Traffic

TRAFFIC

News, updates, traffic map, travel times and info about driving in Toronto and Ontario.

The TTC's newest streetcar is shown while on its maiden voyage early on March 14, 2013. (Brad Ross/Twitter.com)

TRANSIT

News, updates and important information about transit systems for Toronto & the GTA.

In this June 1, 2009 file photo, a truck loaded with Ford and Lincoln vehicles travels from Canada to the U.S. Peace Bridge border crossing in Buffalo, N.Y. (AP / David Duprey)

BORDER CROSSINGS

News, updates, wait times and traveller information about Ontario border crossings.

CP24 - Toronto News | Breaking News Headlines | Weather, Traffic, Sports

Real-time traffic information for Toronto, GTA, and surrounding areas.


Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Traffic

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
BLACKTHORN AVE @ 432
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
SUN VALLEY DR
From ST MARKS RD to PASADENA GDNS
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
VALLEYMEDE RD
From ELLIS PARK RD to KENNEDY AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ISLINGTON AVE
From FORDWICH CRES to BARKER AVE
2019-06-17 07:00 2020-12-31 19:00 Daily
NB/SB left and right lane occupied due to repairing bridge.
RATHBURN RD
From MARTIN GROVE RD to RAVENSCREST DR
2019-07-02 07:00 2020-06-30 07:00 Continuous
Rehabilitation of Rathburn Road over Mimico Creek Bridge. Westbound/Eastbound alternating left and right lanes closed.
EASTSIDE DR @ NORTH QUEEN ST
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Northbound lane closed.
VICKERS RD @ THE EAST MALL
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Southbound lane closed.
BROW DR
From EXMOOR DR to LAKE SHORE BLVD W
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of two ground water monitoring wells. Southbound shoulder closed.
BLUE GOOSE ST
From MANCHESTER AVE to CAVELL AVE
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of groundwater monitoring wells. Northbound curb lane closed.
SCOTT RD
From TROWELL AVE to KERSDALE AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
KANE AVE
From TROWELL AVE to KERSDALE AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
SILVERTHORN AVE
From TROWELL AVE to KERSDALE AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
TROWELL AVE
From SCOTT RD to SILVERTHORN AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
DUNRAVEN DR
From SCOTT RD to SILVERTHORN AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
WESTOWANIS DR
From CINRICKBAR DR to HUMBERWOOD BLVD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
KINGSPLATE CRES
From KINGSPLATE CRES to THOROUGHBRED CRES
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
HULLRICK DR
From HUMBERWOOD BLVD to WESTLAWN PL
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
CINRICKBAR DR
From WESTLAWN PL to HULLRICK DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
WESTLAWN PL
From HULLRICK DR to CINRICKBAR DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
VIEW GREEN CRES
From HUMBERWOOD BLVD to VIEW GREEN CRES
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
LAKE SHORE BLVD W
From SIXTH ST to THIRD ST
2020-03-01 07:00 2020-08-20 19:00 Continuous
East-West bound all lanes Watermain and Water Service Installation
AILEEN AVE
From SCOTT RD to SILVERTHORN AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions closed.
HARPREET CRCL @ HUMBERWOOD BLVD
2020-06-01 07:00 2020-06-06 19:00 Weekdays
Restoration work. Curb lanes in both directions occupied.
HUMBERWOOD BLVD
From HARPREET CRCL to KINGSPLATE CRES
2020-06-01 07:00 2020-06-06 19:00 Weekdays
Restoration work. Curb lanes in both directions occupied.
ARBORWOOD DR
From HULLRICK DR to HUMBERWOOD BLVD
2020-06-01 07:00 2020-06-06 19:00 Weekdays
Restoration work. Curb lanes in both directions occupied.
BOYD AVE
From RALPH ST to MERRILL AVE
2020-03-03 07:00 2020-08-31 19:00 Continuous
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
VAUGHAN RD @ OAKWOOD AVE
2020-03-02 07:00 2020-06-30 19:00 Daily
Westbound lane occupied due to road reconstruction.
RONALD AVE @ CASTLEFIELD AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to road reconstruction, water services and paving.
KEYWEST AVE
From LAUDER AVE to NORTHCLIFFE BLVD
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
BERTAL RD @ INDUSTRY ST
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to sidewalk construction.
ELEANOR AVE @ OAKWOOD AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
DONALD AVE
From KEELE ST to KANE AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
DIESEL DR @ EVANS AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to resurfacing and sidewalk construction.
BROCKHOUSE RD @ BESTOBELL LANE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
CARSON ST
From HORNER AVE to STAFFORDSHIRE PL
2020-03-02 07:00 2020-06-30 21:00 Daily
Eastbound and westbound lanes intermittently occupied due to road resurfacing.
CHURCH ST
From JANE ST to ELM ST
2020-03-05 07:00 2020-09-30 18:00 Daily
Eastbound and westbound lane occupied one at a time for road resurfacing.
CARLINGVIEW DR
From RENFORTH DR to HWY 401 COLLECTOR EB
2020-03-16 00:01 2020-11-20 00:01 Daily
Southbounds all Lanes are occupied due to bridge Rehabilitation project.
WESTON RD
From WRIGHT AVE to CLOUSTON AVE
2020-03-02 07:00 2020-09-11 19:00 Daily
Upgrading the storm sewer system. 2 Southbound lanes closed.
KERSDALE AVE
From SCOTT RD to SILVERTHORN AVE
2020-06-01 09:00 2020-06-06 16:00 Daily
Restoration work. Curb lane in both directions occupied.
KIPLING AVE
From WINGROVE HILL to RATHBURN RD
2020-03-17 07:00 2020-08-29 16:00 Daily
Northbound 2 lanes blocked due to basement flooding protection program.
ANTIOCH DR
From DEWITT RD to MILLBURN DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
DEWITT RD
From MARTIN GROVE RD to ANTIOCH DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
DORNOCH DR
From PRINCESS MARGARET BLVD to GLEN AGAR DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
GLEN AGAR DR
From BURWOOD RD to PENTLAND PL
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
HEDGES BLVD
From TROMLEY DR to MARTIN GROVE RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
MASSINGHAM RD
From DEWITT RD to SABINE RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
PENTLAND PL
From GLEN AGAR DR to PENTLAND PL
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
STOREY CRES
From ANTIOCH DR to DEWITT RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
CARLINGVIEW DR
From RENFORTH DR to CARLINGVIEW SB HWY 401 EXPRESS EB RAMP
2020-03-23 00:01 2020-11-20 00:01 Daily
MTO 2019-2001 Bridge Rehabilitation Project. All Southbound lanes closed.
EGLINTON AVE W @ BEMERSYDE DR
2020-03-30 07:00 2020-07-30 17:00 Daily
Trench excavation and duct bank installation for Toronto Hydro. Eastbound curb closed.
JOHN GARLAND BLVD
From KIPLING AVE to JAMESTOWN CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
Westbound and Eastbound curb lanes alternating, partially occupied due to trench excavation and duct bank installation. Weekend hours: 07:00am-07:00pm
KENDLETON DR
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
BURNHAMILL PL @ MILL RD
2020-04-04 07:00 2020-09-27 19:00 Daily
Eastbound curb lane occupied due to trench excavation and duct bank installation for Toronto Hydro.
STONEHAM RD
From MILL RD to OLD BURNHAMTHORPE RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Eastbound and Westbound lanes occupied alternatively due to trench excavation and duct bank installation for Toronto Hydro.
MILL RD @ STONEHAM RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Northbound lanes occupied due to trench excavation and duct bank installation for Toronto Hydro.
MARKBURN CRT
From STONEHAM RD to MARKBURN CRT
2020-04-13 07:00 2020-09-27 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
VANGE CRES
From MOUNT OLIVE DR to MOUNT OLIVE DR
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Southbound lane closed.
GOLDSBORO RD
From DUNCANWOODS DR to GRACEDALE BLVD
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Southbound lane closed.
JODPHUR AVE
From ANN ARBOUR RD to MELODY RD
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Alternating closure of Northbound and Southbound lanes.
YORKDALE CRES
From LOVILLA BLVD to ANN ARBOUR RD
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Alternating closure of Westbound and Eastbound lanes.
BROADOAKS DR
From HUCKNALL RD to KEELE ST
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Alternating closure of Westbound and Eastbound lanes.
LOVILLA BLVD
From STRATHBURN BLVD to WESTON RD
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Alternating closure of Westbound and Eastbound lanes.
FIFTH ST @ ALEX FAULKNER LN
At BIRMINGHAM ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From NINTH ST to EIGHTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From SEVENTH ST to SIXTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From THIRD ST to FIFTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
KENDLETON DR @ JOHN GARLAND BLVD
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-20 07:00 2020-09-30 19:00 Daily
North and southbound curb lanes occupied due to Toronto Hydro trench excavation and duct installation work.
INDEX RD @ 305m North
At NORTH QUEEN ST
2020-05-04 07:00 2020-06-12 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm
GRENADIER HTS
From GRENADIER HTS to ELLIS AVE
2020-05-04 07:00 2020-06-12 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm
FORTIETH ST
From LAKE PROMENADE to LAKE SHORE BLVD
2020-05-04 07:00 2020-06-12 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm
MAGDALENA CRT @ KIDRON VALLEY DR
2020-04-27 07:00 2020-06-19 19:00 Daily
Roadway improvement and restoration. Alternating closure of Northbound and Southbound curb lanes.
BENRUBIN DR
From FIRENZA DR to DUNCANWOODS DR
2020-04-20 07:00 2020-06-05 19:00 Continuous
Roadway improvement and restoration. Alternating closure of Northbound and Southbound curb lanes.
WOODBINE DOWNS BLVD
From FINCH AVE W to CARRIER DR
2020-04-20 07:00 2020-06-05 19:00 Daily
Roadway improvement and restoration. Alternating closure of Northbound and Southbound curb lanes.
CLAIREVILLE DR
From HUMBERLINE DR to HUMBERLINE DR
2020-04-20 07:00 2020-06-05 19:00 Daily
Roadway improvement and restoration. Alternating closure of Northbound and Southbound curb lanes.
WEST WARESIDE RD
From RENFORTH DR to CRENDON DR
2020-04-22 07:00 2020-06-12 19:00 Daily
Roadway improvement and restoration. Alternating closure of Westbound and Eastbound curb lanes.
NEWINGTON CRES
From ELMBROOK CRES to ELMBROOK CRES
2020-04-22 07:00 2020-06-12 19:00 Daily
Roadway improvement and restoration. Alternating closure of Northbound and Southbound curb lanes.
LONE OAK CRT @ RAKELY CRT
2020-04-20 07:00 2020-06-05 19:00 Daily
Roadway improvement and restoration. Alternating closure of Westbound and Eastbound curb lanes.
FIRENZA DR
From MILADY RD to DUNCANWOODS DR
2020-04-20 07:00 2020-06-05 19:00 Continuous
Roadway improvement and restoration. Alternating closure of Westbound and Eastbound curb lanes.
HWY 27 COLLECTOR S
From BELFIELD RD to FARNBORO RD
2020-04-24 07:00 2020-06-30 17:00 Daily
Southbound right curb lane blocked due to Construction
EVANS AVE
From GAIR DR to SHELDON AVE
2020-05-05 07:00 2020-06-26 17:00 Continuous
Evans westbound curb lane and Brown's Line northbound off ramp to westbound Evans blocked due to bridge rehab.
PRINCESS MARGARET BLVD
From LLOYD MANOR RD to CRAMOND CRT
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
LAURA RD
From SHEPPARD AVE W to FRITH RD
2020-05-05 07:00 2020-10-15 19:00 Daily
Construction work to replace storm sewers. Southbound lane closed.
HARTLAND RD @ 41
At RANGOON RD
2020-05-19 07:00 2020-06-05 19:00 Daily
One northbound lane occupied due to sewer rehabilitation work by Empipe Solutions Ltd.
LITTLEWOOD CRES @ 5
At WELLESWORTH DR
2020-05-19 07:00 2020-06-05 19:00 Daily
One northbound lane blocked due to sewer rehabilitation work by Empipe Solutions Ltd.
LITTLEWOOD CRES @ 26
At INVERDON RD
2020-05-19 07:00 2020-06-05 19:00 Daily
One westbound lane occupied due to sewer rehabilitation work by Empipe Solutions Ltd.
LITTLEWOOD CRES @ 2-28
2020-05-19 07:00 2020-06-05 19:00 Daily
One southbound lane occupied due to sewer rehabilitation work by Empipe Solutions Ltd.
LITTLEWOOD CRES @ 28
At INVERDON RD
2020-05-19 07:00 2020-06-05 19:00 Daily
One westbound lane occupied due to sewer rehabilitation work by Empipe Solutions Ltd.
COTMAN CRES @ ANTIOCH DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
CRAMOND CRT @ PRINCESS MARGARET BLVD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
ALBION RD
From BENSTROW AVE to TODD BROOK DR
2020-05-21 07:00 2020-07-31 17:00 Continuous
Construction work. 1 Westbound and 1 Eastbound lane closed.
OLD MILL DR @ RIVERSIDE DR
2020-05-25 07:00 2020-06-12 19:00 Daily
Northbound and southbound alternating lanes partially occupied due to groundwater level monitoring, K-tests, and groundwater testing.
OLD MILL DR
From HALFORD AVE to CATHERINE ST
2020-05-25 07:00 2020-06-12 19:00 Daily
Eastbound and westbound alternating lanes partially occupied due to groundwater level monitoring, K-tests, and groundwater testing.
OLD MILL DR @ BLOOR ST W
2020-05-25 07:00 2020-06-12 19:00 Daily
Northbound, eastbound, and westbound alternating lanes partially occupied due to groundwater level monitoring, K-tests, and groundwater testing.
CATHERINE ST @ OLD MILL DR
2020-05-25 07:00 2020-06-12 19:00 Daily
Northbound, southbound, and westbound alternating lanes partially occupied due to groundwater level monitoring, K-tests, and groundwater testing.
EVA RD @ THE WEST MALL
2020-05-02 07:00 2020-06-05 19:00 Daily
Westbound curb lane occupied for directional boring and conduit placement by Azimuth Three Enterprises.
WESTON RD @ LAWRENCE AVE W
2020-05-25 07:00 2020-06-30 19:00 Daily
Northbound, eastbound, and southbound lanes partially occupied due to Hydro trenching work. Weekend hours: 9:00am-7:00pm
ROYAL YORK RD @ 357-347
2020-05-25 07:00 2020-06-05 19:00 Daily
Northbound lane partially occupied due to trenchless sewer rehabilitation.
OLD MILL TER @ 46-129
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Northbound lane closed.
STANLEY RD
From JANE ST to LAURA RD
2020-05-25 07:00 2020-09-04 19:00 Daily
Construction of a sanitary sewer system. 1 Westbound lane closed.
LAKE SHORE BLVD @ 3062
At TWELFTH ST
2020-06-01 07:00 2020-06-08 19:00 Daily
Westbound right lane occupied due to manhole installation by Capital Sewer Services Inc.
JODPHUR AVE
From ANN ARBOUR RD to MELODY RD
2020-04-16 07:00 2020-06-15 21:00 Daily
