Traffic

TRAFFIC

News, updates, traffic map, travel times and info about driving in Toronto and Ontario.

The TTC's newest streetcar is shown while on its maiden voyage early on March 14, 2013. (Brad Ross/Twitter.com)

TRANSIT

News, updates and important information about transit systems for Toronto & the GTA.

In this June 1, 2009 file photo, a truck loaded with Ford and Lincoln vehicles travels from Canada to the U.S. Peace Bridge border crossing in Buffalo, N.Y. (AP / David Duprey)

BORDER CROSSINGS

News, updates, wait times and traveller information about Ontario border crossings.

Real-time traffic information for Toronto, GTA, and surrounding areas.


Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Traffic

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
BLACKTHORN AVE @ 432
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
SUN VALLEY DR
From ST MARKS RD to PASADENA GDNS
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
VALLEYMEDE RD
From ELLIS PARK RD to KENNEDY AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ISLINGTON AVE
From FORDWICH CRES to BARKER AVE
2019-06-17 07:00 2020-12-31 19:00 Daily
NB/SB left and right lane occupied due to repairing bridge.
RATHBURN RD
From MARTIN GROVE RD to RAVENSCREST DR
2019-07-02 07:00 2020-06-30 07:00 Continuous
Rehabilitation of Rathburn Road over Mimico Creek Bridge. Westbound/Eastbound alternating left and right lanes closed.
CHURCH ST
From ROSEMOUNT AVE to JOSEPH ST
2019-12-09 07:00 2020-06-01 18:00 Daily
WB/EB Basement Flooring Protection Program Phase 4.
WILLIAM ST
From WADSWORTH BLVD to PINE ST
2019-12-10 07:00 2020-06-01 18:00 Daily
eb Basement Flooring Protection Program Phase 4.
GRATTAN ST
From JOSEPH ST to CHURCH ST
2019-12-10 07:00 2020-06-01 18:00 Daily
EB/WB Basement Flooring Protection
JOSEPH ST
From ROSEMOUNT AVE to CHURCH ST
2019-12-06 07:00 2020-06-01 18:00 Daily
EB/WB Basement Flooring Protection
ELM ST
From QUEENS DR to KING ST
2020-01-06 07:00 2020-06-01 18:00 Daily
nb/sb Storm sewer, sanitary sewer, water main, road resurfacing and related improvements for Basement Flooring Protection Program Phase 4.
QUEENS DR @ ELM ST
2020-01-06 07:00 2020-06-01 18:00 Daily
EB/WB Storm sewer, sanitary sewer, water main, road resurfacing and related improvements for Basement Flooring Protection Program
EASTSIDE DR @ NORTH QUEEN ST
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Northbound lane closed.
VICKERS RD @ THE EAST MALL
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Southbound lane closed.
KING ST
From PINE ST to ELM ST
2020-01-30 07:00 2020-06-01 18:00 Daily
Sanitary sewer and water main improvements for Basement Flooring Protection Program. All Eastbound and Westbound lane closed; local traffic allowed only.
BROW DR
From EXMOOR DR to LAKE SHORE BLVD W
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of two ground water monitoring wells. Southbound shoulder closed.
BLUE GOOSE ST
From MANCHESTER AVE to CAVELL AVE
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of groundwater monitoring wells. Northbound curb lane closed.
THE WEST MALL
From DUNDAS ST W to THE QUEENSWAY
2020-02-10 07:30 2020-04-30 16:00 Daily
Installing new OH pole line. Southbound lane closed.
EGLINTON AVE W
From RENFORTH DR to MARTIN GROVE RD
2020-02-14 09:00 2020-03-31 16:00 Daily
Eastbound and westbound curb lane closed due to geotechnical, geo-environmental and hydrogeologocal investigation.
HEMAN ST
From DWIGHT AVE to ROYAL YORK RD
2020-02-14 07:00 2020-04-14 19:00 Daily
Westbound lane partially occupied due to duct installation by directional drilling and trenching.
ROYAL YORK RD
From LAKE SHORE BLVD W to ALBANI ST
2020-02-14 09:00 2020-04-14 16:00 Daily
Westbound lane partially occupied due to duct installation by directional drilling and trenching.
MURRIE ST
From ROYAL YORK RD to BIRMINGHAM ST
2020-02-14 07:00 2020-04-14 19:00 Daily
Westbound and eastbound lane partially occupied one at a time due to duct installation by directional drilling and trenching.
DWIGHT AVE
From SYMONS ST to ALBANI ST
2020-02-14 09:00 2020-04-14 16:00 Daily
Northbound and southbound lane partially occupied one at a time due to duct installation by directional drilling and trenching.
SECOND ST
From MAPLE BLVD to BIRMINGHAM ST
2020-02-14 07:00 2020-04-14 19:00 Daily
Northbound and southbound lane partially occupied one at a time due to duct installation by directional drilling and trenching.
LAKE SHORE BLVD W
From SIXTH ST to THIRD ST
2020-03-01 07:00 2020-08-20 19:00 Continuous
East-West bound all lanes Watermain and Water Service Installation
SILVERTHORN AVE
From TROWELL AVE to KERSDALE AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
Northbound curb lane occupied due to installation of new conduit and cable for rogers.
SCOTT RD
From TROWELL AVE to KERSDALE AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
North and south bound curb lane installing conduit and cable.
KANE AVE
From TROWELL AVE to KERSDALE AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
North and south bound curb lane installing conduit and cable.
TROWELL AVE
From SCOTT RD to SILVERTHORN AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
West and east bound curb lane installing conduit and cable.
DUNRAVEN DR
From SCOTT RD to SILVERTHORN AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
West and east bound curb lane installing conduit and cable.
AILEEN AVE
From SCOTT RD to SILVERTHORN AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
EB/WB installing new rogers conduit and cable.
BOYD AVE
From RALPH ST to MERRILL AVE
2020-03-03 07:00 2020-08-31 19:00 Continuous
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
VAUGHAN RD @ OAKWOOD AVE
2020-03-02 07:00 2020-06-30 19:00 Daily
Westbound lane occupied due to road reconstruction.
RONALD AVE @ CASTLEFIELD AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to road reconstruction, water services and paving.
KEYWEST AVE
From LAUDER AVE to NORTHCLIFFE BLVD
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
BERTAL RD @ INDUSTRY ST
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to sidewalk construction.
ELEANOR AVE @ OAKWOOD AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
DONALD AVE
From KEELE ST to KANE AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
DIESEL DR @ EVANS AVE
2020-03-02 07:00 2020-06-30 21:00 Daily
Southbound lane occupied due to resurfacing and sidewalk construction.
BROCKHOUSE RD @ BESTOBELL LANE
2020-03-02 07:00 2020-06-30 21:00 Daily
Westbound lane occupied due to road reconstruction.
CARSON ST
From HORNER AVE to STAFFORDSHIRE PL
2020-03-02 07:00 2020-06-30 21:00 Daily
Eastbound and westbound lanes intermittently occupied due to road resurfacing.
CHURCH ST
From JANE ST to ELM ST
2020-03-05 07:00 2020-09-30 18:00 Daily
Eastbound and westbound lane occupied one at a time for road resurfacing.
EGLINTON AVE W
From EMMETT AVE to SCARLETT RD
2020-03-04 07:00 2020-04-02 15:30 Daily
Westbound curb lane closed for borehole investigation.
CARLINGVIEW DR
From RENFORTH DR to HWY 401 COLLECTOR EB
2020-03-16 00:01 2020-11-20 00:01 Daily
Southbounds all Lanes are occupied due to bridge Rehabilitation project.
EGLINTON AVE W
From SCARLETT RD to EMMETT AVE
2020-03-06 07:00 2020-04-02 15:30 Daily
Westbound curb lane and shoulder blocked due to GEOTECHNICAL & ENVIRONMENTAL BOREHOLE INVESTIGATION
THE WESTWAY
From ISLINGTON AVE to HARTSDALE DR
2020-03-09 09:00 2020-04-06 16:00 Daily
Left lane occupied intermittently in both directions due to rehabilitation of various sewer lines across the City of Toronto.
WESTON RD
From WRIGHT AVE to CLOUSTON AVE
2020-03-02 07:00 2020-09-11 19:00 Daily
Upgrading the storm sewer system. 2 Southbound lanes closed.
RENFORTH DR
From HWY 401 EB to EGLINTON AVE W
2020-03-10 09:00 2020-04-02 16:00 Daily
Curb lane of EB of Renforth Dr blocked due to Geotechnical, Geo-environmental and Hydrogeological Investigation.
LAKE SHORE BLVD W
From FIFTH ST to THIRD ST
2020-03-13 07:00 2020-03-31 21:00 Daily
East and west bound all lanes blocked due to Water main and water service installation
DUNEDIN DR
From GOVERNMENT RD to QUEEN MARYS DR
2020-03-11 07:00 2020-04-11 19:00 Daily
Both directions lane 1 occupied due to duct installation by directional drilling and trenching.
GOVERNMENT RD
From ROYAL YORK RD to DUNEDIN DR
2020-03-11 07:00 2020-04-11 19:00 Daily
Both directions lane 1 occupied due to duct installation by directional drilling and trenching.
RECTORY RD
From WESTON RD to HOLLEY AVE
2020-03-23 07:00 2020-05-08 19:00 Daily
Watermain Rehabilitation Project
WIDDICOMBE HILL @ HUNTING RIDGE
2020-03-13 07:00 2020-04-10 19:00 Daily
Northbound and Southbound curb lanes occupied due to installation of new conduit, cable, vaults and pedestals for Rogers.
HUNTING RIDGE
From WIDDICOMBE HILL to WINCOTT DR
2020-03-13 07:00 2020-04-10 19:00 Daily
Eastbound and Westbound curb lanes occupied due to installation of new conduit, cable, vaults and pedestals for Rogers.
LINSTEAD CRT @ HUNTING RIDGE
2020-03-13 07:00 2020-04-10 19:00 Daily
Southbound curb lane occupied due to installation of new conduit, cable, vaults and pedestals for Rogers.
WINCOTT DR
From STRATHDEE DR to HUNTING RIDGE
2020-03-13 07:00 2020-04-10 19:00 Daily
Southbound and Northbound curb lanes occupied due to installation of new conduit, cable, vaults and pedestals for Rogers.
STRATHDEE DR @ WINCOTT DR
2020-03-13 07:00 2020-04-10 19:00 Daily
Eastbound curb lane occupied due to installation of a new conduit, cable, vaults and pedestals
WATERFORD DR @ WINCOTT DR
2020-03-13 07:00 2020-04-10 19:00 Daily
Eastbound and Westbound curb lanes occupied due to installation of a new conduit, cable, vaults and pedestals
DIXON AVE
From KELFIELD ST to DIXON AVE
2020-03-11 09:00 2020-04-15 16:00 Daily
East curb lane occupied due to conduit installation.
MUIRDALE AVE
From PETTIT DR to SHEFFLEY CRES
2020-03-16 07:00 2020-04-13 19:00 Daily
Curb lanes occupied due to installation of new conduit.
WINCOTT DR
From SHEFFLEY CRES to STRATHDEE DR
2020-03-11 07:00 2020-04-08 19:00 Daily
Curb lanes occupied due to installation of new conduit.
QUEENSBOROUGH CRES @ STRATHDEE DR
2020-03-16 07:00 2020-04-13 19:00 Daily
Curb lane occupied due to installation of new conduit.
GIHON SPRING DR
From ALABASTER RD to MOUNT OLIVE DR
2020-03-12 07:00 2020-04-03 19:00 Daily
Curb lane occupied due to installation of new conduit.
KERSDALE AVE
From SCOTT RD to SILVERTHORN AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
West and east bound curb lane installing conduit and cable.
SHORTT ST
From EGLINTON AVE W to RAMSDEN RD
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
DYNEVOR RD
From EGLINTON AVE W to HUNTER AVE
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
ATLAS AVE
From EGLINTON AVE W to GLOUCESTER GRV
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
ALAMEDA AVE
From EGLINTON AVE W to LANARK AVE
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
FAIRLEIGH CRES
From EGLINTON AVE W to CITIZENS LANE
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
PARK HILL RD
From EGLINTON AVE W to WHITMORE AVE
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
