Traffic

TRAFFIC

News, updates, traffic map, travel times and info about driving in Toronto and Ontario.

The TTC's newest streetcar is shown while on its maiden voyage early on March 14, 2013. (Brad Ross/Twitter.com)

TRANSIT

News, updates and important information about transit systems for Toronto & the GTA.

In this June 1, 2009 file photo, a truck loaded with Ford and Lincoln vehicles travels from Canada to the U.S. Peace Bridge border crossing in Buffalo, N.Y. (AP / David Duprey)

BORDER CROSSINGS

News, updates, wait times and traveller information about Ontario border crossings.

CP24 - Toronto News | Breaking News Headlines | Weather, Traffic, Sports

Real-time traffic information for Toronto, GTA, and surrounding areas.


Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Traffic

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
BLACKTHORN AVE @ 432
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
SUN VALLEY DR
From ST MARKS RD to PASADENA GDNS
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
VALLEYMEDE RD
From ELLIS PARK RD to KENNEDY AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ISLINGTON AVE
From FORDWICH CRES to BARKER AVE
2019-06-17 07:00 2020-12-31 19:00 Daily
NB/SB left and right lane occupied due to repairing bridge.
EASTSIDE DR @ NORTH QUEEN ST
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Northbound lane closed.
VICKERS RD @ THE EAST MALL
2020-01-06 07:00 2020-09-01 19:00 Daily
Mendota, Queensway and Long Branch Sanitary Trunk Sewer Rehab. Southbound lane closed.
BROW DR
From EXMOOR DR to LAKE SHORE BLVD W
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of two ground water monitoring wells. Southbound shoulder closed.
BLUE GOOSE ST
From MANCHESTER AVE to CAVELL AVE
2020-02-03 09:00 2020-07-24 16:00 Daily
Installation of groundwater monitoring wells. Northbound curb lane closed.
LAKE SHORE BLVD W
From SIXTH ST to THIRD ST
2020-03-01 07:00 2020-08-20 19:00 Continuous
East-West bound all lanes Watermain and Water Service Installation
BOYD AVE
From RALPH ST to MERRILL AVE
2020-03-03 07:00 2020-08-31 19:00 Continuous
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
CHURCH ST
From JANE ST to ELM ST
2020-03-05 07:00 2020-09-30 18:00 Daily
Eastbound and westbound lane occupied one at a time for road resurfacing.
CARLINGVIEW DR
From RENFORTH DR to HWY 401 COLLECTOR EB
2020-03-16 00:01 2020-11-20 00:01 Daily
Southbounds all Lanes are occupied due to bridge Rehabilitation project.
WESTON RD
From WRIGHT AVE to CLOUSTON AVE
2020-03-02 07:00 2020-09-11 19:00 Daily
Upgrading the storm sewer system. 2 Southbound lanes closed.
KIPLING AVE
From WINGROVE HILL to RATHBURN RD
2020-03-17 07:00 2020-08-29 16:00 Daily
Northbound 2 lanes blocked due to basement flooding protection program.
CARLINGVIEW DR
From RENFORTH DR to CARLINGVIEW SB HWY 401 EXPRESS EB RAMP
2020-03-23 00:01 2020-11-20 00:01 Daily
MTO 2019-2001 Bridge Rehabilitation Project. All Southbound lanes closed.
EGLINTON AVE W @ BEMERSYDE DR
2020-03-30 07:00 2020-07-30 17:00 Daily
Trench excavation and duct bank installation for Toronto Hydro. Eastbound curb closed.
JOHN GARLAND BLVD
From KIPLING AVE to JAMESTOWN CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
Westbound and Eastbound curb lanes alternating, partially occupied due to trench excavation and duct bank installation. Weekend hours: 07:00am-07:00pm
KENDLETON DR
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-06 07:00 2020-09-30 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
BURNHAMILL PL @ MILL RD
2020-04-04 07:00 2020-09-27 19:00 Daily
Eastbound curb lane occupied due to trench excavation and duct bank installation for Toronto Hydro.
STONEHAM RD
From MILL RD to OLD BURNHAMTHORPE RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Eastbound and Westbound lanes occupied alternatively due to trench excavation and duct bank installation for Toronto Hydro.
MILL RD @ STONEHAM RD
2020-04-13 07:00 2020-09-27 19:00 Daily
Northbound lanes occupied due to trench excavation and duct bank installation for Toronto Hydro.
MARKBURN CRT
From STONEHAM RD to MARKBURN CRT
2020-04-13 07:00 2020-09-27 19:00 Daily
North and south bound curb lane blocked due to trench excavation and duct bank installation.
FIFTH ST @ ALEX FAULKNER LN
At BIRMINGHAM ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From NINTH ST to EIGHTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From SEVENTH ST to SIXTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
LAKE SHORE BLVD W
From THIRD ST to FIFTH ST
2020-04-14 07:00 2020-08-30 19:00 Continuous
All directions lanes blocked due to Laneway Reconstruction
KENDLETON DR @ JOHN GARLAND BLVD
From JOHN GARLAND BLVD to ORPINGTON CRES
2020-04-20 07:00 2020-09-30 19:00 Daily
North and southbound curb lanes occupied due to Toronto Hydro trench excavation and duct installation work.
