News, updates, traffic map, travel times and info about driving in Toronto and Ontario.

News, updates and important information about transit systems for Toronto & the GTA.

News, updates, wait times and traveller information about Ontario border crossings.

Real-time traffic information for Toronto, GTA, and surrounding areas.


Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Traffic

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
CYPRESS ST
From ROBERT ST to LAMONT AVE
2019-01-30 09:08 2020-01-30 12:08 Continuous
One Northbound lane occupied due to storm sewer, water main, road resurfacing & related improvements for basement flooring protection program.
WOODWARD AVE
From ROBERT ST to LAMONT AVE
2019-01-07 07:00 2020-01-30 11:59 Continuous
One Northbound curb lane occupied due to storm sewer, water main, road resurfacing & related improvements for basement flooring protection program.
QUEENS DR
From JANE ST to PINE ST
2019-02-07 07:00 2019-12-31 17:30 Daily
Full closure due to basement flooding projection program. Local traffic only.
SYKES AVE
From WESTON RD to DENISON RD W
2019-03-25 07:00 2020-03-25 17:00 Continuous
Westbound lane closed for sewer replacement and road resurfacing.
HARTFIELD RD
From ROYAL YORK RD to ANGLESEY BLVD
2019-04-08 07:00 2019-12-31 19:00 Daily
Westbound and eastbound lanes closed for watermain replacement and local road resurfacing.
MENDOTA RD
From MORGAN AVE to GALA LANE
2019-04-08 07:00 2019-12-31 19:00 Daily
Westbound and eastbound lanes closed for watermain replacement and local road resurfacing.
PENHURST AVE
From THE QUEENSWAY to DALESFORD RD
2019-04-08 07:00 2019-12-31 19:00 Daily
Northbound and southbound lanes closed for watermain replacement and local road resurfacing.
BEXHILL CRT @ THE KINGSWAY
2019-04-08 07:00 2019-12-31 19:00 Daily
Westbound and eastbound lanes closed for watermain replacement and local road resurfacing.
REMINGTON DR @ BYWOOD DR
2019-05-08 09:00 2019-12-31 16:00 Continuous
Full road closure for site trailer occupation.
BURNHAMILL PL
From OLD BURNHAMTHORPE RD to MILL RD
2019-05-27 07:00 2019-11-15 21:00 Daily
1 Eastbound water main reconstruction, both for road reconstruction.
GREAT OAK DR
From KIPLING AVE to REMINGTON DR
2019-05-06 07:00 2019-12-13 19:00 Daily
Full road closure due to construction.
PELLATT AVE @ ACADEMY RD
2019-06-05 07:00 2020-01-07 17:30 Daily
Eastbound lane closed due to construction.
CLARION RD
From REDGRAVE DR to WATERBURY DR
2019-06-14 07:00 2019-11-23 21:00 Daily
Watermain and waterservice replacement on Clarion Road.
ISLINGTON AVE
From BARKER AVE to FORDWICH CRES
2019-06-27 07:00 2019-11-30 19:00 Continuous
Repair to the Islington Bridge over Humber River
RATHBURN RD
From MARTIN GROVE RD to RAVENSCREST DR
2019-07-02 07:00 2019-10-31 19:00 Continuous
Rehabilitation of Rathburn Rd over Mimico Creek Bridge.
RATHBURN RD
From MARTIN GROVE RD to RAVENSCREST DR
2019-06-27 07:00 2019-10-31 07:00 Continuous
Rehabilitation of Rathburn Rd over Mimico Creek Bridge; alternating left and right lanes occupied.
RENOWN RD
From TYRE AVE to DUNDAS ST W
2019-07-02 07:00 2019-12-13 19:00 Daily
Trenchless Rehabilitation (CIPP System) of existing watermains in Toronto Districts. Contract No. 19TW-CTS-01CWD; Renown Rd from Tyre Ave to Dundas St W; northbound and southbound curb lanes occupied.
ROYAL YORK RD
From LAWRENCE AVE W to SUMMITCREST DR
2019-07-08 07:00 2019-11-30 23:00 Daily
Northbound and Southbound curb lane occupied for road resurfacing
RENFORTH DR
From CONVAIR DR to MATHESON BLVD
2019-08-01 09:00 2019-11-15 16:00 Daily
Northbound and Southbound lanes 1 and 2 occupied alternatively due to jacking up the structures, replacing bearings, retaining walls, abutments, expansion joints, parapet walls, and repairing columns, soffit and resurfacing.
THE QUEENSWAY
From THE EAST MALL to ATOMIC AVE
2019-08-06 07:00 2019-11-22 19:00 Daily
Structural Watermain Rehabilitation Project
DISCO RD @ HWY427
At CARLINGVIEW DR
2019-08-06 07:00 2019-12-31 23:00 Daily
Eastbound and Westbound 2 lane occupied for road reconstruction
ATTWELL DR @ CARLINGVIEW DR
2019-08-06 07:00 2019-12-31 23:00 Daily
Eastbound and Westbound lane occupied for road reconstruction
THE QUEENSWAY
From THE EAST MALL to ATOMIC AVE
2019-08-06 20:00 2019-11-22 06:00 Daily
Eastbound and westbound curb lane closed due to structural water main rehabilitation project. Night & weekend work (weekend hours: 0900 am - 0700 pm)
COLBORNE LODGE DR
From LAKE SHORE BLVD W to THE QUEENSWAY
2019-08-28 07:00 2019-11-01 19:00 Daily
Bridge rehabilitation along the Oakville Subdivision on behalf of Metrolinx.
JOHN ST
From WESTON RD to SOUTH STATION ST
2019-08-19 07:00 2019-11-08 19:00 Daily
Eastbound and westbound lane closed due to streetscaping and landscaping.
OLD BURNHAMTHORPE RD
From EMBERS DR to BURNHAMTHORPE RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
RATHGAR AVE
From MULGROVE DR to RENFORTH DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
RENFORTH DR
From REXTON RD to ALLONSIUS DR
2019-08-22 09:00 2019-10-31 16:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
REXTON RD
From RENFORTH DR to MOORESHEAD DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
TUNBRIDGE CRES
From BURNHAMTHORPE RD to BURNHAMTHORPE RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
WINDUST GT
From BURNHAMTHORPE RD to ALLONSIUS DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
ALLONSIUS DR
From RENFORTH DR to RENFORTH DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
BOTLEY RD
From TUNBRIDGE CRES to CRENDON DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
BURNHAMTHORPE RD
From OLD BURNHAMTHORPE RD to MULGROVE DR
2019-08-22 09:00 2019-10-31 16:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
CRENDON DR
From GLOS RD to ULVERSTON RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
BURNHAMTHORPE RD
From OLD BURNHAMTHORPE RD to MULGROVE DR
2019-08-22 09:00 2019-10-31 16:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
GLOS RD
From ELDERFIELD CRES to CRENDON DR
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
INDIANOLA DR
From OLD BURNHAMTHORPE RD to OLD BURNHAMTHORPE RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
MOORESHEAD DR
From MULGROVE DR to REXTON RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
MULGROVE DR
From BURNHAMTHORPE RD to REXTON RD
2019-08-22 07:00 2019-10-31 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
BLOOR ST W
From BEAMISH DR to KIPLING AVE
2019-08-26 21:00 2019-12-02 16:00 Continuous
Reconstruction of the six points interchange.
ISLINGTON AVE
From FORDWICH CRES to GOSFIELD GT
2019-09-03 07:00 2019-11-16 07:00 Continuous
Manhole reconstruction for Bell Canada.
THE QUEENSWAY
From THE EAST MALL to KIPLING AVE
2019-03-04 09:00 2019-10-31 16:00 Daily
Structural Watermain Rehabilitation Project
PARKWAY AVE
From DUNDAS ST W to GRENADIER RD
2019-10-20 11:00 2019-10-20 17:00 Daily
Temporary closure of the road for the Street Play Pilot Project.
ISLINGTON AVE
From FORDWICH CRES to GOSFIELD GT
2019-09-04 07:00 2019-11-16 19:00 Daily
Manhole reconstruction for Bell Canada. NB bus lane and right lane closure.
FAVERSHAM CRES
From RHINESTONE DR to WELLESWORTH DR
2019-09-09 07:00 2019-10-31 19:00 Daily
Pave road surface. All curb lanes closed alternately east and west bound.
DUNDAS ST W @ ROYAL YORK RD
From PRINCE EDWARD DR N to GOVERNMENT RD
2019-07-08 07:00 2019-12-19 17:00 Daily
Install poles
LAMONT AVE
From LANGSIDE AVE to WALWYN AVE
2019-09-06 07:00 2020-02-28 17:30 Continuous
Storm sewer, sanitary sewer, water main, road resurfacing and related improvements for Basement Flooring Protection Program
MEADOWVALE DR @ PRINCE EDWARD DR S
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
ASHTON MANOR
From PRINCE EDWARD DR S to GRENVIEW BLVD S
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
EDGEMORE DR
From PRINCE EDWARD DR S to ELSFIELD RD
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
ATHLONE DR
From PRINCE EDWARD DR S to GRENVIEW BLVD S
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
GLENROY AVE
From PRINCE EDWARD DR S to GRENVIEW BLVD S
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
GLENADEN AVE W
From PRINCE EDWARD DR S to GRENVIEW BLVD S
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
HUMBERVALE BLVD
From GLENROY AVE to WINSTON GRV
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
WINSTON GRV
From PRINCE EDWARD DR S to HUMBERVALE BLVD
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
SUNNYLEA AVE W
From PRINCE EDWARD DR S to HUMBERVALE BLVD
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
SUNNYDALE DR
From PRINCE EDWARD DR S to HUMBERVALE BLVD
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
REID MANOR
From PRINCE EDWARD DR S to HUMBERVALE BLVD
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
PRINCE EDWARD DR S
From REID MANOR to MEADOWVALE DR
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
GRENVIEW BLVD S
From MEADOWVALE DR to REID MANOR
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
ELSFIELD RD
From EDGEMORE DR to GLENROY AVE
2019-09-09 07:00 2019-11-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
MARTIN GROVE RD
From WESTHUMBER BLVD to MILKWOOD AVE
2019-09-09 07:00 2019-10-31 19:00 Daily
Northbound lane closed due to Bell maintenance hole rebuild.
PAMELA CRT
At STEVENSON RD
2019-09-16 07:00 2019-12-21 21:00 Daily
Water main and Water Service Installation
VANGE CRES @ MOUNT OLIVE DR
2019-09-16 07:00 2019-12-21 21:00 Daily
Water main and Water Service Installation
BLOOR ST W
From LAUREL AVE to TREMONT RD
2019-09-16 09:00 2019-10-31 16:00 Daily
Duct installation by directional drilling and trenching.
JANE ST @ YORK GATE BLVD
2019-09-16 09:00 2019-10-31 16:00 Daily
Duct installation by directional drilling and trenching.
ARDUA ST @ THE WEST MALL
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at NB/SB. All curb lanes closed alternately
MOYLES CRT @ WEST WARESIDE RD
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at NB/SB. All curb lanes closed alternately
LONE OAK CRT @ RAKELY CRT
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at EB/WB. All curb lanes closed alternately
WEST WARESIDE RD
From RENFORTH DR to CRENDON DR
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at EB/WB. All curb lanes closed alternately
THE WEST MALL
From RATHBURN RD to WELLESWORTH DR
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at NB/SB. All curb lanes closed alternately
SUMMERFIELD CRES @ ODESSA AVE
2019-09-18 07:07 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at EB/WB. All curb lanes closed alternately
RHINESTONE DR
From BIRGITTA CRES to FAVERSHAM CRES
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at EB/WB. All curb lanes closed alternately
NEWINGTON CRES
From ELMBROOK CRES to ELMBROOK CRES
2019-09-18 07:00 2019-11-01 19:00 Daily
Mill and pave road surface, remove & replace deficient sidewalk at NB/SB. All curb lanes closed alternately
DIXON RD
From CARLINGVIEW DR to HWY 427
2019-09-20 09:00 2019-10-27 15:30 Daily
Sidewalk repair on Dixon Rd between Carlingview Dr and Highway 427; (1) Westbound lane occupied.
EVANS AVE
From BROWNS LINE to GAIR DR
2019-09-20 00:01 2019-10-21 23:59 Daily
Rehab of Evans Ave Bridge over Brown's Line. (1) EB and WB lane occupied on Evans Ave.
EVANS AVE
From BROWNS LINE to GAIR DR
2019-09-20 00:01 2019-10-21 23:59 Continuous
EB & WB Evans Ave right or left lane is occupied due to rehab bridge.
TURNVALE RD
From LYNMONT RD to WESTHUMBER BLVD
2019-09-23 07:00 2019-12-20 19:00 Daily
Trenchless rehabilitation of existing storm sewer in Humber Gate Park, eastbound shoulder occupied
MIRANDA AVE @ CASTLEFIELD AVE
2019-09-19 09:00 2019-10-31 16:00 Daily
Maintenance work.
ROGERS RD @ BOON AVE
2019-09-30 09:00 2019-12-31 16:00 Daily
Installation of traffic signals.
CASTLEFIELD AVE
From RONALD AVE to MIRANDA AVE
2019-10-03 07:00 2019-10-20 19:00 Daily
Alternate West and East bound Curb lane occupied due to installation of new conduit for fiber optics
BROWNS LINE
From EVANS AVE to EVANS AVE
2019-10-04 00:01 2019-11-29 23:59 Continuous
SB right shoulder blocked due to rehab of bridge.
GLENADEN AVE E
From PRINCE EDWARD DR S to RIVERWOOD PKWY
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
SUNNYLEA AVE E
From PRINCE EDWARD DR S to RIVERWOOD PKWY
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
HAZELRIDGE DR
From SUNNYLEA AVE E to IVY LEA CRES
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
IVY LEA CRES
From RIVERWOOD PKWY to SUNNYLEA AVE E
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
BALLACAINE DR
From SOUTH KINGSLEA DR to GLENADEN AVE E
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
BREEZEWOOD DR @ IVY LEA CRES
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
NORTH KINGSLEA DR
From BALLACAINE DR to KINGSLEA CRT
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
KINGSLEA CRT
From GLENELLEN DR E to SOUTH KINGSLEA DR
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
KINGSLEA GDNS
From PRINCE EDWARD DR S to KINGSLEA CRT
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
PARK LAWN RD
From SOUTH KINGSLEA DR to GLENELLEN DR E
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
PRINCE EDWARD DR S
From SUNNYLEA AVE E to GLENELLEN DR E
2019-10-07 09:00 2019-12-20 16:00 Daily
Duct installation by directional drilling and trenching.
RIVERWOOD PKWY
From GLENADEN AVE E to IVY LEA CRES
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
SOUTH KINGSLEA DR
From KINGSLEA CRT to IVY LEA CRES
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
WOODWAY TRL
From RIVERWOOD PKWY to IVY LEA CRES
2019-10-07 07:00 2019-12-20 19:00 Daily
Duct installation by directional drilling and trenching.
YORKTOWN DR @ TRETHEWEY DR
2019-10-07 09:30 2019-10-30 15:30 Daily
Installation of conduit; Southbound and Westbound lane closed.