Northbound lane partially occupied due to road construction. Weekend hours: 9:00am-7:00pm
DERRYDOWN RD
From BRANTLEY CRES to CONAMORE CRES
2020-06-01 00:01 2020-06-05 23:59 Continuous
Watermain, sewer and road reconstruction work. Full road closure, local traffic only.
KEELE ST @ WILSON AVE
2020-05-29 07:00 2020-06-12 19:00 Daily
Geotechnical investigation. Northbound sidewalk closed.
GREAT OAK DR @ 5 - 16
2020-06-01 07:00 2020-06-12 19:00 Daily
One eastbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
GREAT OAK DR @ 18-24
At CEDARLAND DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One westbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
HILLDOWNTREE RD @ 7 - 9
At WIMBLETON RD
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
HILLDOWNTREE RD @ 40 - 44
At CEDARLAND DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One westbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
KOOS RD @ 8 - 26
At RADWAY AVE
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
LEAVENWORTH CRES @ 8 - 10
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
LEAVENWORTH CRES @ 10 - 14
At CEDARLAND DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
LEAVENWORTH CRES
At BASKERVILLE CRES
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
REMINGTON DR @ 4
At RATHBURN RD
2020-06-01 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
REMINGTON DR
At GREAT OAK DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
REMINGTON DR @ 40
At RATHBURN RD
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
BASKERVILLE CRES @ 27
2020-06-01 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
BASKERVILLE CRES @ 38 - 16
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
KOOS RD @ 8 - 14
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
LEAVENWORTH CRES @ 2
At BASKERVILLE CRES
2020-06-01 07:00 2020-06-12 19:00 Daily
One southbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
HUDDERSFIELD RD
At CLAIREVILLE DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One westbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
BLOOR ST W
From THE WEST MALL to THE EAST MALL
2020-05-29 00:01 2020-06-05 23:59 Continuous
Westbound and eastbound left lane occupied to finish staging works for bridge rehabilitation by Toronto Zenith Contracting.
KEELE ST @ 1700
2020-06-01 07:00 2020-06-30 19:00 Daily
Southbound curb lane occupied for construction by Aecon Utilities.
KEELE ST @ 1700
2020-06-01 07:00 2020-06-30 19:00 Daily
Manhole rebuilding. Southbound curb lane closed.
MOSSFORD CRT
From PRINCESS MARGARET BLVD to PRINCESS MARGARET BLVD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
MILLBURN DR
From PUCKERIDGE CRES to MARTIN GROVE RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
PUCKERIDGE CRES @ MILLBURN DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
SABINE RD
From ANTIOCH DR to MARTIN GROVE RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
ROYAL YORK RD
From CAVELL AVE to JUDSON ST
2020-06-03 07:00 2020-06-12 12:59 Continuous
Northbound and southbound lanes intermittently occupied due to construction.
BLOOR ST W
From THOMPSON AVE to PRINCE EDWARD DR N
2020-06-01 07:00 2020-06-05 19:00 Daily
Eastbound Right Lane and curb will be partially occupied due to removal?and?disposal?of?existing?pedestrian?light?poles.
BIRMINGHAM ST @ 80
2020-06-02 07:00 2020-06-07 19:00 Daily
Northbound curb lane blocked due to conduit and vault installation.
ISLINGTON AVE @ 170
2020-06-02 07:00 2020-06-07 19:00 Daily
Northbound curb lane blocked due to conduit and vault installation.
KIPLING AVE @ TORLAKE CRES
From TORLAKE CRES to HORNER AVE
2020-06-02 07:00 2020-07-02 17:00 Daily
Northbound right lane and curb lane occupied due to construction work by Entera Utility Contractors.
DISCO RD @ BROCKPORT DR
From BROCKPORT DR to ATTWELL DR
2020-06-04 07:00 2020-06-08 19:00 Daily
One eastbound curb lane occupied due to a conduit and vault installation by Click Group Inc.
FIRST ST
From LAKE SHORE BLVD to LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From FIRST ST to SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From THIRD ST to FIFTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FIFTH ST @ Lake SHORE Dr
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From FIFTH ST to ELEVENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ELEVENTH ST @ LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From ELEVENTH ST to THIRTEENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE PROMENADE
From TWENTY THIRD ST to FORTY SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SIXTH ST @ LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SEVENTH ST
From LAKE SHORE BLVD to LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNDALK DR
From ELLESMERE RD to ANTRIM CRES
2020-05-26 00:01 2020-09-30 00:01 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SECORD AVE
From DAWES RD to EASTDALE AVE
2020-04-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ROYAL YORK RD
From CAVELL AVE to JUDSON ST
2020-06-03 07:00 2020-06-12 07:00 Continuous
Northbound and southbound lanes partially occupied due to construction. This project will be continuous over the weekend.
HORNER AVE @ 511
From BROWNS LINE to ORIANNA DR
2020-06-04 09:00 2020-06-12 16:00 Daily
Eastbound curb lane partially occupied due to dig and repair.
AVA RD
From CHILTERN HILL RD to BATHURST ST
2020-06-03 07:00 2020-06-17 19:00 Daily
Construction work. Curb lanes in both directions closed.
GLEN PARK AVE @ DUFFERIN ST
2020-06-04 07:00 2020-06-24 19:00 Daily
Installation of telecommunication conduit and fibre. Westbound curb lane closed.
HORNER AVE @ 511
From BROWNS LINE to ORIANNA DR
2020-06-04 09:00 2020-06-12 16:00 Daily
Dig and repair construction work. Eastbound curb lane closed.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HILLHURST BLVD @ 236
2019-11-29 07:00 2020-11-27 19:00 Continuous
WB Sanitary & Storm Sewer upgrades as part of Basement Flooding Prevention Project Phase 4
JANE ST @ SHOREHAM DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SECROFT CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
HULLMAR DR
From GOSFORD BLVD to YORK GATE BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SHOREHAM DR
From GOSFORD BLVD to JANE ST
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
YORK GATE BLVD @ HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
ARTECH CRT @ GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
FLETCHERDON CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From SHOREHAM DR to FLETCHERDON CRES
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From ARTECH CRT to HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
CORTLEIGH BLVD @ 344-384
2019-10-02 07:00 2020-11-27 19:00 Continuous
All eastbound lanes closed due to sanitary & storm sewer upgrades as part of the Basement Flooding Prevention Project.
WILKINSON DR
From DOUBLETREE RD to PATRICK BLVD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
BRIAN DR
From VAN HORNE AVE to SHEPPARD AVE E
2020-02-10 09:00 2020-06-30 16:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
CLIPPER RD
From VAN HORNE AVE to PLEASANT VIEW DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
CONSUMERS RD
From SHEPPARD AVE E to HALLCROWN PL
2020-02-10 09:00 2020-06-30 16:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
HAZELNUT CRES @ HICKORYNUT DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
MARGARET AVE
From PLEASANT VIEW DR to ENDSLEIGH CRES
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PINDAR CRES
From LADNER DR to LADNER DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PLEASANT VIEW DR
From BRIAN DR to CLIPPER RD
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PONDSVIEW DR
From MARGARET AVE to IPSWICH CRES
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
SNAPDRAGON DR @ CLEMATIS RD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
GATEHEAD RD @ ALAMOSA DR
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
BATHFORD CRES @ CHASE RD
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
QUEENSLEA AVE
From WALWYN AVE to ROSEMOUNT AVE
2020-03-02 07:00 2020-08-31 18:00 Daily
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
ALAMOSA DR @ 52
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
HOVE ST
From SEARLE AVE to COCKSFIELD AVE
2020-03-10 07:00 2020-06-10 19:00 Daily
North or south bound 1 lane occupied due to water main and storm sewer re-construction.
LAWRENCE AVE W @ BOLINGBROKE RD
2020-03-17 09:30 2020-08-20 15:00 Daily
East bound 1 lane blocked due to unload material.
STEELES AVE W
From FENMAR DR to ROSSDEAN DR
2020-03-30 07:00 2020-08-01 19:00 Daily
One Eastbound lane occupied due to watermain work.
BETH NEALSON DR @ WICKSTEED AVE
2019-10-25 07:00 2020-07-31 19:00 Daily
Southbound lane occupied due to watermain work.
DANE AVE
From CONLAND AVE to DUFFERIN ST
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
MARLEE AVE
From GLENGROVE AVE to GLEN PARK AVE
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
BOLDMERE CRES @ ALAMOSA DR
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
ALLENWOOD CRES
From ALAMOSA DR to APPIAN DR
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
GERALDTON CRES
From ALAMOSA DR to GERALDTON CRES
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
APPIAN DR
From ALLVIEW CRES to ALLENWOOD CRES
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
ALLVIEW CRES
From APPIAN DR to ALLVIEW CRES
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
HALLSPORT CRES @ 106-41
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
BUNNELL CRES
From HALLSPORT CRES to KEEFER RD
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
ELLERSLIE AVE @ 240
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
ALDERSHOT CRES
From YORKMINSTER RD to ALDERSHOT CRES
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
OLD YONGE ST
From YORK MILLS RD to MUNRO BLVD
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
OLD YONGE ST @ 239
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
YORKMINSTER RD @ 42
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
OAKLEY PL
From OLD YONGE ST to OLD YONGE ST
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
BUCKLAND RD @ GILTSPUR DR
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Southbound lane closed.
SHARPECROFT BLVD
From GRANDRAVINE DR to DOVEHOUSE AVE
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Alternating closure of Northbound and Southbound lanes.
STREAMDALE CRT @ SENTINEL RD
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Eastbound lane closed.
VIRGILWOOD DR @ AILSA CRAIG CRT
2020-04-14 07:00 2020-06-30 21:00 Daily
Water main and water service installation. Southbound lane closed.
RODING ST @ #611 to #557
2020-04-13 07:00 2020-07-13 19:00 Continuous
Full lane closure due to storm sewer installation work.
WENTWORTH AVE
From MYLESVIEW PL to EDDFIELD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BRENTWOOD AVE @ SHEPPARD AVE W
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BURNDALE AVE
From SENLAC RD to WELBECK RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
CAMERON AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FLORENCE AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FRANKLIN AVE
From BASSANO RD to GWENDOLEN AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
JOHNSTON AVE
From EASTON RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
PEWTER RD
From FLORENCE AVE to CAMERON AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
POYNTZ AVE
From BEAMAN RD to EASTON RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
RADINE RD
From POYNTZ AVE to STUART AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
ROYCREST AVE @ BRENTWOOD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
WILLOWDALE AVE
From FINCH AVE E to EMPRESS AVE
2020-04-27 07:00 2020-07-31 19:00 Daily
Construction work. Northbound and Southbound curb lanes closed.
LESLIE ST
From FINCH AVE E to STEELES AVE E
2020-04-15 09:00 2020-06-30 16:00 Daily
Construction work. Northbound and Southbound curb lane closed.
CARHARTT ST @ MARQUETTE AVE
2020-04-20 07:00 2020-06-05 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm.
HOTSPUR RD
From BATHURST ST to NEPTUNE DR
2020-04-20 07:00 2020-06-05 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm.
WILSON HEIGHTS BLVD
From WATERLOO AVE to BRIGHTON AVE
2020-05-03 07:00 2020-08-03 19:00 Daily
Northbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
SEARLE AVE
From DUFFERIN ST to SHAFTESBURY AVE
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
CODSELL AVE
From MAXWELL ST to BATHURST ST
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
SHIPPIGAN CRES
From TRAILSIDE DR to DALLINGTON DR
2020-04-27 07:00 2020-06-06 21:00 Daily
Westbound lane blocked due to Watermain and Water Service Installation
TRAILSIDE DR
From SHAUGHNESSY BLVD to SHIPPIGAN CRES
2020-04-27 07:00 2020-06-06 21:00 Daily
Westbound lane blocked due to Watermain and Water Service Installation
TUNA CRT
At FENELON DR
2020-04-27 07:00 2020-06-06 19:00 Daily
Northbound lane blocked due to Watermain and Water Service Installation
CHIPPING RD
From DON MILLS RD to PARK GLEN DR
2020-04-27 07:00 2020-06-06 19:00 Daily
Westbound lane blocked due to Watermain and Water Service Installation
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2020-05-04 07:00 2020-06-30 21:00 Daily
Watermain and Water Service Installation. Southbound lane closed. Two-way traffic maintained will be maintained.
FINCH AVE E
From CHEROKEE BLVD to GORDON BAKER RD
2020-05-04 07:00 2020-06-30 21:00 Daily
Watermain and Water Service Installation. Westbound curb lane closed.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2020-05-04 07:00 2020-06-30 21:00 Daily
Watermain and Water Service Installation. 2 Westbound curb lane closed.
OLD LESLIE ST @ SHEPPARD AVE E
2020-05-04 07:00 2020-06-30 21:00 Daily
Watermain and Water Service Installation. Southbound lane closed.
WHITBURN CRES
From KEELE ST to BLAYDON AVE
2020-05-04 07:00 2020-06-30 21:00 Daily
Watermain and Water Service Installation. Southbound/Eastbound lane closed.
STEELES AVE E @ BIRCHMOUNT RD
2020-04-27 07:00 2020-07-31 19:00 Daily
Concrete, sidewalk and curb removal and replacement. One lane in each direction available at all times. Deleted By: pwu2; When: 04/28/2020 6:59:06 AM; Reason: dfuplicate
DON MILLS RD @ Steeles AV E
2020-04-28 07:00 2020-07-01 19:00 Daily
Both directions blocked due to Concrete Sidewalk & Curbs Removal and Replacement
HOLBORNE AVE
From WOODBINE AVE to GLEDHILL AVE
2020-05-05 07:00 2020-06-23 19:00 Daily
Asphalt driveway and boulevard improvement and restoration as required. Westbound and Eastbound curb lanes closed alternatively.
MALLARD RD @ DON MILLS RD