FLANDERS RD
From EGLINTON AVE W to DEWBOURNE AVE
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound and Southbound lane closed.
WEMBLEY RD
From GLENARDEN RD to WR ALLEN RD
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Westbound lane closed.
WESTOVER HILL RD
From EGLINTON AVE W to WR ALLEN RD
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Southbound lane closed.
CASTLEFIELD AVE @ KINCORT ST
2020-03-20 09:00 2020-04-20 09:00 Continuous
Eastbound 1 lane blocked due to construction.
GREAT OAK DR
From REMINGTON DR to KIPLING AVE
2020-03-17 07:00 2020-04-30 17:00 Continuous
All directions lanes blocked due to Basement Flooding Protection Program
KIPLING AVE
From WINGROVE HILL to RATHBURN RD
2020-03-17 07:00 2020-08-29 16:00 Daily
Northbound 2 lanes blocked due to basement flooding protection program.
MUIRDALE AVE
From SHEFFLEY CRES to PETTIT DR
2020-03-20 07:00 2020-04-17 19:00 Daily
South and north bound curb lane blocked due to installing new conduit, cable, vaults and pedestals.
ALABASTER RD
From MINGLEHAZE DR to SHOCKLEY DR
2020-03-23 07:00 2020-04-27 19:00 Daily
South and north bound curb lane blocked due to installing new conduit, cable, vaults and pedestals.
MARTIN GROVE RD
From DEWITT RD to NOTTINGHILL GT
2020-03-20 09:00 2020-04-04 16:00 Daily
East and west bound all lanes blocked due to installing new conduit and cable.
ANTIOCH DR
From DEWITT RD to MILLBURN DR
2020-03-20 09:00 2020-04-04 16:00 Daily
North and south bound all lanes blocked due to installing new conduit and cable.
DEWITT RD
From MARTIN GROVE RD to ANTIOCH DR
2020-03-20 09:00 2020-04-04 16:00 Daily
East and west bound all lanes blocked due to installing new conduit and cable.
DORNOCH DR
From PRINCESS MARGARET BLVD to GLEN AGAR DR
2020-03-20 09:00 2020-04-04 16:00 Daily
North and south bound all lanes blocked due to installing new conduit and cable.
GLEN AGAR DR
From BURWOOD RD to PENTLAND PL
2020-03-20 09:00 2020-04-04 16:00 Daily
east and west bound all lanes blocked due to installing new conduit and cable.
HEDGES BLVD
From TROMLEY DR to MARTIN GROVE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
east and west bound all lanes blocked due to installing new conduit and cable.
MASSINGHAM RD
From DEWITT RD to SABINE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
North and south bound all lanes blocked due to installing new conduit and cable.
PENTLAND PL
From GLEN AGAR DR to PENTLAND PL
2020-03-20 09:00 2020-04-04 16:00 Daily
North and south bound all lanes blocked due to installing new conduit and cable.
STOREY CRES
From ANTIOCH DR to DEWITT RD
2020-03-20 09:00 2020-04-04 16:00 Daily
North and south bound all lanes blocked due to installing new conduit and cable.
GEORGE ST @ 100-166
2020-03-23 07:00 2020-04-03 19:00 Daily
South bound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
MANCHESTER ST
From AUDLEY ST to PORTLAND ST
2020-03-23 07:00 2020-04-03 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
NEWCASTLE ST @ 39-27
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
CARLINGVIEW DR
From RENFORTH DR to CARLINGVIEW SB HWY 401 EXPRESS EB RAMP
2020-03-23 00:01 2020-11-20 00:01 Daily
MTO 2019-2001 Bridge Rehabilitation Project. All Southbound lanes closed.
FINCH AVE W
From HWY 27 NB to SILVERSTONE DR
2020-03-23 07:00 2020-04-10 18:00 Daily
Eastbound and Westbound lanes blocked due to drilling boreholes.
HUMBER COLLEGE BLVD
From WESTMORE DR to HWY 27 NB
2020-03-23 09:00 2020-04-10 16:00 Daily
Eastbound and Westbound lanes blocked due to drilling boreholes.
HWY 27 NB
From HUMBER COLLEGE BLVD to FINCH AVE W
2020-03-23 09:00 2020-04-10 17:00 Daily
Southbound lane and right turning lane blocked due to drilling boreholes.
EGLINTON AVE W @ BEMERSYDE DR
2020-03-30 07:00 2020-07-30 17:00 Daily
Trench excavation and duct bank installation for Toronto Hydro. Eastbound curb closed.
NORFINCH DR @ 165
From FINCH AVE W to STEELES AVE W
2020-03-25 08:00 2020-04-01 19:00 Daily
Bell PED work. 1 Northbound lane closed. Deleted By: pwu2; When: 03/23/2020 3:08:13 PM; Reason: Duplicate
TWENTY SECOND ST
From BIRMINGHAM ST to LAKE SHORE BLVD
2020-03-30 07:00 2020-04-02 19:00 Daily
South bound 1 lane blocked due to Rehabilitation of various sewer lines.
LAKE SHORE BLVD W @ 2686
2020-03-25 09:00 2020-04-20 16:00 Daily
New installations. Westbound curb lane closed.
LAKE SHORE BLVD W
From SECOND ST to THIRD ST
2020-03-25 07:00 2020-05-14 19:00 Daily
Trenchless rehabilitation of existing water mains. Westbound curb lane closed.
COMMODORE AVE
From HAVERSON BLVD to SILVERTHORN AVE
2020-03-09 07:00 2020-04-09 17:00 Daily
Full road closure due to main sewer repairs.
GARDINER EXPY
From HWY 427 to ISLINGTON AVE
2020-03-29 21:30 2020-04-03 05:30 Daily
Eastbound lanes intermittently occupied due to CCTV inspection and assessment of sewer and manhole.
RENFORTH DR @ MATHESON BLVD
2020-03-30 09:00 2020-03-31 16:00 Daily
Southbound off-ramp curb lane blocked due to work vehicles parking.
VIEW GREEN CRES
From HUMBERWOOD BLVD to HUMBERWOOD BLVD
2020-03-27 09:00 2020-04-04 16:00 Daily
Curb lanes on both sides of the road will be occupied for installation of new conduit by NX Utilities.
KINGSPLATE CRES @ 18
2020-03-30 09:00 2020-04-04 16:00 Daily
Northbound and southbound curb lane occupied for the installation of new conduit by NX Utilities.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
BROADWAY AVE @ REDPATH AVE
2017-02-27 00:01 2020-03-31 23:59 Continuous
Eastbound sidewalk and portion of the lane closed due to construction.
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and Water Service Installation- Contract # 19ECS-LU-06SU
FINCH AVE E
From CHEROKEE BLVD to GORDON BAKER RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and Water Service Installation
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
OLD LESLIE ST
At SHEPPARD AVE E
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation from Sheppard Ave E to west side of CNR Tracks.
WHITBURN CRES
From KEELE ST to BLAYDON AVE
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Water main and Water Service Installation
FINCH AVE E
From CHEROKEE BLVD to GORDON BAKER RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
OLD LESLIE ST @ SHEPPARD AVE E
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
WHITBURN CRES
From KEELE ST to BLAYDON AVE
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-07-29 07:00 2020-04-30 21:00 Daily
Watermain and water service installation - Contract No. 19ECS-LU-06SU.
GODSTONE RD
From FAIRVIEW MALL DR to KINGSLAKE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Waterman and Water Service installation at north and south bound.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Waterman and Water Service installation, 2 westbound lanes occupied.
FAIRVIEW MALL DR
From DON MILLS RD to DON MILLS RD
2019-10-06 19:00 2020-04-30 06:00 Daily
NB/SB/EB/WB lanes occupied due to Waterman and Water Service Installation
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-09-10 07:00 2020-04-30 21:00 Daily
Watermain and water service installation. (2) westbound lanes closed.
FAIRVIEW MALL DR
From DON MILLS RD to GODSTONE RD
2019-11-07 07:00 2020-04-30 21:00 Daily
EB/WB watermain and water service installation.
HILLHURST BLVD @ 236
2019-11-29 07:00 2020-11-27 19:00 Continuous
WB Sanitary & Storm Sewer upgrades as part of Basement Flooding Prevention Project Phase 4
EGLINTON AVE E
From BRENTCLIFFE RD to LESLIE ST
2019-12-19 07:00 2020-03-31 23:00 Continuous
1 Through Lane EB and WB on Eglinton blocked due to a minor traffic realignment will be implemented to facilitate ECLRT construction
JANE ST @ SHOREHAM DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SECROFT CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
HULLMAR DR
From GOSFORD BLVD to YORK GATE BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SHOREHAM DR
From GOSFORD BLVD to JANE ST
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
YORK GATE BLVD @ HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
ARTECH CRT @ GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
FLETCHERDON CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From SHOREHAM DR to FLETCHERDON CRES
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From ARTECH CRT to HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
CORTLEIGH BLVD @ 344-384
2019-10-02 07:00 2020-11-27 19:00 Continuous
All eastbound lanes closed due to sanitary & storm sewer upgrades as part of the Basement Flooding Prevention Project.
CODSELL AVE
From MAXWELL AVE to BATHURST ST
2020-01-24 07:00 2020-04-24 19:00 Daily
Northbound and southbound one lane closed one direction at a time due to water main and storm sewer re-construction.
SEARLE AVE
From DUFFERIN ST to SHAFTESBURY AVE
2020-01-24 07:00 2020-04-24 19:00 Daily
Eastbound and westbound one lane closed one direction at a time due to water main and storm sewer reconstruction.
YORK MILLS RD
From PARKWOODS VILLAGE DR to NESS DR
2020-01-30 07:00 2020-04-03 16:00 Daily
Manhole rebuild, right lane occupied
GADE DR
From RODING ST to IANHALL RD
2020-01-21 07:00 2020-04-21 19:00 Continuous
Storm sewer installations. 1 lane closed, local traffic only.
NASH DR
From RODING ST to BUNNELL CRES
2020-01-21 07:00 2020-04-21 19:00 Daily
Storm sewer installations. One lane closed, local traffic only.
RODING ST @ 661-557
2020-01-21 07:00 2020-04-21 19:00 Daily
Storm sewer installations. One lane closed, local traffic only.
WILMINGTON AVE
From ARLSTAN DR to BLUE FOREST DR
2020-03-17 09:00 2020-04-04 16:00 Daily
Installing new Rogers conduit and cable. Northbound and Southbound curb lanes closed.
MAXWELL ST
From ARTREEVA DR to WILMINGTON AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
Installing new Rogers conduit and cable. Eastbound curb lane closed.
BLUE FOREST DR
From WILMINGTON AVE to ELDER ST
2020-03-17 09:00 2020-04-04 16:00 Daily
Installing new Rogers conduit and cable. Westbound and Eastbound curb lanes closed.
DON MILLS RD @ OVERLEA BLVD
2020-02-17 08:00 2020-04-30 17:00 Daily
Eastbound curb lane occupied to place ducts underground.
WILKINSON DR
From DOUBLETREE RD to PATRICK BLVD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
BRIAN DR
From VAN HORNE AVE to SHEPPARD AVE E
2020-02-10 09:00 2020-06-30 16:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
CLIPPER RD
From VAN HORNE AVE to PLEASANT VIEW DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
CONSUMERS RD
From SHEPPARD AVE E to HALLCROWN PL
2020-02-10 09:00 2020-06-30 16:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
HAZELNUT CRES @ HICKORYNUT DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
MARGARET AVE
From PLEASANT VIEW DR to ENDSLEIGH CRES
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PINDAR CRES
From LADNER DR to LADNER DR
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PLEASANT VIEW DR
From BRIAN DR to CLIPPER RD
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
PONDSVIEW DR
From MARGARET AVE to IPSWICH CRES
2020-02-10 08:00 2020-06-30 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
SNAPDRAGON DR @ CLEMATIS RD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
ROSELAWN AVE @ DUFFERIN ST
