation of new manholes.
BEECH AVE
From QUEEN ST E to KINGSTON RD
2020-07-13 07:00 2020-09-07 19:00 Daily
Asphalt driveway and boulevard improvement/restoration. Northbound and Southbound curb lanes closed alternately.
BATER AVE
From BROADVIEW AVE to FLOYD AVE
2020-07-06 07:00 2020-12-20 21:00 Daily
Full road closure due to water main installation.
GLENWOOD CRES
From STAG HILL DR to ST COLUMBA PL
2020-07-13 07:00 2020-12-31 19:00 Continuous
Full closure of all lanes for Toronto Basement Flooding Protection Program which includes installation of storm sewer, sanitary sewer, and watermain along with road restoration by Trisan Construction. Exceptions for emergency vehicles may be made.
GLENWOOD CRES
From STAG HILL DR to ST COLUMBA PL
2020-07-13 07:00 2020-09-13 23:59 Daily
Northbound, eastbound, southbound, and westbound lanes partially occupied due to the installation of sewer and water mains.
DANFORTH AVE @ Mortan Rd
2020-07-15 07:00 2020-09-25 19:00 Daily
Westbound lanes partially occupied due to TTC Cable Chamber installation. Weekend hours: 7:00am-7:00pm
DANFORTH AVE @ OAK PARK AVE
2020-07-15 07:00 2020-09-25 19:00 Daily
Westbound lanes partially occupied due to TTC Cable Chamber installation. Weekend hours: 7:00am-7:00pm
WINCHESTER ST @ SUMACH ST
2020-07-14 15:00 2020-10-06 19:00 Daily
Occupying eastbound curb lane every Tuesday 3:00pm - 7:00pm for Cabbagetown Farmers Market.
LESLIE ST
From COMMISSIONERS ST to QUEEN ST E
2020-07-15 07:00 2020-07-24 17:00 Daily
Northbound curb lane occupied due to repairs to the sidewalk and roadway at various locations.
ADELAIDE ST W
From ADELAIDE PL to PORTLAND ST
2020-07-16 21:00 2020-07-31 05:00 Daily
Eastbound left curb lane to be occupied for borehole investigation by WSP Canada.
DANFORTH AVE @ 2852
From KELVIN AVE to TRENT AVE
2020-07-15 09:00 2020-07-24 19:00 Daily
Westbound lane occupied due to Bell emergency aerial placement of a cable.
EARNBRIDGE ST
From BROCK AVE to STRICKLAND AVE
2020-07-20 09:00 2020-08-07 19:36 Continuous
Westbound lanes occupied due to roadway crack filling at various locations.
GALLEY AVE
From RONCESVALLES AVE to SUNNYSIDE AVE
2020-07-20 09:00 2020-08-07 16:00 Continuous
Westbound lanes occupied due to roadway crack filling at various locations.
PEARSON AVE
From SORAUREN AVE to MACDONELL AVE
2020-07-20 09:00 2020-08-07 16:00 Continuous
Eastbound lanes occupied due to roadway crack filling at various locations.
STRICKLAND AVE
From EARNBRIDGE ST to NOBLE ST
2020-07-20 09:00 2020-08-07 16:00 Continuous
Westbound lanes occupied due to roadway crack filling at various locations.
TYNDALL AVE
From TEMPLE AVE to KING ST W
2020-07-20 09:00 2020-08-07 16:00 Continuous
Northbound and Southbound lanes occupied due to roadway crack filling at various locations.
CASTLEFIELD AVE
From CALEDONIA RD to KINCORT ST
2020-07-20 09:00 2020-07-24 16:00 Daily
Eastbound and westbound lanes partially occupied due to borehole investigation.
OAK PARK AVE @ DANFORTH AVE
2020-07-17 07:00 2020-09-25 17:00 Daily
One southbound curb lane occupied due to TTC cable chamber work by Hastings Utilities Contracting Ltd.
KINCORT ST
From CASTLEFIELD AVE to SHEFFIELD ST
2020-07-20 09:00 2020-07-24 16:00 Daily
Northbound and southbound lanes partially occupied due to borehole investigation.
SHEFFIELD ST
From KINCORT ST to DENSLEY AVE
2020-07-20 09:00 2020-07-24 16:00 Daily
Northbound and southbound lanes partially occupied due to bore hole investigation.
LAKE SHORE BLVD W @ YORK ST
From YORK ST to LOWER SIMCOE ST
2020-07-17 07:00 2020-07-24 15:00 Weekdays
Westbound passing lane and curb lane occupied due to bridge maintenance work by Pave-Tar Construction Ltd.
BLOOR ST W @ 2
From MAYFAIR MEWS to BAY ST
2020-07-20 09:00 2020-07-24 16:00 Daily
Westbound curb and passing lanes occupied due to gas service installation work by NPL Canada on behalf of Enbridge Gas.
DOVERCOURT RD @ 233-235
From FOXLEY ST to MACKENZIE CRES
2020-07-22 07:00 2020-08-07 19:00 Daily
One northbound and southbound lane occupied due to sanitary and water service installation work by Rabcon Contractors Ltd.
DUPLEX AVE @ 400
From EGLINTON AVE W to ORCHARD VIEW BLVD