ISLINGTON AVE
From DISAN CRT to WARDLAW CRES
2019-10-08 09:00 2019-10-31 16:00 Daily
Installation of new conduit for fiber optics.
CLAIREVILLE DR
From HUMBERLINE DR to HUMBERLINE DR
2019-10-15 07:00 2019-11-14 19:00 Daily
SB/NB curb lane occupied due to mill and pave road surface.
HUDDERSFIELD RD
From HUMBERLINE DR to CLAIREVILLE DR
2019-10-15 07:00 2019-11-15 19:00 Daily
EB/WB curb lane occupied due to mill and pave road surface.
ELDER AVE
From TWENTY NINTH ST to TWENTY SIXTH ST
2019-10-08 09:00 2019-11-05 16:00 Daily
SB lane occupied due to inspection and rehabilitation.
BLACKTHORN AVE @ 432
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
SUN VALLEY DR
From ST MARKS RD to PASADENA GDNS
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
VALLEYMEDE RD
From ELLIS PARK RD to KENNEDY AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ARDUA ST @ THE WEST MALL
2019-10-08 07:00 2019-11-15 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
WEST WARESIDE RD
From RENFORTH DR to CRENDON DR
2019-10-08 07:00 2019-11-01 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
THE WEST MALL
From RATHBURN RD to WELLESWORTH DR
2019-10-08 07:00 2019-11-15 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
RHINESTONE DR
From BIRGITTA CRES to FAVERSHAM CRES
2019-10-08 07:00 2019-11-15 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
NEWINGTON CRES @ ELMBROOK CRES
2019-10-08 07:00 2019-11-15 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
FAVERSHAM CRES
From RHINESTONE DR to WELLESWORTH DR
2019-10-08 07:00 2019-11-15 19:00 Daily
Mill and pave road surface. All curb lanes closed alternatively.
REDWATER DR @ 33 to 29
2019-10-09 07:00 2019-11-29 19:00 Daily
NB 1 lane occupied due to wing wall reconstruction.
BROWNS LINE
From EVANS AVE to EVANS AVE
2019-10-09 07:00 2019-10-30 15:00 Daily
SB right lane of Brown's Line is occupied due to rehab.
HWY 27 COLLECTOR S
From ALBION RD to FINCH AVE W
2019-10-07 09:00 2019-10-21 16:30 Daily
sb curb and shoulder lane is occupied due to utility cut.
DONALD AVE
From SCOTT RD to SILVERTHORN AVE
2019-10-07 09:00 2019-11-09 16:00 Daily
EB curb lane occupied due to installing new rogers conduit and cable.
BURNHAMTHORPE RD
From MARTIN GROVE RD to DUNDAS ST W
2019-10-10 07:00 2019-10-31 17:30 Daily
Curb and Sidewalk repairs
GALAXY BLVD
From INTERNATIONAL BLVD to MERIDIAN RD
2019-10-16 08:00 2019-11-22 16:00 Daily
WB 1 curb lane occupied due to pipeline integrity dig
RIDELLE AVE
From DUFFERIN ST to MARLEE AVE
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
TIMES RD
From ROSELAWN AVE to BRIAR HILL AVE
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
DANESBURY AVE
From ROSELAWN AVE to RIDELLE AVE
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
CASTLEFIELD AVE
From MARLEE AVE to DANESBURY AVE
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
KIPLING AVE @ 1866
2019-10-15 09:00 2019-11-01 16:00 Daily
SB 1 shoulder occupied due to Drilling, Conduit Placement, Cable Pull.
TAYSHAM CRES
From AMARON AVE to FARR AVE
2019-10-10 09:00 2019-10-30 16:00 Daily
Borehole drilling for geotechnical investigation.
AMARON AVE
From BENSTROW AVE to MONTERREY DR
2019-10-10 09:00 2019-10-30 16:00 Daily
Borehole drilling for geotechnical investigation.
KIPLING AVE
From GENTHORN AVE to SNARESBROOK DR
2019-10-10 09:00 2019-10-30 16:00 Daily
Borehole drilling for geotechnical investigation.
THE WESTWAY
From SASKATOON DR to BRAECREST AVE
2019-10-10 09:00 2019-10-30 16:00 Daily
Borehole drilling for geotechnical investigation.
THE QUEENSWAY @ 110
2019-10-14 19:00 2019-10-25 07:00 Daily
Trenchless sewer work. (1) Northbound lane closed.
WINDERMERE PL @ SOUTHPORT ST
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work. (1) Westbound lane closed.
KENNETH AVE @ 85
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
GRAY AVE @ 23
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
THE EAST MALL @ 596
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
FARNINGHAM CRES @ 4
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
BISSET AVE
At EVANS AVE
2019-10-15 07:00 2019-12-21 17:00 Daily
EB occupied due to construction.
CEDRIC AVE @ 185
From JESMOND AVE to HOLLAND PARK AVE
2019-10-15 07:00 2019-11-15 19:00 Daily
NB/SB lane occupied due to sanitary and water service installation.
JANE ST
From BLACK CREEK BLVD to BLACK CREEK BLVD
2019-10-15 07:00 2019-11-10 19:00 Daily
Both direction lane occupied due to duct installation.
BLACK CREEK BLVD
From JANE ST to STONEY BROOKE DR
2019-10-15 07:00 2019-11-10 19:00 Daily
NW lane occupied due to duct installation.
STONEY BROOKE DR
From BLACK CREEK BLVD to ROSE VALLEY CRES
2019-10-15 07:00 2019-11-10 19:00 Daily
NE lane occupied due to duct installation.
ROSE VALLEY CRES
From STONEY BROOKE DR to WOODGATE DR
2019-10-15 07:00 2019-11-10 19:00 Daily
NE lane occupied due to duct installation.
WOODGATE DR
From ROSE VALLEY CRES to EAST DR
2019-10-15 07:00 2019-11-10 19:00 Daily
NE lane occupied due to duct installation.
EAST DR
From WOODGATE DR to WOODGATE DR
2019-10-15 07:00 2019-11-10 19:00 Daily
NE lane occupied due to duct installation.
EAST DR
From WOODGATE DR to SCARLETT RD
2019-10-15 07:00 2019-12-20 19:00 Daily
SB lane occupied due to duct installation.
BELGROVE DR
From SHAVER AVE N to SMITHWOOD DR
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
BLOOR ST W
From LAUREL AVE to MARTIN GROVE RD
2019-10-15 09:00 2019-12-20 15:00 Daily
NW lane occupied due to duct installation.
CHARLESTON RD
From SWAN AVE to BLOOR ST W
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
LEAGATE RD
From SHAVER AVE N to CHARLESTON RD
2019-10-15 07:00 2019-12-20 19:00 Daily
SB occupied due to duct installation.
LORENE DR
From NORTHAMPTON DR to SHAVER AVE N
2019-10-15 07:00 2019-12-20 19:00 Daily
SB occupied due to duct installation.
MARTIN GROVE RD
From GAYLORD AVE to BLOOR ST W
2019-10-15 09:00 2019-12-20 16:00 Daily
NW occupied due to duct installation.
MAYDOLPH RD
From NORTHAMPTON DR to SMITHWOOD DR
2019-10-15 07:00 2019-12-20 19:00 Daily
SE occupied due to duct installation.
MERVYN AVE
From MARTIN GROVE RD to CHARLESTON RD
2019-10-15 07:00 2019-12-20 19:00 Daily
EB occupied due to duct installation.
NORTHAMPTON DR
From LORENE DR to SHAVER AVE N
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
ROCKFIELD DR
From MARTIN GROVE RD to CHARLESTON RD
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
SHAVER AVE N
From LORENE DR to BLOOR ST W
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
SMITHWOOD DR
From LORENE DR to LAUREL GT
2019-10-15 07:00 2019-12-20 19:00 Daily
Both direction occupied due to duct installation.
TRETHEWEY DR @ 80
2019-10-16 09:30 2019-10-30 15:30 Daily
Conduit installation. Southbound lane closed.
BERRY RD
From CLOVERHILL RD to STEPHEN DR
2019-10-17 07:00 2019-10-25 19:00 Daily
Directional drill and installation for conduit and vault. Eastbound curb lane closed.
ALLIANCE AVE @ 391
2019-10-17 09:00 2019-10-21 16:00 Daily
sewer rehab
EIGHTH ST
From MORRISON ST to MORRISON ST
2019-10-17 07:00 2019-10-21 19:00 Daily
SB west curb lane occupied due to excavation to place relocate bell conduit.
ROGERS RD @ 605
From FORBES AVE to KEELE ST
2019-10-16 09:00 2019-10-30 16:00 Daily
EAST BND CURB LANE PERMANENT SURFACE RESINSTATEMENT
KEELE ST @ 623
From ST CLAIR AVE W to LLOYD AVE
2019-10-16 09:00 2019-10-30 16:00 Daily
NORTH BND MIDDLE LANE PERMANENT SURFACE RESINSTATEMENT
WESTON RD @ 1308
From VICTORIA BLVD to RUTHERFORD AVE
2019-10-16 09:00 2019-10-31 16:00 Daily
EAST BND CURB LANE PERMANENT SURFACE RESINSTATEMENT
EGLINTON AVE W
From HWY 427 to MATHESON BLVD
2019-10-16 09:00 2019-10-23 15:30 Continuous
WB 1 shoulder lane occupied due to geotechnical borehole to be drilled.
ROGERS RD
From SCOTT RD to REGENT ST
2019-10-16 09:00 2019-10-30 16:00 Daily
PERMANENT SURFACE RESINSTATEMENT TO TORONTO WATER REPAIR AT VARIOUS LOCATIONS WITHIIN THE CITY OF TORONTO.19TW-DC-309OCS. 550 Rogers Rd, WEST BND CURB LANE occupied.
JANE ST
From BEXLEY CRES to PENDEEN AVE
2019-10-16 09:00 2019-10-30 16:00 Daily
PERMANENT SURFACE RESINSTATEMENT TO TORONTO WATER REPAIR AT VARIOUS LOCATIONS WITHIIN THE CITY OF TORONTO.19TW-DC-309OCS.SOUTH BND CURB LANE. 962 Jane St.
WESTON RD
From JOHN ST to LAWRENCE AVE W
2019-10-16 09:00 2019-10-31 16:00 Daily
PERMANENT SURFACE RESINSTATEMENT TO TORONTO WATER REPAIR AT VARIOUS LOCATIONS WITHIIN THE CITY OF TORONTO.19TW-DC-309OCS.1901 WESTON RD. NORTH BND CURB LANE occupied.
AUDLEY ST
From NEWCASTLE ST to PORTLAND ST
2019-10-17 07:00 2020-02-01 19:00 Daily
SB shoulder blocked due to sewer rehabilitation.
GRAND AVE
From PORTLAND ST to ALGOMA ST
2019-10-17 07:00 2020-02-01 19:00 Daily
NB sidewalk and lane blocked due to sewer rehabilitation.
PORTLAND ST @ 80
At GRAND AVE
2019-10-17 07:00 2020-02-01 19:00 Daily
WB lane blocked due to sewer rehabilitation.
BROWNS LINE @ EVANS AVE
2019-09-17 00:01 2019-11-30 23:59 Continuous
EB/WB/SB either right or left lane occupied due to bridge rehabilitation.
BISSET AVE
At EVANS AVE
2019-10-15 12:00 2019-12-21 16:00 Daily
EB right curb lane blocked due to construction.
ROSELAWN AVE
From MARLEE AVE to ELM RIDGE DR
2019-10-17 09:00 2019-11-01 16:00 Daily
EB curb lane blocked due to boring
MARLEE AVE
From RIDELLE AVE to MARLEE AVE
2019-10-17 09:00 2019-11-01 16:00 Daily
EB curb lane blocked due to boring
WESTON RD @ 1980
From LITTLE AVE to JOHN ST
2019-10-18 07:00 2019-10-31 21:00 Daily
EAST BND CURB LANE BLOCKED DUE TO PERMANENT SURFACE RESINSTATEMENT
VINE AVE @ 27
From KEELE ST to JACKSON PL
2019-10-18 18:25 2019-10-20 23:59 Daily
Sewer Relay Deleted By: abutt2; When: 10/18/2019 8:02:14 PM; Reason: Duplicate
TRETHEWEY DR
From TODD BAYLIS BLVD to BLACK CREEK DR
2019-10-07 09:30 2019-11-01 15:30 Daily
Conduit installation. Northbound lane on Tood Baylis Blvd and Eastbound lane on Trethewey Dr closed.
ISLINGTON AVE
From FORDWICH CRES to BARKER AVE
2019-06-17 07:00 2019-12-31 07:00 Continuous
Repair to the Islington Bridge over Humber River. Northbound and Southbound alternating left and right lanes closed.
QUEEN ELIZABETH BLVD
From MARKET GARDEN MEWS to CANMOTOR AVE
2019-10-19 03:00 2019-10-20 18:00 Daily
Temporary road closure for store event.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
BROADWAY AVE @ REDPATH AVE
2017-02-27 00:01 2020-03-31 23:59 Continuous
Eastbound sidewalk and portion of the lane closed due to construction.
BARSE ST
From OLD ORCHARD GRV to DELORAINE AVE
2019-01-07 07:00 2019-12-11 17:30 Daily
The centre lane will be occupied due to replace and upgrade the storm sewers and install new catch basins.
PRINCE CHARLES DR
From BATHURST ST to RIDGEVALE DR
2019-01-14 07:00 2019-12-11 17:30 Weekdays
The centre lane will be occupied due to road construction.
PATIKA AVE
From JANE ST to PINE ST
2019-02-19 07:00 2019-12-31 19:00 Daily
Westbound lanes occupied due to water main, Storm sanitation & Restoration.
INDIAN TRL
From INDIAN RD to INDIAN GRV
2019-02-21 07:00 2019-10-31 19:00 Daily
Eastbound and westbound lane closed due to new water main installation.
STEELES AVE E
From FENMAR DR to ROSSDEAN DR
2019-05-07 09:00 2019-11-30 16:00 Daily
Northbound lanes occupied due to waterman relining CIPP.
FOREST MANOR RD @ PARKWAY FOREST DR
2019-05-13 07:00 2019-11-01 19:00 Daily
All lanes alternately occupied due to Concrete curb/sidewalk repairs, Asphalt Milling and Paving.
GRAYDON HALL DR
From FENELON DR to GRAYDON HALL PL
2019-05-13 07:00 2019-11-01 19:00 Daily
ALL lanes alternately occupied due to Concrete curb/sidewalk repairs, Asphalt Milling and Paving.
PARKWAY FOREST DR
From DON MILLS RD to SHEPPARD AVE E
2019-05-13 07:00 2019-11-01 19:00 Daily
Various lanes occupied due to Concrete curb/sidewalk repairs, Asphalt Milling and Paving.
PELLATT AVE @ ACADEMY RD
2019-06-04 07:00 2020-01-07 17:30 Continuous
City of Toronto Contract 18ECS-LU-10FP-BFPP: Storm sewer, sanitary sewer, water main, road resurfacing and related improvements for Basement Flooring Protection Program Phase 4.
EBONYWOOD GT
From FRESHMEADOW DR to HOLLYBERRY TRL
2019-06-10 07:00 2019-12-20 21:00 Daily
Watermain and Water Service Installation- Contract # 19ECS-LU-07SU. Ebonywood Gate from Freshmeadow Dr to Hollyberry Trail
LESLIE ST
From FINCH AVE E to STEELES AVE E
2019-06-25 09:00 2019-11-15 16:00 Daily
Trenchless Rehabilitation (CIPP System) of Existing Watermains in Toronto Districts on Leslie St.
PLAYFAIR AVE
2019-07-02 07:00 2019-11-27 19:00 Continuous
Sewer upgrades. From 42-83 Playfair Ave.
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and Water Service Installation- Contract # 19ECS-LU-06SU
WILLOWDALE AVE
From FINCH AVE E to EMPRESS AVE
2019-07-22 07:00 2019-12-25 19:00 Daily
Northbound and southbound curb lanes occupied due to contract 19ECS-TI-09MAR.
EGLINTON AVE W @ WINNETT AVE
2019-08-06 12:00 2019-12-31 15:00 Daily
Eastbound lane occupied for storage of materials
EBONYWOOD GT
From FRESHMEADOW DR to HOLLYBERRY TRL
2019-06-30 07:00 2019-11-30 19:00 Daily
Watermain replacement.
SHEPPARD AVE W
From LOMAR DR to JANE ST
2019-09-23 07:00 2019-12-20 19:00 Continuous
Replacement of storm sewers,sanitary sewers, water main and valves.
HURLINGHAM CRES @ BALLYRONAN RD
2019-08-14 07:00 2019-11-30 19:00 Daily
Northbound and southbound lanes closed due to structural water main rehabilitation.
RESOLUTION CRES
From MCNICOLL AVE to CRESTHAVEN DR
2019-08-14 07:00 2019-11-15 19:00 Daily
Northbound and southbound lanes closed due to trenchless rehabilitation of existing water main.
MICHIGAN DR
From NIPIGON AVE to OTONABEE AVE
2019-08-20 07:00 2019-10-29 19:00 Daily
Trenchless Rehabilitation
WHITMAN ST
At STEELES AVE E
2019-08-20 07:00 2019-10-29 19:00 Daily
Trenchless Rehabilitation
GILLEY RD
From GARRATT BLVD to KESWICK RD
2019-08-21 07:00 2019-12-11 19:00 Continuous
Watermain, Sewer and Road Reconstruction
THREADNEEDLE CRES
From DEXTER BLVD to CLANSMAN BLVD