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration as required. Westbound and Eastbound curb lanes closed alternatively.
RUSTYWOOD DR
From AVONWICK GT to DEERPATH RD
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration as required. Westbound and Eastbound curb lanes closed alternatively.
SHEPPARD AVE E @ BRIAN DR
From BRIAN DR to ATRIA BLVD
2020-05-04 07:00 2020-07-03 19:00 Daily
Eastbound curb lane and boulevard occupied due to streetscape landscaping by Tridel.
GILLEY RD @ Garratt Boulevard
From GARRATT BLVD to KESWICK RD
2020-05-04 00:01 2020-06-11 23:59 Daily
One north and southbound lane blocked due to watermain and sewer reconstruction by Timbel Limited.
APPLETREE CRT @ DIANA DR
2020-05-04 00:01 2020-06-11 23:59 Continuous
All lanes occupied due to a watermain and sewer reconstruction by Timbel Limited.
KENNETH AVE @ SPRING GARDEN AVE
2020-05-07 00:01 2020-07-31 23:59 Continuous
Southbound lane blocked due to rehabilitation of sanitary sewer.
DON MILLS RD @ EGLINTON AVE E
2020-05-04 09:00 2020-06-30 23:00 Continuous
North, south and eastbound 1 left turn blocked due to ECLRT construction.
FAIRLAWN AVE @ GREER RD
2020-05-06 07:00 2020-06-05 19:00 Daily
Eastbound curb lane partially occupied due to construction conduit from the North-East corner of Greer Road and Fairlawn Avenue
GREER RD
From BROOKDALE AVE to FAIRLAWN AVE
2020-05-06 07:00 2020-06-05 19:00 Daily
Northbound curb lane partially occupied due to conduit construction.
JEDBURGH RD @ FAIRLAWN AVE
2020-05-06 07:00 2020-06-05 19:00 Daily
Northbound and eastbound curb lanes partially occupied due to conduit construction.
LORD SEATON RD @ 69 - 2
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
OLD YONGE ST
From UPPER CANADA DR to DON RIDGE DR
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
YORK RIDGE RD @ YORK MILLS RD
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
YORK RIDGE RD @ YORK MILLS RD
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
ALDERSHOT CRES @ UPPER CANADA DR
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
BASSWOOD RD @ 8
From JOHNSON FARM LANE to CHURCHILL AVE
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
DERRYDOWN RD
From BRANTLEY CRES to CONAMORE CRES
2020-05-04 07:00 2020-06-11 19:00 Continuous
Both lanes on Derrydown Rd occupied but only one at a time due to road surface cut.
DON MILLS RD
From EGLINTON AVE E to WYNFORD DR
2020-05-08 09:00 2020-06-05 17:00 Daily
Borehole investigation, NORTHBOUND CURBLANE.
WATERLOO AVE
From HOVE ST to TILLPLAIN RD
2020-05-11 07:00 2020-08-11 19:00 Continuous
East and westbound partially blocked due to Storm sewer re-construction
KENNEDY RD
From HAVENDALE RD to LINWOOD AVE
2020-05-12 07:00 2020-06-30 19:00 Daily
Northbound and southbound alternating lanes partially occupied due to underground Hydro installation.
BANTON RD @ PALM DR
2020-05-19 07:00 2020-06-05 19:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
BANTON RD @ 14-6
2020-05-19 07:00 2020-06-05 19:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
AMEER AVE @ NEPTUNE DR
2020-05-19 07:00 2020-06-05 19:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
GLEN PARK AVE @ 113-95
2020-05-19 07:00 2020-06-05 19:00 Daily
Eastbound lane partially occupied due to trenchless sewer rehabilitation.
BANTON RD
From BANTON RD to PALM DR
2020-05-19 07:00 2020-06-05 19:00 Daily
Southbound pane partially occupied due to trenchless sewer rehabilitation.
BANTON RD @ 14-6
2020-05-19 07:00 2020-06-05 19:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
KENNETH AVE
From SPRING GARDEN AVE to SHEPPARD AVE E
2020-05-20 00:01 2020-08-28 00:01 Continuous
Southbound lane partially occupied due to sewer rehabilitation, temporary by-pass, and MH Emplacement.
YONGE ST @ 6285
From OTONABEE AVE to ATHABASKA AVE
2020-06-01 07:00 2020-06-12 18:00 Daily
Northbound lane partially occupied due to sidewalk and road repairs.
KENNETH AVE @ SPRING GARDEN AVE
2020-05-20 00:01 2020-08-28 23:59 Continuous
All southbound lanes occupied due to sewer rehabilitation work by Capital Sewer Services Ltd.
FLORENCE AVE
From RADINE RD to PEWTER RD
2020-05-25 07:00 2020-06-19 22:00 Daily
Eastbound lane partially occupied due to asphalt coring, drilling boreholes and monitoring well installations.
JOHNSTON AVE
From EASTON RD to RADINE RD
2020-05-25 07:00 2020-06-19 22:00 Daily
Eastbound lane partially occupied due to asphalt coring, drilling boreholes and monitoring well installations.
POYNTZ AVE
From EASTON RD to SENLAC RD
2020-05-25 07:00 2020-06-19 22:00 Daily
Westbound lane partially occupied due to asphalt coring, drilling boreholes and monitoring well installations.
MEDACA ST
From KINGSLAKE RD to BARONESS CRES
2020-05-25 07:00 2020-07-25 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to underground Hydro installation.
RIDGE RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
PRIVET RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-20 19:00 Continuous
Full road closure due to construction work. Local traffic only.
MONTANA AVE @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
STEELES AVE E @ LAURELEAF RD S
From LAURELEAF RD S to BESTVIEW DR
2020-05-25 09:00 2020-06-05 16:00 Daily
One westbound lane occupied due to a hydro installation by Trans Power Construction Ltd.
PEMBERTON AVE @ KENNETH AVE
2020-06-01 07:00 2020-06-12 18:00 Daily
Two westbound lanes occupied due to sidewalk and road repairs by Suncrete Construction Co. Ltd.
LAURA RD @ 1-340
2020-06-01 07:00 2020-09-01 19:00 Continuous
One westbound lane occupied due to a sanitary sewer system installation by Varcon Construction.
DON MILLS RD @ WYNFORD DR
From WYNFORD DR to EGLINTON AVE E
2020-05-25 07:00 2020-06-26 19:00 Daily
Northbound passing lane occupie due to a borehole investigation by WSP Canada Inc.
WESTON RD
From LAWRENCE AVE W to BELLEVUE CRES
2020-05-25 07:00 2020-06-30 19:00 Daily
Northbound and southbound lanes partially occupied due to Hydro trenching work.
DON MILLS RD @ 1400-1390
2020-05-25 19:00 2020-06-05 05:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
DON MILLS RD
From WYNFORD DR to GREEN BELT DR
2020-05-21 09:00 2020-06-26 16:00 Daily
Geotechnical and environmental borehole investigation. Northbound curb lane closed.
MILLWOOD RD @ LAIRD DR
2020-05-21 07:00 2020-06-12 19:00 Daily
Repair of partial sidewalks, curbs and landscaping. Curb lanes in all directions closed.
ST CLAIR AVE E
From ALVIN AVE to CLIFTON AVE
2020-05-21 07:00 2020-06-12 19:00 Daily
Repair of partial sidewalks and curbs. Restrictions on Eastbound and Westbound lanes.
WR ALLEN RD @ WILSON AVE
2020-06-01 23:00 2020-10-16 05:00 Daily
Replacement of barrier fencing. 1 Northbound lane closed.
CAVOTTI CRES
From EVANSTON DR to SHAFTESBURY ST
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
EVANSTON DR
From CAVOTTI CRES to TERRYDALE DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
EVANSTON DR @ TERRYDALE DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
ARLSTAN DR
From EVANSTON DR to WILMINGTON AVE
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
WILMINGTON AVE
From ARLSTAN DR to BLUE FOREST DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
MAXWELL ST @ 297
From ARTREEVA DR to WILMINGTON AVE
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
BLUE FOREST DR
From WILMINGTON AVE to ELDER ST
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration work. Curb lanes in both directions occupied.
DON MILLS RD
From GOODVIEW RD to SHEPPARD AVE E
2020-05-25 07:00 2020-06-08 19:00 Daily
northbound, eastbound, southbound, and westbound curb lane partially occupied due to road and sidewalk repairs.
YONGE ST @ HWY 401
From HWY 401 to SHEPPARD AVE E
2020-05-25 07:00 2020-06-05 18:00 Daily
Two northbound lanes occupied due to sidewalk and road repairs by Suncrete Construction Co. Ltd.
YONGE ST @ BISHOP AVE
2020-06-01 07:00 2020-06-12 18:00 Daily
Two northbound lanes occupied due to sidewalk and road repairs by Suncrete Construction Co Ltd.
YONGE ST @ HOLLYWOOD AVE
2020-06-01 07:00 2020-06-12 18:00 Daily
Two northbound lanes occupied due to sidewalk and road repairs by Suncrete Construction Co Ltd.
CHARLESWOOD DR @ COLLINSON BLVD
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Westbound lane closed.
TORRESDALE AVE @ 184-178
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Northbound lane closed.
DUNLOE RD @ HAWARDEN CRES
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
HURSTING AVE
From WINONA DR to ATLAS AVE
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Eastbound lane closed.
MILDENHALL RD @ 106-102
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
FRIVICK CRT @ 2
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Eastbound lane closed.
NORWIN ST
From SHETLAND ST to DREWRY AVE
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Northbound lane closed.
SHETLAND ST @ NORWIN ST
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Eastbound lane closed.
LONGMORE ST @ NORTON AVE
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
HILLCREST AVE
From WILLOWDALE AVE to LONGMORE ST
2020-05-29 07:00 2020-11-30 19:00 Daily
Watermain rehabilitation. Westbound lane closed.
DORIS AVE @ SHEPAPRD AVE E
2020-05-28 08:00 2020-06-05 19:00 Daily
Construction work on behalf of Bell. Eastbound lane closed.
ALFRED AVE @ DUDLEY AVE
From KENNETH AVE to WILFRED AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Westbound lanes partially occupied due to water main rehabilitation.
GREENFIELD AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.
FINCH AVE W
From TOBERMORY DR to SENTINEL RD
2020-05-27 07:00 2020-06-05 17:00 Daily
Eastbound curb lane partially occupied due to stripping of topsoil, curb removal, and sidewalk construction.
DON MILLS RD
From LEGATO CRT to BOND AVE
2020-06-01 07:00 2020-06-09 19:00 Daily
Northbound left lane occupied for trenchless sewer rehabilitation by Insituform Technologies. No left turn from Legato Court and Bond Avenue onto Don Mills Road.
GILLEY RD
From GARRATT BLVD to KESWICK RD
2020-05-04 00:01 2020-06-11 23:59 Continuous
Watermain, sewer and road reconstruction. Westbound lane closed.
TULANE CRES @ 140
From SLIDELL CRES to ROYWOOD DR
2020-06-01 08:00 2020-06-12 19:00 Daily
Southbound curb lane occupied for utility put installation by Grimsby Utility Contractors.
KNOX AVE @ 17
At VANHILL AVE
2020-06-01 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
STARCROSS CRT
At EMILY AVE
2020-06-01 07:00 2020-06-12 19:00 Daily
One westbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
STARCROSS CRT
From EMILY AVE to STARCROSS CRT
2020-06-01 07:00 2020-06-12 19:00 Daily
One eastbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
WHITFIELD AVE @ 34 - 16
2020-06-01 07:00 2020-06-12 19:00 Daily
One eastbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
WHITFIELD AVE @ 116 - 138
2020-06-01 07:00 2020-06-12 19:00 Daily
One eastbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
CLAIREVILLE DR
From HUMBERLINE DR to CLAIREVILLE DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
CLAIREVILLE DR @ HUMBERLINE DR
2020-06-01 07:00 2020-06-12 19:00 Daily
One westbound lane occupied due to trenchless (No Dig) Sewer Rehabilitation cleaning works.
CUMMER AVE
From WILLOWDALE AVE to MAXOME AVE
2020-06-01 09:00 2020-06-12 19:00 Daily
Alternating westbound and eastbound curb lane closures for underground servicing for proposed storm, sanitary, and watermain connection.
BYNG AVE @ 132
From WILLOWDALE AVE to DUDLEY AVE
2020-05-29 08:00 2020-06-05 19:00 Daily
Emergency Bell Cable repairs. Westbound lane closed.
LAWRENCE AVE W @ BRUCEWOOD CRES
2020-06-01 09:00 2020-06-06 16:00 Daily
Northbound and southbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
KIRKLAND BLVD
From BROOKVIEW DR to BRUCEWOOD CRES
2020-06-01 09:00 2020-06-06 16:00 Daily
Eastbound and westbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
BRUCEWOOD CRES
From DREXEL RD to LAWRENCE AVE W
2020-06-01 09:00 2020-06-06 16:00 Daily
Northbound and southbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
COVINGTON RD @ BRUCEWOOD CRES
2020-06-01 09:00 2020-06-06 16:00 Daily
Eastbound and westbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
UPPER CANADA DR
From LORD SEATON RD to ALDERSHOT CRES
2020-06-01 09:00 2020-06-06 19:00 Daily
Restoration work. Curb lane in both directions occupied.
SARANAC BLVD
From COVINGTON RD to BATHURST ST
2020-06-01 09:00 2020-06-06 16:00 Daily
Eastbound and westbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
DREXEL RD
From SARANAC BLVD to BRUCEWOOD CRES
2020-06-01 09:00 2020-06-06 16:00 Daily
Eastbound and westbound lanes partially occupied due to the installation of new Rogers conduit and cable. Weekend hours: 9:00am-7:00pm
YORKLAND BLVD @ CONSUMERS RD
2020-05-21 07:00 2020-06-16 19:00 Daily
Eastbound curb lane occupied due to hydro and streetight installation work by Trans Power Construction Ltd.
WR ALLEN RD @ HWY 401
2020-06-03 22:00 2020-06-06 05:30 Daily
Southbound Allen Road fully closed at Highway 401 due to construction work. Southbound traffic diverting onto Highway 401.
FINCH AVE W @ BLACK CREEK BLVD
From BLACK CREEK BLVD to ROMFIELD DR
2020-05-29 07:00 2020-06-26 17:00 Daily
One eastbound curb lane occupied due to storm sewer work by Mosaic Transit Group.
THORNCLIFFE PARK DR
From OVERLEA BLVD to BETH NEALSON DR
2020-06-02 09:30 2020-06-05 15:30 Daily
Southbound left turning lane occupied due to road work.
DON MILLS RD
From GATEWAY BLVD to OVERLEA BLVD
2020-06-02 09:30 2020-06-05 15:30 Daily
Southbound one lane occupied due to environmental borehole investigation.
OVERLEA BLVD
From MILLWOOD RD to THORNCLIFFE PARK DR
2020-06-02 07:00 2020-06-05 19:00 Daily
Northbound curb lane occupied due to environmental borehole investigation.
PAPE AVE
From MINTON PL to WESTWOOD AVE
2020-06-02 07:00 2020-06-05 19:00 Daily
Northbound and southbound curb lane occupied due to environmental borehole investigation.
CHEROKEE BLVD @ 326
2020-06-03 09:00 2020-06-17 19:00 Daily
South bound lane blocked due to bell enc pit.
TAVISTOCK RD @ 218
2020-06-02 07:00 2020-06-04 19:00 Daily
Westbound left lane blocked due to TRENCHLESS REHABILITATION OF EXISTING GRAVITY SEWERS
YONGE BLVD @ 259
2020-06-04 07:30 2020-06-05 17:30 Daily
Northbound curb lane occupied for new water and sewer service connection by Utility Force Construction.
BLUE HAVEN CRES @ ARDWICK BLVD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure from Ardwick Boulevard and Blue Haven Crescent to Bluehaven Park trailhead due to City of Toronto's Active TO Initiative. Local traffic only.
ARDWICK BLVD
From FINCH AVE W to BLUE HAVEN CRES
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNCANWOODS DR
From ISLINGTON AVE to FINCH AVE W