LAURA RD
From SHEPPARD AVE W to FRITH RD
2020-05-05 07:00 2020-10-15 19:00 Daily
Construction work to replace storm sewers. Southbound lane closed.
ALBION RD
From BENSTROW AVE to TODD BROOK DR
2020-05-21 07:00 2020-07-31 17:00 Continuous
Construction work. 1 Westbound and 1 Eastbound lane closed.
STANLEY RD
From JANE ST to LAURA RD
2020-05-25 07:00 2020-09-04 19:00 Daily
Construction of a sanitary sewer system. 1 Westbound lane closed.
GARDINER EXPY W LAKE SHORE BLVD W RAMP @ GARDINER EXPY
2020-06-06 06:00 2020-08-03 23:00 Weekends
Ramp fully closed from Saturday 6 AM to Sunday 11 PM due to City of Toronto's ActiveTO Initiative.
RATHBURN RD
From THE EAST MALL to MARTIN GROVE RD
2020-06-15 07:00 2020-07-20 19:00 Daily
Eastbound and westbound lanes partially occupied due to the removal of concrete and replacement of asphalt. Weekend hours: 7:00am-7:00pm
KIPLING AVE @ TORLAKE CRES
From TORLAKE CRES to HORNER AVE
2020-06-02 07:00 2020-07-02 17:00 Daily
Northbound right lane and curb lane occupied due to construction work by Entera Utility Contractors.
FIRST ST
From LAKE SHORE BLVD to LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From FIRST ST to SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
LAKE SHORE DR
From THIRD ST to FIFTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FIFTH ST @ Lake SHORE Dr
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From FIFTH ST to ELEVENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ELEVENTH ST @ LAKE SHORE DR
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE SHORE DR
From ELEVENTH ST to THIRTEENTH ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LAKE PROMENADE
From TWENTY THIRD ST to FORTY SECOND ST
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SIXTH ST @ LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THIRTY SEVENTH ST
From LAKE SHORE BLVD to LAKE PROMENADE
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNDALK DR
From ELLESMERE RD to ANTRIM CRES
2020-05-26 00:01 2020-09-30 00:01 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SECORD AVE
From DAWES RD to EASTDALE AVE
2020-04-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JANE ST BLACK CREEK DR SB RAMP @ JANE ST
2020-06-05 00:01 2020-10-30 00:01 Daily
On-ramp from Jane St to Southbound Black Creek Dr closed for long-term construction.
THIRTY THIRD ST
From LAKE SHORE BLVD to PARK BLVD
2020-06-11 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement followed by road reconstruction.
THIRTY FIFTH ST
From LAKE SHORE BLVD W to LAKE PROMENADE
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main replacement and road construction.
BRULE CRES @ BRULE GDNS
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound lane partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
SHAND AVE
From DUNEDIN DR to PRINCE EDWARD DR N
2020-06-08 07:00 2020-12-31 21:00 Daily
Eastbound and westbound lanes partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
SKYLARK RD
From VAN STASSEN BLVD to ALTHEA RD
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lane partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
THIRTY SECOND ST @ LAKE SHORE BLVD W
2020-06-08 07:00 2020-12-31 21:00 Daily
Northbound and southbound lanes partially occupied due to water main construction. Weekend hours: 9:00am-7:00pm
CHARTWELL RD
From ATHOL AVE to NORSEMAN ST
2020-06-03 00:01 2020-09-30 23:59 Daily
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EDGECROFT RD
From CHARTWELL RD to BENTLEY DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BENTLEY DR
From UNO CRT to YORKVIEW DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
YORKVIEW DR
From BENTLEY DR to ROYAL YORK RD
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DELROY DR @ Jeff Healey Park
From ROYAL YORK RD to DELROY DR
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
KIPLING AVE
From TORLAKE CRES to HORNER AVE
2020-06-02 07:00 2020-07-02 17:00 Daily
Northbound curb lane partially occupied due to roadwork.
BRANCH AVE @ FORTIETH ST
2020-06-08 07:00 2020-12-30 19:00 Daily
Westbound lane partially occupied due to water main service installation. Weekend hours: 9:00am-4:00pm
FORTY FIRST ST
From LAKE SHORE BLVD W to LAKE PROMENADE
2020-06-09 07:00 2020-07-08 19:00 Daily
North and southbound 1 curb lane blocked due to general maintenance.
LAWRENCE AVE W @ KEELE ST
2020-06-11 07:00 2020-07-10 19:00 Daily
Eastbound curb lane partially occupied due to geotechnical investigation fir City's Black Creek Drainage Improvement.
HUNTING RIDGE
From WINCOTT DR to KIPLING AVE
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
KINGSBOROUGH CRES
From HUNTING RIDGE to HUNTING RIDGE
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
REMINGTON DR @ GREAT OAK DR
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
SUNVALE DR
From KIPLING AVE to BRAMPTON RD
2020-06-08 07:00 2020-12-30 19:00 Daily
Watermain and water service installation. Lane restrictions in both directions.