2020-02-10 07:00 2020-03-31 17:00 Daily
Loading and unloading of construction material. Eastbound lane closed.
WILSON AVE
From WILSON HEIGHTS BLVD to FAYWOOD BLVD
2020-02-19 08:00 2020-03-31 19:00 Daily
East and West Bound Curb/ Middle lane Install New district station and decommission active district station.
ARLSTAN DR
From EVANSTON DR to WILMINGTON AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
East and northbound curb lanes occupied due to installing new conduit and cable.
WILSON AVE
From WILSON HEIGHTS BLVD to FAYWOOD BLVD
2020-02-24 09:00 2020-03-31 16:00 Daily
Curb/ Middle lane east and westbound blocked due to installing new district station.
HWY 400 NB FINCH AVE W EB RAMP
From HWY 400 SB FINCH AVE W WB RAMP to HWY 400 NB FINCH AVE W EB RAMP
2020-03-30 09:00 2020-04-03 16:00 Daily
Eastbound and Westbound on ramp only occupied due to LRT project.
WILLIAM SYLVESTER DR @ SHINLEAF TERRACE
2020-02-26 07:00 2020-03-31 19:00 Daily
Hydro installation. Westbound curb lane closed.
QUEENSLEA AVE
From WALWYN AVE to ROSEMOUNT AVE
2020-03-02 07:00 2020-08-31 18:00 Daily
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
LAURA RD
From SHEPPARD AVE W to FRITH RD
2020-02-29 07:00 2020-05-05 19:00 Continuous
Southbound 1 lane blocked due to Basement Flooding Protection Program. Replacement of Storm sewers.
FINCH AVE W
From SIGNET DR to TOBERMORY DR
2020-03-04 07:00 2020-04-03 17:00 Daily
Tree removal / Clearing and grubbing. Westbound curb lane and Eastbound curb lane closed.
WILMINGTON AVE
From CEDAR SPRINGS GRV to FINCH AVE W
2020-03-09 07:00 2020-04-11 16:00 Daily
Westbound right lane blocked due to manhole rebuild
HOVE ST
From SEARLE AVE to COCKSFIELD AVE
2020-03-10 07:00 2020-06-10 19:00 Daily
North or south bound 1 lane occupied due to water main and storm sewer re-construction.
CAVOTTI CRES
From SHAFTESBURY ST to CAVOTTI CRES
2020-03-17 09:00 2020-04-04 16:00 Daily
South bound curb lanes blocked due to installing new conduit and cable.
CAVOTTI CRES
From EVANSTON DR to SHAFTESBURY AVE
2020-03-17 09:00 2020-04-04 16:00 Daily
North bound curb lane blocked due to installing new conduit and cable.
EVANSTON DR
From CAVOTTI CRES to TERRYDALE DR
2020-03-17 09:00 2020-04-04 16:00 Daily
East and west bound curb lane blocked due to installing new conduit and cable.
EVANSTON DR
From TERRYDALE DR to EVANSTON DR
2020-03-17 09:00 2020-04-04 16:00 Daily
East and west bound curb lane blocked due to installing new conduit and cable.
RECTORY RD
From WESTON RD to HOLLEY AVE
2020-03-23 07:00 2020-05-08 19:00 Daily
Westbound shoulder on Rectory Rd and Northbound shoulder on Holley Ave occupied due to watermain rehabilitation project.
VAUGHAN RD
At NORTHCLIFFE BLVD
2020-03-16 00:01 2020-04-13 23:59 Continuous
Eastbound and westbound lanes occupied due to construction.
ELM ST
From JOHN ST to KING ST
2020-03-16 07:00 2020-06-01 18:00 Daily
Road closure Northbound and Southbound due to sewer and water main work.
BAYVIEW AVE @ DAVISVILLE AVE
2020-03-16 09:00 2020-04-03 16:00 Daily
Building a traffic signal. Northbound and Southbound curb lanes closed during various periods of time.
YONGE ST @ 5949
2020-03-18 10:00 2020-04-03 15:00 Daily
Geotechnical investigation for Proposed Metrolinx Yonge North Subway Extension Project. Northbound curb lane closed.
FINCH AVE W
From ROMFIELD DR to TANGIERS RD
2020-03-14 07:00 2020-04-04 17:00 Daily
Road widening works. Westbound and Eastbound curb lane closed.
FRANKLIN AVE
From BASSANO RD to GWENDOLEN CRES
2020-03-16 09:00 2020-04-04 16:00 Daily
One lane blocked in each direction due to asphalt coring.
YONGE ST
From PATRICIA AVE to HOMEWOOD AVE
2020-03-19 09:00 2020-04-03 15:30 Continuous
Southbound centre lane closed due to borehold investigation.
LAWRENCE AVE W @ BOLINGBROKE RD
2020-03-17 09:30 2020-08-20 15:00 Daily
East bound 1 lane blocked due to unload material.
BRUCEWOOD CRES
From DREXEL RD to LAWRENCE AVE W
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes occupied due to conduit and cable installation.
LAWRENCE AVE E @ BRUCEWOOD CRES
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
COVINGTON RD @ BRUCEWOOD CRES
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
KIRKLAND BLVD
From BROOKVIEW DR to BRUCEWOOD CRES
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes occupied due to conduit and cable installation.
SARANAC BLVD
From COVINGTON RD to BATHURST ST
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
WILMINGTON AVE @ SEARLE AVE
2020-03-18 09:00 2020-04-24 16:00 Daily
Northbound and Southbound lanes occupied due to traffic signal install.
STEELES AVE W
From FENMAR DR to ROSSDEAN DR
2020-03-30 07:00 2020-08-01 19:00 Daily
One Eastbound lane occupied due to watermain work.
TORRESDALE AVE @ 251 248-231 207-201 185-183
2020-03-23 07:00 2020-04-03 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation
TEPEE CRT @ KINGSLAKE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
Southbound all lanes blocked due to installing new conduit and cable.
TEPEE CRT @ KINGSLAKE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
Southbound all lanes blocked due to installing new conduit and cable.
KINGSLAKE RD @ SENECA HILL DR
2020-03-20 09:00 2020-04-04 16:00 Daily
South and west bound all lanes blocked due to installing new conduit and cable.
SENECA HILL DR @ HOBART DR
2020-03-20 09:00 2020-04-04 16:00 Daily
North and west bound all lanes blocked due to installing new conduit and cable.
WHITEHORN CRES @ KINGSLAKE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
North and east bound all lanes blocked due to installing new conduit and cable.
BARONESS CRES @ KINGSLAKE RD
2020-03-20 09:00 2020-04-04 16:00 Daily
South and east bound all lanes blocked due to installing new conduit and cable.
LONGMORE ST @ 363
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
SENLAC RD
From BOGERT AVE to POYNTZ AVE
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
SHETLAND ST
From CONNAUGHT AVE to CAINES AVE
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
CAINES AVE
From AVONHILL CRT to SHETLAND ST
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Empipe Solutions Ltd.
EDITHVALE DR @ 7
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
NORWIN ST @ 14
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
HENDON AVE @ 313
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Empipe Solutions.
BLAKELEY RD @ 10
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
ELMVIEW AVE @ 9
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
FARGO AVE
From MOORE PARK AVE to PATRICIA AVE
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
FRIVICK CRT @ 6
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
GRANTBROOK ST
From CALDERON CRES to DEVONDALE AVE
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
JOHN MCKENZIE GT
From PARKVIEW AVE to KINGSDALE AVE
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
NORTON AVE @ 200
2020-03-23 07:00 2020-04-23 19:00 Daily
Westbound lane occupied for sewer rehabilitation by Empipe Solutions.
RUBICON CRT @ 10
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
RUTH AVE @ 484
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Empipe Solutions.
TOFFOLI PL @ 6
2020-03-23 07:00 2020-04-03 19:00 Daily
Southbound lane occupied for sewer rehabilitation by Empipe Solutions.
CHARNWOOD RD @ 1-18
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
HURLINGHAM CRES @ 39-31
2020-03-23 07:00 2020-04-03 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
MERREDIN PL @ 16-12
2020-03-23 07:00 2020-04-03 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
SOUTHWELL DR @ 10-12
2020-03-23 07:00 2020-04-03 19:00 Daily
Westbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
TORRYBURN PL @ 14-27
2020-03-23 07:00 2020-04-03 19:00 Daily
Westbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
NORFINCH DR @ 165
From FINCH AVE W to STEELES AVE W
2020-03-25 08:00 2020-04-01 19:00 Daily
North bound 1 lane blocked due to bell ped work.
SHEPPARD AVE E
From DUDLEY AVE to WILLOWDALE AVE
2020-03-24 07:00 2020-03-31 19:00 Daily
ALL DIRECTIONS ONE LANE AT A TIME BLOCKED DUE TO HYDRO INSTALLATION.
DRIFTWOOD AVE @ 404
From DRIFTWOOD CRT to JANE ST
2020-03-26 08:00 2020-04-02 19:00 Daily
Eastbound lane occupied due to Bell ped work.
HOUNSLOW AVE @ 392 to 451
2020-03-30 07:00 2020-04-03 19:00 Daily
Westbound and eastbound curb lanes occupied due to cable repairs.
HORSHAM AVE @ 378-394
2020-03-30 07:00 2020-04-03 19:00 Daily
Westbound curb lane blocked due to Replace existing Rogers cable
WYNN RD @ EVERSLIE AVE
2020-03-30 07:00 2020-04-03 19:00 Daily
Northbound and Eastbound curb lanes occupied due to Rogers cable work.
DON MILLS RD
From GATEWAY BLVD to OVERLEA BLVD
2020-03-27 07:00 2020-04-24 19:00 Daily
Southbound curb lane and center lane blocked due to geotechnical and environmental borehole investigation.
DON MILLS RD
From ST DENNIS DR to EGLINTON AVE E
2020-03-26 07:00 2020-04-24 19:00 Daily
Southbound shoulder blocked due to geotechnical and environmental borehole investigation.
SHEPPARD AVE W @ 1170
2020-03-30 07:00 2020-04-10 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
CHESSWOOD DR @ 3701-3741
2020-03-30 07:00 2020-04-10 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
CALVINGTON DR @ 129-143
2020-03-30 07:00 2020-04-10 19:00 Daily
Westbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
CHARLESWOOD DR @ 36
2020-03-30 07:00 2020-04-10 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
OVERBROOK PL
From MAXWELL ST to GODDARD ST
2020-03-30 07:00 2020-04-10 19:00 Daily
Westbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
OVERBROOK PL @ 56-50
2020-03-30 07:00 2020-04-10 19:00 Daily
Eastbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
LONGWOOD DR @ 30-26, 12-1
2020-03-30 07:00 2020-04-10 19:00 Daily
South east west and northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
FARGO AVE @ 80 PATRICIA AVE
2020-03-30 07:00 2020-04-10 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
GRANTBROOK ST @ 39-22
2020-03-30 07:00 2020-04-10 19:00 Daily
Northbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
FRANKLIN AVE
From BASSANO RD to GWENDOLEN AVE
2020-03-16 09:00 2020-04-04 16:00 Daily
Asphalt coring, drilling boreholes and installation of monitoring wells. Westbound lane closed; two-way traffic maintained at all times.
POYNTZ AVE
From BEAMAN RD to EASTON RD
2020-03-16 09:00 2020-04-04 16:00 Daily
Asphalt coring, drilling boreholes and installing monitoring wells. Westbound lane closed; two-way traffic maintained ant all times.
RADINE RD
From POYNTZ AVE to STUART AVE
2020-03-16 09:00 2020-04-04 16:00 Daily
Asphalt coring, drilling boreholes and installing monitoring wells. Northbound and Southbound lanes closed; two-way traffic maintained ant all times.
BALLYRONAN RD
From SOUTHWELL DR to MERREDIN PL
2020-03-30 07:00 2020-04-10 19:00 Daily
One southbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
LESLIE ST @ TORRYBURN PL
2020-03-30 07:00 2020-04-10 19:00 Daily
One northbound and one eastbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
LESLIE ST @ TORRYBURN PL
2020-03-30 07:00 2020-04-10 19:00 Daily