2019-08-19 07:00 2020-01-31 19:00 Daily
Structural Watermain Rehabilitation
ALMINGTON ST
From LAURELCREST AVE to INVERARY CRES
2019-08-20 07:00 2019-10-22 19:00 Daily
Northbound curb lane closed due to trenchless rehabilitation of existing water mains.
LESLIE ST
From FINCH AVE E to STEELES AVE E
2019-06-25 09:00 2019-11-15 16:00 Daily
Northbound and southbound curb lane closed due to trenchless rehabilitation of existing water mains.
DONINO AVE
From DONWOODS DR to BROOKFIELD RD
2019-08-21 07:00 2019-12-20 17:00 Daily
Full road closure due to bridge rehabilitation.
FINCH AVE E
From CHEROKEE BLVD to GORDON BAKER RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and Water Service Installation
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
OLD LESLIE ST
At SHEPPARD AVE E
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation from Sheppard Ave E to west side of CNR Tracks.
WHITBURN CRES
From KEELE ST to BLAYDON AVE
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
FLETCHERDON CRES @ GOSFORD BLVD
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
GOSFORD BLVD
From SHOREHAM DR to FLETCHERDON CRES
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
GOSFORD BLVD
From ARTECH CRT to HULLMAR DR
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
HULLMAR DR
From GOSFORD BLVD to YORK GATE BLVD
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
JANE ST @ SHOREHAM DR
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
SECROFT CRES @ GOSFORD BLVD
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
SHOREHAM DR
From GOSFORD BLVD to JANE ST
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
YORK GATE BLVD @ HULLMAR DR
2019-09-01 07:00 2019-12-31 18:00 Daily
Basement flooding
FINCH AVE E
From CHEROKEE BLVD to GORDON BAKER RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
OLD LESLIE ST @ SHEPPARD AVE E
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
WHITBURN CRES
From KEELE ST to BLAYDON AVE
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
HOMEWOOD AVE @ CACTUS AVE
2019-09-06 07:00 2019-10-30 19:00 Daily
DUCT INSTALLATION BY DIRECTIONAL DRILLING AND TRENCHING
DUFFERIN ST
From ROSELAWN AVE to HOPEWELL AVE
2019-09-11 07:00 2019-10-31 19:00 Daily
Southbound curb lane closed due to rehabilitation of Dufferin St bridge under Beltline Trail
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Waterman and Water Service installation at north and south bound.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Waterman and Water Service installation, 2 westbound lanes occupied.
YORK MILLS RD
From LESLIE ST to DON MILLS RD
2019-09-16 07:00 2019-11-30 23:00 Daily
Mill and pave road surface at east/westbound. All curb lanes occupied.
SHARPECROFT BLVD
From DOVEHOUSE AVE to GRANDRAVINE DR
2019-09-16 07:00 2019-12-21 21:00 Daily
Water main and water service installation.
STREAMDALE CRT @ SENTINEL RD
2019-09-16 07:00 2019-12-21 21:00 Daily
Water main and water service installation.
BUCKLAND RD @ GILTSPUR DR
2019-09-16 07:00 2019-12-21 21:00 Daily
Water main and water service installation.
GOSFORD BLVD
From HULLMAR DR to ARTECH CRT
2019-09-23 07:00 2019-10-28 18:00 Continuous
Basement flooding, all directions are occupied.
VARNA DR
From BAGOT CRT to DORNEY CRT
2019-09-16 07:00 2019-12-20 17:30 Daily
Installation of sewers, watermain and road reconstruction at EB
VIRGILWOOD DR
From AILSA CRAIG CRT to FINCH AVE W
2019-09-16 07:00 2019-12-21 21:00 Daily
Watermain and Water Service Installation
JODPHUR AVE
From ANN ARBOUR RD to MELODY RD
2019-09-16 07:00 2019-12-21 21:00 Daily
Watermain and Water Service Installation
GOLDSBORO RD
From DUNCANWOODS DR to GRACEDALE BLVD
2019-09-16 07:00 2019-12-21 21:00 Daily
Watermain and Water Service Installation
VIRGILWOOD DR
From AILSA CRAIG CRT to FINCH AVE W
2019-09-23 07:00 2020-02-20 21:00 Daily
New watermain installation
JODPHUR AVE
From ANN ARBOUR RD to MELODY RD
2019-09-23 07:00 2020-02-20 21:00 Daily
New watermain installation
GOLDSBORO RD
From DUNCANWOODS DR to GRACEDALE BLVD
2019-09-23 07:00 2020-02-20 21:00 Daily
New watermain installation
WR ALLEN RD @ RANEE AVE
2019-09-23 07:00 2020-01-27 17:00 Daily
Deteriorated concrete removal and repair at Allen Rd and Ranee Ave.
RANEE AVE @ WR ALLEN RD
2019-09-23 07:00 2020-01-27 17:00 Daily
Deteriorated concrete removal and repair at Allen Rd and Ranee Ave.
FINCH AVE E @ ALAMOSA DR
2019-09-23 20:00 2019-11-15 05:00 Daily
Water main Rehabilitation Project at East Bound, West Bound Curb Lane Occupied.
QUEENSLEA AVE
From WALWYN AVE to ROSEMOUNT AVE
2019-09-20 07:00 2020-02-20 18:00 Daily
1 Lane Eastbound is occupied due to Basement Flooring Protection
FELBRIGG AVE
From JOICEY BLVD to GREER RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
HILLHURST BLVD
From PROUDFOOT AVE to BATHURST ST
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
WR ALLEN RD SB YORKDALE RD RAMP
From YORKDALE RD to YORKDALE RD
2019-09-22 23:00 2019-10-26 05:00 Daily
Allen Road Southbound ramp to Yorkdale Rd alternating 1 or 2 of 3 lanes (different nights) for bridge work
CLAYWOOD RD
From SANTA BARBARA RD to CHURCHILL AVE
2019-09-23 09:00 2019-10-28 19:00 Daily
SB of Claywood occupied due to conduit and PED W/Vault
SANTA BARBARA RD @ 129
From ABBOTSFORD RD to CLAYWOOD RD
2019-09-23 09:00 2019-10-28 19:00 Daily
WB of Santa Barabara Rd occupied due to conduit and PED W/Vault
HOUNSLOW AVE @ 223
From ABBOTSFORD RD to CLAYWOOD RD
2019-09-23 09:00 2019-10-28 19:00 Daily
WB of Hounslow Ave occupied due to conduit and PED W/Vault
LURGAN DR @ 57
From SENLAC RD to BEVDALE RD
2019-09-23 09:00 2019-10-28 19:00 Daily
WB of Lurgan Dr occupied due to conduit and PED W/Vault
BEVDALE RD @ 125
From LURGAN DR to YORKVIEW DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB of Bevdale occupied due to conduit and PED W/Vault
YORKVIEW DR
From ELGIN RD to SENLAC RD
2019-09-23 09:00 2019-10-28 19:00 Daily
WB of Yorkview SE occupied due to conduit and PED W/Vault
HAZELGLEN AVE
From COBDEN ST to CHURCHILL AVE
2019-09-23 09:00 2019-10-28 19:00 Daily
NB of Hazelglen Ave occupied due to conduit and PED W/Vault
CHURCHILL AVE
From SENLAC RD to COBDEN ST
2019-09-23 09:00 2019-10-28 19:00 Daily
WB of Churchill Ave occupied due to conduit and PED W/Vault
SENLAC RD
From LURGAN DR to CHURCHILL AVE
2019-09-23 09:00 2019-10-28 19:00 Daily
SB of Senlac Rd occupied due to conduit and PED W/Vault
TULANE CRES
From ROYWOOD DR to SLIDELL CRES
2019-09-23 09:00 2019-10-28 19:00 Daily
SB lane occupied due to conduit and ped w/vault.
FORTROSE CRES
From ROYWOOD DR to ROYWOOD DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB lane of Fortrose Cres occupied due to conduit and ped w/vault.
BALTRAY CRES
From ROYWOOD DR to ROYWOOD DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB lane occupied due to conduit and ped w/vault.
NIANTIC CRES
From BALTRAY CRES to ROYWOOD DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB lane occupied due to conduit and ped w/vault.
ROYWOOD DR @ NIANTIC CRES
2019-09-23 09:00 2019-10-28 19:00 Daily
NB EAST CURBLANE OF ROYWOOD AT NIANTIC occupied due to conduit and ped w/vault.
BILLINGTON CRES @ 90
From SKELMORE CRES to KANTURK GT
2019-09-23 09:00 2019-10-28 16:00 Daily
EB LANE OF BILLINGTON CRES occupied due to conduit and ped w/vault.
SLIDELL CRES @ 10
From FENSIDE DR to TULANE CRES
2019-09-23 09:00 2019-10-28 19:00 Daily
WB LANE OF SLIDELL CRES occupied due to conduit and ped w/vault.
FENSIDE DR
From SLIDELL CRES to ROYWOOD DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB LANE OF FENSIDE DR occupied due to conduit and ped w/vault.
ROYWOOD DR @ 125
From FORTROSE CRES to FORTROSE CRES
2019-09-23 09:00 2019-10-28 19:00 Daily
EB LANE OF ROYWOOD DR occupied due to conduit and ped w/vault.
FORTROSE CRES @ 52
From ROYWOOD DR to ROYWOOD DR
2019-09-23 09:00 2019-10-28 19:00 Daily
SB LANE OF FORTROSE CRES occupied due to conduit and ped w/vault.
SKELMORE CRES @ 12
From BILLINGTON CRES to BILLINGTON CRES
2019-09-23 09:00 2019-10-28 19:00 Daily
WB LANE OF SKELMORE occupied due to conduit and ped w/vault.
ROE AVE
From GREER RD to ELM RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
HADDON AVE
From BROOKE AVE to OLD ORCHARD GRV
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
CHURCH AVE
From LONGMORE ST to WILLOWDALE AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
ANNDALE DR
From GLENDORA AVE to WILLOWDALE AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
BURNETT AVE
From SENLAC RD to ADDINGTON AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
CRAIGMORE CRES
From GLENDORA AVE to WILLOWDALE AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
MOORE PARK AVE
From CACTUS AVE to HILDA AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
PLEASANT AVE
From PECKHAM AVE to CHELMSFORD AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
ST PASCHAL CRT @ MOORE PARK AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
ELLERSLIE AVE
From BEECROFT RD to TAMWORTH RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
WYNN RD
From BETTY ANN DR to YORKVIEW DR
2019-09-19 09:00 2019-10-31 16:00 Continuous
Maintenance work.
WR ALLEN RD SB YORKDALE RD RAMP @ YORKDALE RD
2019-09-22 23:00 2019-10-26 05:00 Weekdays
Southbound alternating left and right lane and shoulder closed due to bridge work on MTO contract 2017-2030.
GLEN PARK AVE @ 5
From HOLLAMAN RD to GLENMOUNT AVE
2019-09-24 07:00 2019-10-31 17:00 Daily
Eastbound lane occupied due to replacing curbs
LAURENTIDE DR
From YORK MILLS RD to BUSHBURY DR
2019-09-29 07:00 2019-10-25 19:00 Daily
WB and NB curb lane blocked due to trenchless rehabilitation project.
FAWNHAVEN CRT @ HIDDEN TRL
2019-09-30 07:00 2019-10-31 19:00 Continuous
EB/WB all curb lanes occupied due to road surface removal.
TORRESDALE AVE @ FINCH AVE W
2019-09-30 07:00 2019-10-31 19:00 Daily
NB/SB all curb lanes occupied due to road surface removal.
AGATE RD
From WILSON AVE to VICTORY DR
2019-09-26 07:00 2019-11-30 19:00 Daily
Both direction lane 1 occupied due to duct installation.
VICTORY DR
From PLEASANT HOME BLVD to KEELE ST
2019-09-26 07:00 2019-11-30 19:00 Daily
Both direction lane 1 occupied due to duct installation.
IANHALL RD
From VICTORY DR to GADE DR
2019-09-26 07:00 2019-11-22 19:00 Daily
Both direction lane 1 occupied due to duct installation.
LARCHWOOD RD @ LOMAR DR
2019-07-31 07:00 2019-10-31 19:00 Continuous
1 NB & SB lane occupied due to basement flooding protection program.
BRIAN DR
From VAN HORNE AVE to SHEPPARD AVE E
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
CLIPPER RD
From VAN HORNE AVE to PLEASANT VIEW DR
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
CONSUMERS RD
From SHEPPARD AVE E to HALLCROWN PL
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
ENDSLEIGH CRES
From MARGARET AVE to IPSWICH CRES
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
KAMLOOPS DR
From MARGARET AVE to BRIAN DR
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
MARGARET AVE
From PLEASANT VIEW DR to ENDSLEIGH CRES
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
PINDAR CRES @ LADNER DR
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
PLEASANT VIEW DR
From BRIAN DR to CLIPPER RD
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
PONDSVIEW DR
From MARGARET AVE to IPSWICH CRES
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
WILKINSON DR
From DOUBLETREE RD to PATRICK BLVD
2019-10-01 09:00 2019-10-31 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
FINCH AVE W
From CHESSWOOD DR to ALEXDON RD
2019-10-02 09:00 2019-11-15 09:00 Continuous
Construction.
DONWOODS DR
From KNIGHTSWOOD RD to DONINO AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
GLEN RUSH BLVD
From GLENCAIRN AVE to LAWRENCE AVE W
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
LAWRENCE AVE E
At LESLIE ST
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
EMPRESS AVE @ WILLOWDALE AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
ARGONNE CRES
From BAYVIEW AVE to FLEMING DR
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
FLEMING DR
From CUMMER AVE to ARGONNE CRES
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
PEMBERTON AVE
From MAXOME AVE to DUDLEY AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
ARTISAN PL
From BRAHMS AVE to BRAHMS AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
BERNICK RD
From CRAIGMONT DR to PINEWAY BLVD
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
COUNTRY LANE
From BAYVIEW AVE to BAYVIEW AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
DAWLISH AVE
From FIDELIA AVE to BAYVIEW AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
DONWOODS DR
From KNIGHTSWOOD RD to DONINO AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
MILDENHALL RD
From LAWRENCE AVE E to BRAESIDE CRES
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
ROSLIN AVE
From MOUNT PLEASANT RD to RONAN AVE
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
VYNER RD
From FOREST HEIGHTS BLVD to BANNATYNE DR
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
FOREST GLEN CRES
From DONCLIFFE PL to DONCLIFFE PL
2019-09-24 09:00 2019-10-31 16:00 Continuous
Construction.
CORTLEIGH BLVD @ 344 to 384
2019-10-02 07:00 2019-11-27 19:00 Continuous
EB both lanes occupied due to basement flooding prevention project.
BROOKE AVE @ AVENUE RD
2019-10-04 09:30 2019-10-31 15:30 Daily
WB lane occupied by boom truck for material delivery and hoisting.
PINTO DR
From CHIPWOOD CRES to EDMONTON DR
2019-10-04 07:00 2019-12-31 19:00 Daily
Underground hydro work. Road fully closed.
GLEN ECHO RD @ YONGE ST
2019-10-07 07:00 2019-11-25 07:00 Daily
Hydro vault roof rebuilding. Westbound curb lane closed.
CHURCHILL AVE @ 93
From TAMWORTH RD to ABBOTSFORD RD
2019-10-07 00:01 2019-11-09 23:59 Daily
Construction.
HOVE ST
From SEARLE AVE to COCKSFIELD AVE
2019-10-09 07:00 2019-12-09 19:00 Daily