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ROWNTREE MILL RD
From EMILY AVE to ISLINGTON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EXBURY RD
From JANE ST to CAMBORNE AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
CHALKFARM DR
From GRAVENHURST AVE to JANE ST
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
GRAVENHURST AVE
From CHALKFARM DR to FOXRUN AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAYMARKET RD
From MAYALL AVE to WILSON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
NISKA RD
From DRIFTWOOD AVE to TOBERMORY DR
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
TOBERMORY DR
From FINCH AVE W to NISKA RD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
POTSDAM RD
From TOBERMORY DR to DRIFTWOOD AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAWRENCE AVE W @ Blossomfield rd
2020-06-04 07:00 2020-06-05 17:00 Daily
Westbound curb lane partially occupied due to hard surface restoration Deleted By: mamutha; When: 06/04/2020 9:51:24 AM; Reason: duplicate
IRONDALE DR
From STEELES AVE W to GARYRAY DR
2020-06-04 09:00 2020-06-04 19:00 Daily
Full closure for watermain re-lining project by Robert B. Somerville Co.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
CLAREMORE AVE
From KINGSTON RD to CRAIGLEE DR
2019-12-02 07:00 2020-06-30 19:00 Continuous
Open Cut Transmission Main - construction of 1050mm WM along Claremore Ave. from Kingston Rd to Craiglee Dr. staging of material, equipment and trucks
KINGSTON RD
From GLEN EVEREST RD to CLAREMORE AVE
2019-12-02 07:00 2020-06-30 19:00 Continuous
Open Cut Transmission - construction of 1050mm WM along Kingston Rd from Glen Everest Rd to Claremore Ave. construction of Shaft 3 and Compound 3 (Construction Staging Area) staging of material, equipment and trucks
MOSSBANK DR
From SCARBOROUGH GOLF CLUB RD to LAWRENCE AVE E
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water service replacement. Westbound curb lane closed.
GREENHEDGES CRT
At APPLEMORE RD
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water services replacement on Green Hedges Ct from Applemore Rd to East end.
SEASONS DR @ STAINES RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
DANFORTH RD
From DANFORTH AVE to ST CLAIR AVE E
2020-03-30 07:00 2020-08-31 19:00 Daily
Road resurfacing and intersection improvements. Northbound and Southbound curb lanes closed.
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-04-06 07:00 2020-08-11 19:00 Daily
Sewer Rehabilitation Program. Eastbound curb lane closed.
WARDEN AVE
From SHEPPARD AVE E to PALMDALE DR
2019-12-09 07:00 2020-06-25 19:00 Daily
Installation of Toronto Hydro duct bank. 1 Northbound and Southbound lane closed.
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-04-06 07:00 2020-08-11 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Capital Sewer Services. Westbound traffic will be maintained.
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-04-06 07:00 2020-08-11 19:00 Daily
Southbound curb lane occupied for sewer rehabilitation by Capital Sewer Services.
NEILSON RD
From HWY 401 COLLECTOR EB NEILSON RD RAMP to HWY 401 COLLECTOR WB NEILSON RD RAMP
2020-04-13 07:00 2020-11-30 16:00 Daily
Northbound and southbound curb lane closures for bridge rehabilitation by Brennan Paving. Daytime at 7am, one lane in one direction will be occupied. Daytime at 9am one lane in both direction will be occupied. Lanes will reopen at 4pm and than close again for the night from 7pm to 6am.
LAKERIDGE DR
From BRIDGEPORT DR to FREEPORT DR
2020-04-14 00:01 2020-10-30 23:59 Continuous
Sanitary force main. Eastbound lane closed.
MCNAB BLVD
From KINGSTON RD to AYRE POINT RD
2020-04-22 07:00 2020-08-01 19:00 Daily
Alternating northbound and southbound curb lanes occupied for curb and sidewalk repairs by D. Crupi and Sons Limited.
LIVINGSTON RD
From WESTLAKE RD to GUILDWOOD PKWY
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
TOYNBEE TRL
From LIVINGSTON RD to LIVINGSTON RD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
LEVERHUME CRES
From LIVINGSTON RD to LIVINGSTON RD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
BURNAGE CRT
From TOYNBEE TRL to TOYNBEE TRL
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
DEARHAM WOOD
From TOYNBEE TRL to GALLOWAY RD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
ROWATSON RD
From LIVINGSTON RD to GUILDWOOD PKWY
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
FAREHAM CRES
From ROWATSON RD to ROWATSON RD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SARI CRES
From WESTLAKE RD to WESTLAKE RD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
NUFFIELD DR
From TOYNBEE TRL to TOYNBEE TRL
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
WESTLAKE AVE
From KINGSTON RD to SARI CRES
2020-05-04 11:48 2020-06-19 14:48 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
WYTHENSHAWE WOOD
From TOYNBEE TRL to WYTHENSHAWE WOOD
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
REGENCY SQ
From TOYNBEE TRL to TOYNBEE TRL
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SOMERDALE SQ
From TOYNBEE TRL to TOYNBEE TRL
2020-05-04 07:00 2020-06-19 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-01 07:00 2020-07-31 21:00 Continuous
1 Southbound lane occupied due to construction
MILNER AVE @ East of Neilson Road
2020-04-23 07:00 2020-12-31 16:00 Daily
Eastbound / Westbound alternating lanes occupied due to construction
MILNER AVE @ NEILSON RD
2020-04-22 00:01 2020-12-31 23:59 Continuous
Temporary street closure to complete road and bridge rehabilitation MTO contract # 2019-2011
EGLINTON AVE E
From ROSEMOUNT AVE to KENNEDY AVE
2020-04-27 07:00 2020-06-30 17:00 Continuous
Westbound 1 lane on Eglinton Ave blocked due to ECLRT construction.
STARRY CRES
From STAINES RD to STARRY CRES
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
STAINES RD
From STARRY CRES to RIVENDELL TRL
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
SOLITUDE ST
From STAINES RD to BOULDERBROOK DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
BOULDERBROOK DR
From STAINES RD to SOLITUDE ST
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
RIVENDELL TRL
From STAINES RD to SOLITUDE ST
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
BIRCHMOUNT RD @ Steeles AV E
2020-04-28 07:00 2020-07-31 19:00 Daily
Both directions blocked due to Concrete Sidewalk & Curbs Removal and Replacement
CASCADEN ST @ SCOVILLE SQ
From SCOVILLE SQ to ASHCOTT ST
2020-04-27 07:00 2020-07-30 19:00 Daily
Eastbound and westbound curb lanes occupied due to an underground hydro installation by Powerline Plus LTD.
ANTRIM CRES @ KENNEDY RD
2020-05-04 07:00 2020-06-22 19:00 Daily
East and westbound all curb lanes blocked due to Mill and pave road surface
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-05-03 19:00 2020-08-11 07:00 Daily
Southbound curb lane blocked due to Sewer Rehabilitation Program
SIRIUS CRES @ STAINES RD
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-11 07:00 2020-07-31 21:00 Continuous
Watermain and water service installation.
BELGREEN AVE
From HAVENDALE RD to FARMINGTON CRES
2020-03-30 07:00 2020-06-30 07:00 Daily
All lanes intermittently occupied due to underground Hydro installation.
KENNEDY RD
From HAVENDALE RD to REIDMOUNT AVE
2020-03-30 07:00 2020-06-30 07:00 Daily
All lanes occupied intermittently due to hydro installation.
HAVENDALE RD
From KENNEDY RD to FULBERT CRES
2020-03-30 07:00 2020-06-30 07:00 Daily
All lanes intermittently occupied due to hydro installation.
FULBERT CRES @ HAVENDALE RD
2020-03-30 07:00 2020-06-30 07:00 Daily
All lanes intermittently occupied due to hydro installation.
FARMINGTON CRES
From HAVENDALE RD to BELGREEN AVE
2020-05-13 07:00 2020-06-30 07:00 Daily
All lanes intermittently occupied due to hydro installation.
SHEPPARD AVE E
From MCCOWAN RD to SHORTING RD
2020-05-19 09:30 2020-06-30 15:30 Daily
Westbound lane occupied due to construction.
SHEPPARD AVE E
From MCCOWAN RD to SHORTING RD
2020-05-19 09:30 2020-06-30 15:30 Daily
Eastbound shoulder partially occupied due to geotechnical, hydrogeological, environmental borehole investigation.
HEPATICA ST
From STAINES RD to BOULDERBROOK DR
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
BOULDERBROOK DR @ 68
From BOULDERBROOK DR to HEPATICA ST
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
BLACKWATER CRES
From WICKSON TRL to GREYPOINT DR
2020-05-19 09:00 2020-06-05 19:00 Daily
Southbound lanes occupied due to construction.
PHARMACY AVE @ 953
From SHANGARRY DR to ELM BANK RD
2020-05-19 09:00 2020-06-05 19:00 Daily
Northbound lanes occupied due to construction.
STEELES AVE E
From WOODBINE AVE to VICTORIA PARK AVE
2020-05-19 00:01 2020-06-17 23:59 Continuous
Eastbound curb lane closure to permit construction of a pavement widening for a right-turn lane driveway entrance to 3125 Steeles Avenue East
TIDEFALL DR @ 3
At HUNTINGWOOD DR
2020-05-20 07:00 2020-06-05 19:00 Daily
Eastbound lane occupied due to construction.
TILLEY DR @ 8
From HAVILAND DR to MCGRATH CRT
2020-05-21 09:00 2020-06-12 19:00 Daily
Southbound lane occupied due to construction.
PASSMORE AVE
From MIDDLEFIELD RD to STATE CROWN BLVD
2020-05-25 07:00 2020-07-03 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to the installation of Toronto Hydro duct bank break and ties, and underground cables. Deleted By: pwu2; When: 05/20/2020 5:12:07 PM; Reason: Duplicate
STAINES RD
From SIRIUS CRES to CULVER LANE
2020-06-01 07:00 2020-06-06 19:00 Daily
Restoration works. Curb lanes in both directions occupied.
STATE CROWN BLVD
From PASSMORE AVE to SELECT AVE
2020-05-25 07:00 2020-07-03 19:00 Daily
Northbound and southbound curb lanes partially occupied due to the installation of Toronto Hydro duct bank break and ties, and underground cables.
WICKSON TRL @ 7
From BERNER TRL to KESSACK CRT
2020-05-21 07:00 2020-06-05 19:00 Daily
All eastbound lanes occupied due to Bell CBL pit work by Grimsby Utility Contractors.
FRED BLAND CRES @ 48
From MCCOWAN RD to TRUDELLE ST
2020-05-20 07:00 2020-06-04 19:00 Daily
All northbound lanes occupied due to Bell ENC work by Grimsby Utility Contractors
THISTLEWAITE CRES @ 24
From INVERGORDON AVE to WYPER SQ
2020-05-22 09:00 2020-06-05 19:00 Daily
Southbound lane occupied due to construction.
MARCELLA ST @ 35
From MAYHILL CRES to SUMMERBRIDGE RD
2020-05-20 07:00 2020-06-12 19:00 Daily
Bell Cable Pit Work. Eastbound lane closed.
PASSMORE AVE
From MIDDLEFIELD RD to STATE CROWN BLVD
2020-05-25 07:00 2020-07-03 19:00 Daily
Installation of Toronto Hydro Cables. Westbound curb lane and Eastbound curb lane closed.
STATE CROWN BLVD
From PASSMORE AVE to SELECT AVE
2020-05-25 07:00 2020-07-03 19:00 Daily
Installation of Toronto Hydro Cables. Northbound curb lane and Southbound curb lane closed.
MCCOWAN RD
From PROGRESS AVE to CORPORATE DR
2020-05-21 07:00 2020-07-16 19:00 Daily
Borehole drilling. 1 Northbound lane closed.
BENROYAL CRES @ 36
2020-05-25 07:00 2020-06-08 19:00 Daily
Northbound lane partially occupied due to trenchless rehabilitation of various sewer lines.
MCCOWAN RD
From PROGRESS AVE to CORPORATE DR
2020-05-25 07:00 2020-07-16 19:00 Daily
Northbound lane partially occupied due to Geotechnical/Geo-Environmental investigation activities including BH Drilling & Hydrogeology.
MARINE APPROACH DR
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORT UNION RD
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEPORT DR
From LAWRENCE AVE E to LAKERIDGE DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORTSMOUTH DR
From LAWRENCE AVE E to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 11:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From MARINE APPROACH DR to SHOALHAVEN DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From PORT UNION RD to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MILITARY TRL
From BONSPIEL DR to HIGHCASTLE RD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HIGHCASTLE RD
From MILITARY TRL to SEALSTONE TER
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
TRUDELLE ST
From DANFORTH RD to CEDAR BRAE BLVD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CEDAR BRAE BLVD
From TRUDELLE ST to BELLAMY RD N
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
NATAL AVE @ AYLESWORTH AVE
2020-06-02 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
NATAL AVE
From PARK ST to MCINTOSH AVE
2020-06-01 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
PHARMACY AVE @ SHEPPARD AVE E
2020-05-25 07:00 2020-06-05 19:00 Daily
One northbound lane occupied due to Bell conduit work by Grimsby Utility Contractors Inc.
KILCHURN CASTLE DR @ 46
At INVERARY CRES
2020-05-25 07:00 2020-06-05 19:00 Daily
One southbound lane occupied due to Bell BW pit work by Grimsby Utility Contractors.
CLAPPISON BLVD @ 39
From PORT UNION RD to SHEA CRT
2020-05-25 09:00 2020-06-05 19:00 Daily
One northbound lane occupied due to Bell ENC pit work by Grimsby Utility Contruction Inc.
LAWRENCE AVE E @ 1790
From TOWNLEY AVE to PHARMACY AVE
2020-05-26 07:00 2020-06-09 19:00 Daily
Eastbound and westbound curb lanes will be occupied for conduit installation by Click Group.
SILVER STAR BLVD @ STEELES AVE E
2020-05-26 08:00 2020-06-05 19:00 Daily
Southbound curb lane occupied for emergency utility work by Grimsby Utility Contractors.
MASSIE ST
From INVERGORDON AVE to PLUM BROOK CRES
2020-05-27 07:00 2020-06-05 19:00 Daily
BELL ENC PIT.9 Massie St, northbound occupied
ARKONA DR
At HEASLIP TER
2020-05-27 07:00 2020-06-05 19:00 Daily
BELL CBL PIT , southbound lane occupied, 4 Arkona dr.
SCHUBERT DR
From ROSSINI PL to DEARHAM WOOD
2020-05-27 07:00 2020-06-05 19:00 Daily
BELL CBL PIT. 14 SCHUBERT DR, southbound lane occupied .
PASSMORE AVE @ MARKHAM RD
2020-05-28 07:00 2020-06-12 19:00 Daily
Westbound curb lane occupied for utility work by Grimsby Utility Contractors.
REDHEUGH CRES @ 66
2020-05-26 07:00 2020-06-05 19:00 Daily
Westbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
MARKHAM RD @ 689-785
2020-05-26 09:00 2020-06-09 15:30 Daily
Construction work due to rehabilitation of various sewer lines.
SINNOTT RD
From CIVIC RD to EGLINTON AVE E
2020-06-01 07:00 2020-06-14 19:00 Daily
Open trenching and placement of conduit & fibre. Northbound curb lane closed.
SHEPPARD AVE E @ JOHN GRAHAM CRT
2020-05-28 08:00 2020-06-05 19:00 Daily
Westbound lane partially occupied due to Bell pole replacements and installation.
WARDEN AVE
From BERTRAND AVE to MARBLE ARCH CRES
2020-05-28 07:00 2020-06-12 19:00 Continuous
Relocating existing Bell conduit. Northbound curb lane closed.
MARKHAM RD @ 763
2020-05-29 09:00 2020-06-12 16:00 Daily
Northbound and southbound lane partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ 689-707
2020-05-29 09:00 2020-06-12 16:00 Daily