One northbound and one eastbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
BALLYRONAN RD @ SOUTHWELL DR
2020-03-30 07:00 2020-04-10 19:00 Daily
One westbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
HURLINGHAM CRES @ 49 - 50
2020-03-30 07:00 2020-04-10 19:00 Daily
One southbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
BALLYRONAN RD @ SOUTHWELL DR
2020-03-30 07:00 2020-04-10 19:00 Daily
One westbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
BALLYMENA CRT @ 7
At BARBER GREENE RD
2020-03-30 07:00 2020-04-10 19:00 Daily
One westbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
BALLYMENA CRT
At BARBER GREENE RD
2020-03-30 07:00 2020-04-10 19:00 Daily
One westbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
HURLINGHAM CRES @ 49 - 50
At BARBER GREENE RD
2020-03-30 07:00 2020-04-10 19:00 Daily
One southbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
MALLARD RD @ DON MILLS RD
2020-03-30 07:00 2020-04-10 19:00 Daily
One eastbound lane occupied due to Trenchless (No Dig) Sewer Rehabilitation.
O CONNOR DR
From WAKUNDA PL to NORTHLINE RD
2020-03-30 09:00 2020-04-03 17:00 Daily
Construction work on behalf of Bell. Northbound lane closed.
SECROFT CRES @ 46
From GOSFORD BLVD to GOSFORD BLVD
2020-03-30 08:00 2020-04-03 19:00 Daily
Bell PED work. Southbound lane closed.
WR ALLEN RD SB YORKDALE RD RAMP @ YORKDALE RD
2020-03-30 08:00 2020-04-17 17:00 Daily
Southbound one or two lanes occupied due to for bridge work.
FAIRLAWN AVE @ 377
From AVENUE RD to GREY RD
2020-03-30 07:00 2020-04-15 19:00 Daily
Northbound and southbound lanes occupied due to directional bore work.
JANE ST
From TRETHEWEY DR to EXBURY RD
2020-03-30 07:00 2020-04-15 19:00 Daily
NORTH/SOUTH Bound lanes blocked due to Directional bore & place conduit & fibre
GRANDRAVINE DR
From SHARPECROFT BLVD to DERRYDOWN RD
2020-03-27 07:00 2020-04-24 19:00 Daily
Eastbound curb lane blocked due to Directional bore & place conduit & fibre
FINCH AVE E @ LESLIE ST
2020-03-26 09:00 2020-04-04 16:00 Daily
All northbound and southbound lanes blocked due to new Rogers conduit and cable installation.
BETH NEALSON DR @ WICKSTEED AVE
2019-10-25 07:00 2020-07-31 19:00 Daily
Southbound lane occupied due to watermain work.
DON MILLS RD
From GATEWAY BLVD to OVERLEA BLVD
2020-03-27 07:00 2020-04-24 19:00 Daily
South bound shoulder, curb lane and middle lanes blocked due to geotechnical and environmental borehole investigation.
DANE AVE
From CONLAND AVE to DUFFERIN ST
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
DUFFERIN ST
From SAMOR RD to LAWRENCE AVE W
2020-03-30 09:30 2020-04-30 15:30 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
LAWRENCE AVE W
From DUFFERIN ST to CORONA ST
2020-03-30 09:30 2020-04-30 15:30 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
MARLEE AVE
From GLENGROVE AVE to GLEN PARK AVE
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
FINCH AVE W
From KEELE ST to TANGIERS RD
2020-03-30 07:00 2020-04-02 17:00 Daily
Eastbound left lane and two westbound left lanes occupied for watermain survey by Mosaic Transit Contractors.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
CLAREMORE AVE
From KINGSTON RD to CRAIGLEE DR
2019-12-02 07:00 2020-06-30 19:00 Continuous
Open Cut Transmission Main - construction of 1050mm WM along Claremore Ave. from Kingston Rd to Craiglee Dr. staging of material, equipment and trucks
KINGSTON RD
From GLEN EVEREST RD to CLAREMORE AVE
2019-12-02 07:00 2020-06-30 19:00 Continuous
Open Cut Transmission - construction of 1050mm WM along Kingston Rd from Glen Everest Rd to Claremore Ave. construction of Shaft 3 and Compound 3 (Construction Staging Area) staging of material, equipment and trucks
BORNHOLM DR
From RIDGEWOOD RD to FRIENDSHIP AVE
2020-01-07 07:00 2020-04-30 19:00 Daily
Hydro Installation
MOSSBANK DR
From SCARBOROUGH GOLF CLUB RD to LAWRENCE AVE E
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water service replacement. Westbound curb lane closed.
GREENHEDGES CRT
At APPLEMORE RD
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water services replacement on Green Hedges Ct from Applemore Rd to East end.
TERRYHILL CRES
From PITFIELD RD to SNOWHILL CRES
2020-01-31 07:00 2020-03-31 07:00 Daily
Hydro installation. Northbound and Southbound curb lanes closed.
LAWRENCE AVE E @ ROUGH HILL DR
2020-02-17 07:00 2020-05-31 19:00 Daily
Eastbound curb lane occupied due to hydro installation.
GREYBEAVER TRL
From BLUEKING CRES to BORNHOLM DR
2020-02-19 07:00 2020-04-03 19:00 Daily
Northbound and southbound lane closed one at a time due to hydro installation.
ROSEMOUNT DR
From EGLINTON AVE E to MAIDA VALE
2020-02-24 07:00 2020-04-01 17:00 Continuous
NB/SB Lanes on Rosemount; EB/WB Lanes on Eglinton blocked due to ECLRT construction
PASSMORE AVE
At TAPSCOTT RD
2020-02-27 07:00 2020-03-31 17:30 Daily
West bound lanes blocked due to temporary water main.
MIDDLEFIELD RD @ STEELES AVE E
From STEELES AVE E to PASSMORE AVE
2020-03-07 09:00 2020-04-09 19:00 Daily
Curb lanes occupied due to Toronto hydro duct bank break and underground cable installation. Two way traffic maintained at all times.
SELECT AVE
From MIDDLEFIELD RD to STATE CROWN BLVD
2020-03-07 09:00 2020-04-09 19:00 Daily
Curb lane occupied due to Toronto hydro duct bank break and underground cable installation.
STEELES AVE E
From MCCOWAN RD to MIDDLEFIELD RD
2020-03-07 09:00 2020-04-09 16:00 Daily
Curb lane occupied due to Toronto hydro duct bank break and underground cable installation.
KENNEDY RD
From HAVENDALE RD to LINWOOD AVE
2020-03-09 09:00 2020-04-03 16:00 Daily
NORTHBOUND 2 Lanes on Kennedy Rd blocked due to Hydro Installation
HAVENDALE RD
From KENNEDY AVE to AGINCOURT DR
2020-03-16 09:00 2020-04-10 19:00 Daily
Hydro Installation. All directions closed, one at a time.
BIRCHMOUNT RD @ Before HWY 401
2020-03-05 09:00 2020-03-31 15:00 Daily
Northbound / Southbound lanes blocked due to Bridge rehabilitation
MIDLAND AVE @ Before HWY 401
2020-03-05 09:00 2020-03-31 15:00 Daily
Northbound / Southbound lanes blocked due to Bridge rehabilitation
GUILDWOOD PKWY
From LIVINGSTON RD to NAVARRE CRES
2020-03-12 09:00 2020-04-15 19:00 Daily
EB lane partially occupied due to duct installation. Weekend hours (0900-1600)
CATALINA DR
From BLEDLOW MANOR DR to BOURNVILLE DR
2020-03-12 09:00 2020-04-15 19:00 Daily
Curblane partially occupied due to duct installation. Weekend times (0900-1600)
BOURNVILLE DR
From CATALINA DR to PRINCE PHILIP BLVD
2020-03-12 09:00 2020-04-15 19:00 Daily
Centre lane partially occupied due to duct installation . Weekend Timings (0900-1600)
BLEDLOW MANOR DR
From CATALINA DR to LIVINGSTON RD
2020-03-12 09:00 2020-04-15 19:00 Daily
Curb lane partially occupied due to duct installation. Weekend (0900-1600)
PRINCE PHILIP BLVD
From BOURNVILLE DR to GRANDOR CRT
2020-03-12 09:00 2020-04-15 19:00 Daily
Curb lane partially occupied due to duct installation. Weekend (0900-1600)
AVONMORE SQ @ PRINCE PHILIP BLVD
2020-03-12 09:00 2020-04-15 19:00 Daily
Curb lane partially occupied due to duct installation. Weekend (0900-1600)
GRANDOR CRT @ PRINCE PHILIP BLVD
2020-03-12 09:00 2020-04-15 19:00 Daily
Curb lane partially occupied due to duct installation. Weekend (0900-1600)
EARSWICK DR
From BOURNVILLE DR to LIVINGSTON RD
2020-03-12 09:00 2020-04-15 19:00 Daily
Curb lane partially occupied due to duct installation. Weekend (0900-1600)
GUILDWOOD PKWY
From LIVINGSTON RD to NAVARRE CRES
2020-03-12 09:00 2020-04-15 19:00 Daily
One lane partially occupied due to duct installation. Weekend Timings (0900-1600)
NAVARRE CRES
From GUILDWOOD PKWY to TOYNBEE TRL
2020-03-12 09:00 2020-04-15 19:00 Daily
e lane partially occupied due to duct installation. Weekend Timings (0900-1600)
TOYNBEE TRL
From SOMERDALE SQ to REGENCY SQ
2020-03-12 09:00 2020-04-15 19:00 Daily
Lane partially occupied due to duct installation. Weekend hours (0900-1600)
CHANCERY LANE
From TOYNBEE TRL to GUILDWOOD PKWY
2020-03-12 09:00 2020-04-15 19:00 Daily
Lane partially occupied due to duct installation. Weekend hours (0900-1600)
CADBURY CRT
From CHANCERY LANE to CHANCERY LANE
2020-03-12 12:07 2020-04-15 15:07 Daily
Lane partially occupied due to duct installation. Weekend hours (0900-1600)
DONALDA CRES
From ROKER CRES to ROSS AVE
2020-03-16 09:00 2020-03-31 19:00 Daily
Curb lane occupied due to installation of new conduit.
BEVERLY GLEN BLVD
From BRIDLETOWNE CRCL to STONEBRIDGE BLVD
2020-03-16 09:00 2020-04-03 16:00 Daily
Directional drilling. 1 Westbound lane closed.
BRIDLETOWNE CRCL
From BEVERLY GLEN BLVD to GLEN SPRINGS DR
2020-03-16 09:00 2020-04-03 16:00 Daily
Directional drilling. 1 Southbound lane closed.
STONEBRIDGE BLVD
From BEVERLY GLEN BLVD to HILLWOOD CRT
2020-03-16 09:00 2020-04-03 16:00 Daily
Directional drilling. 1 Northbound lane closed.
STARRY CRES @ STAINES RD
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
STAINES RD
From STARRY CRES to RIVENDELL TRL
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes occupied due to conduit and cable installation.
SOLITUDE ST
From STAINES RD to BOULDERBROOK DR
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
RIVENDELL TRL
From STAINES RD to SOLITUDE ST
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes blocked due to conduit and cable installation.
BOULDERBROOK DR
From STAINES RD to SOLITUDE ST
2020-03-18 09:00 2020-04-04 16:00 Daily
All lanes occupied due to conduit and cable installation.
MIDLAND AVE
From DANFORTH RD to WOLFE AVE
2020-03-19 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Northbound curb lane closed.
DANFORTH RD
From HUNTINGTON AVE to WINTER AVE
2020-03-19 07:00 2020-04-03 16:00 Daily
Duct installation by directional drilling and trenching. Northbound curb lane closed.
COMMONWEALTH AVE
From WOLFE AVE to VERDUN AVE
2020-03-19 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Northbound and Southbound curb lanes closed.
WINTER AVE
From VERDUN AVE to LORRAINE AVE
2020-03-19 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Northbound and Southbound curb lanes closed.
HUNTINGTON AVE
From DANFORTH RD to VERDUN AVE
2020-03-19 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Northbound and Southbound curb lanes closed.
WOLFE AVE
From DANFORTH RD to MIDLAND AVE
2020-03-19 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Westbound and Eastbound curb lanes closed.
VERDUN AVE
From MIDLAND AVE to WINTER AVE
2020-03-19 09:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Westbound and Eastbound curb lanes closed.
MCCOWAN RD
From ELLESMERE RD to CONSILIUM PL
2020-03-20 09:00 2020-04-03 16:00 Daily
Southbound 1 Borehole drilling
MCCOWAN RD
From ELLESMERE RD to CORPORATE DR
2020-03-20 07:00 2020-04-03 16:00 Daily
North bound 2 lanes blocked due to 1 Borehole drilling
MCCOWAN RD
From INVERGORDON AVE to SHEPPARD AVE E
2020-03-23 07:00 2020-04-06 19:00 Daily
One Northbound lane blocked due to Scarborough subway extention project.
MCCOWAN RD
From CHANNEL NINE CRT to PITFIELD RD
2020-03-23 07:00 2020-04-06 19:00 Daily
One lane blocked Southbound due to Scarborough subway exchange project.
MCCOWAN RD
From PITFIELD RD to CHANNEL NINE CRT
2020-03-23 07:00 2020-04-06 19:00 Daily