FINCH AVE W
From HWY 27 COLLECTOR N to DAMASCUS DR
2020-06-10 07:00 2020-09-30 19:00 Daily
Bell Relocation Works. Westbound and Eastbound curb lane occupied.
FINCH AVE W
From DRIFTWOOD AVE to SENTINEL RD
2020-06-10 07:00 2020-11-13 19:00 Daily
Bell Relocation Works. Westbound and Eastbound curb lane occupied.
HWY 27 NB
From REXDALE BLVD to BETHRIDGE RD
2020-06-12 07:00 2020-09-04 19:00 Daily
Southbound lane partially occupied due to Hydro trenching work.
NETHERLY DR @ DORWARD DR
From DORWARD DR to SILVERSTONE DR
2020-06-01 07:00 2020-07-15 21:00 Daily
Northbound and southbound curb lanes occupied due to watermain installtion and road resurfacing work by Trisan Construction.
HWY 27 NB
From HUMBER COLLEGE BLVD to FINCH AVE W
2020-06-18 07:00 2020-10-31 19:00 Daily
Southbound lane partially occupied due to temporary road widening.
OLDHAM RD
From BEMERSYDE DR to PRINCESS ANNE CRES
2020-06-22 07:00 2020-09-30 19:00 Daily
Alternating eastbound and westbound curb lanes occupied for trench excavation by Valard Construction.
PRINCESS ANNE CRES
From OLDHAM RD to BOURNEMOUTH RD
2020-06-22 07:00 2020-09-30 19:00 Daily
Alternating northbound and southbound curb lanes occupied for trench excavation by Valard Construction.
TETTENHALL RD
From BEMERSYDE DR to PRINCESS ANNE CRES
2020-06-22 07:00 2020-09-30 19:00 Daily
Alternating eastbound and westbound curb lanes occupied for trench excavation by Valard Construction.
ENNERDALE RD @ 15
From ROCHDALE AVE to HATHERLEY RD
2020-06-22 07:00 2020-07-10 19:00 Daily
Westbound lane closed due to construction.
MARTIN GROVE RD
From ALBION RD to FINCH AVE W
2020-06-22 07:00 2020-08-06 19:00 Daily
Northbound and southbound lanes partially occupied due to concrete removal. Weekend hours:7:00am-7:00pm
BURLINGAME RD @ 21-5
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. Eastbound lane closed.
HIGH ST @ 36-16
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. Northbound lane closed.
PRIMROSE AVE
From QUEENS AVE to LAKE SHORE BLVD W
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
KIPLING AVE @ 831-821
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. Center turn lane closed.
NORTH QUEEN ST @ 101
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
BRIDGELAND AVE @ 55-71
2020-06-22 19:00 2020-07-03 06:00 Daily
Trenchless Sewer Rehabilitation. 1 Westbound/Eastbound lane closed.
RIVERLEA DR
From WESTONA ST to FREEMONT AVE
2020-06-22 07:00 2020-12-31 19:00 Daily
Sewer Replacement and Water Service Installation.
NORANDA DR @ BROOKHAVEN DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Sewer Replacement and Water Service Installation.
WIMBLETON CRES
2020-06-29 07:00 2020-07-08 17:00 Daily
Trenchless (No Dig) Sewer Rehabilitation works under City of Toronto Contract 20TW-CTS-08CWD.2 WIMBLETON CRES. Southbound lane occupied
BLOOR ST W @ 2525
2020-06-19 07:00 2020-07-03 19:00 Daily
Permanent surface re-instatement to Toronto Water repairs. Eastbound lane closed.
WINDERMERE AVE @ 282
2020-06-19 07:00 2020-07-03 19:00 Daily
Permanent surface re-instatement to Toronto Water repairs. Southbound lane closed.
MORNINGSIDE AVE @ 63
2020-06-19 07:00 2020-07-03 19:00 Daily
Permanent surface re-instatement to Toronto Water repairs. Eastbound lane closed.
SOUTH KINGSWAY @ 202
2020-06-19 07:00 2020-07-03 19:00 Daily
Permanent surface re-instatement to Toronto Water repairs. Southbound lane closed.
WESTON RD @ TORYORK DR
2020-06-22 07:00 2020-07-03 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Northbound lane closed.
HUMBERLINE DR @ 353-333
2020-06-22 09:00 2020-07-03 18:00 Daily
Trenchless Sewer Rehabilitation. 1 Northbound lane closed.
ASHFORD DR @ 29-31
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
BIRCHCROFT RD @ 2-7
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Northbound lane closed.
BYWOOD DR @ 4-8
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
ERINGATE DR @ 99
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
RADWAY AVE @ 10-21
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Westbound lane closed.
TERRYELLEN CRES @ 5-17
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Eastbound lane closed.
THORNBUSH CRES @ 2-15
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Eastbound/Northbound lane closed.
WAINWRIGHT DR @ 2-16
2020-06-29 07:00 2020-07-08 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
BLOOR ST W
From THOMPSON AVE to PRINCE EDWARD DR N
2020-06-29 07:00 2020-07-03 19:00 Daily
Eastbound right land and curb lane blocked due to removal and disposal of existing pedestrian light poles.