Northbound and southbound lanes partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ 739-751
2020-05-29 07:00 2020-06-12 19:00 Daily
Northbound lane partially occupied due to rehabilitation of various sewer lines.
MARKHAM RD @ 689
2020-05-29 09:00 2020-06-12 16:00 Daily
Northbound lane partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ 725-739
2020-05-29 07:00 2020-06-12 19:00 Daily
Northbound lane partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ MEADOWGLEN PL
2020-05-29 09:00 2020-06-12 16:00 Daily
Northbound lane partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ 711-725
2020-05-29 07:00 2020-06-12 19:00 Daily
Northbound lane partially occupied due to the rehabilitation of various sewer lines.
MARKHAM RD @ 785-803 - 769
2020-05-29 07:00 2020-06-12 19:00 Daily
Northbound lane partially occupied due to the rehabilitation of various sewer lines.
MCCOWAN RD @ TRITON RD
2020-05-28 07:00 2020-06-11 19:00 Daily
Southbound left lane and northbound left turn lane occupied for drilling of borehole for geotechnical investigation by Wood Environment and Infrastructure Solution.
GARDENTREE ST @ KITCHENER RD
2020-05-28 08:00 2020-06-05 19:00 Daily
Eastbound curb lane occupied for emergency aerial utility work by Grimsby Utility Contractors.
KINGSTON RD
From CORNELL AVE to QUEENSBURY AVE
2020-06-01 00:01 2020-06-19 23:59 Continuous
Rebuilding Bell Manhole. 2 Westbound lanes closed; two-way traffic maintained at all times.
SADDLEBACK CRT @ 57
From BRAYMORE BLVD to KENSCOTT RD
2020-05-29 07:00 2020-06-12 19:00 Daily
Westbound curb lane occupied for utility pit installation by Grimsby Utility Contractors.
STARRY CRES @ STAINES RD
2020-06-01 09:00 2020-06-06 16:00 Daily
Eastbound and southbound lanes partially occupied due to the installation of new Rogers conduit and cables. Weekend hours: 9:00am-7:00pm
MARKHAM RD @ Gatineau Trail
2020-06-01 07:00 2020-06-15 19:00 Daily
Southbound lane partially occupied due to the rehabilitation of various sewer lines.
WICKSON TRL @ 4
2020-06-01 09:00 2020-06-12 19:00 Daily
Westbound curb lane occupied for installation of utility pit by Grimsby Utility Contractors.
PITFIELD RD @ 323
From HALLBANK TER to KEYWORTH TRL
2020-06-01 09:00 2020-06-12 19:00 Daily
Eastbound curb lane occupied for installation of utility pit by Grimsby Utility Contractors.
TAMBROOK DR @ 74
2020-06-01 09:00 2020-06-12 19:00 Daily
Southbound curb lane occupied for installation of utility pit by Grimsby Utility Contractors.
KINGSTON RD @ 3655
From MARKHAM RD to MUIR DR
2020-06-02 07:00 2020-06-12 19:00 Daily
Site servicing to building
MIDLAND AVE
From DANFORTH RD to LAWRENCE AVE E
2020-06-02 07:00 2020-12-31 21:00 Daily
Various multiple lane closures for water service replacement and full road reconstruction by Sanscon Construction. Two-way traffic will be maintained.
MASON RD @ 110
From EGLINTON AVE E to STANLAND DR
2020-06-04 07:00 2020-06-19 19:00 Daily
One southbound lane occupied due to directional drilling work by Confra Global Solutions Inc.
COMMONWEALTH AVE
From WOLFE AVE to EGLINTON AVE E
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAWRENCE AVE E @ 5316
2020-06-04 07:00 2020-06-04 19:00 Daily
Westbound curb lane occupied due to gas service installation.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ROSEHILL AVE @ AVOCA AVE
2018-05-09 07:00 2020-08-31 19:00 Daily
STRUCTURAL, CIVIL, ELECTRICAL AND MECHANICAL REHBILITATION WORKS AS PERT OF THE ROSEHILL RESERVOIR REHABILITATION WORKS PROJECT [ECS CONTRACT NO. 17ECS-MI-03WA].
ABBOTT AVE @ INDIAN RD
2019-09-17 07:00 2020-08-01 19:00 Daily
One Eastbound and Westbound lane occupied due to water main, water service and installation.
RIVERDALE AVE
From PAPE AVE to POUCHER ST
2019-09-23 09:00 2020-08-01 16:00 Daily
Watermain reconstruction, water service replacement and lane way reconstruction. Eastbound/Westbound lane on Riverdale Ave from Pape Ave to Poucher St.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-01 19:00 Daily
One Northbound and Southbound lane occupied due to water main reconstruction, water service replacement and road resurfacing,
VICTORIA PARK AVE
From DENTON AVE to CRESCENT TOWN RD
2019-09-23 07:00 2020-07-31 19:00 Daily
1 NB/SB lane occupied due to pedestrian bridge rehabilitation.
QUEENS QUAY E
From KNAPP LANE to DOCKSIDE DR
2019-09-26 07:00 2020-09-26 19:30 Continuous
Shaft and tunnel for Enwave western infrastructure expansion. (1) EB lane closed. Deleted By: pwu2; When: 09/27/2019 7:30:25 PM; Reason:
ROXBOROUGH DR
From MOUNT PLEASANT RD to HIGHLAND AVE
2019-10-01 00:01 2020-08-28 23:59 Continuous
EB/WB all lanes occupied due to sanitary force main.
AVENUE RD @ OXTON AVE
From HILLHOLM RD to CHAPLIN CRES
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
AVENUE RD @ CHAPLIN CRES
From TRANMER AVE to OXTON AVE
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CHESTNUT PK
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ABBOTT AVE
From INDIAN RD to INDIAN RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
AVENUE RD
From HILLHOLM RD to CHAPLIN CRES
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CARIBOO AVE
At OSLER ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
EUCLID PL @ EUCLID AVE
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
FRONT ST E
From EASTERN AVE to CHERRY ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MACPHERSON AVE @ AVENUE RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MANNING AVE
From QUEEN ST W to ROBINSON ST
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
ORMSKIRK CRT
At ORMSKIRK AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB/NB/SB 1 lane occupied due to water main reconstruction.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
GARDINER EXPY WB
From DON ROADWAY to YORK ST
2019-10-14 00:01 2021-01-31 23:59 Continuous
Westbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
LAKE SHORE BLVD E GARDINER EXPY RAMP
From DON ROADWAY to DON VALLEY PARKWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
1 lane closed at the top of the westbound Lake Shore on ramp to westbound Gardiner Expressway due to Gardiner Expressway Rehabilitation Project.
GARDINER EXPY EB
From YORK ST to DON ROADWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
Eastbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
JARVIS ST
From QUEEN ST E to FRONT ST E
2019-11-17 00:02 2020-08-22 23:59 Continuous
1 NB lane and 1 SB lane closed for Watermain and Water Service Installation.
WELLINGTON ST W
From PORTLAND ST to BATHURST ST
2019-12-16 07:00 2020-06-30 19:00 Continuous
WB left lane Geotechnical Work for the Proposed Metrolinx Ontario Line Project.
STEWART ST
From PORTLAND ST to BATHURST ST
2019-12-16 07:00 2020-06-30 19:00 Continuous
EB left lane Geotechnical Work for the Proposed Metrolinx Ontario Line Project.
COMMISSIONERS ST @ DON ROADWAY
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Westbound and Eastbound due to bridge construction.
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (Monday through Friday)
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON ROADWAY @ COMMISSIONERS ST
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Northbound and Southbound due to bridge construction.
COMMISSIONERS ST
From MUNITION ST to DON ROADWAY
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Commissioners St.
DON ROADWAY
From VILLIERS ST to COMMISSIONERS ST
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Don Roadway.
FRONT ST W
From BAY ST to YORK ST
2020-01-17 00:01 2020-07-31 23:59 Continuous
Hydro vault rehabilitation. Westbound drop off/pick-up parking zones closed.
WINDERMERE AVE
From LAKE SHORE BLVD W to GARDINER EXPY
2020-02-10 07:00 2020-12-31 16:00 Daily
Northbound intermittent lane closure due to staging of construction vehicles.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
SHUTER ST
From YONGE ST to VICTORIA ST
2020-03-02 19:00 2020-06-18 06:00 Daily
East bound 1 lane blocked due to chilled water supply and return lines.
YORK ST
From FRONT ST W to BREMNER BLVD
2020-03-03 05:00 2020-06-08 23:59 Continuous
North and south bound curb lane blocked due to Metrolinx Project.
CONRAD AVE
From HILLCREST DR to TYRREL AVE
2020-03-02 07:00 2020-06-30 21:00 Continuous
Eastbound and westbound lanes intermittently blocked due to road reconstruction.
BOND ST @ GOULD ST
2020-03-06 07:00 2020-08-28 19:00 Daily
Full road closure due to emergency steam line replacement.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
From COXWELL BLVD to COXWELL BLVD
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
PEARL ST
From DUNCAN ST to SIMCOE ST
2020-04-01 07:00 2020-06-10 19:00 Daily
Westbound lane occupied due to installation of hot and cold water.
CHRISTIE ST
From BARTON AVE to BLOOR ST W
2020-03-23 07:00 2020-06-12 19:00 Daily
Trenchless rehabilitation of existing water mains. Southbound curb lane closed.
ED MIRVISH WAY
From KING ST W to PEARL ST
2020-04-06 07:00 2020-06-10 19:00 Daily
Northbound 1 lane blocked due to installation of hot water pipe.
JOHN ST
From WELLINGTON ST W to KING ST W
2020-04-08 07:00 2020-07-13 19:00 Daily
Alternating closures of two southbound or two northbound lanes for hot water pipe installation by Aecon Utilities. Two way traffic will be maintained at all times.
GARDINER EXPY YONGE/BAY/YORK RAMP @ GARDINER EXPY WB
2020-04-19 00:01 2020-08-09 23:59 Continuous
Westbound Gardiner York-Bay-Yonge off ramp closed for the Gardiner Expressway Rehabilitation Project by Aecon Utilities.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
RICHMOND ST W @ PORTLAND ST
From PORTLAND ST to BATHURST ST
2020-04-13 07:00 2020-06-30 19:00 Continuous
Left westbound lane occupied due to geotechnical work for the Metrolinx Ontario line project.
ADELAIDE ST W
From JOSEPH SALSBERG LANE to BATHURST ST
2020-04-14 07:00 2020-06-30 19:00 Daily
Eastbound right curb lane occupied for geotechnical work by Thurber Engineering.
SIMCOE ST
From ADELAIDE ST W to PEARL ST
2020-04-13 07:00 2020-06-05 19:00 Continuous
Installation of hot and chilled water pipes. Southbound bike lane closed.
BEDFORD PARK AVE
From UNSWORTH AVE to JEDBURGH RD
2020-04-14 07:00 2020-06-30 19:00 Continuous
All directions all lanes blocked due to Laneway Resonstruction
YONGE ST
At BEDFORD PARK AVE
2020-04-14 07:00 2020-06-30 19:00 Continuous
All directions all lanes blocked due to Laneway Resonstruction
YONGE ST @ FARNHAM AVE
2020-04-14 07:00 2020-06-30 19:00 Continuous
All directions all lanes blocked due to Laneway Resonstruction
MELROSE AVE
From AVENUE RD to GREER RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
GREER RD
From OLD ORCHARD GRV to MELROSE AVE
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
DELORAINE AVE
From AVENUE RD to GREER RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
OLD ORCHARD GRV
From AVENUE RD to GREER RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
ROE AVE
From AVENUE RD to ELM RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
ELM RD
From ROE AVE to CRANBROOKE AVE
2020-04-20 07:00 2020-06-20 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
ST GERMAIN AVE
From AVENUE RD to GREER RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
FAIRLAWN AVE
From AVENUE RD to GREER RD
2020-04-20 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
BROOKDALE AVE
From AVENUE RD to ELM RD
2020-04-16 07:00 2020-06-30 19:00 Daily
Duct installation by direction drilling and trenching. Center lane in both directions partially occupied.
DON MILLS RD
From DON MILLS RD SB DVP NB RAMP to DON MILLS RD NB DVP SB RAMP
2020-04-27 00:01 2020-08-07 23:59 Continuous
Rehabilitation of the Don Mills Rd Bridge over the Don Valley Parkway. 1 Northbound and 1 Southbound lane closed on Don Mills Rd.
AVA RD
From VESTA DR to GLENAYR RD
2020-04-27 07:00 2020-06-05 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the renovation of sidewalks, curbs, gutters, driveways, and boulevards. Weekend hours: 7:00am-7:00pm.
DANFORTH AVE
From PATRICIA DR to MORTON RD
2020-04-30 07:00 2020-06-30 19:00 Daily
Eastbound curb lane occupied for sidewalk construction by Jen-Dan Limited.
ADELAIDE ST W @ 76
From BAY ST to SHEPPARD AVE E
2020-04-29 07:00 2020-06-13 17:00 Continuous
Northbound curb lane occupied due to Toronto Hydro vault work.
YONGE ST
From SHUTER ST to QUEEN ST W
2020-04-27 07:30 2020-06-08 19:00 Continuous
Northbound 1 lane blocked due to removal replacement and rehabilitation of subway vent shaft surface.
DUNDAS ST E
From DALHOUSIE ST to MUTUAL ST
2020-04-27 07:00 2020-06-30 07:00 Daily
East and west bound curb lane blocked due to construction.
PARKVIEW HILL CRES
From WOODBINE HEIGHTS BLVD to WELBY CRCL
2020-04-27 08:00 2020-06-30 17:00 Daily
Westbound north lane blocked due to geotechnical investigation.
GLENCREST BLVD
At PLAXTON DR
2020-04-27 07:00 2020-06-06 21:00 Daily
Eastbound lane blocked due to Watermain and Water Service Installation
MC CONNELL AVE @ LOGAN AVE
From LOGAN AVE to FENWICK AVE
2020-05-04 07:00 2020-06-22 19:00 Daily
Eastbound and westbound curb lanes closed alternately due to roadwork by Sanscon Construction.
ADELAIDE ST W
From STRACHAN AVE to SHAW ST
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvements and restoration. Westbound lane closed.
CRAWFORD ST
From DOURO ST to LOGIE PL
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvements and restoration. Northbound and Southbound curb lanes closed alternatively.
CANNIFF ST
From STAFFORD RD to STRACHAN AVE
2020-05-06 07:00 2020-06-24 19:00 Daily
Asphalt driveway and boulevard improvements and restoration. Westbound and Eastbound curb lanes alternatively closed.
ELM AVE
From MOUNT PLEASANT RD to NANTON AVE
2020-05-06 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration. Westbound and Eastbound curb lane closed alternatively.
MANCHESTER AVE
From SHAW ST to OSSINGTON AVE
2020-05-07 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration. Both Westbound curb lanes closed alternatively.
BURNFIELD AVE
From SHAW ST to OSSINGTON AVE
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration. Westbound and Eastbound curb lanes closed alternatively.
HALLAM ST
From SHAW ST to OSSINGTON AVE
2020-05-04 07:00 2020-06-22 19:00 Daily
Asphalt driveway and boulevard improvement and restoration. Westbound and Eastbound curb lanes closed alternatively.
BLOOR ST W
From THOMPSON AVE to PRINCE EDWARD DR N
2020-05-11 10:00 2020-08-20 15:00 Daily
Removal and disposal of existing pedestrian light poles. Westbound and Eastbound curb lanes closed.
BOND ST @ DUNDAS ST E
From DUNDAS ST E to SHUTER ST
2020-05-04 07:00 2020-08-07 19:00 Daily
Northbound right lane and eastbound right lane blocked due to conduit and cable chamber work by Entera Utility Contractors.