Two southbound lanes occupied for geotechnical investigation by Golder Associates.
CHAPEL PARK SQ @ 91
From CHAPEL PARK SQ to CANONGATE TRL
2020-03-26 08:00 2020-04-02 19:00 Daily
Southbound lane blocked due to Bell ENC pit work.
SCARBOROUGH GOLF CLUB RD @ 896
From BRIMORTON DR to SCARBOROUGH GOLF CLUB RD
2020-03-25 08:00 2020-04-01 19:00 Daily
Eastbound lane occupied due to Bell anchor installation work.
BANKWELL AVE @ 10
From SLAN AVE to BRIMORTON DR
2020-03-25 08:00 2020-04-01 19:00 Daily
Westbound lane blocked due to BELL ANCHOR INSTALLATION
BANKWELL AVE @ 3
From BRIMORTON DR to SCARBOROUGH GOLF CLUB RD
2020-03-25 08:00 2020-04-01 19:00 Daily
Eastbound lane blocked due to BELL ANCHOR INSTALLATION
CORPORATE DR @ Private Access
2020-03-25 10:00 2020-04-03 15:00 Daily
Eastbound and Westbound right lane and curb lane will be partially occupied due to Installation of Traffic Control Devices
NEILSON RD @ ELLESMERE RD
2020-03-27 07:00 2020-04-09 19:00 Daily
ALL DIRECTIONS ONE AT A TIME all lanes blocked due to hydro installation.
DANFORTH RD
From DANFORTH AVE to ST CLAIR AVE E
2020-03-30 07:00 2020-08-31 19:00 Daily
Road resurfacing and intersection improvements. Northbound and Southbound curb lanes closed.
VICTORIA PARK AVE @ ELLESMERE RD
2020-03-27 07:00 2020-04-09 19:00 Daily
ALL DIRECTIONS ONE AT A TIME lane blocked due to Hydro Installation
DANFORTH AVE
From CENTURY DR to BRIMLEY RD
2020-03-27 07:00 2020-04-27 19:00 Daily
Northbound left lane partially occupied due to duct installation. Weekend hours: 09:00-14:00
NESTON AVE
From DANFORTH RD to DANFORTH RD
2020-03-27 19:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation. Weekend hours: 09:00-19:00
TYNE CRT
From DANFORTH RD to DANFORTH RD
2020-03-27 07:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation.
STAVELY AVE
From DANFORTH RD to BRIMLEY RD
2020-03-27 07:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation. Weekend hours: 09:00-16:00
BRIMLEY RD
From STAVELY AVE to BOYCE AVE
2020-03-27 07:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation. Weekend hours: 09:00-16:00
GLENSHEPHARD DR
From DANFORTH RD to LOMBARDY CRES
2020-03-27 07:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation. Weekend hours: 09:00-16:00
LOMBARDY CRES
From GLENSHEPHARD DR to BRIMLEY RD
2020-03-27 07:00 2020-04-27 19:00 Daily
Left lane partially occupied due to duct installation. Weekend hours: 09:00-16:00
FULBERT CRES @ HAVENDALE RD
2020-03-30 07:00 2020-05-30 19:00 Daily
Northbound, Eastbound, Southbound, and Westbound lanes will be partially occupied one at a time due to Hydro installation.
PAINTED POST DR
From MORNINGTON GT to MARLAWR GT
2020-03-27 08:00 2020-04-03 19:00 Daily
Westbound curb lane partially occupied due to Bell Cable PIT.
FIRESIDE DR
From BRAYMORE BLVD to BRAYMORE BLVD
2020-03-30 08:00 2020-04-03 19:00 Daily
Westbound curb lane partially occupied due to Bell Cable PIT.
BLUEFIN CRES @ 38
From DOLLY VARDEN BLVD to DOLLY VARDEN BLVD
2020-03-30 08:00 2020-04-03 19:00 Daily
West Bound Lane blocked due to BELL CABLE PITS,
SCARBOROUGH GOLF CLUB RD @ 463
From TILLINGHAST LANE to CONFEDERATION DR
2020-03-30 08:00 2020-04-03 19:00 Daily
Bell ENC Pit. 1 Northbound lane closed.
ANNIS RD @ 28
From HILL CRES to PARKCREST DR
2020-03-30 08:00 2020-04-03 19:00 Daily
South Bound Lane blocked due to BELL ENC PIT
EAST AVE @ 98
From WHEELING DR to GOLDERS GREEN AVE
2020-03-30 08:00 2020-04-03 19:00 Daily
South Bound Lane blocked due to Bell cable pit.
SANTAMONICA BLVD
From CLAPPERTON AVE to HUDDLESTON CRT
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
TARTAN AVE
From SANTAMONICA BLVD to CLAPPERTON AVE
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
CHESAPEAKE AVE
From SANTAMONICA BLVD to TRINNELL BLVD
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
CLAPPERTON AVE
From SANTAMONICA BLVD to CHESAPEAKE AVE
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
ELFREDA BLVD
From TRINNELL BLVD to ST CLAIR AVE E
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
HUDDLESTON CRT
From SANTAMONICA BLVD to SANTAMONICA BLVD
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
TRINNELL BLVD
From SANTAMONICA BLVD to ELFREDA BLVD
2020-03-26 09:00 2020-04-03 19:00 Daily
CURB LANE PARTIALLY OCCUPIED DUE TO DUCT INSTALLATION
BIRCHMOUNT RD
From HWY 401 to HWY 401
2020-03-27 07:00 2020-03-31 20:00 Daily
Northbound / Southbound alternating lanes blocked due to Bridge rehabilitation
PHARMACY AVE @ SHEPPARD AVE E
2020-03-30 09:00 2020-04-03 16:00 Daily
Bell conduit construction work. Northbound curb lane closed.
HEPATICA ST
From STAINES RD to BOULDERBROOK DR
2020-03-27 09:00 2020-04-04 16:00 Daily
Northbound and southbound curb lanes occupied for installation of new cable by NX Utilities.
BOULDERBROOK DR @ 68
2020-03-27 09:00 2020-04-04 16:00 Daily
Westbound curb lane occupied for installation of cable by NX Utilities.
RIVENDELL TRL @ 69
2020-03-27 09:00 2020-04-04 16:00 Daily
Eastbound curb lane occupied for the installation of cable by NX Utilities.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ROSEHILL AVE @ AVOCA AVE
2018-05-09 07:00 2020-08-31 19:00 Daily
STRUCTURAL, CIVIL, ELECTRICAL AND MECHANICAL REHBILITATION WORKS AS PERT OF THE ROSEHILL RESERVOIR REHABILITATION WORKS PROJECT [ECS CONTRACT NO. 17ECS-MI-03WA].
ABBOTT AVE @ INDIAN RD
2019-09-17 07:00 2020-08-01 19:00 Daily
One Eastbound and Westbound lane occupied due to water main, water service and installation.
RIVERDALE AVE
From PAPE AVE to POUCHER ST
2019-09-23 09:00 2020-08-01 16:00 Daily
Watermain reconstruction, water service replacement and lane way reconstruction. Eastbound/Westbound lane on Riverdale Ave from Pape Ave to Poucher St.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-01 19:00 Daily
One Northbound and Southbound lane occupied due to water main reconstruction, water service replacement and road resurfacing,
VICTORIA PARK AVE
From DENTON AVE to CRESCENT TOWN RD
2019-09-23 07:00 2020-07-31 19:00 Daily
1 NB/SB lane occupied due to pedestrian bridge rehabilitation.
QUEENS QUAY E
From KNAPP LANE to DOCKSIDE DR
2019-09-26 07:00 2020-09-26 19:30 Continuous
Shaft and tunnel for Enwave western infrastructure expansion. (1) EB lane closed. Deleted By: pwu2; When: 09/27/2019 7:30:25 PM; Reason:
GARDINER EXPY W SHERBOURNE RAMP
From PARLIAMENT ST to LOWER SHERBOURNE ST
2019-10-05 00:01 2020-04-04 00:01 Continuous
Sherbourne St/Lower Jarvis St Ramp closed due to road work, Gardiner Expressway Rehabilitation Project
ROXBOROUGH DR
From MOUNT PLEASANT RD to HIGHLAND AVE
2019-10-01 00:01 2020-08-28 23:59 Continuous
EB/WB all lanes occupied due to sanitary force main.
AVENUE RD @ OXTON AVE
From HILLHOLM RD to CHAPLIN CRES
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
AVENUE RD @ CHAPLIN CRES
From TRANMER AVE to OXTON AVE
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CHESTNUT PK
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ABBOTT AVE
From INDIAN RD to INDIAN RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
AVENUE RD
From HILLHOLM RD to CHAPLIN CRES
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CARIBOO AVE
At OSLER ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
EUCLID PL @ EUCLID AVE
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
FRONT ST E
From EASTERN AVE to CHERRY ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MACPHERSON AVE @ AVENUE RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MANNING AVE
From QUEEN ST W to ROBINSON ST
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
ORMSKIRK CRT
At ORMSKIRK AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB/NB/SB 1 lane occupied due to water main reconstruction.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
GARDINER EXPY WB
From DON ROADWAY to YORK ST
2019-10-14 00:01 2021-01-31 23:59 Continuous
Westbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
LAKE SHORE BLVD E GARDINER EXPY RAMP
From DON ROADWAY to DON VALLEY PARKWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
1 lane closed at the top of the westbound Lake Shore on ramp to westbound Gardiner Expressway due to Gardiner Expressway Rehabilitation Project.
GARDINER EXPY EB
From YORK ST to DON ROADWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
Eastbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
JARVIS ST
From QUEEN ST E to FRONT ST E
2019-11-17 00:02 2020-08-22 23:59 Continuous
NB/SB Watermain and Water Service Installation
PINE ST
From BOYD AVE to KING ST
2019-12-13 07:00 2020-06-01 18:00 Continuous
Storm sewer improvements . East and Westbound occupied.
WELLINGTON ST W
From PORTLAND ST to BATHURST ST
2019-12-16 07:00 2020-06-30 19:00 Continuous
WB left lane Geotechnical Work for the Proposed Metrolinx Ontario Line Project.
STEWART ST
From PORTLAND ST to BATHURST ST
2019-12-16 07:00 2020-06-30 19:00 Continuous
EB left lane Geotechnical Work for the Proposed Metrolinx Ontario Line Project.
PINE ST
From BOYD AVE to KING ST
2019-12-19 07:00 2020-06-01 18:00 Daily
EB/WB Storm sewer, sanitary sewer, water main, road resurfacing and related improvements for Basement Flooring Protection Program Phase 4.
COMMISSIONERS ST @ DON ROADWAY
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Westbound and Eastbound due to bridge construction.
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-01-02 10:00 2020-08-09 15:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (Monday through Friday)
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-01-02 22:00 2020-08-09 05:00 Continuous
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON ROADWAY @ COMMISSIONERS ST
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Northbound and Southbound due to bridge construction.
KING ST W @ BLUE JAYS WAY
2020-01-06 00:01 2020-03-31 23:59 Daily
Eastbound right lane closed due to construction.
COMMISSIONERS ST
From MUNITION ST to DON ROADWAY
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Commissioners St.
DON ROADWAY
From VILLIERS ST to COMMISSIONERS ST
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Don Roadway.
ED MIRVISH WAY
From KING ST W to DUNCAN ST
2020-01-09 07:00 2020-04-30 19:00 Daily
NB 1 lane Installation of hot and chilled water
FRONT ST W
From BAY ST to YORK ST
2020-01-17 00:01 2020-07-31 23:59 Continuous
Hydro vault rehabilitation. Westbound drop off/pick-up parking zones closed.
YONGE ST
From FARNHAM AVE to WOODLAWN AVE W
2020-01-27 07:00 2020-05-30 23:00 Daily
Watermain and water service installation
DON MILLS RD @ EGLINTON AVE E
2020-02-08 09:00 2020-04-10 23:00 Continuous
ECLRT Construction. Eastbound left turn lane closed starting Feb 8; Northbound and Southbound left turn lane closed starting Feb 10.
CAVELL AVE
From BURLINGTON ST to SKELTON ST
2020-02-14 07:00 2020-03-31 17:00 Daily
Curb lane closed, minimal obstruction to traffic. Lane occupied southbound. Traffic drawing attached with no pay duty required. Working hours will be 7am - 5p,. Monday to Friday.
GARDINER EXPY WB
From PARLIAMENT ST to LOWER SHERBOURNE ST
2020-02-29 00:01 2020-04-04 00:01 Continuous
West bound 1 lane occupied due to Gardiner Expressway Rehabilitation Project, Section 1, Jarvis to Cherry
WINDERMERE AVE
From LAKE SHORE BLVD W to GARDINER EXPY