RENFORTH DR
From MATHESON BLVD to EGLINTON AVE W
2020-06-25 07:00 2020-08-31 19:00 Daily
Southbound two right lanes occupied for geotechnical investigation by 4Transit Joint Venture.
WEATHERSTONE CRES
At PINEWAY BLVD
2020-06-29 09:00 2020-07-10 19:00 Daily
BELL ENC PIT.4 WEATHERSTONE CRES.southbound lane occupied.
RENFORTH DR
From HWY 401 COLLECTOR EB to EGLINTON AVE W
2020-06-25 07:00 2020-08-31 19:00 Daily
Geotechnical and hydrogeological investigation. Southbound curb lane closed.
JANE ST
From COBALT ST to TRETHEWEY DR
2020-06-26 07:00 2020-07-03 19:00 Daily
Minor Bridge Repairs.
TRETHEWEY DR
From BLACK CREEK DR to GREENBROOK DR
2020-06-26 07:00 2020-07-03 19:00 Daily
Minor Bridge Repairs.
RAY AVE
From VICTORIA BLVD to GODDARD AVE
2020-06-26 07:00 2020-07-03 19:00 Daily
Minor Bridge Repairs.
FORTY FIRST ST
From GARDEN PL to JAMES ST
2020-06-29 07:00 2020-07-03 19:00 Daily
Northbound and southbound lanes partially occupied due to geotechnical investigations.
MABELLE AVE
From CORDOVA AVE to DUNDAS ST W
2020-06-29 09:00 2020-07-03 16:00 Daily
Eastbound and westbound lanes partially occupied due to geotechnical investigation.
DRUMHELLER RD @ ELMHURST DR
From ELMHURST DR to CLEARBROOKE CRCL
2020-06-08 07:00 2020-10-15 17:00 Continuous
Road fully closed in both directions due to bridge rehabilitation work by Alliance Verdi Civil Inc.
EGLINTON AVE W
From WINCOTT DR to DRYDEN WAY
2020-06-29 07:00 2020-08-29 19:00 Daily
Geotechnical and environmental borehole investigation. Westbound curb lane closed.
EDNA AVE
From DORVAL RD to DUNDAS ST W
2020-06-08 07:00 2020-07-15 17:00 Continuous
Construction work. 1 Eastbound lane closed.
WINDERMERE AVE @ 758
2020-06-26 07:00 2020-07-10 19:00 Daily
Permanent surface reinstatement to Toronto Water Repairs. 1 Southbound lane closed.
CLARENDON AVE @ 2
From POPLAR PLAINS RD to AVENUE RD
2020-06-30 07:00 2020-07-04 19:00 Daily
Sanitary and Water Service Installation. 1 Westbound lane closed.
CLAIREVILLE DR
From HUMBERLINE DR to CLAIREVILLE DR
2020-06-29 07:00 2020-07-10 19:00 Daily
One northbound lane occupied due to trenchless sewer rehabilitation.
CLAIREVILLE DR @ 175
At HUMBERLINE DR
2020-06-29 07:00 2020-07-10 19:00 Daily
One northbound lane occupied due to trenchless sewer rehabilitation.
CLAIREVILLE DR @ HUMBERLINE DR
2020-06-29 07:00 2020-07-10 19:00 Daily
One westbound lane occupied due to trenchless sewer rehabilitation.
COLLANUS CRT @ 8
At HOLYOAKE CRES
2020-06-29 07:00 2020-07-10 19:00 Daily
One eastbound lane occupied due to trenchless sewer rehabilitation.
HUDDERSFIELD RD
From CLAIREVILLE DR to HUDDERSFIELD RD
2020-06-29 07:00 2020-07-10 19:00 Daily
One westbound lane occupied due to trenchless sewer rehabilitation.
BYWOOD DR @ 61A
2020-06-29 07:00 2020-07-10 19:00 Daily
One eastbound lane occupied due to trenchless sewer rehabilitation.
BASKERVILLE CRES @ 32 - 16
2020-06-29 07:00 2020-07-10 19:00 Daily
One southbound lane occupied due to trenchless sewer rehabilitation.
BASKERVILLE CRES @ 38 - 32
2020-06-29 07:00 2020-07-10 19:00 Daily
One southbound lane occupied due to trenchless sewer rehabilitation.
BROWNS LINE
From ALCAN AVE to WOODBURY RD
2020-06-29 09:00 2020-07-10 16:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
IANHALL RD @ GADE DR
2020-06-25 07:00 2020-09-25 19:00 Continuous
Storm Sewer Installations. 1 lane closed, local traffic only.
GADE DR @ RODING ST
2020-06-25 07:00 2020-09-25 19:00 Continuous
Storm Sewer Installations. 1 lane closed, local traffic only.