DOVERCOURT RD @ NORTHUMBERLAND ST
2020-05-04 07:00 2020-09-05 19:00 Daily
Traffic Signals & Control Devices on all 4 corners of the intersection.
ELM AVE
From MOUNT PLEASANT RD to NANTON AVE
2020-05-06 07:00 2020-06-22 19:00 Daily
East and westbound all lanes blocked due to Mill and pave road surface
MANCHESTER AVE
From SHAW ST to OSSINGTON AVE
2020-05-07 07:00 2020-06-22 19:00 Daily
East and westbound all lanes blocked due to Mill and pave road surface
CASTLE FRANK RD
From DRUMSNAB RD to NANTON AVE
2020-05-05 07:00 2020-06-22 19:00 Daily
North and southbound all lanes blocked due to Mill and pave road surface
HALLAM ST
From SHAW ST to OSSINGTON AVE
2020-05-04 07:00 2020-06-22 19:00 Daily
East and westbound all lanes blocked due to Mill and pave road surface
BURNFIELD AVE
From SHAW ST to OSSINGTON AVE
2020-05-04 07:00 2020-06-22 19:00 Daily
East and westbound all lanes blocked due to Mill and pave road surface
PICKERING ST
From KINGSTON RD to GERRARD ST E
2020-05-04 07:00 2020-08-15 19:00 Daily
Road re-constructions and paving. Alternating lane closures in both directions.
LAKE SHORE BLVD E
From CARLAW AVE to LESLIE ST
2020-05-11 07:00 2020-06-11 19:00 Daily
Eastbound curb lane partially occupied due to underground hydro installation.
PAPE AVE
From GOWAN AVE to DANFORTH AVE
2020-05-11 07:00 2020-07-25 17:00 Continuous
Northbound and southbound lanes partially occupied due to trench restoration of concrete and line painting.
YORKVILLE AVE @ BAY ST
2020-05-11 07:00 2020-06-05 17:00 Continuous
Eastbound lane partially occupied due to construction.
QUEEN ST W @ 485-487
From VANAULEY ST to CAMERON ST
2020-05-04 10:00 2020-06-30 15:00 Daily
Northbound curb lanes occupied due to utility cut repairs by Aqua Tech Solutions Inc.
UNIVERSITY AVE @ 380-426
From ARMOURY ST to QUEEN ST W
2020-05-04 09:30 2020-06-30 15:30 Daily
Southbound curb lanes occupied due to utility cut repairs by Aqua Tech Solutions Inc.
UNIVERSITY AVE @ 345-361
From ARMOURY ST to QUEEN ST W
2020-05-04 09:30 2020-06-30 15:30 Daily
Northbound curb lanes occupied due to utility cut repairs by Aqua Tech Solutions Inc.
UNIVERSITY AVE @ QUEEN ST W
From QUEEN ST W to RICHMOND ST W
2020-05-04 10:00 2020-06-30 15:00 Daily
Southbound curb lanes occupied due to utility cut repairs by Aqua Tech Solutions Inc.
HURON ST @ PHOEBE ST
2020-05-04 10:00 2020-06-30 15:00 Daily
Northbound curb lanes occupied due to utility cut repairs by Aqua Tech Solutions Inc.
AIRDRIE RD @ MILLWOOD RD
From MILLWOOD RD to LEA AVE
2020-05-12 07:00 2020-07-01 19:00 Daily
Northbound and southbound curb lanes occupied due to sidewalk repairs by Sanscon Construction.
WARDELL ST @ DE GRASSI ST
From DE GRASSI ST to QUEEN ST E
2020-05-21 07:00 2020-06-04 19:00 Daily
One northbound lane occupied due to borehole drilling work by Wood Environmental & Infrastructure Solutions.
GERRARD ST E
From TED REEVE DR to LAWLOR AVE
2020-05-19 07:00 2020-07-31 19:00 Daily
Eastbound and westbound curb lanes occupied due to construction.
GREENWOOD AVE
From MORTIMER AVE to O CONNOR DR
2020-05-19 07:00 2020-07-31 19:00 Daily
Northbound and southbound curb lanes occupied due to construction.
LAKE SHORE BLVD W @ WINDERMERE AVE
From WINDERMERE AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
BAYVIEW AVE
From FRONT ST E to ROSEDALE VALLEY RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All lanes closed due to City of Toronto's ActiveTo Initiative, additionally River St west of Bayview Ave will be also be closed.
LAKE SHORE BLVD W @ ELLIS AVE
From ELLIS AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ COLBORNE LODGE DR
From COLBORNE LODGE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ PARKSIDE DR
From PARKSIDE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ BRITISH COLUMBIA DR
From BRITISH COLUMBIA DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ ONTARIO DR
From ONTARIO DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ NEW BRUNSWICK WAY
From NEW BRUNSWICK WAY to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ STRACHAN AVE
From STRACHAN AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
GARDINER EXPY E LOWER JARVIS ST RAMP @ JARVIS ST
2020-05-18 00:01 2021-02-26 23:59 Continuous
Eastbound Jarvis on-ramp to be closed to facilitate the rehabilitation of the Gardiner Expressway including removal and replacement of bridge deck section alongside corresponding construction areas.
SIMCOE ST @ WELLINGTON ST E
From WELLINGTON ST E to FRONT ST E
2020-05-19 09:00 2020-06-05 16:00 Daily
Right turn lane occupied due to HydroVac operations and borehole drilling by Thurber Engineering Ltd.
LAKE SHORE BLVD W
From WINDERMERE AVE to STADIUM RD
2020-05-23 06:00 2020-08-03 23:00 Weekends
Full closure of eastbound lanes for ActiveTO initiative. Closure will be in effect every weekend. During long weekends, closure will end on Monday at 11 pm. Deleted By: mamutha; When: 05/20/2020 11:13:02 AM; Reason: duplicate
NASSAU ST
From LEONARD AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
AUGUSTA AVE
From COLLEGE ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only.
EMERSON AVE
From DUPONT ST to BLOOR ST W
2020-05-19 00:01 2020-09-30 15:29 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BALDWIN ST
From AUGUSTA AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only. Local taffic only
BROCK AVE
From BLOOR ST W to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
COWAN AVE
From SPRINGHURST AVE to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KENSINGTON AVE
From BALDWIN ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
WINONA DR
From EGLINTON AVE W to DAVENPORT RD
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CRAWFORD ST
From MONTROSE AVE to QUEEN ST W
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MONTROSE AVE
From BLOOR ST E to CRAWFORD ST
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
RICHMOND ST E @ CHURCH ST
2020-05-25 08:00 2020-06-30 23:00 Continuous
Westbound traffic on Richmond St E is advised to turn at Sherbourne Street to use Queen Street East to travel further west. Crews will repair the concrete and track system.
LANSDOWNE AVE @ BLOOR ST W
2020-06-01 07:00 2020-08-27 19:00 Daily
One northbound curb lane occupied due to TTC cable chamber rebuild work by Hastings Utilities Cotnracting Ltd.
BICKNELL AVE @ ROGERS RD
From ROGERS RD to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
LAUGHTON AVE
From DAVENPORT RD to HOUNSLOW AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BLACKTHORN AVE @ CAMERON AVE
From CAMERON AVE to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTo Quiet Streets initiative by the City of Toronto. Local traffic only.
HOUNSLOW HEATH RD
From LAUGHTON AVE to ST CLAIR AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HAVERSON BLVD @ DONALD AVE
From DONALD AVE to CAMERON AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
SILVERTHORN AVE
From ST CLAIR AVE W to DONALD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
DONALD AVE @ SILVERTHORN AVE
From SILVERTHORN AVE to HAVERSON BLVD
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CHANDOS AVE @ 19
From CHANDOS AVE to DUFFERIN ST
2020-05-25 07:00 2020-06-05 19:00 Daily
Eastbound lane partially occupied due to trenchless sewer rehabilitation.
WALMER RD @ 10, 11, 15
From LOWTHER AVE to BLOOR ST W
2020-05-19 07:00 2020-06-30 19:00 Daily
Northbound curb lane partially occupied due to repairs to utility cut.
MONARCH PARK AVE
From SAMMON AVE to FELSTEAD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
DANFORTH AVE
From ELLERBECK ST to PLAYTER BLVD
2020-05-05 07:00 2020-06-10 23:00 Daily
Hydro Installation. Eastbound curb lane closed.
LAKE SHORE BLVD E
From LOWER JARVIS ST to SHERBOURNE ST
2020-05-24 22:00 2020-06-29 07:00 Continuous
Eastbound lane partially occupied due to Gardiner Expressway Rehabilitation from Jarvis to Cherry. Weekend hours starting at 10:00pm.
WALMER RD @ 10, 11, 15
From LOWTHER AVE to BLOOR ST W
2020-05-19 07:00 2020-06-30 19:00 Daily
Northbound curb lane partially occupied due to repairs to utility cut.
DUPONT ST @ 392
From HOWLAND AVE to BRUNSWICK AVE
2020-05-19 07:00 2020-06-30 19:00 Daily
Northbound curb lane partially occupied due to repairs to utility cut.
SPADINA RD @ 50,54,56-66,73-75,69-73
From KENDAL AVE to LOWTHER AVE
2020-05-19 07:00 2020-06-30 19:00 Daily
Northbound curb lane partially occupied due to repairs to utility cut.
SPADINA RD @ 24,20,25
From LOWTHER AVE to ANNEX LANE
2020-05-19 07:00 2020-06-30 19:00 Daily
Northbound curb lane partially occupied due to repairs to utility cut.
BOULTON AVE
From DUNDAS ST E to GERRARD ST E
2020-05-27 07:00 2020-07-10 19:00 Daily
Northbound and southbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
DALHOUSIE ST @ QUEEN ST E
2020-05-22 07:00 2020-06-09 19:00 Daily
Northbound lane closed due to borehole drilling.
BARTON AVE
From BATHURST ST to WILLOWVALE LANE
2020-05-28 07:00 2020-07-13 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
MC ALPINE ST
From MCMURRICH ST to DAVENPORT RD
2020-06-01 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
EARL ST
From HUNTLEY ST to SHERBOURNE ST
2020-05-25 07:00 2020-07-13 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
AVENUE RD
From ELGIN AVE to WEBSTER AVE
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Northbound curb lane closed.
AVENUE RD
From PEARS AVE to DAVENPORT RD
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Southbound curb lane closed.
BERNARD AVE @ 114
From MADISON AVE to HURON ST
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Northbound curb lane closed.
ST GEORGE ST @ 135
From PRINCE ARTHUR AVE to BLOOR ST W
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Northbound curb lane closed.
DUPONT ST @ 272
From SPADINA RD to MADISON AVE
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Southbound curb lane closed.
DAVENPORT RD @ 344
From DUPONT ST to BEDFORD RD
2020-05-19 07:00 2020-06-30 19:00 Daily
Utility cut repairs. Southbound curb lane closed.
AVENUE RD @ BROOKE AVE
2020-05-27 07:00 2020-06-19 17:30 Daily
Southbound and westbound curb lanes occupied due to curb and sidewalk work by Jen-Dan Ltd.
RIDELLE AVE
From WR ALLEN RD to BATHURST ST
2020-05-23 09:00 2020-06-22 16:00 Daily
Eastbound and northbound curb lanes occupied due to a conduit installation by Cap Utilities.
SHUTER ST
From PARLIAMENT ST to POULETT ST
2020-05-28 09:00 2020-06-17 16:00 Daily
Westbound curb lane occupied for directional boring and placement of conduit by Azimuth Three Enterprises.
WOODFIELD RD @ QUEEN ST E
2020-05-25 07:00 2020-06-05 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
BATHURST ST
From FRONT ST W to FORT YORK BLVD
2020-05-25 00:01 2021-01-31 23:59 Continuous
Full closure of all northbound and southbound lanes for City of Toronto project No. 20ECS-TI-02BE by Grascan/Torbridge Construction.
LAIRD DR
From ESANDAR DR to CANVARCO RD
2020-05-29 08:00 2020-08-15 16:00 Daily
Southbound and westbound shoulder lanes partially occupied due to the construction of manholes and conduit.
BREMNER BLVD @ GRAND TRUNK CRES
From GRAND TRUNK CRES to LOWER SIMCOE ST
2020-06-02 09:00 2020-06-05 16:00 Daily
Westbound lane partially occupied due to road digging and repairs.
SPADINA CRES @ RUSSELL ST
2020-05-28 07:00 2020-06-05 19:00 Daily
Northbound, southbound, and westbound lanes at the intersection partially occupied due to traffic signals and control devices.
SPADINA RD
From SILVERWOOD AVE to ARDMORE RD
2020-06-01 07:00 2020-06-12 19:00 Daily
Southbound lane partially occupied due to trenchless sewer rehabilitation.
DANFORTH AVE @ GREENWOOD AVE
2020-06-01 07:00 2020-06-05 19:00 Daily
North of Danforth Avenue; southbound lane occupied for conduit installation. South of Danforth Avenue; southbound lane occupied for conduit installation. At the intersection of Danforth Avenue and Greenwood Avenue; northbound left turn lane occupied for conduit installation. Only one zone will be shut down at a time.
THE ESPLANADE
From YONGE ST to SCOTT ST
2020-06-01 00:01 2020-06-19 23:59 Daily
Work will be done in two stages, westbound traffic only, no eastbound traffic allowed. Phase 1 - Westbound lanes occupied for reconstruction by Pave-Al Limited. Phase 2 - Eastbound lanes to be occupied for reconstruction by Pave-Al Limited.
DUFFERIN ST @ PEEL AVE
2020-06-04 07:00 2020-06-09 19:00 Daily
One southbound curb lane occupied due to construction.
HARBORD ST @ MONTROSE AVE
2020-05-29 08:00 2020-06-19 16:00 Daily
Northbound and southbound lane partially occupied due to directional bore, placement of conduit, fibre, and manholes.
LAIRD DR
From ESANDAR DR to CANADA BLVD
2020-05-29 07:00 2020-08-15 19:00 Continuous
Southbound and westbound curb lane partially occupied due to the construction of manholes and conduit.
BEECH AVE @ KINGSTON RD
2020-06-01 09:00 2020-06-19 19:00 Daily
Construction work. Full road closure, local traffic only.
LANGFORD AVE
From DANFORTH AVE to FIELDING AVE
2020-05-29 07:00 2020-06-19 19:00 Daily
Northbound and southbound lanes partially occupied due to directional bore, placement of conduit, fibre, and manholes.
WICKSTEED AVE @ 209
From LESLIE ST to BETH NEALSON DR
2020-06-01 08:00 2020-06-12 19:00 Daily
Eastbound curb lane occupied for cable pit installation by Grimsby Utility Contractors.
YORKVILLE AVE
From YONGE ST to BAY ST
2020-06-01 07:00 2020-06-05 19:00 Daily
Closure of eastbound and westbound lanes for sewer and water disconnection by CG Construction Services Ltd. No access to and from Yonge Street. Partial access of Yorkville Avenue to and from Bay Street.
BLOOR ST W @ 876
From CARLING AVE to OSSINGTON AVE
2020-06-03 07:00 2020-06-13 19:00 Daily
Westbound and eastbound curb lane occupied for water service installation by Rabcon Contractors.
WELLESLEY ST E @ CHURCH ST
2020-06-02 07:00 2020-06-05 17:00 Continuous
Replacement of existing slabs for Hydro vault. Southbound curb lane closed.
PATON RD @ CAMPBELL AVE
2020-05-11 07:00 2020-06-22 19:00 Daily
Eastbound and westbound lanes partially occupied due to the construction of access point. Weekend hours: 9:00am-7:00pm
AVENUE RD
From LONSDALE RD to ST CLAIR AVE W
2020-06-03 07:00 2020-07-03 19:00 Daily
Northbound and southbound curb lanes partially occupied due to directional bore, and placement of conduit and fibre.
ADELAIDE ST W
From JOHN ST to DUNCAN ST
2020-06-01 07:00 2020-07-31 17:00 Daily
Eastbound curb lane partially occupied due to construction.
GLOUCESTER ST
From YONGE ST to GLOUCESTER LANE
2020-06-03 07:00 2020-06-05 19:00 Daily
Westbound lanes partially occupied due to sewer and water disconnects.
MINTON PL
At PAPE AVE
2020-06-02 09:30 2020-06-05 15:30 Daily
Northbound curb lane occupied due to environmental borehole investigation.