2020-02-10 07:00 2020-12-31 16:00 Daily
Northbound intermittent lane closure due to staging of construction vehicles.
LAKE SHORE BLVD
From CHERRY ST to JARVIS ST
2020-03-01 10:00 2020-08-09 14:59 Daily
Westbound 2 lanes Gardiner Expressway Rehabilitation Project. Night time off peak: Sunday to Thursday, 10:00 PM till 4:59 AM (the following day) Day time off peak: Monday to Friday, 10:00 AM till 2:59 PM
DORSET RD
From KINGSTON RD to RANDALL CRES
2020-02-21 07:00 2020-05-01 19:00 Daily
Storm sewer/pumping station installation
SHUTER ST
From YONGE ST to VICTORIA ST
2020-03-02 19:00 2020-06-18 06:00 Daily
East bound 1 lane blocked due to chilled water supply and return lines.
DOVERCOURT RD
From BLOOR ST W to DUPONT ST
2020-02-25 00:01 2020-05-02 23:59 Daily
South and North bound 1 lane blocked due to rehabilitation of various sewer lines
BELSIZE DR
From YONGE ST to ACACIA AVE
2020-02-26 07:00 2020-04-26 19:00 Daily
Eastbound and westbound left lane closed due to construction.
ACACIA AVE
From BELSIZE DR to DAVISVILLE AVE
2020-02-25 07:00 2020-04-26 19:00 Daily
Eastbound and westbound left lane closed due to construction.
MILLWOOD RD
From YONGE ST to ACACIA AVE
2020-02-25 07:00 2020-04-26 19:00 Daily
Eastbound and westbound left lane closed due to construction.
CUTHBERT CRES
From BELSIZE DR to CAREY RD
2020-02-26 07:00 2020-04-26 19:00 Daily
Northbound and southbound left lane closed due to construction.
GLEBE RD E @ TULLIS DR
2020-02-26 07:00 2020-04-26 19:00 Daily
Northbound and southbound left lane closed due to construction.
CAREY RD @ TULLIS DR
2020-02-26 07:00 2020-04-26 19:00 Daily
Eastbound and westbound left lane closed due to construction.
WELLINGTON ST W @ JOHN ST
2020-02-25 07:00 2020-03-31 19:00 Continuous
Northbound curb lanes occupied due to area used for compound.
YORK ST
From FRONT ST W to BREMNER BLVD
2020-03-03 05:00 2020-06-08 23:59 Continuous
North and south bound curb lane blocked due to Metrolinx Project.
CONRAD AVE
From HILLCREST DR to TYRREL AVE
2020-03-02 07:00 2020-06-30 21:00 Continuous
Eastbound and westbound lanes intermittently blocked due to road reconstruction.
JARVIS ST
From CARLTON ST to GERRARD ST E
2020-03-06 07:00 2020-04-06 19:00 Daily
Southbound curb lane occupied due to hydro installation.
HURON ST
From DUPONT ST to LOWTHER AVE
2020-03-04 07:00 2020-04-02 16:00 Daily
Northbound and southbound lane occupied one at a time due to boring and trenching.
BEDFORD RD @ DAVENPORT RD
2020-03-05 09:00 2020-04-09 15:30 Daily
Westbound and eastbound lanes occupied due to directional bore & place conduit.
DANFORTH RD
From ELLERBECK ST to PLAYTER BLVD
2020-03-18 07:00 2020-05-05 23:00 Daily
EASTBOUND CURB LANE blocked due to Hydro Installation
HIGHLAND CRES
From YORK MILLS RD to BEECHWOOD AVE
2020-03-09 07:00 2020-04-06 19:00 Daily
Full road closure both due to rehabilitation of various sewer lines across the City of Toronto.
UNIVERSITY AVE
From ELM ST to GERRARD ST W
2020-03-09 07:00 2020-04-06 19:00 Daily
Southbound right lane occupied due to rehabilitation of various sewer lines across the City of Toronto.
DUNDAS ST E
From HEINTZMAN ST to WATKINSON AVE
2020-03-23 09:00 2020-04-06 15:00 Daily
Left lane occupied in each direction due to rehabilitation of various sewer lines across the City of Toronto.
BOND ST @ GOULD ST
2020-03-06 07:00 2020-08-28 19:00 Daily
Full road closure due to emergency steam line replacement.
GRENADIER RD
From SUNNYSIDE AVE to LYND AVE
2020-03-11 09:00 2020-04-10 16:00 Daily
East bound all lanes blocked due to Inspection and Rehabilitation of lateral sewer pipes.
INDIAN RD
From PARKDALE RD to ALGONQUIN AVE
2020-03-10 09:00 2020-04-10 16:00 Daily
North bound all lanes blocked due to Inspection and Rehabilitation of lateral sewer pipes.
GARDEN AVE
From GLENDALE AVE to RIDLEY GDNS
2020-03-11 09:00 2020-04-10 16:00 Daily
East bound all lanes blocked due to Inspection and Rehabilitation of lateral sewer pipes.
GEOFFREY ST
From PARKSIDE DR to RONCESVALLES AVE
2020-03-11 09:00 2020-04-10 16:00 Daily
East bound all lanes blocked due to Inspection and Rehabilitation of lateral sewer pipes.
DUNVEGAN RD
From FRYBROOK RD to KILBARRY RD
2020-03-11 07:00 2020-03-31 17:30 Daily
Eastbound partial lane blocked due to storage of materials.
LAKE SHORE BLVD E
From SHERBOURNE ST to CHERRY ST
2020-03-10 22:00 2020-04-03 04:59 Daily
Eastbound 2 lanes occupied due to Gardiner Expressway Rehabilitation Project.
GAMBLE AVE
From PAPE AVE to TODMORDEN LANE
2020-03-10 07:00 2020-03-31 19:00 Daily
Westbound all lanes blocked due to geotechnical and environmental borehole investigation.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
COSBURN AVE
From PAPE AVE to TODMORDEN LANE
2020-03-10 09:00 2020-03-31 16:00 Daily
Westbound curb lane occupied due to geotechnical & environmental borehole investigation.
BROADWAY AVE
From YONGE ST to REDPATH AVE
2020-03-12 09:00 2020-04-02 16:00 Daily
Installing new conduit , westbound lane occupied .
CHARLES ST E
From YONGE ST to CHURCH ST
2020-03-16 07:00 2020-04-04 16:00 Daily
One eastbound and one westbound lane occupied alternately due to relocation of fire hydrant.
JOHN ST
From STEPHANIE ST to QUEEN ST E
2020-03-23 09:00 2020-04-10 15:00 Daily
Full road closure due to rehabilitation of sewer lanes.
WELLESLEY ST W @ 77
From BAY ST to QUEENS PARK
2020-03-16 07:00 2020-04-03 19:00 Daily
Sidewalk and bike lane occupied due to hydro vault abandonment.
FLETCHERDON CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-03-14 07:00 2020-04-10 18:00 Daily
City of Toronto Basement Flooding Project. All lanes in both directions closed.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
From COXWELL BLVD to COXWELL BLVD
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
ENNERDALE RD
From EGLINTON AVE W to BRANSTONE RD
2020-03-17 09:00 2020-03-31 16:00 Daily
Decommissioning monitoring wells. 1 Northbound lane closed.
COSBURN AVE
From COXWELL AVE to WOODBINE AVE
2020-03-12 09:00 2020-05-04 16:00 Daily
Duct installation by directional drilling and trenching. 1 Westbound and Eastbound lane closed.
COXWELL AVE
From COSBURN AVE to PLAINS RD
2020-03-12 09:00 2020-05-04 16:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
BINSWOOD AVE
From O CONNOR DR to BARKER AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
MACHOCKIE RD
From PLAINS RD to O CONNOR DR
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
PLAINS RD
From MACHOCKIE RD to WOODMOUNT AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Westbound and Eastbound lane closed.
VIRGINIA AVE
From FAIRSIDE AVE to WOODMOUNT AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Westbound and Eastbound lane closed.
O CONNOR DR
From BINSWOOD AVE to WOODMOUNT AVE
2020-03-12 09:00 2020-05-04 16:00 Daily
Duct installation by directional drilling and trenching. 1 Eastbound lane closed.
ROBLIN AVE
From O CONNOR DR to COSBURN AVE
2020-03-12 07:00 2020-05-06 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
GLEBEMOUNT AVE
From O CONNOR DR to COSBURN AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
NORLONG BLVD
From O CONNOR DR to COSBURN AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
WOODMOUNT AVE
From O CONNOR DR to BARKER AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
FAIRSIDE AVE
From COSBURN AVE to BARKER AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Northbound and Southbound lane closed.
HOLBORNE AVE
From FAIRSIDE AVE to BARKER AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Westbound and Eastbound lane closed.
BARKER AVE
From FAIRSIDE AVE to WOODMOUNT AVE
2020-03-12 07:00 2020-05-04 19:00 Daily
Duct installation by directional drilling and trenching. 1 Westbound and Eastbound lane closed.
BROOKVIEW DR
From COVINGTON RD to RONDALE BLVD
2020-03-16 09:00 2020-04-04 16:00 Daily
All lanes occupied due to conduit and cable installation.
BLOOR ST W @ 1415 BLOOR ST W
2020-03-23 07:00 2020-04-10 17:00 Continuous
Southbound curb lane occupied due to Toronto vault roof rebuild.
KING ST E
From SUMACH ST to SACKVILLE ST
2020-03-23 09:00 2020-04-02 15:30 Daily
Westbound, one lane occupied due to construction (alternating lanes, one at a time)
RIVERSIDE CRES @ 20-22
2020-03-23 09:00 2020-04-30 16:00 Continuous
Rehabilitation process for the Riverside Pumping station
BOULDERBROOK DR
From STAINES RD to SOLITUDE ST
2020-03-19 09:00 2020-04-04 16:00 Daily
East and west bound all lanes blocked due to installing new rogers conduit and cable.
YONGE ST @ BREADALBANE ST
2020-03-20 09:00 2020-04-10 16:00 Daily
North bound curb lane blocked due to construct conduit
COLBORNE LODGE DR
From THE QUEENSWAY to LAKE SHORE BLVD W
2020-03-23 09:00 2020-04-02 15:30 Daily
South and northbound 1 lane blocked due to Bridge 034 Chipping
WALLACE AVE
2020-03-24 07:00 2020-04-24 19:00 Daily
Eastbound curb lane occupied due to utility work.
YONGE ST @ 415
From GERRARD ST E to CARLTON ST
2020-03-27 09:00 2020-04-03 16:00 Daily
Northbound 1 lane blocked due to construct conduit.
SHERBOURNE ST
From WELLESLEY ST E to CARLTON ST
2020-03-23 19:00 2020-04-03 07:00 Daily
Trenchless rehabilitation of existing gravity sewers. Northbound lane closed.
KNAPP LANE @ DOCKSIDE DR
2020-03-09 07:00 2020-05-01 17:00 Continuous
Full road closure due to installation of new underground District Energy Healing and Cooling lines.
DUNDAS ST W
From YONGE ST to BAY ST
2020-03-23 09:30 2020-04-03 19:00 Daily
Curb lanes occupied to install new conduit. Timing for WB lanes 0700am -0330pm
EGLINTON AVE W
From WINCOTT DR to ISLINGTON AVE
2020-03-25 07:00 2020-04-22 15:30 Daily
Geotechnical and environmental borehole investigation. Westbound boulevard and curb lane.
JOHN ST
From STEPHANIE ST to QUEEN ST W
2020-03-30 21:00 2020-04-02 05:00 Daily
Both directions 1 lane blocked due to Rehabilitation of various sewer lines
RIDELLE AVE
From WR ALLEN RD to BATHURST ST
2020-03-24 09:00 2020-04-24 16:00 Daily
EASTBOUND CURB LANE occupied due to BORING, CONDUIT INTSALL,
BROADWAY AVE
From YONGE ST to REDPATH AVE
2020-03-23 09:00 2020-04-17 17:00 Daily
ALL DIRECTIONS 1 lane at a time blocked due to hydro installation.
OVERLEA BLVD @ 86
From WILLIAM MORGAN DR to CHARLES H HISCOTT BDGE
2020-03-25 09:00 2020-04-15 16:00 Daily
Eastbound lane occupied due to directional bore & place conduit work.
DUNDAS ST W
From YONGE ST to BAY ST
2020-03-24 07:00 2020-04-03 19:00 Daily
East and west bound curb lane blocked due to installing new conduit, cable, vaults and pedestals.
SPENCER AVE
From KING ST W to SPRINGHURST AVE
2020-03-30 07:00 2020-04-10 19:00 Daily
North and South lanes occupied due to Water Service Installation.
MOUNT PLEASANT RD @ BROADWAY AVE
2020-03-25 07:00 2020-03-31 21:00 Daily
Northbound curb lane occupied due to conduit repair and cable installation.
DUNDAS ST E
From GLENLAKE AVE to CHELSEA AVE
2020-03-30 07:00 2020-04-02 19:00 Daily
Alternating eastbound and westbound lanes occupied due to sewer line rehabilitation work.
ORIOLE RD @ 61
From HEATH ST W to ORIOLE GDNS
2020-03-27 07:00 2020-04-07 19:00 Daily
North and southbound lanes occupied due to water service installation.
MERTON ST
From MOUNT PLEASANT RD to YONGE ST
2020-03-27 09:00 2020-04-10 16:00 Daily