ROCKCLIFFE BLVD
From ALLIANCE AVE to WOOLNER AVE
2020-06-30 07:00 2020-07-03 19:00 Daily
Curb lanes occupied in both directions occupied for a geotechnical investigation by Wood Environmental and Infrastructure Solutions.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HILLHURST BLVD @ 236
2019-11-29 07:00 2020-11-27 19:00 Continuous
WB Sanitary & Storm Sewer upgrades as part of Basement Flooding Prevention Project Phase 4
JANE ST @ SHOREHAM DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SECROFT CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
HULLMAR DR
From GOSFORD BLVD to YORK GATE BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
SHOREHAM DR
From GOSFORD BLVD to JANE ST
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
YORK GATE BLVD @ HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
ARTECH CRT @ GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
FLETCHERDON CRES
From GOSFORD BLVD to GOSFORD BLVD
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From SHOREHAM DR to FLETCHERDON CRES
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
GOSFORD BLVD
From ARTECH CRT to HULLMAR DR
2020-01-01 07:00 2020-12-31 18:00 Daily
Both direction blocked due to Toronto Basement Flooding Project.
CORTLEIGH BLVD @ 344-384
2019-10-02 07:00 2020-11-27 19:00 Continuous
All eastbound lanes closed due to sanitary & storm sewer upgrades as part of the Basement Flooding Prevention Project.
WILKINSON DR
From DOUBLETREE RD to PATRICK BLVD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
SNAPDRAGON DR @ CLEMATIS RD
2020-02-10 08:00 2020-08-06 17:00 Daily
Water level monitoring, groundwater sampling and slug test. Alternating closure in both directions.
QUEENSLEA AVE
From WALWYN AVE to ROSEMOUNT AVE
2020-03-02 07:00 2020-08-31 18:00 Daily
Eastbound lane occupied due to resurfacing of roads, water main, sanitary sewer and storm sewer.
LAWRENCE AVE W @ BOLINGBROKE RD
2020-03-17 09:30 2020-08-20 15:00 Daily
East bound 1 lane blocked due to unload material.
STEELES AVE W
From FENMAR DR to ROSSDEAN DR
2020-03-30 07:00 2020-08-01 19:00 Daily
One Eastbound lane occupied due to watermain work.
BETH NEALSON DR @ WICKSTEED AVE
2019-10-25 07:00 2020-07-31 19:00 Daily
Southbound lane occupied due to watermain work.
DANE AVE
From CONLAND AVE to DUFFERIN ST
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
MARLEE AVE
From GLENGROVE AVE to GLEN PARK AVE
2020-03-30 07:00 2020-09-30 19:00 Daily
Alternating 1 lane blocked due to Groundwater level monitoring
HALLSPORT CRES @ 106-41
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
BUNNELL CRES
From HALLSPORT CRES to KEEFER RD
2020-04-03 07:00 2020-07-31 19:00 Continuous
Storm sewer installations.
RODING ST @ #611 to #557
2020-04-13 07:00 2020-07-13 19:00 Continuous
Full lane closure due to storm sewer installation work.
WENTWORTH AVE
From MYLESVIEW PL to EDDFIELD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BRENTWOOD AVE @ SHEPPARD AVE W
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
BURNDALE AVE
From SENLAC RD to WELBECK RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
CAMERON AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FLORENCE AVE
From RADINE RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
FRANKLIN AVE
From BASSANO RD to GWENDOLEN AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
JOHNSTON AVE
From EASTON RD to BOTHAM RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
PEWTER RD
From FLORENCE AVE to CAMERON AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
POYNTZ AVE
From BEAMAN RD to EASTON RD
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
RADINE RD
From POYNTZ AVE to STUART AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
ROYCREST AVE @ BRENTWOOD AVE
2020-04-20 07:00 2020-12-31 19:00 Daily
Groundwater level monitoring, K-tests and groundwater sampling. Alternating lane closures in both directions.
WILLOWDALE AVE
From FINCH AVE E to EMPRESS AVE
2020-04-27 07:00 2020-07-31 19:00 Daily
Construction work. Northbound and Southbound curb lanes closed.
WILSON HEIGHTS BLVD
From WATERLOO AVE to BRIGHTON AVE
2020-05-03 07:00 2020-08-03 19:00 Daily
Northbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
SEARLE AVE
From DUFFERIN ST to SHAFTESBURY AVE
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
CODSELL AVE
From MAXWELL ST to BATHURST ST
2020-04-24 07:00 2020-07-24 19:00 Daily
Alternating eastbound and westbound curb lane occupied for watermain and storm sewer construction by GFL Infrastructure.
STEELES AVE E @ BIRCHMOUNT RD
2020-04-27 07:00 2020-07-31 19:00 Daily
Concrete, sidewalk and curb removal and replacement. One lane in each direction available at all times. Deleted By: pwu2; When: 04/28/2020 6:59:06 AM; Reason: dfuplicate
SHEPPARD AVE E @ BRIAN DR
From BRIAN DR to ATRIA BLVD
2020-05-04 07:00 2020-07-03 19:00 Daily
Eastbound curb lane and boulevard occupied due to streetscape landscaping by Tridel.
KENNETH AVE @ SPRING GARDEN AVE
2020-05-07 00:01 2020-07-31 23:59 Continuous
Southbound lane blocked due to rehabilitation of sanitary sewer.
WATERLOO AVE
From HOVE ST to TILLPLAIN RD
2020-05-11 07:00 2020-08-11 19:00 Continuous
East and westbound partially blocked due to Storm sewer re-construction
KENNETH AVE
From SPRING GARDEN AVE to SHEPPARD AVE E
2020-05-20 00:01 2020-08-28 00:01 Continuous
Southbound lane partially occupied due to sewer rehabilitation, temporary by-pass, and MH Emplacement.