Watermain and storm sewer re-construction. (1) lane closed at a time.
ANCHOR DR
From ARLETA AVE to ARLETA AVE
2019-10-08 07:00 2019-11-15 19:00 Continuous
EB/WB curb lane occupied due to mill and pave road surface
WATNEY CRES
From SPENVALLEY DR to SPENVALLEY DR
2019-10-08 07:00 2019-11-15 19:00 Continuous
EB/WB curb lane occupied due to mill and pave road surface
MARKAY ST
From CHARRINGTON CRES to SPENVALLEY DR
2019-10-08 07:00 2019-11-15 19:00 Continuous
EB/WB curb lane occupied due to mill and pave road surface
MANDY ST
From CHARRINGTON CRES to YATESCASTLE DR
2019-10-08 07:00 2019-11-15 19:00 Continuous
EB/WB curb lane occupied due to mill and pave road surface
COBB AVE
From SPENVALLEY DR to DOLORES RD
2019-10-08 07:00 2019-11-15 19:00 Continuous
NB/SB curb lane occupied due to mill and pave road surface
CHARRINGTON CRES
From MARKAY ST to MARKAY ST
2019-10-08 07:00 2019-11-15 19:00 Continuous
NB/SB curb lane occupied due to mill and pave road surface
ORFUS RD
From DUFFERIN ST to CALEDONIA RD
2019-10-08 07:00 2019-11-15 19:00 Daily
EB/WB curb lane occupied due to mill and pave road surface
DUFFLAW RD
From LAWRENCE AVE W to ORFUS RD
2019-10-08 07:00 2019-11-15 19:00 Daily
NB/SB curb lane occupied due to mill and pave road surface
FAIRVIEW MALL DR
From DON MILLS RD to DON MILLS RD
2019-10-06 19:00 2020-04-30 06:00 Daily
NB/SB/EB/WB lanes occupied due to Waterman and Water Service Installation
YORKLAND BLVD @ 285
2019-10-07 09:30 2019-10-21 15:30 Daily
EB/WB occupied due to hydro installation.
WILSON HEIGHTS BLVD
From TRANSIT RD to CLANTON PARK RD
2019-10-15 09:00 2019-11-05 15:00 Daily
SB curb lane occupied due to Waterman Chamber Fittings Replacement
BLUE FLAG GT
From BATHURST ST to CARSCADDEN DR
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
CARSCADDEN DR
From DENMARK CRES to HEARTHSTONE CRES
2019-10-09 09:00 2019-10-31 16:00 Continuous
Construction
GILLEY RD
From GARRATT BLVD to KESWICK RD
2019-10-15 00:01 2019-10-31 23:59 Continuous
WB lane occupied due to Water main, Sewer and Road Reconstruction
STEELES AVE W @ BATHURST ST
2019-10-16 09:00 2019-10-26 16:00 Daily
Gas pipeline installation. (2) Eastbound lanes closed at a time.
SCARSDALE RD @ PREAKNESS DR
2019-10-17 09:00 2019-10-31 16:00 Daily
Construction of conduit and pull fiber. Northbound boulevard closed.
HYCREST AVE @ SHEPPARD AVE E
2019-10-19 07:00 2019-11-01 19:00 Daily
Conduit and PED w/Vault. Northbound curb lane closed.
SHEPPARD AVE E
From HYCREST AVE to CLAIRTRELL RD
2019-10-19 09:30 2019-11-01 15:30 Daily
Conduit and PED w/Vault. Eastbound curb lane closed.
YORK MILLS RD
From VALLEY WOODS RD to VICTORIA PARK AVE
2019-10-15 09:00 2019-11-22 16:00 Daily
Manhole rebuild.
LAWRENCE AVE W @ 1508
At CULFORD RD
2019-10-16 09:00 2019-10-30 16:00 Daily
WEST BND CURB LANE PERMANENT SURFACE RESINSTATEMENT
LAWRENCE AVE W @ 1622
From DE MARCO BLVD to CULFORD RD
2019-10-16 09:00 2019-10-30 16:00 Daily
WEST BND CURB LANE PERMANENT SURFACE RESINSTATEMENT
KEELE ST @ 2392
From LAWRENCE AVE W to COLVILLE RD
2019-10-16 09:00 2019-10-30 16:00 Daily
SOUTH BND CURB LANE PERMANENT SURFACE RESINSTATEMENT
LAWRENCE AVE W
From THE DONWAY W to TREMONT CRES
2019-10-15 09:00 2019-10-31 16:00 Continuous
Construction
LAWRENCE AVE E
From WOODCLIFF PL to DON VALLEY PARKWAY
2019-10-15 09:00 2019-10-31 16:00 Continuous
Construction
DERRYDOWN RD
From BRANTLEY CRES to CONAMORE CRES
2019-10-07 07:00 2019-10-31 19:00 Continuous
Watermain, Sewer and Road Reconstruction 19ECS-TI-11LR. Both, but only one at a time. Occupied.
SHEPPARD AVE E
2019-10-18 09:30 2019-10-21 15:30 Daily
Gas service installation. 95 Sheppard Ave E. Eastbound and westbound curb lane occupied .
GLENCAIRN AVE
From WESTGROVE CRES to MONA DR
2019-10-17 09:00 2019-10-31 16:00 Daily
Geotechnical investigation and borehole drilling.
HOUNSLOW AVE @ 485
From STAFFORD RD to BATHURST ST
2019-10-17 08:00 2019-10-24 19:00 Daily
Bell Cable Pits. Eastbound lane closed.
DONNALYN DR @ 24
From CRISPIN CRES to CHELMSFORD AVE
2019-10-17 08:00 2019-10-24 19:00 Daily
Bell Cable Pits. Eastbound lane closed.
PATRICIA AVE @ 311
2019-10-18 07:00 2019-10-21 17:00 Daily
New water sewer
CALEDONIA RD
From LOTHERTON PTWY to GLENGROVE AVE
2019-10-18 09:00 2019-10-21 16:00 Daily
SB lane occupied due to DIRECTIONAL BORING CONDUIT INSTALLATION
GORDON BAKER RD
From VICTORIA PARK AVE to SPARKS AVE
2019-10-18 09:00 2019-10-25 16:00 Daily
WB north curb lane occupied due to Structural Water main Rehabilitation Project
TEMPO AVE
From VICTORIA PARK AVE to HAROLD EVANS CRES
2019-10-18 09:00 2019-10-25 16:00 Daily
WB north curb lane occupied due to Structural Water main Rehabilitation Project
UNDERHILL DR
From BROOKBANKS DR to CASSANDRA BLVD
2019-10-18 09:00 2019-11-02 16:00 Daily
SB curb lane occupied due to boring, trenching, cable placement.
BROOKBANKS DR
From UNDERHILL DR to VALLEY WOODS RD
2019-10-18 09:00 2019-11-02 16:00 Daily
SB curb lane occupied due to boring, trenching, cable placement.
WENDELL AVE
From QUEENSLEA AVE to GARY DR
2019-10-18 07:00 2019-10-24 18:00 Daily
NB 1 lane blocked due to storm sewer, sanitary sewer, water main, road resurfacing
DUFFERIN ST
From HWY 401 to HWY 401
2019-10-17 22:00 2019-10-25 05:00 Daily
NB/SB 1 or 2 lane occupied due to Construction on Hwy 401WB from Allen Rd to Jane St.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Watermain and water service installation. (2) westbound lanes closed.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
EGLINTON AVE E
From WARDEN AVE to SINNOTT RD
2019-03-18 07:00 2019-12-31 23:59 Daily
Eastbound and Westbound median occupied due to crosslinx road work.
ELLESMERE RD
From MARKHAM RD to DOLLY VARDEN BLVD
2019-07-05 09:00 2020-01-05 16:00 Daily
Right lane occupied for Blvd. restoration.
STEELES AVE E
From REDLEA AVE to SILVER STAR BLVD
2019-07-11 21:30 2019-10-31 20:00 Continuous
North sidewalk removal from Redlea Ave to Old Kennedy along Steeles Ave.
SILVER SPRINGS BLVD
From BIRCHMOUNT RD to MCNICOLL AVE
2019-07-17 07:00 2019-12-27 19:00 Daily
INSTALL TORONTO HYDRO DUCT BANK, VAULTS AND PADMOUNTS.
ELLESMERE RD @ WHITE ABBEY PK
2019-07-16 00:01 2019-12-15 23:59 Daily
Ellesmere Rd and Massey Creek culvert rehabilitation.
AYLESWORTH AVE
From PHILLIP AVE to VANBRUGH AVE
2019-08-14 07:00 2019-11-08 19:00 Daily
Material storage and construction maneuver.
PHYLLIS AVE
From RANDALL CRES to ROCKWOOD DR
2019-08-19 07:00 2019-12-20 19:00 Daily
Structural Watermain Rehabilitation
PAWNEE AVE
From VICTORIA PARK AVE to CHEROKEE BLVD
2019-06-30 07:00 2019-11-30 19:00 Daily
Watermain replacement on Pawnee Avenue.
CLAREMORE AVE
From MCINTOSH AVE to AYLESWORTH AVE
2019-09-12 07:00 2019-12-20 19:00 Continuous
Open cut transmission main.
CLAREMORE AVE
From MCINTOSH ST to AYLESWORTH AVE
2019-09-12 07:00 2019-12-20 19:00 Continuous
Open Cut Transmission Main at SB/NB, 1 lane occupied.
BIRCHMOUNT RD
From HUNTINGWOOD DR to CHALDEAN ST
2019-09-23 09:00 2019-10-28 19:00 Daily
SB curb lane occupied due to conduit and PED W/Vault
CHALDEAN ST
From BIRCHMOUNT RD to TIMBERBANK BLVD
2019-09-23 09:00 2019-10-28 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault
GLENDOWER CRCT @ 1
From BIRCHMOUNT RD to RAINIER SQ
2019-09-23 09:00 2019-10-28 19:00 Daily
WB curb lane occupied due to conduit and PED W/Vault
WAKEFIELD CRES
From WAKEFIELD CRES to CHALDEAN ST
2019-09-23 09:00 2019-10-28 16:00 Daily
NB curb lane occupied due to conduit and PED W/Vault
GLOXINIA CRES
From TIMBERBANK BLVD to TIMBERBANK BLVD
2019-09-23 09:00 2019-10-28 16:00 Daily
EB curb lane occupied due to conduit and PED W/Vault
TIMBERBANK BLVD @ 301
From GLOXINIA CRES to BIRCHMOUNT RD
2019-09-23 09:00 2019-10-28 16:00 Daily
EB curb lane occupied due to conduit and PED W/Vault
LAWRENCE AVE E @ TOWNLEY AVE
2019-09-25 09:00 2019-11-30 15:00 Daily
Shoulder lane blocked due to traffic signal installation.
PROGRESS AVE
From MCCOWAN RD to GRANGEWAY AVE
2019-10-01 00:01 2019-10-31 23:59 Continuous
1 EB right lane blocked due to replacement.
SILVER SPRINGS BLVD @ REVLIS CRES
2019-10-03 09:00 2019-10-20 19:00 Daily
Installation of new conduit, cable, vaults and pedestals for Rogers.
KENNEDY RD
From LAWRENCE AVE E to ELLESMERE RD
2019-10-03 07:00 2019-11-01 19:00 Daily
NB curb lane occupied due to trenchless rehabilitation.
BRIMORTON DR
From DOLLY VARDEN BLVD to AMBERJACK BLVD
2019-10-04 09:00 2019-10-25 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault.
BRIMORTON DR
From STOKEWELL PL to JACKMUIR CRES
2019-10-04 09:00 2019-10-25 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault.
INVERGORDON AVE
From MCCOWAN RD to GLENSTROKE DR
2019-10-07 07:00 2019-12-31 19:00 Daily
WB curb lane and EB curb lane are occupied due to gas service installation.
TINETA CRES @ 26 to 68
2019-10-07 07:00 2019-12-31 19:00 Daily
WB curb lane is occupied due to gas service installation.
MCGRISKIN RD @ SHORTING RD
2019-10-19 09:00 2019-10-31 19:00 Daily
SB/EB curb lane occupied due to directional bore & place conduit & fibre
SHEPPARD AVE E @ 2933
2019-10-15 00:01 2019-10-23 23:59 Continuous
EB/WB lane occupied due to daylighting project.
ASHDEAN DR
From MCGREGOR RD to HOLLINGWORTH DR
2019-10-10 09:00 2019-10-25 19:00 Daily
SB curb lane of Ashdean Dr is occupied due to conduit and PED W/Vault.
HOLLINGWORTH DR
From MCGREGOR RD to ASHDEAN DR
2019-10-10 09:00 2019-10-25 19:00 Daily
Sb curb lane of Hollingworth Dr occupied due to conduit and PED W/Vault.
TRIPP CRES
From FLINTRIDGE RD to LEAHANN DR
2019-10-10 09:00 2019-10-25 19:00 Daily
SB curb lane of Tripp Cres is occupied due to conduit and PED W/Vault.
CINDY NICHOLAS DR
From MILITARY TRL to LAMPMAN DR
2019-10-10 09:00 2019-11-01 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault
DARTMOOR DR
From MILITARY TRL to CINDY NICHOLAS DR
2019-10-10 09:00 2019-11-01 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault
KEELER BLVD
From CINDY NICHOLAS DR to LAMPMAN DR
2019-10-10 09:00 2019-11-01 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault
MILITARY TRL
From DARTMOOR DR to CINDY NICHOLAS DR
2019-10-10 09:00 2019-11-01 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault
MOELLER CRT
From MOELLER CRT to CINDY NICHOLAS DR
2019-10-10 09:00 2019-11-01 19:00 Daily
WB curb lane occupied due to conduit and PED W/Vault
PICKTHALL TER
From CINDY NICHOLAS DR to LAMPMAN DR
2019-10-10 09:00 2019-11-01 19:00 Daily
WB curb lane occupied due to conduit and PED W/Vault
LAMPMAN DR
From CINDY NICHOLAS DR to PICKTHALL TER
2019-10-10 09:00 2019-11-01 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault
LAUREL AVE
From DANFORTH AVE to CORVETTE AVE
2019-10-12 09:00 2019-11-01 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault.
DANFORTH RD
From LAUREL AVE to MAGNOLIA AVE
2019-10-12 09:00 2019-11-01 19:00 Daily
SB curb lane occupied due to conduit and PED W/Vault.
GRACE ST
From GREENWICH SQ to BELLAMY RD N
2019-10-11 09:00 2019-10-25 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault.
GRANGER AVE
From DANFORTH RD to DANFORTH RD
2019-10-12 09:00 2019-11-01 19:00 Daily
SB curb lane occupied due to conduit and PED W/Vault.
GREENWICH SQ
From GRACE ST to KINSMEN GT
2019-10-11 09:00 2019-10-25 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault.
KINSMEN GT
From NELSON ST to GREENWICH SQ
2019-10-11 09:00 2019-10-25 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault.
LINDEN AVE
From DANFORTH AVE to CORVETTE AVE
2019-10-12 09:00 2019-11-01 19:00 Daily
NB curb lane occupied due to conduit and PED W/Vault.
NELSON ST
From CEDAR BRAE BLVD to BELLAMY RD N
2019-10-11 09:00 2019-10-25 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault.
WHEATON GRV
From GREENWICH SQ to GREENWICH SQ
2019-10-11 09:00 2019-10-25 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault.
SUMMER DR
From LINDEN AVE to GRANGER AVE
2019-10-12 09:00 2019-11-01 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault
STEELES AVE E @ 4675
2019-10-15 07:00 2019-11-20 16:00 Daily
Gas main installation. Eastbound curb lane closed.
STEELES AVE E @ 4675 to 4779
2019-10-15 07:00 2019-11-20 16:00 Daily
EB curb lane occupied due to gas main installation.
STEELES AVE E @ 4390 to 4556
2019-10-15 09:00 2019-11-20 19:00 Daily
WB curb lane occupied due to gas main installation.
ELLESMERE RD @ MASSEY CREEK
2019-10-15 00:01 2019-12-15 23:59 Continuous
EB 2 lane occupied due to culvert rehabilitation.
GREYABBEY TRL @ 220
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
MCCOWAN RD @ 21
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
MINUK ACRES @ 20
2019-10-14 09:00 2019-10-25 19:00 Daily
Trenchless sewer work.
EAST AVE @ CLARK SECOR PL
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
GLEN EVEREST RD @ 45
2019-10-14 09:00 2019-10-25 19:00 Daily
Trenchless sewer work.
RENSBURG DR @ 9
From IONVIEW RD to LANDSEER RD
2019-10-15 08:00 2019-10-22 19:00 Daily
Bell Cable Pits. (1) Northbound lane closed.
TERRYHILL CRES
From REDBUD CRES to SNOWHILL CRES
2019-10-15 09:00 2019-10-31 19:00 Daily
Install new conduit, cable, vaults and pedestals for rogers.
ALTON TOWERS CRCL @ WHISTLING HILLS DR
2019-10-11 09:00 2019-10-25 19:00 Daily
SB/EB curb lane occupied due to Install new conduit, cable, vaults and pedestals for rogers.
KENNEDY RD @ GLAMORGAN AVE
2019-10-16 09:00 2019-10-23 16:00 Daily
SB curb lane occupied due to sidewalk and road repairs.
BIRCHMOUNT RD @ FINCH AVE E
2019-10-16 09:00 2019-10-23 16:00 Daily
NB curb lane occupied due to sidewalk and road repairs.
FINCH AVE E @ BIRCHMOUNT RD
2019-10-16 09:00 2019-10-23 16:00 Daily
WB/EB curb lane occupied due to sidewalk and road repairs.
SHEPPARD AVE E @ KENNEDY RD
2019-10-15 09:00 2019-10-23 16:00 Daily
WB/EB curb lane occupied due to sidewalk and road repairs.
KENNEDY RD @ SHEPPARD AVE E
2019-10-15 09:00 2019-10-23 16:00 Daily
SB/NB curb lane occupied due to sidewalk and road repairs.
BRIDLETOWNE CRCL
From WARDEN AVE to FINCH AVE E