One westbound lane occupied due to directional drilling work.
MUNRO ST @ 180
From DUNDAS ST E to MOUNTSTEPHEN ST
2020-03-30 07:00 2020-04-10 19:00 Daily
Northbound lane occupied due to water and sanitary service installation work.
JONES AVE
From BOULTBEE AVE to GERRARD ST E
2020-03-30 07:00 2020-04-02 19:00 Daily
Both directions 1 lane blocked due to Rehabilitation of various sewer lines.
OSSINGTON AVE
From COLLEGE ST to HEPBOURNE ST
2020-03-30 07:00 2020-04-02 19:00 Daily
Both directions 1 lane blocked due to Rehabilitation of various sewer lines.
YONGE ST
From WALLY CROUTER WALKWAY to HEATH ST E
2020-03-25 07:00 2020-04-03 19:00 Daily
NORTH BOUND CURB LANE blocked due to Hydro Installation
BLUE JAYS WAY @ FRONT ST W
2020-03-27 07:00 2020-04-08 19:00 Daily
West bound curb lane blocked due to hydro installation.
DUNVEGAN RD @ 235-174
2020-03-30 07:00 2020-04-10 19:00 Daily
East north and westbound 1 lane blocked due to Trenchless (No Dig) Sewer Rehabilitation cleaning works
DUNDONALD ST
From CHURCH ST to CHECHALK LN
2020-03-30 07:00 2020-04-03 16:00 Daily
Hydro vault rehabilitation work. Westbound curb lane closed.
ST GEORGE ST
From BERNARD AVE to LOWTHER AVE
2020-03-26 07:00 2020-04-24 16:00 Daily
North and South bound 1 lane blocked due to boring and trenching.
CHRISTIE ST
From BARTON AVE to BLOOR ST W
2020-03-23 07:00 2020-06-12 19:00 Daily
Trenchless rehabilitation of existing water mains. Southbound curb lane closed.
DVP NB DON MILLS RD NB RAMP @ DON VALLEY PARKWAY NB
2020-03-30 09:00 2020-04-03 17:00 Daily
Northbound Don Valley Parkway ramp to Northbound Don Mills closed for bridge rehabilitation work.
DON VALLEY PARKWAY SB @ DVP SB DON MILLS RD SB RAMP
2020-03-30 09:00 2020-04-03 17:00 Daily
Southbound Don Valley Parkway ramp to Southbound Don Mills closed for bridge rehabilitation work.
QUEEN ST E @ 1638
At COXWELL AVE
2020-03-26 09:00 2020-03-31 19:00 Daily
Westbound curb lane occupied due to directional drilling.
RHODES AVE @ 478-482
2020-03-30 08:00 2020-04-03 18:00 Daily
Geotechnical investigation. 1 Southbound lane closed.
BEDFORD RD @ DAVENPORT RD
2020-03-26 09:00 2020-04-09 15:30 Daily
West and eastbound all lanes blocked due to directional bore & place conduit & fibre
PARK RD @ CHURCH ST
2020-03-30 07:00 2020-04-10 19:00 Daily
center intersection blocked due to Rebuild Toronto Hydro Manhole Roof
GRENVILLE ST
From YONGE ST to ELIZABETH ST
2020-03-30 09:00 2020-03-31 15:00 Daily
East Bound Lanes and West Bound Lane 1 Lane at the time blocked due to test hole investigation.
DANFORTH AVE @ WOODBINE AVE
2020-03-30 09:00 2020-04-03 16:00 Daily
North Bound Lane blocked due to BELL MH repair.
WICKSTEED AVE @ 209
From LESLIE ST to BETH NEALSON DR
2020-03-30 08:00 2020-04-03 19:00 Daily
East Bound Lane blocked due to Bell cable pit.
HOLLY ST
From SOUDAN AVE to EGLINTON AVE E
2020-03-31 00:01 2020-04-02 23:59 Continuous
Installation of Toronto Water connections to construction site. Northbound curb lane closed.
AUGUSTA AVE
From WOLSELEY ST to QUEEN ST W
2020-03-30 07:00 2020-04-09 19:00 Daily
Northbound 1 lane blocked due to Rehabilitation of various sewer lines
WELLESLEY ST E @ 25
2020-03-29 08:00 2020-04-17 17:00 Daily
Eastbound curb lane blocked due to construct conduit.
COLEMAN AVE @ 88
2020-03-30 07:30 2020-04-03 23:30 Daily
Northbound curb lane blocked due to replace Transformer
DOVERCOURT RD
From QUEEN ST W to COLLEGE ST
2020-03-30 09:30 2020-04-01 15:30 Daily
South and northbound 1 lane blocked due to test hole investigation.
O CONNOR DR
From YARDLEY AVE to DOHME AVE
2020-03-30 09:00 2020-04-02 16:00 Daily
Northbound curb lane blocked due to directional drill/trench.
SPADINA AVE
From CECIL ST to WELLINGTON ST W
2020-03-30 07:00 2020-04-10 16:00 Daily
South bound curb lane blocked due to Pulling fiber optic cable in existing hydro structure
QUEENS QUAY E
From COOPER ST to LOWER JARVIS ST
2020-03-27 09:00 2020-04-20 19:00 Daily
Drilling work with hydrovac truck. Westbound curb lane closed.
LAKE SHORE BLVD E
From BAY ST to YORK ST
2020-03-29 20:00 2020-04-01 06:00 Daily
2 Westbound lanes closed alternatively on Lake Shore Blvd E for Gardiner Expressway Hammer Sounding.
THE ESPLANADE @ LOWER JARVIS ST
2020-03-26 08:00 2020-04-03 16:00 Daily
Eastbound and westbound curb lanes occupied due to installation of new conduit for fiber optics.
JARVIS ST
From WELLESLEY ST E to MAITLAND ST
2020-03-31 00:01 2020-03-31 21:00 Continuous
Northbound and southbound lanes occupied due to deployment space for Paramedics, Toronto Police and Corporate Security.
DAVENPORT RD @ AVENUE RD
2020-03-30 10:00 2020-03-31 17:00 Daily
Eastbound and Westbound one lane in each direction blocked due to cable repairs until 5pm March 31/2020.
WIDMER ST
From KING ST W to ADELAIDE ST W
2020-03-30 09:00 2020-04-01 16:00 Daily
Southbound curb lane occupied due to full length trenchless rehabilitation of existing gravity sewers.
OVERLEA BLVD
From MILLWOOD RD to THORNCLIFFE PARK DR
2020-03-30 07:00 2020-04-30 19:00 Daily
Northbound curb lane occupied for borehole investigation by WSP Canada Inc.
BETH NEALSON DR
From PAT MOORE DR to WICKSTEED AVE
2020-03-30 07:00 2020-04-30 19:00 Daily
Alternating northbound and southbound lane closures for borehole investigation by WSP Canada Inc.
GARDINER EXPY WB @ GARDINER EXPY YONGE/BAY/YORK RAMP
2020-03-31 02:00 2020-03-31 05:00 Daily
Gardiner Expressway Rehabilitation. Westbound right lane closed.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
FRONT ST W
From JOHN ST to SIMCOE ST
2020-03-31 09:00 2020-04-02 16:00 Daily
East bound 1 lane blocked due to Rehabilitation of various sewer lines.
JOHN GARLAND BLVD
From KIPLING AVE to JAMESTOWN CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
Westbound and Eastbound curb lanes alternating, partially occupied due to trench excavation and duct bank installation. Weekend hours: 07:00am-07:00pm
KENDLETON DR
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
GARDINER EXPY
From ISLINGTON AVE to PARK LAWN RD
2020-04-05 21:30 2020-04-10 05:30 Daily
Eastbound lanes intermittently occupied due to CCTV inspection and assessment of sewer and manhole.
ANNABELLE DR
From KIPLING AVE to BEACONHILL RD
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
BEACONHILL RD
From MARYHILL DR to SILVERSTONE DR
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
KIPLING AVE
From ANNABELLE DR to MOUNT OLIVE DR
2020-03-31 09:00 2020-04-23 16:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
MARYHILL DR
From SUZY ST to ANNABELLE DR
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SHEILA CRT
From SILVERSTONE DR to SILVERSTONE DR
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SILVERSTONE DR
From BEACONHILL RD to SHEILA CRT
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SUZY ST
From BEACONHILL RD to MARYHILL DR
2020-03-31 07:00 2020-04-03 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
WICKHAM CRT
From ANNABELLE DR to ANNABELLE DR
2020-03-31 07:00 2020-04-23 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
ISLINGTON AVE
From DUNDAS ST W to CENTRAL PARK RDWY
2020-04-01 09:00 2020-04-07 16:00 Daily
Direction drill and trenching, installation of conduit and new GLB. Southbound curb lane closed.
ST CLAIR AVE W @ 700
2020-04-15 07:30 2020-04-15 23:30 Daily
Eastbound curb lane and sidewalk occupied for replacement of transformer by Toronto Hydro.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
SHEPPARD AVE W @ SEELEY DR
2020-03-31 07:00 2020-05-01 19:00 Daily
Traffic Signals & Control Devices
YONGE ST @ 6500
2020-04-01 10:00 2020-04-10 15:00 Daily
Southbound Curb lane blocked due to Geotechnical Investigation
KIPLING AVE
From ANNABELLE DR to MOUNT OLIVE DR
2020-03-31 09:00 2020-04-23 19:00 Daily
Alternating lane partially blocked eastbound/westbound due to duct installation.
OLD MEADOW LANE @ REPLIN RD
2020-03-31 08:00 2020-04-03 19:00 Daily
Bell Anchor Installation. Westbound curb lane closed.
REPLIN RD @ OLD MEADOW LANE
2020-03-31 08:00 2020-04-03 19:00 Daily
Bell Anchor Installation. Southbound curb lane closed.
PARKHURST BLVD @ 112
2020-03-31 08:00 2020-04-03 19:00 Daily
Bell Anchor Installation. Westbound lane closed.
ANTIBES DR @ 10
From TORRESDALE AVE to COACH LITEWAY
2020-04-01 08:00 2020-04-08 19:00 Daily
Bell ENC Pit work. Westbound lane closed.
FAIRHOLME AVE @ GLENMOUNT AVE
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
MADOC DR @ GLENMOUNT AVE
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
DELL PARK AVE @ GLENMOUNT AVE
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
SHELBORNE AVE @ BATHURST ST
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
DALEMOUNT AVE @ MADOC DR
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
GLENMOUNT AVE @ FAIRHOLME AVE
2020-04-01 07:00 2020-04-17 19:00 Daily
Duct installation by directional drilling and trenching. Center lane in both directions partially occupied.
FINCH AVE W
From NORFINCH DR to TOBERMORY DR
2020-03-31 08:00 2020-04-17 17:00 Daily
West, east, north and south bound lanes blocked due to soil sampling.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
EGLINTON AVE E
From PHARMACY AVE to HAKIMI AVE
2020-03-31 07:00 2020-04-03 16:00 Daily
1 Lanes EB, 2 Lanes WB, 1 Lane NB blocked due to The ECLRT work
MARKHAM RD
From HWY 401 to HWY 401
2020-04-01 07:00 2020-04-30 16:00 Daily
Northbound / Southbound alternating lane blocked due to bridge rehabilitation.
MIDLAND AVE
From HWY 401 to HWY 401
2020-04-01 07:00 2020-04-30 16:00 Daily
Northbound / Southbound alternating lane blocked due to bridge rehabilitation.
BIRCHMOUNT RD
From HWY 401 to HWY 401
2020-04-01 07:00 2020-04-30 16:00 Daily
Northbound / Southbound alternating lane blocked due to bridge rehabilitation.
KENNEDY RD
From HWY 401 to HWY 401
2020-04-01 07:00 2020-04-30 16:00 Daily
Northbound / Southbound alternating lane blocked due to bridge rehabilitation.
BURNLEY AVE
From GOLDSMITH AVE to BELMORE AVE
2020-04-01 08:00 2020-04-08 19:00 Daily
Bell Cable Pit work. Southbound lane closed.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ST CLAIR AVE W @ 700
2020-04-04 07:30 2020-04-04 23:30 Daily
Eastbound curb lane Work on sidewalk to replace Transformer
COLEMAN AVE @ 88
2020-04-17 07:30 2020-04-17 23:30 Daily
Northbound curb lane Work on sidewalk to replace Transformer
PEARL ST
From DUNCAN ST to SIMCOE ST
2020-04-01 07:00 2020-06-10 19:00 Daily
Westbound lane occupied due to installation of hot and cold water.
DAWES RD @ 469-471
2020-04-01 09:00 2020-04-02 16:00 Daily
North bound lane blocked due to Repair Beanfield Manhole
WINDERMERE AVE
From LAKE SHORE BLVD W to THE QUEENSWAY
2020-04-01 00:01 2020-05-04 23:59 Continuous
Bridge rehabilitation work. 1 Northbound and Southbound lane closed.
JARVIS ST
From WELLESLEY ST E to MAITLAND ST
2020-03-31 07:00 2020-03-31 18:00 Daily
Support for TESS cheque distribution. Southbound curb lane closed.
ANNETTE ST @ QUEBEC AVE
2020-04-01 09:00 2020-04-20 15:00 Daily
Left and right curb lanes occupied due to traffic signal work.
LASCELLES BLVD @ WILBERTON RD
2020-03-31 08:00 2020-04-07 19:00 Daily
Bell conduit work. Northbound lane closed.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