KENNETH AVE @ SPRING GARDEN AVE
2020-05-20 00:01 2020-08-28 23:59 Continuous
All southbound lanes occupied due to sewer rehabilitation work by Capital Sewer Services Ltd.
MEDACA ST
From KINGSLAKE RD to BARONESS CRES
2020-05-25 07:00 2020-07-25 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to underground Hydro installation.
RIDGE RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
PRIVET RD @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-20 19:00 Continuous
Full road closure due to construction work. Local traffic only.
MONTANA AVE @ DOWNSVIEW AVE
2020-05-19 07:00 2020-08-28 19:00 Continuous
Full road closure due to construction work. Local traffic only.
LAURA RD @ 1-340
2020-06-01 07:00 2020-09-01 19:00 Continuous
One westbound lane occupied due to a sanitary sewer system installation by Varcon Construction.
WR ALLEN RD @ WILSON AVE
2020-06-01 23:00 2020-10-16 05:00 Daily
Replacement of barrier fencing. 1 Northbound lane closed.
DINNICK CRES
From WEYBOURNE CRES to POTE AVE
2020-06-05 07:00 2020-07-20 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HILLCREST AVE
From WILLOWDALE AVE to LONGMORE ST
2020-05-29 07:00 2020-11-30 19:00 Daily
Watermain rehabilitation. Westbound lane closed.
ALFRED AVE @ DUDLEY AVE
From KENNETH AVE to WILFRED AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Westbound lanes partially occupied due to water main rehabilitation.
GREENFIELD AVE
2020-05-29 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.
TORYORK DR
From WESTON RD to ORMONT DR
2020-06-15 09:30 2020-11-14 15:30 Daily
South bound 1 lane blocked due to installation of storm sewer.
BLUE HAVEN CRES @ ARDWICK BLVD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure from Ardwick Boulevard and Blue Haven Crescent to Bluehaven Park trailhead due to City of Toronto's Active TO Initiative. Local traffic only.
ARDWICK BLVD
From FINCH AVE W to BLUE HAVEN CRES
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUNCANWOODS DR
From ISLINGTON AVE to FINCH AVE W
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
ROWNTREE MILL RD
From EMILY AVE to ISLINGTON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EXBURY RD
From JANE ST to CAMBORNE AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
CHALKFARM DR
From GRAVENHURST AVE to JANE ST
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
GRAVENHURST AVE
From CHALKFARM DR to FOXRUN AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAYMARKET RD
From MAYALL AVE to WILSON AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
NISKA RD
From DRIFTWOOD AVE to TOBERMORY DR
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
TOBERMORY DR
From FINCH AVE W to NISKA RD
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
POTSDAM RD
From TOBERMORY DR to DRIFTWOOD AVE
2020-06-01 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FOREST HEIGHTS BLVD
From BAYVIEW AVE to WIMPOLE DR
2020-06-22 07:00 2020-09-09 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
BISHOP AVE
From KENNETH AVE to WILLOWDALE AVE
2020-06-29 07:00 2020-09-22 07:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
KILLAMARSH DR
From MADRON CRES to DERRYDOWN RD
2020-06-06 07:00 2020-09-08 19:00 Daily
Trenchless rehabilitation of existing watermains. Westbound curb lane closed.
WILLOWDALE AVE
From NORTON AVE to CHURCH AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Northbound and southbound lanes partially occupied due to duct installation.
NORTON AVE
From DORIS AVE to LONGMORE ST
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
KENNETH AVE
From MCKEE AVE to NORTON AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Northbound and southbound lanes partially occupied due to duct installation.
CHURCH AVE
From KENNETH AVE to DUDLEY AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
MCKEE AVE
From DORIS AVE to KENNETH AVE
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
DUDLEY AVE
From DORIS AVE to LONGMORE ST
2020-06-08 07:00 2020-07-17 19:00 Daily
Eastbound and westbound lanes partially occupied due to duct installation.
ESTELLE AVE
From PRINCESS AVE to EMPRESS AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Northbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
EMPRESS AVE
From HIGHGATE AVE to BAYVIEW AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Westbound curb lane occupied for watermain rehabilitation by Fer-Pal Construction.
ELMWOOD AVE
From BAYVIEW AVE to ESTELLE AVE
2020-06-08 07:00 2020-11-30 19:00 Daily
Eastbound and westbound lanes partially occupied due to water main rehabilitation.
WILLOWDALE AVE
From EMPRESS AVE to FINCH AVE E
2020-06-06 07:00 2020-07-31 19:00 Weekdays
Northbound and southbound lanes partially occupied due to construction.
MAXWELL ST
From WILMINGTON AVE to SHEPPARD AVE W
2020-06-03 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WILLOWDALE AVE @ EMPRESS AVE
2020-04-27 07:00 2020-07-31 19:00 Daily
Construction work. All Northbound and Southbound lanes closed.