OVERLAND DR
From THE DONWAY W to PAPERBIRCH DR
2020-06-01 07:00 2020-06-05 19:00 Daily
One westbound lane occupied due to directional drilling.
SOUTH KINGSWAY @ 294
2020-06-03 07:00 2020-06-04 19:00 Daily
Northbound lane occupied due to gas service installation.
LAKE SHORE BLVD W @ 1926
From WINDERMERE AVE to ELLIS AVE
2020-05-28 07:00 2020-06-10 19:00 Daily
Windermere Ave center lane and Lake Shore Blvd W westbound 1 lane blocked due to Sanitary, Storm and Water Service Installation
LAKE SHORE BLVD E
From LESLIE ST to KEW BEACH CRES
2020-05-23 06:00 2020-08-03 23:00 Weekends
All eastbound lanes occupied for City of Toronto's ActiveTO initiative.
HAMMERSMITH AVE @ QUEEN ST E
2020-06-01 07:00 2020-07-24 07:00 Daily
Northbound all lanes blocked due to UNDERGROUND HYDRO INSTALLATION
STRANGE ST
From DE GRASSI ST to QUEEN ST E
2020-06-02 07:00 2020-06-16 19:00 Daily
Northbound lane blocked due to Geotechnical Borehole Drilling / Investigation
NIAGARA ST @ BATHURST ST
From BATHURST ST to PORTLAND ST
2020-06-03 07:00 2020-06-06 19:00 Daily
All lanes occupied due to permanent repairs to utility cuts by Bevcon Construction.
VICTORIA ST @ QUEEN ST E
2020-06-03 07:00 2020-06-17 19:00 Daily
Northbound curb lane occupied for drilling of borehole by Golder Associates.
BINSCARTH RD @ GLEN RD
2020-06-03 07:00 2020-06-06 17:00 Daily
Binscarth Road east of Glen Road to be fully closed for road reconstruction by CRCE Construction Group. No southbound access to Glen Road from eastbound Binscarth Road. Only northbound traffic will be maintained on Glen Road.
SOUDAN AVE
From COWBELL LANE to DUNFIELD AVE
2020-06-02 07:00 2020-06-23 19:00 Daily
Eastbound and westbound curb lanes occupied for construction by A & F Di Carlo Construction. Deleted By: mamutha; When: 06/02/2020 11:34:48 AM; Reason: not approved
LAKE SHORE BLVD E
From JARVIS ST to BONNYCASTLE ST
2020-06-02 07:00 2020-06-29 22:00 Continuous
Right lane occupied for the Gardiner Expressway Rehabilitation Project by Aecon Utilities.
MORTIMER AVE @ GREENWOOD AVE
From GREENWOOD AVE to LEROY AVE
2020-06-03 09:00 2020-06-05 16:00 Daily
One eastbound curb lane occupied due to emergency sidewalk repairs by Lima's Contruction Inc.
EASTDALE AVE
From SECORD AVE to LUMSDEN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LUMSDEN AVE
From EASTDALE AVE to MAIN ST
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
RIDLEY BLVD
From DELORAINE AVE to YONGE BLVD
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
MAIN ST
From HAMSTEAD AVE to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAMSTEAD AVE
From MAIN ST to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JEDBURGH RD
From DELORAINE AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUPLEX AVE
From MONTGOMERY AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTVIEW BLVD
From HOLLAND AVE to ST CLAIR AVE E
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTLAKE AVE
From HAMSTEAD AVE to COSBURN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
COSBURN AVE
From WESTLAKE AVE to OAK PARK AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
TECUMSETH ST @ NIAGARA ST
2020-06-02 10:00 2020-06-08 16:00 Daily
Northbound lane closed due to geophysics investigation.
NIAGARA ST @ TECUMSETH ST
2020-06-02 10:00 2020-06-08 16:00 Daily
Eastbound lane closed due to geophysics investigation.
WELLINGTON ST W @ BATHURST ST
2020-06-02 10:00 2020-06-08 16:00 Daily
Westbound lane closed due to geophysics investigation.
ADELAIDE PL @ ADELAIDE ST W
2020-06-02 10:00 2020-06-08 16:00 Daily
Southbound lane closed due to geophysics investigation.
PORTLAND ST
From RICHMOND ST W to ADELAIDE ST W
2020-06-02 10:00 2020-06-08 16:00 Daily
Southbound lane closed due to geophysics investigation.
RUSH LANE
From PORTLAND ST to AUGUSTA AVE
2020-06-02 10:00 2020-06-08 16:00 Daily
Eastbound lane closed due to geophysics investigation.
RIVER ST @ DUNDAS ST E
2020-06-03 07:00 2020-06-04 19:00 Daily
Repair Beanfield manhole. Southbound curb lane closed.
COLLEGE VIEW AVE
From AVENUE RD to ORIOLE PKWY
2020-06-04 07:00 2020-06-25 19:00 Daily
Construction work. Curb lanes in both directions closed.
WARDELL ST
From DE GRASSI ST to QUEEN ST E
2020-05-21 07:00 2020-06-04 19:00 Daily
Northbound lane partially occupied due to borehole drilling.
AVENUE RD @ 455
From FOXBAR RD to LYNWOOD AVE
2020-06-03 07:00 2020-07-31 17:00 Daily
Northbound curb lane partially occupied due to sidewalk and road construction. Weekend hours: 9:00am-7:00pm
WELLINGTON ST W @ TECUMSETH ST
From TECUMSETH ST to BATHURST ST
2020-05-29 07:00 2020-08-30 19:00 Continuous
Left westbound lane occupied due to geotechnical work by Thurber Engineering Ltd for Metrolinx.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
GARDINER EXPY W LAKE SHORE BLVD W RAMP @ GARDINER EXPY
2020-06-06 06:00 2020-08-03 23:00 Weekends
Ramp fully closed from Saturday 6 AM to Sunday 11 PM due to City of Toronto's ActiveTO Initiative.
RATHBURN RD
From THE EAST MALL to MARTIN GROVE RD
2020-06-15 07:00 2020-07-20 19:00 Daily
Eastbound and westbound lanes partially occupied due to the removal of concrete and replacement of asphalt. Weekend hours: 7:00am-7:00pm
BATHURST ST @ CLAXTON BLVD
2020-06-09 07:00 2020-06-11 19:00 Daily
Excavation repair work. Southbound curb lane closed.
JANE ST BLACK CREEK DR SB RAMP @ JANE ST
2020-06-05 00:01 2020-10-30 00:01 Daily
On-ramp from Jane St to Southbound Black Creek Dr closed for long-term construction.
JUDSON ST
From ROYAL YORK RD to CAVELL AVE
2020-06-12 07:00 2020-06-27 17:00 Daily
One eastbound lane partially occupied due to sidewalk construction. Weekend hours: 7:00am-5:00pm
THIRTY THIRD ST
From LAKE SHORE BLVD to PARK BLVD
2020-06-11 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement followed by road reconstruction.
THIRTY FIFTH ST
From LAKE SHORE BLVD W to LAKE PROMENADE
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement and road construction.
OAKWOOD AVE @ 260
From EARNSCLIFFE RD to CONWAY AVE
2020-06-08 09:00 2020-06-08 16:00 Daily
Northbound and southbound curb lanes occupied for the monitoring of road wells by Terrapex Environmental.
REXDALE BLVD
From BERGAMOT AVE to FIRST ST
2020-06-09 07:00 2020-06-09 17:30 Daily
Westbound curb lane partially occupied due to the unloading of equipment for Pipeline/Hydro One.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
DINNICK CRES
From WEYBOURNE CRES to POTE AVE
2020-06-05 07:00 2020-07-20 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HELEN LU RD
From DON MILLS RD to FOREST MANOR RD
2020-06-05 07:00 2020-06-05 17:00 Daily
Full closure for crane hoisting by Lift All Crane Service.
SNOWCREST AVE @ 63-77
2020-06-08 07:00 2020-06-26 19:00 Daily
Rehabilitation of various sewer lines. 1 Westbound lane closed.
YONGE ST @ BISHOP AVE
From BISHOP AVE to LORD SEATON RD
2020-06-08 07:00 2020-06-15 19:00 Daily
Northbound and southbound curb lanes occupied due to sidewalk repairs by A&F Di Carlo Construction Inc.
TORYORK DR
From WESTON RD to ORMONT DR
2020-06-15 09:30 2020-11-14 15:30 Daily
South bound 1 lane blocked due to installation of storm sewer.
TORRESDALE AVE
2020-06-08 07:00 2020-06-12 19:00 Daily
One northbound lane occupied due to trenchless sewer rehabilitation work by Insituform Technologies Ltd.
SHEPPARD AVE W @ 656
2020-06-08 07:00 2020-06-09 19:00 Daily
Westbound curb lane occupied due to gas service installation.
FOREST HEIGHTS BLVD
From BAYVIEW AVE to WIMPOLE DR
2020-06-22 07:00 2020-09-09 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
BISHOP AVE
From KENNETH AVE to WILLOWDALE AVE
2020-06-29 07:00 2020-09-22 07:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
KILLAMARSH DR
From MADRON CRES to DERRYDOWN RD
2020-06-06 07:00 2020-09-08 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
WILLOWDALE AVE
From NORTON AVE to CHURCH AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Northbound and southbound lanes partially occupied due to duct installation.
NORTON AVE
From DORIS AVE to LONGMORE ST
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
KENNETH AVE
From MCKEE AVE to NORTON AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Northbound and southbound lanes partially occupied due to duct installation.
DORIS AVE
From NORTON AVE to MCKEE AVE
2020-06-08 07:00 2020-06-17 19:00 Daily
Northbound and southbound lanes partially occupied due to duct installation.
CHURCH AVE
From KENNETH AVE to DUDLEY AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
MCKEE AVE
From DORIS AVE to KENNETH AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
DUDLEY AVE
From DORIS AVE to LONGMORE ST
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
BERMONDSEY RD @ 143
From BARTLEY DR to SUNRISE AVE
2020-06-08 09:00 2020-06-19 19:00 Daily
One northbound lane occupied due to Bell sidewalk restoration by Grimsby Utility Contractors.
VALLEYBROOK DR @ 45
From LESMILL RD to MOATFIELD DR
2020-06-08 09:00 2020-06-19 19:00 Daily
Northbound lane occupied due to Bell sod restoration work by Grimsby Utility Contractors Inc.
HARLANDALE AVE @ 59
At BEECROFT RD
2020-06-08 09:00 2020-06-19 19:00 Daily
One northbound lane occupied due to Bell sod restoration by Grimsby Utility Contractors Inc.
HOLMES AVE @ YONGE ST
From YONGE ST to DORIS AVE
2020-06-05 07:00 2020-06-05 19:00 Daily
One eastbound and one westbound lane occupied due to emergency sewer work by CG Construction Services Ltd.
ESTELLE AVE
From PRINCESS AVE to EMPRESS AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Northbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
EMPRESS AVE
From HIGHGATE AVE to BAYVIEW AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Westbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
ELMWOOD AVE
From BAYVIEW AVE to ESTELLE AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
PHARMACY AVE
From ELLESMERE RD to HWY 401
2020-06-15 07:00 2020-08-03 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BROADBENT AVE
From MIDLAND AVE to CHILLERY AVE
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
FRED BLAND CRES
From MCCOWAN RD to TRUDELLE ST
2020-06-05 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BRIMLEY RD @ 666
2020-06-05 07:00 2020-06-05 19:00 Daily
Southbound curb lane occupied due to gas service installation.
DANFORTH RD @ 1496
2020-06-05 07:00 2020-06-05 19:00 Daily
Southbound curb lane occupied due to gas service installation.
MINUK ACRES @ BEECHGROVE DR
2020-06-08 07:00 2020-06-11 19:00 Daily
Southbound curb lane partially occupied due to water service installation.
SHEPPARD AVE E @ 4015
From KENNEDY RD to GORDON AVE
2020-06-08 09:00 2020-06-08 16:00 Daily
Eastbound curb lane occupied for the monitoring of road wells by Terrapex Environmental.
GATEFORTH DR
From SHEPPARD AVE E to RAYWARD CRT
2020-06-08 09:00 2020-06-09 19:00 Daily
Northbound curb lane partially occupied due to the installation of conduit.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
BOULTBEE AVE
From KISWICK ST to JONES AVE
2020-06-15 07:00 2020-08-03 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HARRIET ST
From LESLIE ST to HASTINGS AVE
2020-06-12 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
PARKHURST BLVD
From DONEGALL DR to CAMERON CRES
2020-06-05 07:00 2020-07-20 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
SELKIRK ST @ WOODYCREST AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HERRICK ST
From BATHURST ST to MARKHAM ST
2020-06-05 07:00 2020-07-21 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
MARKHAM ST
From DUNDAS ST W to COLLEGE ST
2020-06-05 07:00 2020-07-21 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BARTON AVE
From HOWLAND AVE to ALBANY AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
ALBANY AVE
From BARTON AVE to BLOOR ST W
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
JOHN ST @ QUEEN ST W
2020-06-08 07:00 2020-06-12 23:59 Daily
Rehabilitation of various sewer lines. 1 Westbound lane and 1 Northbound lane closed.
BULWER ST @ 45
From SPADINA AVE to SOHO ST
2020-06-08 07:00 2020-06-15 17:30 Daily
Full closure of street for rebuilding of the hydro cable chamber by Valard Construction.
BAY ST
From BLOOR ST W to CHARLES ST W
2020-06-08 00:01 2020-07-07 23:59 Continuous
Replacement of landscaping. 1 Northbound lane closed.
LANSDOWNE AVE
From SHIRLEY ST to DUNDAS ST W
2020-06-08 07:00 2020-06-21 00:01 Daily
Northbound curb lane occupied for sewer line rehabilitation by Clean Water Works.
SIMCOE ST @ 234
From MICHAEL SWEET AVE to DUNDAS ST W
2020-06-05 07:00 2020-06-05 19:00 Daily
Northbound lanes occupied for crane hoisting by Modern Crane.
HARBOUR ST @ 60
From YORK ST to BAY ST
2020-06-09 07:00 2020-06-17 19:00 Daily
Two eastbound lanes occupied due to hydro service installation by Entera Utility Contractors.
INDIAN RD
From WRIGHT AVE to HIGH PARK AVE
2020-06-08 07:00 2020-06-12 19:00 Daily
Northbound and southbound curb lane occupied for conduit installation by Trinity Communication Services.
ROEHAMPTON AVE @ 177
From YONGE ST to REDPATH AVE
2020-06-08 09:00 2020-06-19 16:00 Daily
Westbound and eastbound curb lane occupied for conduit installation by Trinity Communication Services.
DUNVEGAN RD @ 139-151
2020-06-08 07:00 2020-06-12 19:00 Daily
Trenchless Sewer Rehabilitation. Northbound lane closed.
KING ST W
From JEFFERSON AVE to ATLANTIC AVE
2020-06-09 08:00 2020-06-12 16:00 Daily
Installation of new hydro pole and bus stop. Eastbound curb lane closed.
BRACKEN AVE @ 29
From BINGHAM AVE to KINGSWOOD RD
2020-06-08 08:00 2020-06-19 16:00 Daily
One eastbound lane occupied due to Bell sod restoration by Grimsby Utility Contractors Inc.
DUPONT ST @ 740
From SHAW ST to CHRISTIE ST
2020-06-08 07:00 2020-10-23 23:00 Continuous
One northbound curb lane occupied due to watermain and service connection replacement by R.V. Anderson Associated Ltd.
WELLINGTON ST W
From PORTLAND ST to DRAPER ST
2020-06-10 09:00 2020-06-13 17:00 Daily
Eastbound curb lane occupied for daylighting of utilities by Infrastructure Intelligence Services.
BAYVIEW AVE @ ROSEDALE VALLEY RD
2020-06-05 09:00 2020-06-05 16:00 Daily
Southbound curb lane occupied for gas pipeline marker installations by Enbridge Gas Distribution.
YORKVILLE AVE @ 21
2020-06-05 09:00 2020-06-05 16:00 Daily
Back laneway occupied for gas service disconnection by Enbridge Gas Distribution.
BRACKEN AVE @ 29
From KINGSWOOD RD to BINGHAM AVE
2020-06-08 08:00 2020-06-19 16:00 Daily
Eastbound curb lane occupied for utility sod restoration by Grimsby Utility Contractors.
QUEENS QUAY E @ 100
2020-06-08 07:00 2020-06-19 19:00 Daily
Eastbound and westbound curb lane occupied for gas service installation by NPL Canada.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