A parking ticket is affixed to the windshield of a vehicle on Wednesday June 9, 2010. (CP24/Mathew Reid)

Transportation Services

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

toronto traffic, rush hour, commute

Vehicle and Licencing

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Wasaga Beach tourism

Ontario Travel Tips

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Insurance paper

Insuring a vehicle in Ont.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Traffic file photo

Road Safety

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Highway 407

407 ETR

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.


Transit Twitter Stream

Service advisories from the Toronto Transit Commission

Service updates from GO Transit

Service advisories from York Region Transit

Service updates and news from Durham Region Transit

Service updates from Brampton Transit

Greater Toronto and Hamilton Area transportation updates

Latest news about Ontario's public transit smartcard

Transit Systems Servicing Toronto and the GTA

GO train
Transit announcement in York Region

Bus lines offering service throughout Ontario

Greyhound bus

Greyhound

Greyhound Canada is the largest provider of intercity bus transportation in Canada, serving nearly 1,100 locations.

Coach Canada Bus (Coach Canada Facebook page)

Coach Canada

Information on scheduled bus routes, convenient door-to-door airport van transfers, fun city sightseeing tours, and first class charter service.

Ontario Northland Bus. Gravelle says planned investments in ONTC infrastructure include more than $23 million over three years to purchase new motor coaches for its bus line and to refurbish rail coaches for the Polar Bear Express. (ontarionorthland.ca)

Ontario Northland

Ontario Northland's operations encompass more than 1,100 km of track, including bus service to 56 communities.


Information for Canadians crossing the United States border

In this June 2, 2009 file photo, the Statue of Liberty is seen in New York harbor.(AP Photo/Richard Drew, File)

Travelling to the U.S.

Everything citizens of Canada travelling to the United States need to know before going through customs.

Traffic makes its way to Ambassador Bridge that connects Canada to the United States in Windsor Ont. on Friday June 15, 2012. (The Canadian Press/Mark Spowart)

Tips for border crossing

CBSA provides travel tips, frequently asked questions and helpful hints for crossing the border.

To carry out the scheme, when the surrogate got to the testing centre, they presented a fake passport showing their picture along with the identification details of the person who hired them.

Get or renew a passport

Find information on getting or renewing a Canadian passport. Download and complete all related forms.

Border Crossing Twitter Stream

News from the Canada Border Services Agency

Traffic Updates for Rainbow, Peace, Lewiston Queenston & Whirlpool

Traffic Updates from Blue Water Bridge, Crossing between Canada & USA

Traffic Updates from Sault Ste. Marie International Bridge