LEACOCK CRES @ DENLOW BLVD
2020-06-15 07:00 2020-07-20 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
WILLOWDALE AVE
From EMPRESS AVE to FINCH AVE E
2020-06-06 09:00 2020-07-31 21:00 Daily
All Northbound and Southbound lanes closed due to road surface cutting.
SHEPPARD AVE W @ JANE ST
2020-06-15 07:00 2020-10-15 19:00 Daily
Basement Flooding Protection Program. 2 Westbound lanes closed.
FAIRVIEW MALL DR @ 180
2020-06-18 07:00 2020-07-02 19:00 Daily
Eastbound curb lane occupied for utility work by Grimsby Utility Contractors.
STEELES AVE W @ CACTUS AVE
2020-06-22 07:00 2020-07-06 19:00 Daily
Eastbound curb lane partially occupied due to gas service replacement.
KITCHENER AVE
From GILBERT AVE to MCROBERTS AVE
2020-06-22 07:00 2020-12-31 19:00 Daily
Full road closure due to sewer replacement and water service installation.
NORANDA DR
At BROOKHAVEN DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Full road closure due to watermain replacement. Weekend Timings (0900am-0700pm)
MARISA CRT @ 5
2020-06-22 09:00 2020-07-03 19:00 Daily
Northbound curb lane occupied for utility pit construction by Grimsby Utility Contractors.
OAKDALE RD
From FINCH AVE W to SHEPPARD AVE W
2020-06-22 07:00 2020-09-30 19:00 Daily
Northbound and southbound lanes partially occupied due to concrete removal and replacement. Weekend hours: 12:00am-7:00pm
FAIRCHILD AVE @ TALBOT RD
2020-06-15 07:30 2020-07-31 15:30 Continuous
Installing new Feeder Cable. West along Fairchild Ave, west along Blake Ave, turning north up Grantbrook St, east along Drewry Ave, north up Cactus Ave to the north side of Steeles Ave.
YORK MILLS RD
From CEDARWOOD AVE to BAYVIEW AVE
2020-06-22 07:00 2020-12-31 22:00 Continuous
Watermain and water service installation. 2 Eastbound lanes closed.
ALDERSHOT CRES @ UPPER CANADA DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Watermain and water service installation.
FAIRMEADOW AVE
From LORD SEATON RD to UPPER CANADA DR
2020-06-22 07:00 2020-12-31 19:00 Daily
Watermain and water service installation.
PARK LANE CRCL
At GLENORCHY RD
2020-06-22 08:00 2020-07-03 19:00 Daily
BELL CBL PIT. 72 Parklane
FINCH AVE W
From ARROW RD to NORFINCH DR
2020-06-23 07:00 2020-12-08 19:00 Daily
Westbound and eastbound curb lane blocked due to bell relocation works.
HOVE ST
From SEARLE AVE to COCKSFIELD AVE
2020-06-22 07:00 2020-09-22 19:00 Daily
Southbound lane partially occupied due to storm sewer re-construction.
REGATTA CRES
From GREENWIN VILLAGE RD to BISON DR
2020-06-29 09:00 2020-07-10 19:00 Daily
BELL CBL PIT.1 REGATTA. Eastbound lane occupied .
CARMEL CRT
At GOLDENWOOD RD
2020-06-29 09:00 2020-07-10 19:00 Daily
BELL CBL PIT.W Bound Lane. 4 Carmel
WATERLOO AVE @ MAXWELL ST
2020-06-22 07:00 2020-07-10 19:00 Continuous
Intersection closed due to storm sewer re-construction.
GLENMOUNT AVE
From GLENGROVE AVE to GLEN PARK AVE
2020-06-29 07:00 2020-07-10 19:00 Daily
Trenchless Sewer Rehabilitation. 1 Southbound lane closed.
BETH NEALSON DR
From PAT MOORE DR to WICKSTEED AVE
2020-06-29 00:01 2020-09-30 23:59 Continuous
Replacement of existing watermain and reconstruction of road. Northbound lane closed.
JANE ST
From WILSON AVE to STEELES AVE W
2020-07-01 07:00 2020-07-18 17:00 Daily
Southbound curb lane occupied for sidewalk and road cuts by PTR Paving.
BROOKVIEW DR @ 54
From COVINGTON RD to RONDALE BLVD
2020-06-29 07:00 2020-07-04 19:00 Daily
All lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
BRUCEWOOD CRES @ DREXEL RD
From DREXEL RD to LAWRENCE AVE W
2020-06-29 07:00 2020-07-04 19:00 Daily
All northbound and southbound lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
SARANAC BLVD @ COVINGTON RD
From COVINGTON RD to BATHURST ST
2020-06-29 07:00 2020-07-04 19:00 Daily
All eastbound and westbound lanes occupied due to lawn and driveway road restoration work by NX Utilities Inc.