2020-07-17 07:00 2020-07-27 16:30 Daily
Northbound and southbound lanes partially occupied due to cable chamber and duct installations. Weekend hours: 7:00am-4:30pm
JOHN ST @ 109
2020-07-19 00:01 2020-07-27 23:59 Continuous
Manhole repairs. 1 lane maintained for traffic.
RICHMOND ST W @ JOHN ST
2020-06-30 07:00 2020-08-31 17:00 Daily
Two westbound lanes occupied due to chamber roof rebuilding work by Entera Utility Contractors.
PAPE AVE
From MINTON PL to SAMMON AVE
2020-07-21 07:00 2020-07-31 19:00 Daily
Northbound and southbound curb lanes partially occupied due to geotechnical investigation.
RAY AVE @ 55 RAY AVE
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER SIDEWALK REPAIRS NORTHBOUND
EMMETT AVE @ 40 EMMETT AVE
2020-07-22 07:00 2020-08-05 19:00 Daily
PERMANENT SURFACE REINSTATEMENT TO TORONTO WATER SIDEWALK REPAIRS WESTBOUND
MILLWOOD RD
From OVERLEA BLVD to REDWAY RD
2020-07-22 09:00 2020-07-24 19:00 Continuous
Westbound curb lane occupied for structural watermain rehabilitation by Fer-Pal Construction.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
HWY 27 COLLECTOR S @ HWY 401
2020-07-27 07:00 2020-09-07 16:00 Daily
Southbound shoulder occupied due to Integrity Digs on a site within the hydro corridor.
BLOOR ST W @ LOTHIAN AVE
2020-07-27 10:00 2020-12-24 15:00 Daily
Installation of traffic signal. Westbound and Eastbound curb lanes closed.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
BROOKVIEW DR @ LAWRENCE AVE W
2020-07-27 10:00 2020-12-26 15:00 Daily
Eastbound and westbound left lanes occupied due to traffic signal installations by TM3 Inc.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
ANOLA PL
At GULLY DR
2020-07-27 07:00 2020-12-31 21:00 Daily
Full road closure due to water main installation.
ANNEKE RD
From HIGHVIEW AVE to PINEGROVE AVE
2020-08-03 07:00 2020-12-31 21:00 Daily
Full road closure due to water main installation.
KENNEDY RD
From PARK ST to DANFORTH RD
2020-08-04 07:00 2020-09-21 19:00 Daily
Northbound and southbound lanes partially occupied due to restorations. Weekend hours: 7:00am-7:00pm
SHEPPARD AVE E
From COMMONS DR to PALMDALE DR
2020-07-23 07:00 2020-07-28 19:00 Continuous
East and westbound curb lane blocked due to Permanent repairs to utility cuts, includes sidewalk, curb, and road repairs.
SHEPPARD AVE E
From PHARMACY AVE to WARDEN AVE
2020-07-27 07:00 2020-08-27 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to permanent repairs to utility cuts.
SHEPPARD AVE E
From BIRCHMOUNT RD to KENNEDY RD
2020-07-27 07:00 2020-08-27 19:00 Daily
Eastbound curb lane partially occupied due to permanent road repairs. Weekend hours: 7:00am-7:00pm
SHEPPARD AVE E
From BIRCHMOUNT RD to KENNEDY RD
2020-07-27 07:00 2020-08-27 19:00 Daily
Westbound curb lane partially occupied due to permanent road repairs. Weekend hours: 7:00am-7:00pm
BIRCHMOUNT RD
At ROLARK DR
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
ELLESMERE RD
From OAKLEY BLVD to BIRKDALE RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lanes occupied due to permanent utility cut repairs.
MIDWEST RD
From MIDLAND AVE to GREAT WEST DR
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lanes occupied due to permanent utility cut repairs.
ELLESMERE RD
From BIRKDALE RD to BRIMLEY RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lanes occupied due to permanent utility cut repairs.
WYE VALLEY RD
From DELBERT DR to ELLESMERE RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Southbound lanes occupied due to permanent utility cut repairs.
KENNEDY RD
From BRIGSTOCK RD to ELLESMERE RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Southbound lanes occupied due to permanent utility cut repairs.
GRACE ST
At COLLEGE ST
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
WICKWARE GT
At KENNEDY RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lanes occupied due to permanent utility cut repairs.
WARDEN AVE
From DANUBE DR to HANCOCK CRES
2020-07-23 09:00 2020-08-14 16:00 Daily
Southbound lanes occupied due to permanent utility cut repairs.
RIDGETOP RD
At BIRCHMOUNT RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