2019-10-17 09:00 2019-10-31 19:00 Daily
Geotechnical investigation and borehole drilling.
GLAIVE DR
From LEWISTON RD to WYE VALLEY RD
2019-10-18 09:00 2019-11-22 19:00 Daily
SB lane occupied due to conduit and PED W/Vault
LEWISTON RD
From MAXIM CRES to WYE VALLEY RD
2019-10-18 09:00 2019-11-22 19:00 Daily
WB lane occupied due to conduit and PED W/Vault
DELBERT DR
From WYE VALLEY RD to GILROY DR
2019-10-18 09:00 2019-11-22 19:00 Daily
WB lane occupied due to conduit and PED W/Vault
GILROY DR
From BRIGSTOCK RD to DELBERT DR
2019-10-18 09:00 2019-10-22 19:00 Daily
SB lane occupied due to conduit and PED W/Vault
GLADESIDE RD
From DELBERT DR to ELLESMERE RD
2019-10-18 09:00 2019-11-22 19:00 Daily
SB lane occupied due to conduit and PED W/Vault
MAXIM CRES
From SHROPSHIRE DR to LEWISTON RD
2019-10-18 09:00 2019-11-22 19:00 Daily
NB lane occupied due to conduit and PED W/Vault
MENDIP CRES
From SHROPSHIRE DR to SHROPSHIRE DR
2019-10-18 09:00 2019-11-22 19:00 Daily
EB lane occupied due to conduit and PED W/Vault
SHROPSHIRE DR
From GILROY DR to KENNEDY RD
2019-10-18 09:00 2019-11-22 19:00 Daily
EB lane occupied due to conduit and PED W/Vault
WYE VALLEY RD
From DELBERT DR to DUNDALK DR
2019-10-18 09:00 2019-11-22 19:00 Daily
NB lane occupied due to conduit and PED W/Vault
MIDLAND AVE @ 499
From HAGLEY RD to REEVE AVE
2019-10-18 09:00 2019-10-25 16:00 Daily
NB 1 lane occupied due to bell cable pits.
FINCH AVE E @ 4040
2019-10-18 09:00 2019-10-25 16:00 Daily
Sidewalk and road repairs. Westbound centre lane closed.
BIRCHMOUNT RD @ GLENDOWER CRCT
2019-10-18 09:00 2019-10-25 16:00 Daily
Sidewalk and road repairs. (2) Northbound right lanes closed.
ELLESMERE RD @ WYE VALLEY RD
2019-10-18 09:00 2019-10-25 16:00 Daily
Sidewalk and road repairs. Eastbound curb lane closed.
KENNEDY AVE @ PROGRESS AVE
2019-10-18 09:00 2019-10-25 16:00 Daily
Sidewalk and road repairs. Northbound and Southbound curb lanes closed.
ELLESMERE RD @ 780
2019-10-18 09:00 2019-10-25 16:00 Daily
Sidewalk and road repairs. Westbound centre lane closed.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
YONGE ST @ 197 YONGE ST
2015-10-01 00:01 2019-12-31 23:59 Continuous
Northbound curb lane closed due to construction.
LOMBARD ST
From RICHMOND ST E to VICTORIA ST
2016-09-15 00:01 2019-12-31 23:59 Continuous
Northbound portion of street closed due to construction.
VICTORIA ST @ RICHMOND ST E
2017-05-01 00:01 2019-12-31 23:59 Continuous
Southbound sidewalk closed due to construction.
ROSEHILL AVE @ AVOCA AVE
2018-05-09 07:00 2020-08-31 19:00 Daily
STRUCTURAL, CIVIL, ELECTRICAL AND MECHANICAL REHBILITATION WORKS AS PERT OF THE ROSEHILL RESERVOIR REHABILITATION WORKS PROJECT [ECS CONTRACT NO. 17ECS-MI-03WA].
QUEEN ST E @ LAING ST
2018-06-13 00:01 2019-10-31 23:59 Daily
The eastbound curb lane will be closed due to construction.
GARDINER EXPY JAMESON AVE RAMP
2019-01-01 07:00 2019-12-31 09:00 Weekdays
EB Jameson gate to EB FGG closes from 7:00 AM to 9:00 AM, Mon - Fri ; Excluding Holidays.
COLBORNE ST
From CHURCH ST to YONGE ST
2019-01-28 09:00 2019-10-31 16:00 Continuous
1 Eastbound lane and 1 Westbound lane occupied due to construction.
PAPE AVE
From DANFORTH AVE to GOWAN AVE
2019-02-06 07:00 2019-10-31 19:00 Daily
Northbound and southbound lanes closed due to water main replacement.
ST MATHIAS PL
From ROBINSON ST to BELLWOODS PL
2019-01-28 00:01 2019-10-31 23:59 Daily
The northbound and southbound lanes and alleys will be occupied due to watermain replacement.
DUNDAS ST W
From DUNBLOOR RD to KIPLING AVE
2019-02-24 00:01 2019-10-22 23:59 Continuous
The westbound median lane will be occupied due to six points master contract. Ramps will be reduced to one lane.
O CONNOR DR
From ST CLAIR AVE E to GLENWOOD AVE
2019-03-25 00:01 2019-12-24 23:59 Continuous
Northbound shoulder occupied for site trailer installation.
EGLINTON AVE W
From KEELE ST to MUNICIPAL DR
2019-04-09 21:00 2019-11-30 23:59 Daily
Eastbound and westbound curb lanes occupied due to construction.
WESTMORELAND AVE
From DUPONT ST to BLOOR ST W
2019-04-22 07:00 2019-10-31 19:00 Daily
Northbound curb lane occupied due to watermain rehabilitation.
ST CLAIR AVE E @ ST COLUMBA PL
2019-04-25 09:00 2019-12-24 16:00 Continuous
Northbound shoulder occupied for site trailer installation.
DANFORTH AVE @ 1177
2019-04-16 07:00 2019-12-31 16:00 Daily
One eastbound lane occupied due to construction of a 9 storey, 92 unit condo with two levels of underground parking and retail at ground level.
GLEN RD
From BEAUMONT RD to SUMMERHILL AVE
2019-04-22 07:00 2019-10-31 17:00 Continuous
Southbound lane closed to install a catchbasin and conduct road reconstruction.
SHAW ST @ DUNDAS ST W
2019-05-07 12:30 2019-10-29 20:00 Daily
Temporarily occupy the curb lane for parking vendors in connection with the Trinity Bellwood's Farmers Market. Event times every Tuesday from May 7th to Oct 29th.
RIVERSIDE DR
From BRULE GDNS to SOUTH KINGSWAY
2019-05-08 07:00 2019-12-31 19:00 Daily
2 Southbound lanes occupied due to construction
BLOOR ST W
From SPADINA AVE to BATHURST ST
2019-05-21 00:01 2019-12-31 23:59 Continuous
Road re-surfacing, parkette construction and water main replacement.
HERBERT AVE
From QUEEN ST E to HARTFORD AVE
2019-05-13 07:00 2019-11-01 19:00 Daily
Various lanes alternately occupied due to Concrete curb/sidewalk repairs, Asphalt Milling and Paving.
LUMSDEN AVE
From MAIN ST to BARRINGTON AVE
2019-05-13 07:00 2019-11-01 19:00 Daily
Various lanes alternately occupied due to Concrete curb/sidewalk repairs, Asphalt Milling and Paving.
LA PLANTE AVE @ GERRARD ST W
From HAYTER ST to GERRARD ST W
2019-06-03 09:00 2019-11-02 16:00 Daily
CHW INSTALLATION AND CONNECTION TO 700 BAY ST. WEST
COXWELL AVE
From GERRARD ST E to HANSON ST
2019-06-10 07:00 2019-11-30 17:00 Continuous
Northbound lanes closed and southbound direction reduced to one lane due to bridge rehabilitation.
FIRSTBROOKE RD
From BURGESS AVE to CORLEY AVE
2019-06-10 07:00 2019-12-21 21:00 Daily
Watermain and Water Service Installation- Contract # 19ECS-LU-07SU. Firstbrooke Rd to Burgess Ave and Corley Ave.
GLENCREST BLVD
At PLAXTON DR
2019-06-10 07:00 2019-12-21 21:00 Daily
Watermain and Water Service Installation- Contract # 19ECS-LU-07SU. From plaxton dr to the street limit
HILLHURST BLVD
2019-06-17 07:00 2019-12-12 19:00 Continuous
Storm sewer upgrades as part of the Basement Flooding Prevention Project Phase 4 - Contract No. 18ECS-LU-05FP. 315 Hillhurst Blvd.
CALEDONIA RD @ TYCOS DR
2018-12-07 07:00 2019-10-31 19:00 Daily
1 Northbound lane( curb lane ) occupied due to construction.
PAPE AVE
From DONLANDS AVE to GAMBLE AVE
2019-07-08 07:00 2019-10-30 19:00 Daily
Structural Watermain Rehabilitation - Contract No.19TW-CTS-01CWD; At Pape Ave from Donlands Ave to Gamble Ave; southbound curb lane occupied.
JAMESON AVE GARDINER EXPY W RAMP
2019-01-01 07:00 2019-12-31 09:00 Daily
WB Jameson gate to WB FGG closes from 2:00 PM to 7:00PM, Mon - Fri ; Excluding Holiday
OKEEFE LANE
From GERRARD ST E to GOULD ST
2019-07-22 09:00 2019-12-31 16:00 Daily
Construction staging
RICHMOND ST W
From BATHURST ST to SPADINA AVE
2019-07-22 07:00 2019-12-31 17:00 Continuous
Water main, road, curb and sidewalk construction.
BERWICK AVE @ YONGE ST
2019-07-29 07:00 2019-12-31 11:59 Daily
1 Lane closure at 29 Berwick Ave and Yonge St.
DAWES RD
From DANFORTH AVE to DENTONIA PARK AVE
2019-07-26 07:00 2019-12-31 19:00 Daily
Replacement of watermain and water services on Dawes Rd and resurfacing of road from Danforth Ave to Dentonia Park Ave.
CLARENCE SQ
From SPADINA AVE to WELLINGTON ST W
2019-07-29 07:00 2019-11-30 19:00 Daily
INSTALLATION OF HOT AND CHILLED WATER ALONG CLARENCE SQUARE.
DIVADALE DR
From SUTHERLAND DR to BRENTCLIFFE RD
2019-08-01 07:00 2019-10-31 19:00 Daily
New watermain and Road reconstruction
QUEENS QUAY E @ 7,15,19,21
From QUEENS QUAY E to FREELAND ST
2019-08-06 09:00 2019-10-31 16:00 Daily
Install the storm, sanitary and watermain into the new condominium at Pier 27 at 7,15,19,21 Queens Quay East.
KING ST W @ 40
From YONGE ST to BAY ST
2019-09-01 07:00 2019-10-31 07:00 Daily
Underground hydro vault rebuild.
KINGSTON RD @ VICTORIA PARK AVE
2019-08-09 07:00 2020-01-24 16:00 Daily
Water service conncetion at kingston rd and victoria park, south west corner.
GLENWOOD CRES @ ST COLUMBA PL
2019-08-12 00:01 2019-12-31 23:59 Daily
Northbound and southbound lanes closed due to emergency water service lateral repairs.
BAY ST
From HAYTER ST to GERRARD ST W
2019-08-14 09:30 2019-10-30 15:30 Daily
Construction on side walk.
GERRARD ST W
From ELIZABETH ST to BAY ST
2019-08-14 07:00 2019-10-30 16:30 Daily
Construction.
SHEPPARD ST
From RICHMOND ST W to ADELAIDE ST W
2019-09-02 07:00 2019-12-20 23:00 Daily
Water main and water service installation.
SHERBOURNE ST
From BLOOR ST E to CARLTON ST
2019-09-02 07:00 2019-12-20 23:00 Daily
Water main and water service installation.
COLBORNE ST
From YONGE ST to SCOTT ST
2019-08-19 07:00 2019-11-30 23:00 Continuous
Watermain Replacement
PAPE AVE
From DONLANDS AVE to GAMBLE AVE
2019-07-08 07:00 2019-10-30 19:00 Daily
Structural Watermain Rehabilitation - Contract No. 19TW-CTS-01CWD. Southbound curb lane occupied.
COLBORNE ST
From SCOTT ST to YONGE ST
2019-08-19 07:00 2019-11-30 23:00 Daily
Westbound curb lane closed due to water main replacement.
BLOOR ST W
From BEAMISH DR to KIPLING AVE
2019-08-28 21:00 2019-12-02 05:00 Daily
Northbound and southbound lane closed due to reconstruction of the Six Points Interchange.
PAPE AVE
From DONLANDS AVE to GAMBLE AVE
2019-07-08 07:00 2019-10-30 19:00 Daily
Structural Watermain Rehabilitation
MADISON AVE @ 200
From MACPHERSON AVE to DAVENPORT RD
2019-06-04 00:01 2019-12-04 23:59 Daily
Streetscaping
LOWER JARVIS ST @ THE ESPLANADE
2019-08-26 07:00 2019-10-25 19:00 Continuous
Installation of Wayfinding signs by Future Systems inc.
PARLIAMENT ST @ DISTILLERY LANE
2019-08-26 07:00 2019-10-25 19:00 Continuous
Installation of Wayfinding signs by Future Systems inc.
COLBORNE LODGE DR
From LAKE SHORE BLVD W to THE QUEENSWAY
2019-08-28 07:00 2019-11-01 19:00 Continuous
Bridge rehabilitation
WELLS HILL AVE
From ST CLAIR AVE W to MELGUND RD
2019-09-01 00:01 2019-10-31 23:59 Continuous
Watermain, sewer and road reconstruction.
EGLINTON AVE W
From CHAPLIN CRES to GILGORM RD
2019-04-08 00:01 2019-12-31 23:59 Daily
Construction staging
BUCKINGHAM AVE
From NEWCASTLE ST to PORTLAND ST
2019-09-03 07:00 2019-10-31 19:00 Daily
Pave road surface
DELL PARK AVE
From BATHURST ST to SHERMOUNT AVE
2019-09-09 07:00 2019-10-31 19:00 Daily
Pave road surface . E/B and W/B curb lanes occupied .
QUEEN ST E @ KINGSTON RD/EASTERN AVE
2019-09-07 00:01 2019-10-31 23:59 Continuous
Reconstruction of TTC Track Allowance at the intersection of Queen Street East and Kingston Road along with the Woodbine Loop
DUNDAS ST W @ ANNETTE ST
2019-09-10 07:00 2019-10-25 17:00 Continuous
Bell manhole rebuild on the West side of Dundas south of Annette St.
DUFFERIN ST
From DUFFERIN ST to BRITISH COLUMBIA RD
2019-09-11 09:00 2019-10-31 17:00 Continuous
Rehabilitation of Dufferin St bridge under Beltline Trail. Recoating the structural steel and steel members of the existing structure. SB curb + passing lanes.
DUNDONALD ST @ JAMES CANNING GARDENS
At YONGE ST
2019-08-01 07:00 2019-11-01 19:00 Daily
Constructing a below grade pedestrian tunnel to the TTC. All lanes occupied.
RICHMOND ST W
From YONGE ST to BAY ST
2019-09-16 07:00 2019-10-31 19:00 Daily
To rebuild 2nd phase of Toronto Hydro vaults.
WELLINGTON ST W
From WINDSOR ST to CLARENCE SQ
2019-09-16 07:00 2019-11-22 19:00 Daily
Installation of Hot and Chilled Water. 1 WB/EB/NB/SB lane occupied.
VICTORIA PARK AVE
From JONESVILLE CRES to EGLINTON SQ
2019-09-17 00:01 2019-10-28 23:59 Continuous
Guide way staging. NB and SB lanes on Victoria Park Ave occupied, traffic forced right at Eglinton Ave E
ABBOTT AVE @ INDIAN RD
2019-09-17 07:00 2020-08-01 19:00 Daily
One Eastbound and Westbound lane occupied due to water main, water service and installation.
ARMADALE AVE
From NELLES AVE to BLOOR ST W
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
CLENDENAN AVE
From GLENLAKE AVE to ELORA RD
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
DEFOREST RD
From LAVINIA AVE to WINDERMERE AVE
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both EB/WB.
GLENLAKE AVE
From CLENDENAN AVE to KENNEDY AVE
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
GOOCH AVE
From VAN STASSEN BLVD to UNDERWOOD AVE
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
HIGH PARK AVE
From DUNDAS ST W to ANNETTE ST
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
MAYFIELD AVE
From SOUTH KINGSWAY to WILLARD AVE
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
MEDLAND ST
From ANNETTE ST to HUMBERSIDE AVE
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
PACIFIC AVE
From ANNETTE ST to DUNDAS ST W
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
WILLARD AVE
From ANNETTE ST to BLOOR ST W
2019-09-23 09:00 2019-11-23 16:00 Daily
Pavement Investigation at both NB/SB.
HILLHURST BLVD
From CORTLEIGH BLVD to AVENUE RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
GLENGARRY AVE
From JEDBURGH RD to GREER RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
HEATHER ST
From GLENCAIRN AVE to GLENVIEW AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
WOBURN AVE
From GREER RD to ELM RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
WILLOWBANK BLVD
From AVENUE RD to CASTLE KNOCK RD
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
ORCHARD VIEW BLVD
From YONGE ST to DUPLEX AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
ANSLEY ST
From GLENGROVE AVE to GLENVIEW AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
GLENVIEW AVE
From DUPLEX AVE to GLENVIEW AVE
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
GLENVIEW AVE