A parking ticket is affixed to the windshield of a vehicle on Wednesday June 9, 2010. (CP24/Mathew Reid)

Transportation Services

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

toronto traffic, rush hour, commute

Vehicle and Licencing

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Wasaga Beach tourism

Ontario Travel Tips

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Insurance paper

Insuring a vehicle in Ont.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Traffic file photo

Road Safety

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Highway 407

407 ETR

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.


Transit Twitter Stream

Service advisories from the Toronto Transit Commission

Service updates from GO Transit

Service advisories from York Region Transit

Service updates and news from Durham Region Transit

Service updates from Brampton Transit

Greater Toronto and Hamilton Area transportation updates

Latest news about Ontario's public transit smartcard

Transit Systems Servicing Toronto and the GTA

GO train
Transit announcement in York Region

Bus lines offering service throughout Ontario

Greyhound bus

Greyhound

Greyhound Canada is the largest provider of intercity bus transportation in Canada, serving nearly 1,100 locations.

Coach Canada Bus (Coach Canada Facebook page)

Coach Canada

Information on scheduled bus routes, convenient door-to-door airport van transfers, fun city sightseeing tours, and first class charter service.

Ontario Northland Bus. Gravelle says planned investments in ONTC infrastructure include more than $23 million over three years to purchase new motor coaches for its bus line and to refurbish rail coaches for the Polar Bear Express. (ontarionorthland.ca)

Ontario Northland

Ontario Northland's operations encompass more than 1,100 km of track, including bus service to 56 communities.


Information for Canadians crossing the United States border

In this June 2, 2009 file photo, the Statue of Liberty is seen in New York harbor.(AP Photo/Richard Drew, File)

Travelling to the U.S.

Everything citizens of Canada travelling to the United States need to know before going through customs.

Traffic makes its way to Ambassador Bridge that connects Canada to the United States in Windsor Ont. on Friday June 15, 2012. (The Canadian Press/Mark Spowart)

Tips for border crossing

CBSA provides travel tips, frequently asked questions and helpful hints for crossing the border.

To carry out the scheme, when the surrogate got to the testing centre, they presented a fake passport showing their picture along with the identification details of the person who hired them.

Get or renew a passport

Find information on getting or renewing a Canadian passport. Download and complete all related forms.

Border Crossing Twitter Stream

News from the Canada Border Services Agency

Traffic Updates for Rainbow, Peace, Lewiston Queenston & Whirlpool

Traffic Updates from Blue Water Bridge, Crossing between Canada & USA

Traffic Updates from Sault Ste. Marie International Bridge