KENNEDY RD
From LAWRENCE AVE E to CORNWALLIS DR
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
VICTORIA PARK AVE
From SLOANE AVE to JANET BLVD
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
WHEATON GRV
At GREENWICH SQ
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lanes occupied due to permanent utility cut repairs.
KENNEDY RD
From BERTRAND AVE to KINGSDOWN DR
2020-07-23 09:00 2020-08-14 16:00 Daily
Northbound lanes occupied due to permanent utility cut repairs.
WARDEN AVE
From TOWER DR to CANADIAN RD
2020-07-27 00:01 2020-12-31 23:59 Continuous
Alternating lane closures affecting northbound and southbound traffic. Stage 1, two southbound lanes to be occupied. Stage 2, two northbound lanes to be occupied. Stage 3, one northbound, one southbound, and median lane to be occupied for rehabilitation of culverts. During stage 1 and 2, two northbound lanes and one southbound lanes will be maintained.
MORNINGSIDE AVE
From STAINES RD to OLD FINCH AVE
2020-07-23 07:00 2020-08-07 19:00 Daily
Westbound and eastbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
TRUDELLE ST @ MCCOWAN RD
2020-07-23 09:00 2020-08-14 16:00 Daily
Westbound lane partially occupied due to permanent utility cut repairs.
MIDLAND AVE
From GOODLAND GT to PITFIELD RD
2020-07-29 07:00 2020-08-12 19:00 Daily
Northbound curb lane occupied for utility pole installation by Grimsby Utility Contractors.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
YORK ST @ BREMNER BLVD
2020-07-28 03:00 2020-07-29 22:00 Continuous
Northbound, eastbound, southbound, and westbound lanes partially closed due to path tunnel construction. Deleted By: mamutha; When: 07/22/2020 8:22:58 AM; Reason: cancelled
YONGE ST @ 2161
2020-07-23 08:00 2020-07-23 12:00 Daily
Northbound lane blocked due to removing two electrical transformers.
DON VALLEY PARKWAY SB
At GARDINER EXPY WB
2020-07-25 00:01 2020-07-25 23:59 Continuous
Southbound DVP on-ramp to Gardiner WB closed due to Gardiner expressway rehabilitation project.
GARDINER EXPY EB
From GARDINER EXPY E LOWER JARVIS ST RAMP to LOGAN AVE
2020-07-26 00:01 2020-07-27 05:00 Continuous
Gardiner Expy EB will be closed from west of Jarvis off-ramp to Logan off-ramp due to Gardiner expressway rehabilitation project.
LAKE SHORE BLVD W REES ST SB RAMP
2020-07-26 00:01 2020-07-27 05:00 Continuous
On ramp occupied due to Gardiner expressway rehabilitation project.
LAKE SHORE BLVD E
From LOGAN AVE to BOOTH AVE
2020-07-25 00:01 2020-07-25 23:59 Continuous
Westbound On-ramp closed due to Gardiner expressway rehabilitation project.
WELLINGTON ST W @ BATHURST ST
2020-07-27 10:00 2020-12-26 15:00 Daily
One northbound and southbound lane right lane occupied and one westbound right lane on Bathurst St occupied due to traffic signal installations by TM3 Inc.
ALMA AVE
From GLADSTONE AVE to DUFFERIN ST
2020-07-24 07:00 2020-08-07 19:00 Daily
Westbound lanes partially occupied due to sanitary service installation.
MARGUERETTA ST @ 321
From BLOOR ST W to COLLEGE ST
2020-07-23 07:00 2020-08-07 19:00 Daily
Southbound lane partially occupied due to water service installation.
MACPHERSON AVE @ SPADINA AVE
2020-07-27 10:00 2020-12-26 15:00 Daily
One westbound right lane occupied due to traffic signal installation work by TM3 Inc.
ULSTER ST @ 102-104
At BATHURST ST
2020-07-23 07:00 2020-08-07 19:00 Daily
Westbound lane occupied due to a water and sanitary service installation by Rabcon Contractors Inc.
JARVIS ST
From WELLESLEY ST E to MAITLAND ST
2020-07-31 07:30 2020-07-31 17:30 Daily
One southbound lane closed to support the ODSP payment distribution.
BORDEN ST
From ULSTER ST to VANKOUGHNET ST
2020-07-23 09:00 2020-08-14 16:00 Daily
Full road closure due to tree removal.
O CONNOR DR @ 1401
From BERMONDSEY RD to AMSTERDAM AVE
2020-07-27 07:00 2020-07-28 19:00 Daily
Northbound and southbound curb lane occupied for gas service installation by NPL Canada.
BAY ST NB GARDINER EXPY RAMP
2020-07-26 00:01 2020-07-27 05:00 Continuous
Northbound on-ramp to Gardiner closed due to Gardiner expressway rehabilitation project.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Updates