From ANSLEY ST to HEATHER ST
2019-09-19 09:00 2019-10-31 16:00 Continuous
Contract 19NY-112TR
CHRISTIE ST @ 560
At LAMBERTLODGE AVE
2019-09-20 09:00 2019-11-01 16:00 Daily
NB & SB curb lane is occupied due to gas main installation.
DAVENPORT RD
From CHRISTIE ST to HECTOR AVE
2019-09-20 09:00 2019-11-01 16:00 Daily
WB curb lane is occupied due to gas main installation.
HILLCREST DR
From TURNER RD to CHRISTIE ST
2019-09-20 07:00 2019-11-01 19:00 Daily
EB & WB curb lane is occupied due to gas main installation.
MELITA AVE @ LARRY PRIESTMAN LN
At CHRISTIE ST
2019-09-20 07:00 2019-11-01 19:00 Daily
EB & WB curb lane is occupied due to gas main installation.
DUFFERIN ST @ NORTON AVE
From ST CLAIR AVE W to NORTON AVE
2019-09-24 07:00 2019-10-25 19:00 Daily
SB curb lane occupied due to bell MH rebuild.
RIVERDALE AVE
From PAPE AVE to POUCHER ST
2019-09-23 09:00 2020-08-01 16:00 Daily
Watermain reconstruction, water service replacement and lane way reconstruction. Eastbound/Westbound lane on Riverdale Ave from Pape Ave to Poucher St.
BREADALBANE ST
From BAY ST to YONGE ST
2019-09-20 07:00 2019-12-31 07:00 Daily
Replacement of watermain and portion of sub-standard water services. Southbound curb lane and shoulder occupied.
KEEWATIN AVE @ 385
2019-09-23 07:00 2019-10-28 17:00 Daily
Permanent surface reinstatement to Toronto Water Repairs.
ROEHAMPTON AVE
2019-09-25 23:59 2019-11-29 00:01 Continuous
Street scaping , west side southbound curbalne and sidewalk occupied . 151 Roehampton
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-01 19:00 Daily
One Northbound and Southbound lane occupied due to water main reconstruction, water service replacement and road resurfacing,
VICTORIA PARK AVE
From DENTON AVE to CRESCENT TOWN RD
2019-09-23 07:00 2020-07-31 19:00 Daily
1 NB/SB lane occupied due to pedestrian bridge rehabilitation.
SPADINA RD @ 360
2019-10-20 12:00 2019-10-22 21:00 Daily
Close the layby area fronting the Synagogue for public safety.
LAPPIN AVE @ LANSDOWNE AVE
2019-09-26 07:00 2019-10-25 07:00 Daily
Installation of natural gas main; (1) WB lane on Lappin Ave and (1) NB/SB lane on Lansdowne Ave will be occupied.
GARDINER EXPY E SPADINA AVE RAMP
2019-09-28 00:01 2020-09-30 07:00 Continuous
Ramp fully closed due to rehabilitation of Gardiner bents.
QUEENS QUAY E
From KNAPP LANE to DOCKSIDE DR
2019-09-26 07:00 2020-09-26 19:30 Continuous
Shaft and tunnel for Enwave western infrastructure expansion. (1) EB lane closed. Deleted By: pwu2; When: 09/27/2019 7:30:25 PM; Reason:
DAVENPORT RD
From WESTMORELAND AVE N to DUFFERIN ST
2019-09-30 09:30 2019-12-09 15:30 Daily
1 WB lane occupied due to conduit installation.
KING ST
From GEORGE ST to ROSEMOUNT AVE
2019-09-30 00:01 2019-11-01 23:59 Continuous
NB curb lane occupied due to facilitating construction.
DUNDAS ST W @ 2299
2019-10-01 09:00 2020-02-11 16:00 Daily
SB curb lane occupied due to interior demolition.
GARDINER EXPY @ SHERBOURNE/JARVIS OFF RAMP
2019-10-04 23:59 2020-04-30 23:59 Continuous
Gardiner Westbound Sherbourne/Jarvis off-ramp will be fully closed for an rehabilitate project.
GARDINER EXPY W SHERBOURNE RAMP
From PARLIAMENT ST to LOWER SHERBOURNE ST
2019-10-05 00:01 2020-02-29 00:01 Continuous
Sherbourne St/Lower Jarvis St Ramp closed due to road work, Gardiner Expressway Rehabilitation Project
ELISE TER
At GREENWIN VILLAGE RD
2019-10-01 07:00 2019-10-30 19:00 Daily
Mill and pave road surface .North and South lanes occupied.
HARBORD ST
From CRAWFORD ST to SHAW ST
2019-10-07 07:00 2019-10-21 17:00 Daily
WB lane is occupied due to installing 2 manholes.
CRANBROOKE AVE
From AVENUE RD to JEDBURGH RD
2019-10-01 09:00 2019-10-31 16:00 Continuous
Construction.
ROXBOROUGH DR
From MOUNT PLEASANT RD to HIGHLAND AVE
2019-10-01 00:01 2020-08-28 23:59 Continuous
EB/WB all lanes occupied due to sanitary force main.
UNIVERSITY AVE @ RICHMOND ST W
2019-10-07 21:00 2019-11-30 05:00 Daily
Traffic Installation.
HAGERMAN ST
From BAY ST to ELIZABETH ST
2019-10-19 11:00 2019-10-20 20:00 Daily
Road fully closed due to the Toronto Waterfront Marathon Event. https://tinyurl.com/yy3oacyz
ELIZABETH ST
From BAY ST to HAGERMAN ST
2019-10-19 11:00 2019-10-20 20:00 Daily
Road fully closed due to the Toronto Waterfront Marathon Event. https://tinyurl.com/yy3oacyz
ALBERT ST
From BAY ST to JAMES ST
2019-10-19 11:00 2019-10-20 20:00 Daily
Road fully closed due to the Toronto Waterfront Marathon Event. https://tinyurl.com/yy3oacyz
JAMES ST
From BAY ST to ALBERT ST
2019-10-19 11:00 2019-10-20 20:00 Daily
Road fully closed due to the Toronto Waterfront Marathon Event. https://tinyurl.com/yy3oacyz
BETH NEALSON DR @ PAT MOORE DR
At WICKSTEED AVE
2019-10-03 07:00 2019-12-31 19:00 Daily
SB lanes occupied due to replacing existing water main.
YONGE ST @ ST EDMUNDS DR
2019-10-07 07:00 2019-11-15 20:00 Continuous
Bell manhole rebuilding. (2) Northbound lanes closed.
DUNDAS ST E @ 200
2019-10-07 07:00 2019-11-06 16:00 Daily
Major Streetscaping. Westbound curb lane closed.
ST CLAIR AVE W @ 991
2019-10-07 07:00 2019-11-07 19:00 Daily
MH rebuild. Eastbound curb lane and sidewalk.
DAN LECKIE WAY @ LAKE SHORE BLVD
2019-10-15 09:00 2019-12-15 16:00 Daily
Removal of asphalt and curbs. (1) lane closed.
LOUISA ST
From VICTORIA ST to LAKE SHORE BLVD W
2019-10-08 09:00 2019-11-05 16:00 Daily
SB lane occupied due to inspection and rehabilitation.
STOCK AVE
From WARNICA AVE to THE QUEENSWAY
2019-10-08 09:00 2019-11-05 16:00 Daily
SB lane occupied due to inspection and rehabilitation.
AVENUE RD @ OXTON AVE
From HILLHOLM RD to CHAPLIN CRES
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
AVENUE RD @ CHAPLIN CRES
From TRANMER AVE to OXTON AVE
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CHESTNUT PK
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ABBOTT AVE
From INDIAN RD to INDIAN RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
AVENUE RD
From HILLHOLM RD to CHAPLIN CRES
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CARIBOO AVE
At OSLER ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
EUCLID PL @ EUCLID AVE
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
FRONT ST E
From EASTERN AVE to CHERRY ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MACPHERSON AVE @ AVENUE RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MANNING AVE
From QUEEN ST W to ROBINSON ST
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
ORMSKIRK CRT
At ORMSKIRK AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB/NB/SB 1 lane occupied due to water main reconstruction.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
LAKESHORE AVE @ CHERRY ST
From CHERRY ST to CHERRY ST
2019-10-08 10:00 2019-10-22 15:00 Daily
The Left lane in EB and WB directions on Lake Shore will be closed on and off to accommodate safe removal and rebuilding of the centre median just east of cherry street. Only 1 lane closure is used at a time. There will be no effect on vehicles, cyclist or pedestrians traffic at cherry street intersection. After shift is complete the TC54s will be left on the curb line to delineate no public access to the centre median. Note no cloiuser will be done on Oct 14.
MC CAUL ST
From DUNDAS ST W to DUNDAS ST W
2019-10-10 09:00 2019-10-30 16:00 Daily
SB shoulder occupied due to anchor and pole key installation.
UNIVERSITY AVE @ KING ST W
2019-10-08 21:00 2019-11-30 05:00 Daily
Installation of traffic signals
DANFORTH AVE @ BROADVIEW AVE
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
DANFORTH AVE @ PAPE AVE
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
DONLANDS AVE @ STRATHMORE BLVD
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
LINNSMORE CRES @ STRATHMORE BLVD
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
COXWELL AVE @ STRATHMORE BLVD
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
WOODBINE AVE @ STRATHMORE BLVD
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
MAIN ST @ DANFORTH AVE
2019-10-03 07:00 2019-11-10 19:00 Daily
Installation of wayfinding signs by Future Systems Inc.
DANFORTH AVE
From VICTORIA PARK AVE to THYRA AVE
2019-10-11 09:00 2019-12-11 16:00 Daily
NB/SB occupied due to pavement investigation.
HIGHLAND AVE
From ROXBOROUGH DR to HIGHLAND GDNS
2019-10-11 09:00 2019-12-11 16:00 Daily
NB/SB occupied due to pavement investigation.
HIGHLAND GDNS @ HIGHLAND AVE
2019-10-11 09:00 2019-12-11 16:00 Daily
NB/SB occupied due to pavement investigation.
PAILTON CRES
From MERTON ST to BALLIOL ST
2019-10-10 07:00 2019-10-25 19:00 Daily
Permanent utility cut repairs.
TULLIS DR
From BELSIZE DR to MANOR RD E
2019-10-10 07:00 2019-10-25 19:00 Daily
Permanent utility cut repairs.
SHAFTESBURY AVE @ YONGE ST
2019-10-10 09:00 2019-11-09 16:00 Continuous
Installation of Wayfinding signs
CRESCENT RD @ YONGE ST
2019-10-10 09:00 2019-11-09 16:00 Continuous
Installation of Wayfinding signs
MORTIMER AVE
From PAPE AVE to BROADVIEW AVE
2019-10-10 09:30 2019-10-25 15:30 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
BORDEN ST
From HARBORD ST to VANKOUGHNET ST
2019-10-11 07:00 2019-10-29 19:00 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
LORETTO LANE
From BLOOR ST W to LENNOX ST
2019-10-11 07:00 2019-10-29 19:00 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
BRUNSWICK AVE @ BAEBARA BARRETT LANE
From BORDEN ST to BRUNSWICK AVE
2019-10-11 07:00 2019-10-29 19:00 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
GLENGROVE AVE W @ MONA DR
2019-10-16 09:00 2019-10-25 16:00 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
COLDSTREAM AVE
From GLEN RUSH BLVD to MONA DR
2019-10-16 09:00 2019-10-25 16:00 Daily
Geotechnical Investigation, boreholes drilling and asphalt coring
AVENUE RD @ CHAPLIN CRES
2019-10-15 09:00 2020-02-28 16:00 Daily
NB/SB 2 lane occupied due to water main reconstruction.
MOUNT PLEASANT RD @ 602
From MANOR RD E to PENROSE RD
2019-10-16 09:00 2019-10-31 19:00 Daily
Permanent surface re-instatement to Toronto Water repair.
MOUNT PLEASANT RD @ 670
From HILLSDALE AVE E to SOUDAN AVE
2019-10-16 09:00 2019-10-31 19:00 Daily
Permanent surface re-instatement to Toronto Water repair.
BATHURST ST @ 1431
From VAUGHAN RD to ST CLAIR AVE W
2019-10-16 07:00 2019-10-31 16:00 Daily
Permanent surface re-instatement to Toronto Water repair. Northbound curb lane closed.
REDPATH AVE
From EGLINTON AVE E to SOUDAN AVE
2019-10-15 09:00 2019-10-22 16:00 Daily
Trench and fiber placement. Southbound curb lane closed.
BRIGHTON AVE @ PAPE AVE
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
COADY AVE @ 87
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Northbound lane closed.
DINGWALL AVE @ 15
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
MALLON AVE @ 22
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
O CONNOR DR @ 137
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
SIMPSON AVE @ 156
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work. (1) Westbound lane closed.
HARBORD ST @ 201
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work. (1) Eastbound lane closed.
JARVIS ST @ 33
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work. (1) Northbound lane closed.
QUEENS PARK @ COLLEGE ST
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
ULSTER ST @ 86
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
YONGE ST @ 684
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
AMELIA ST @ 15
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
AMELIA ST @ 110
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
BLOOR ST W @ 162
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
DAVENPORT RD @ 250
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
GERRARD ST W @ 81
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
GLOUCESTER ST @ 50
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
DANFORTH AVE @ 2225
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
FERRIS RD @ 137
2019-10-14 07:00 2019-10-25 19:00 Daily
Trenchless sewer work.
GATEWAY BLVD @ DON MILLS RD
2019-10-14 09:00 2019-10-25 16:00 Daily
Trenchless sewer work.
AVENUE RD @ 88
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 167
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 10
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 10 & 7
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 11 to 13
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 42 to 44
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 84
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 85
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ALBANY AVE @ 9 & 10
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ALBANY AVE @ 44 & 46
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ALBANY AVE @ 60,60 & 63
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ALBANY AVE @ 86
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
BAY ST
From DUNDAS ST W to HAGERMAN ST
2019-10-15 07:00 2019-12-21 17:00 Daily
Work conducted on Southbound right and middle lanes.
GARDINER EXPY EB
From DON ROADWAY to YORK ST
2019-10-14 00:01 2020-01-31 23:59 Continuous
Eastbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
LAKE SHORE BLVD E GARDINER EXPY RAMP
From DON ROADWAY to DON VALLEY PARKWAY
2019-10-14 00:01 2020-01-31 23:59 Continuous
1 lane closed at the top of the westbound Lake Shore on ramp to westbound Gardiner Expressway due to Gardiner Expressway Rehabilitation Project.
GARDINER EXPY WB
From YORK ST to DON ROADWAY
2019-10-14 00:01 2020-01-31 23:59 Continuous
Westbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
MILL ST @ TRINITY ST
2019-10-16 07:00 2019-10-25 19:00 Daily
Drill monitoring wells.
BALMORAL AVE
From WARREN RD to YONGE ST
2019-10-15 07:00 2019-10-29 19:00 Daily
Permanent utility cut repairs.
FORMAN AVE
From DAVISVILLE AVE to MILLWOOD RD
2019-10-15 07:00 2019-10-29 19:00 Daily
Permanent utility cut repairs.
LASCELLES BLVD
From WILBERTON RD to EGLINTON AVE W
2019-10-15 07:00 2019-10-29 19:00 Daily
Permanent utility cut repairs.
POPLAR PLAINS RD
From EDMUND AVE to DUPONT ST
2019-10-15 07:00 2019-10-29 19:00 Daily
Permanent utility cut repairs.
AVENUE RD @ 88
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 167
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 10
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 7
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 11
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 13
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 42
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
ADMIRAL RD @ 84
2019-10-07 07:00 2019-11-30 17:00 Daily
Permanent Repairs to Utility Cuts.
BERWICK AVE
From YONGE ST to DUPLEX AVE
2019-10-18 07:00 2019-10-21 07:00 Daily
Equipment occupancy for Berwick Portal. (1) Eastbound/Westbound lane closed.
HILLSDALE AVE E
From YONGE ST to DUPLEX AVE
2019-10-19 00:01 2019-10-20 23:59 Daily
Site service and material storage. (1) Westbound and Eastbound lane closed.
HASTINGS AVE @ 34
From DUNDAS ST E to QUEEN ST E
2019-10-18 07:00 2019-10-23 19:00 Daily
SB 1 lane blocked due to Sanitary and Water Service Installation
MOUNT PLEASANT RD
From MERTON ST to EGLINTON AVE E
2019-10-17 09:00 2019-11-01 16:00 Daily
Permanent utility cut repairs.
DAVISVILLE AVE
From MOUNT PLEASANT RD to YONGE ST
2019-10-17 09:00 2019-11-01 16:00 Daily
Permanent utility cut repairs.
ORIOLE PKWY
From EGLINTON AVE E to CHAPLIN CRES
2019-10-17 09:00 2019-11-01 16:00 Daily
Permanent utility cut repairs.
ORIOLE GDNS
From ORIOLE RD to LAWTON BLVD
2019-10-19 07:00 2019-11-01 19:00 Daily
Permanent utility cut repairs.
ORIOLE RD
From ST CLAIR AVE W to HEATH ST W
2019-10-19 07:00 2019-11-01 19:00 Daily
Permanent utility cut repairs.
BLOOR ST E
From SHERBOURNE ST to TED ROGERS WAY
2019-10-18 23:00 2019-10-20 19:00 Continuous
Milling and paving. (1) Eastbound and Westbound lane closed.
JORDAN ST @ KING ST W
2019-10-20 09:33 2019-10-20 18:00 Continuous
Roadway closed to the end of street due to water main repair.
DOVERCOURT RD
From QUEEN ST W to SUDBURY ST
2019-10-20 09:36 2019-10-20 18:00 Continuous
Roadway closed due to water main repair.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
PARKWAY AVE
From DUNDAS ST W to GRENADIER RD
2019-10-27 11:00 2019-10-27 17:00 Daily
Temporary closure of the road for the Street Play Pilot Project.
MAGDALENA CRT
From KIDRON VALLEY DR to KIDRON VALLEY DR
2019-10-28 07:00 2019-11-29 19:00 Daily
SB/NB curb lane occupied due to mill and pave road surface.
WOODBINE DOWNS BLVD
From FINCH AVE W to CARRIER DR
2019-10-28 07:00 2019-11-29 19:00 Daily
SB/NB curb lane occupied due to mill and pave road surface.
GLEN CEDAR RD @ 154
From AVENUE RD to WARWICK AVE
2019-10-21 07:00 2019-11-15 19:00 Daily
NB/SB lane occupied due to Sanitary and Water Service Installation
LAKE SHORE BLVD W @ SYMONS ST
From QUEENS AVE to SYMONS ST
2019-10-21 09:00 2019-10-22 15:30 Daily
WB curb lane occupied due to test hole investigation.
DIXON RD
At CARLINGVIEW DR
2019-10-23 09:30 2019-10-25 15:30 Daily
Bridge Inspections
RENFORTH DR
From SILVER DART DR to CARLINGVIEW DR
2019-10-21 09:30 2019-10-25 15:30 Daily
Bridge Inspections
MCROBERTS AVE
From KITCHENER AVE to SUMMIT AVE
2019-10-21 07:00 2019-10-25 19:00 Daily
Borehole investigation.
WESTSIDE DR
At THE WEST MALL
2019-10-21 07:00 2019-12-30 17:00 Daily
NB lane occupied due to water main replacement.
ENNERDALE RD
From EGLINTON AVE W to ROCHDALE AVE
2019-10-21 07:00 2019-10-25 19:00 Continuous
Borehole investigation
JANE ST
From MAPLE LEAF DR to JANE ST NB HWY 400 NB RAMP
2019-10-21 09:00 2019-10-31 16:00 Daily
Installation of new conduit for fiber optics. Northbound and Southbound curb lanes closed.
OAKWOOD AVE
From EARNSCLIFFE RD to CONWAY AVE
2019-10-22 09:00 2019-10-23 16:00 Daily
Monitoring road wells. Northbound and Southbound curb lanes closed.
LITTLE AVE
From LAWRENCE AVE W to WESTON RD
2019-10-22 07:00 2019-10-22 17:00 Daily
City of Toronto Roadway Crackfilling.
SIDNEY BELSEY CRES
From WESTON RD to CHARLTON SETTLEMENT AVE
2019-10-22 07:00 2019-10-22 17:00 Daily
City of Toronto Roadway Crackfilling.
JASPER AVE
From WESTON RD to CLIFF ST
2019-10-22 07:00 2019-10-22 17:00 Daily
City of Toronto Roadway Crackfilling.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
DIVADALE DR
From BESSBOROUGH DR to RUMSEY RD
2019-10-21 09:00 2019-12-13 16:00 Daily
Eastbound curb lane occupied due to conduits and PED W/Vault.
DONLEA DR
From HANNA RD to SUTHERLAND AVE
2019-10-21 09:00 2019-12-13 16:00 Daily
Westbound curb lane occupied due to conduits and PED W/Vault.
GLENVALE BLVD
From ROXVILLE AVE to TANAGER AVE
2019-10-21 09:00 2019-12-13 16:00 Daily
Westbound curb lane occupied due to conduits and PED W/Vault.
HANNA RD
From GLENVALE BLVD to EGLINTON AVE E
2019-10-21 09:00 2019-12-13 16:00 Daily
Northbound curb lane occupied due to conduits and PED W/Vault.
MASON RD
From CHATTERTON BLVD to STANLAND DR
2019-10-28 07:00 2019-11-22 19:00 Daily
Southbound curb lane occupied due to conduits and PED W/Vault.
BESSBOROUGH DR
From EGLINTON AVE E to GLENVALE BLVD
2019-10-21 09:00 2019-12-13 16:00 Daily
Northbound curb lane occupied due to conduit and PED W/vault work.
CRAIG CRES
From BAYVIEW AVE to BESSBOROUGH DR
2019-10-21 09:00 2019-12-13 16:00 Daily
Westbound curb lane occupied due to conduit and PED W/vault work.
HAWKSBURY DR
From BAYVIEW MEWS LANE to SHEPPARD AVE E
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
BURBANK DR
From CITATION DR to SHEPPARD AVE E
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
BAYVIEW MEWS LANE
From BAYVIEW AVE to HAWKSBURY DR
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
SHAUGHNESSY BLVD
From GLENTWORTH RD to SHEPPARD AVE E
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
MOORE AVE
From BRENDAN RD to BAYVIEW AVE
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
YONGE BLVD
From ESGORE DR to BROOKE AVE
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
SENTINEL RD
From FOUR WINDS DR to FINCH AVE W
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
BROADOAKS DR
From KEELE ST to DERRYDOWN RD
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
ALAMOSA DR
From FINCH AVE E to APPIAN DR
2019-10-21 09:00 2019-10-25 16:00 Continuous
Horticultural maintenance, grass cutting, litter pickup and planting centre medians.
CUMMER AVE
2019-10-21 09:00 2019-10-29 16:00 Daily
Sewer main services, 481 Cummer Ave- eastbound right lane occupied.
BRENTWOOD AVE
From SHEPPARD AVE W to ROYCREST AVE
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
BURNDALE AVE
From SENLAC RD to WELBECK RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
CAMERON AVE
From RADINE RD to BOTHAM RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
FLORENCE AVE
From RADINE RD to BOTHAM RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
HARLANDALE AVE
From SENLAC RD to WELBECK RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
JOHNSTON AVE
From EASTON RD to BOTHAM RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
PEWTER RD
From FLORENCE AVE to CAMERON AVE
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
POYNTZ AVE
From BEAMAN RD to EASTON RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
RADINE RD
From POYNTER DR to STUART AVE
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
FRANKLIN AVE
From BASSANO RD to GWENDOLEN AVE
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
ROYCREST AVE @ BRENTWOOD AVE
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
STUART AVE @ BOTHAM RD
2019-10-21 09:00 2019-11-29 16:00 Daily
Asphalt coring, drilling boreholes and monitoring well installations.
HWY 400 NB FINCH AVE W EB RAMP
From HWY 400 SB FINCH AVE W WB RAMP to HWY 400 NB FINCH AVE W EB RAMP
2019-10-21 07:00 2019-10-25 17:00 Daily
Eastbound and Westbound on ramp only occupied due to LRT project.
WILSON AVE
From CORNELIUS PKWY to MURRAY RD
2019-10-21 07:00 2019-12-02 07:00 Continuous
TWO LANE EASTBOUND BLOCKED DUE TO CONSTRUCTION.
BAYVIEW AVE
From CUMMER AVE to ARGONNE CRES
2019-10-22 10:00 2019-10-23 15:00 Daily
Monitoring and sampling road wells in Bayview Ave and Cummer Ave. Northbound, Southbound and Westbound curb lanes closed.
GRANTBROOK ST @ DREWRY AVE
2019-10-21 08:00 2019-10-28 19:00 Daily
Bell Cable Pits. Southbound lane closed.
OLD LESLIE ST @ SHEPPARD AVE E
2019-10-21 07:00 2019-10-21 21:00 Daily
Watermain and water service installation. Northbound lane closed.
JANE ST @ SHEPPARD AVE W
2019-10-21 07:00 2019-11-28 19:00 Daily
Curb lanes at intersection occupied due to structural water main rehabilitation - Emergency Intersection lining.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
ADANAC DR
From BELLAMY RD S to STANLAND DR
2019-10-28 07:00 2019-11-22 19:00 Daily
EB curb lane occupied due to conduit and PED W/Vault.
CHATTERTON BLVD
From BELLAMY RD S to MASON RD
2019-10-28 07:00 2019-11-22 19:00 Daily
Westbound curb lane occupied due to conduit and PED W/vault work.
DANFORTH RD @ MIDLAND AVE
2019-10-28 09:30 2019-11-15 15:30 Daily
NEB 1 lane occupied due to borehole drilling on existing pavement.
GERRARD ST E
From BLANTYRE AVE to RATHMORE AVE
2019-10-21 09:00 2019-11-01 16:00 Daily
EB 1 lane occupied due to daylighting.
PAINTED POST DR @ 300
2019-10-22 09:00 2019-10-31 16:00 Daily
NB/SB lane occupied due to Sanitary, Storm and Water Service Installation.
PROGRESS AVE
From SHEPPARD AVE E to ORCHID PLACE DR
2019-10-21 09:00 2019-10-25 16:00 Daily
Excavation of blockage pit. Southbound curb lane closed.
PAINTED POST DR
From MARKHAM AVE to BRIMORTON DR
2019-10-23 09:00 2019-11-01 16:00 Daily
Sanitary, Storm and Water Service Installation. Northbound and Southbound lanes closed.
MIDLAND AVE @ HWY 401
2019-10-21 19:00 2019-10-25 06:30 Daily
Bridge rehabilitation.
KENNEDY RD @ HWY 401
2019-10-21 19:00 2019-10-25 06:30 Daily
Bridge rehabilitation.
BIRCHMOUNT RD @ HWY 401
2019-10-21 19:00 2019-10-25 06:30 Daily
Bridge rehabilitation.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
DANFORTH AVE @ 569
From CARLAW AVE to GOUGH AVE
2019-10-24 08:00 2019-10-24 22:00 Daily
Temporary installation of a canopy on the sidewalk in connection with events at Korry's Clothing store.
BAY ST @ CHARLES ST W
2019-10-28 07:00 2019-11-08 18:00 Daily
Removal of temporary hard surface and placement of permanent hard surface, asphalt and concrete. SB curb lane closed.
BAY ST
From DUNDAS ST W to RICHMOND ST W
2019-11-11 09:00 2019-11-11 13:00 Daily
Full closure due to a ceremony at Old City Hall to mark Remembrance Day.
JAMES ST
From QUEEN ST W to ALBERT ST
2019-11-11 09:00 2019-11-11 13:00 Daily
Full closure due to a ceremony at Old City Hall to mark Remembrance Day.
QUEEN ST W
From YONGE ST to YORK ST
2019-11-11 09:00 2019-11-11 13:00 Daily
Full closure due to a ceremony at Old City Hall to mark Remembrance Day.
WINSLOE AVE
From BROADWAY AVE to DIVADALE DR
2019-10-21 09:00 2019-12-13 16:00 Daily
Conduit and PED w/Vault. Southbound curb lane closed.
TANAGER AVE
From BROADWAY AVE to GLENVALE BLVD
2019-10-21 09:00 2019-12-13 16:00 Daily
Conduit and PED w/Vault. Southbound curb lane closed.
STANLAND DR
From BELLAMY RD S to MASON RD
2019-10-28 07:00 2019-11-22 19:00 Daily
Conduit and PED w/Vault. Westbound curb lane closed.
RUMSEY RD
From DIVADALE DR to DONLEA DR
2019-10-21 09:00 2019-12-13 16:00 Daily
Conduit and PED w/Vault. Southbound curb lane closed.
ROXVILLE AVE
From GLENVALE BLVD to ANNESLEY AVE
2019-10-21 09:00 2019-12-13 16:00 Daily
Conduit and PED w/Vault. Southbound curb lane closed.
HOPE ST
From HARVIE AVE to NAIRN AVE
2019-10-31 17:00 2019-10-31 23:00 Daily
Public safety for kids trick or treating during Halloween.
DANFORTH AVE @ 2301=2315
From GLEDHILL AVE to OAK PARK AVE
2019-10-21 09:00 2019-11-08 16:00 Daily
WB/EB 1 lane Sanitary and Water Service Installation
ROGERS RD @ 605
From FORBES AVE to KEELE ST
2019-11-11 09:00 2019-11-15 16:00 Daily
EB curb lane blocked due to permanent surface reinstatement.
QUEEN ST E @ 1331
2019-10-22 09:00 2019-10-23 16:00 Daily
EB curb lane blocked due to gas service installation.
AUGUSTA AVE @ BALDWIN ST
2019-10-21 09:00 2019-11-29 15:30 Daily
Northbound curb blocked due to Directional bore & place conduit & fibre.
TIAGO AVE @ 49
2019-10-21 07:00 2019-11-08 19:00 Daily
east and West bound lane blocked due to Sanitary and Water Service Installation
WOODINGTON AVE @ 54
2019-10-21 07:00 2019-11-08 19:00 Daily
North and south bound lane blocked due to Sanitary and Water Service Installation
ISABELLA ST @ CHURCH ST
2019-10-21 09:00 2019-10-22 16:00 Daily
NB curb lane blocked due to directional bore & place conduit & fibre
VILLIERS ST
From CHERRY ST to SAULTER ST
2019-10-21 07:00 2019-12-31 23:00 Continuous
EB/WB occupied due to mill and pave road surface
ANDERSON AVE @ ORIOLE PKWY
2019-10-21 07:00 2019-11-08 19:00 Daily
NB/WB occupied due to directional bore & place conduit & fibre
CARLAW AVE
From GERRARD ST E to LAKE SHORE BLVD E
2019-10-24 09:00 2019-10-24 16:00 Daily
Asphalt Coring
ELIZABETH ST
From GERRARD ST W to ELM ST
2019-10-22 05:00 2019-10-22 17:00 Daily
Ground-breaking Event
BREMNER BLVD @ LAKE SHORE BLVD W
2019-10-21 09:00 2019-10-22 23:59 Daily
Raptors Home Opener Tailgate Party.
FREELAND ST
From QUEENS QUAY E to LAKE SHORE BLVD E
2019-10-21 07:00 2019-10-23 19:00 Daily
Subsurface Utility Engineering investigation. Northbound lane and Southbound lanes closed.
JONES AVE @ HARCOURT AVE
2019-10-21 09:30 2019-10-21 15:30 Daily
Work on gas service. Northbound lane closed.
KING ST E
From ONTARIO ST to PRINCESS ST
2019-10-21 09:30 2019-11-01 15:30 Daily
Installation of conduit to building. Curb lanes in all directions closed.
EGLINTON AVE E
From OLD FOREST HILL RD to BATHURST ST
2019-10-21 09:00 2019-10-25 16:00 Continuous
Excavation of blockage pits. Westbound curb lane closed.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.