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Destination Ontario, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

A parking ticket is affixed to the windshield of a vehicle on Wednesday June 9, 2010. (CP24/Mathew Reid)

Transportation Services

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

toronto traffic, rush hour, commute

Vehicle and Licencing

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Wasaga Beach tourism

Ontario Travel Tips

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Insurance paper

Insuring a vehicle in Ont.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Traffic file photo

Road Safety

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Highway 407

407 ETR

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.



Transit Updates

Service advisories from the Toronto Transit Commission

Service updates from GO Transit

Service advisories from York Region Transit

Service updates and news from Durham Region Transit

Service updates from Brampton Transit

Greater Toronto and Hamilton Area transportation updates

Latest news about Ontario's public transit smartcard

Transit Systems Servicing Toronto and the GTA

GO train
Transit announcement in York Region

Bus lines offering service throughout Ontario

Coach Canada Bus (Coach Canada Facebook page)

Coach Canada

Information on scheduled bus routes, convenient door-to-door airport van transfers, fun city sightseeing tours, and first class charter service.

Ontario Northland Bus. Gravelle says planned investments in ONTC infrastructure include more than $23 million over three years to purchase new motor coaches for its bus line and to refurbish rail coaches for the Polar Bear Express. (ontarionorthland.ca)

Ontario Northland

Ontario Northland's operations encompass more than 1,100 km of track, including bus service to 56 communities.



Information for Canadians crossing the United States border

In this June 2, 2009 file photo, the Statue of Liberty is seen in New York harbor.(AP Photo/Richard Drew, File)

Travelling to the U.S.

Everything citizens of Canada travelling to the United States need to know before going through customs.

Traffic makes its way to Ambassador Bridge that connects Canada to the United States in Windsor Ont. on Friday June 15, 2012. (The Canadian Press/Mark Spowart)

Tips for border crossing

CBSA provides travel tips, frequently asked questions and helpful hints for crossing the border.

To carry out the scheme, when the surrogate got to the testing centre, they presented a fake passport showing their picture along with the identification details of the person who hired them.

Get or renew a passport

Find information on getting or renewing a Canadian passport. Download and complete all related forms.

Border Crossing Updates

News from the Canada Border Services Agency

Traffic Updates for Rainbow, Peace, Lewiston Queenston & Whirlpool

Traffic Updates from Blue Water Bridge, Crossing between Canada & USA

Traffic Updates from Sault Ste. Marie International Bridge



TOP STORY

Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com




Use of this Website assumes acceptance of Terms & Conditions and Privacy Policy