Transit Twitter Stream

Service advisories from the Toronto Transit Commission

Service updates from GO Transit

Service advisories from York Region Transit

Service updates and news from Durham Region Transit

Service updates from Brampton Transit

Greater Toronto and Hamilton Area transportation updates

Latest news about Ontario's public transit smartcard

Transit Systems Servicing Toronto and the GTA

GO train
Transit announcement in York Region

Bus lines offering service throughout Ontario

Greyhound Canada is the largest provider of intercity bus transportation in Canada, serving nearly 1,100 locations.

Information on scheduled bus routes, convenient door-to-door airport van transfers, fun city sightseeing tours, and first class charter service.

Ontario Northland's operations encompass more than 1,100 km of track, including bus service to 56 communities.


Information for Canadians crossing the United States border

Everything citizens of Canada travelling to the United States need to know before going through customs.

CBSA provides travel tips, frequently asked questions and helpful hints for crossing the border.

Find information on getting or renewing a Canadian passport. Download and complete all related forms.

Border Crossing Twitter Stream

News from the Canada Border Services Agency

Traffic Updates for Rainbow, Peace, Lewiston Queenston & Whirlpool

Traffic Updates from Blue Water Bridge, Crossing between Canada & USA

Traffic Updates from Sault Ste. Marie International Bridge