COVINGTON RD @ BRUCEWOOD CRES
From BRUCEWOOD CRES to COVINGTON RD
2020-06-29 07:00 2020-07-04 19:00 Daily
All eastbound and westbound lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
DREXEL RD @ SARANAC BLVD
From SARANAC BLVD to BRUCEWOOD CRES
2020-06-29 07:00 2020-07-04 19:00 Daily
All eastbound and westbound lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
KIRKLAND BLVD @ BROOKVIEW DR
From BROOKVIEW DR to BRUCEWOOD CRES
2020-06-29 07:00 2020-07-04 19:00 Daily
All eastbound and westbound lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
LAWRENCE AVE W @ BEECHWOOD CRES
2020-06-29 07:00 2020-07-04 19:00 Daily
All northbound and southbound lanes occupied due to lawn and driveway restoration work by NX Utilities Inc.
KESTELL LANE @ THREE VALLEYS DR
2020-06-29 07:00 2020-08-14 19:00 Daily
One lane partiallly occupied in both directions due to duct installation work by TRJ Telecom Inc.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
MOSSBANK DR
From SCARBOROUGH GOLF CLUB RD to LAWRENCE AVE E
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water service replacement. Westbound curb lane closed.
GREENHEDGES CRT
At APPLEMORE RD
2020-01-21 07:00 2020-09-30 21:00 Daily
Watermain and water services replacement on Green Hedges Ct from Applemore Rd to East end.
DANFORTH RD
From DANFORTH AVE to ST CLAIR AVE E
2020-03-30 07:00 2020-08-31 19:00 Daily
Road resurfacing and intersection improvements. Northbound and Southbound curb lanes closed.
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-04-06 07:00 2020-08-11 19:00 Daily
Sewer Rehabilitation Program. Eastbound curb lane closed.
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-04-06 07:00 2020-08-11 19:00 Daily
Eastbound lane occupied for sewer rehabilitation by Capital Sewer Services. Westbound traffic will be maintained.
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-04-06 07:00 2020-08-11 19:00 Daily
Southbound curb lane occupied for sewer rehabilitation by Capital Sewer Services.
NEILSON RD
From HWY 401 COLLECTOR EB NEILSON RD RAMP to HWY 401 COLLECTOR WB NEILSON RD RAMP
2020-04-13 07:00 2020-11-30 16:00 Daily
Northbound and southbound curb lane closures for bridge rehabilitation by Brennan Paving. Daytime at 7am, one lane in one direction will be occupied. Daytime at 9am one lane in both direction will be occupied. Lanes will reopen at 4pm and than close again for the night from 7pm to 6am.
LAKERIDGE DR
From BRIDGEPORT DR to FREEPORT DR
2020-04-14 00:01 2020-10-30 23:59 Continuous
Sanitary force main. Eastbound lane closed.
MCNAB BLVD
From KINGSTON RD to AYRE POINT RD
2020-04-22 07:00 2020-08-01 19:00 Daily
Alternating northbound and southbound curb lanes occupied for curb and sidewalk repairs by D. Crupi and Sons Limited.
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-01 07:00 2020-07-31 21:00 Continuous
1 Southbound lane occupied due to construction
MILNER AVE @ East of Neilson Road
2020-04-23 07:00 2020-12-31 16:00 Daily
Eastbound / Westbound alternating lanes occupied due to construction
MILNER AVE @ NEILSON RD
2020-04-22 00:01 2020-12-31 23:59 Continuous
Temporary street closure to complete road and bridge rehabilitation MTO contract # 2019-2011
BIRCHMOUNT RD @ Steeles AV E
2020-04-28 07:00 2020-07-31 19:00 Daily
Both directions blocked due to Concrete Sidewalk & Curbs Removal and Replacement
CASCADEN ST @ SCOVILLE SQ
From SCOVILLE SQ to ASHCOTT ST
2020-04-27 07:00 2020-07-30 19:00 Daily
Eastbound and westbound curb lanes occupied due to an underground hydro installation by Powerline Plus LTD.
WICKWARE GT
From KENNEDY RD to NANTUCKET BLVD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
FORBES RD
From ELLENDALE DR to KENNEDY RD
2020-05-03 19:00 2020-08-11 07:00 Daily
Eastbound curb lane blocked due to Sewer Rehabilitation Program
KENNEDY RD
From FORBES RD to WICKWARE GT
2020-05-03 19:00 2020-08-11 07:00 Daily
Southbound curb lane blocked due to Sewer Rehabilitation Program
PELL ST
From SANDOWN AVE to RIDGEMOOR AVE
2020-05-11 07:00 2020-07-31 21:00 Continuous
Watermain and water service installation.
PASSMORE AVE
From MIDDLEFIELD RD to STATE CROWN BLVD
2020-05-25 07:00 2020-07-03 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to the installation of Toronto Hydro duct bank break and ties, and underground cables. Deleted By: pwu2; When: 05/20/2020 5:12:07 PM; Reason: Duplicate
STATE CROWN BLVD
From PASSMORE AVE to SELECT AVE
2020-05-25 07:00 2020-07-03 19:00 Daily
Northbound and southbound curb lanes partially occupied due to the installation of Toronto Hydro duct bank break and ties, and underground cables.
PASSMORE AVE
From MIDDLEFIELD RD to STATE CROWN BLVD
2020-05-25 07:00 2020-07-03 19:00 Daily
Installation of Toronto Hydro Cables. Westbound curb lane and Eastbound curb lane closed.
STATE CROWN BLVD
From PASSMORE AVE to SELECT AVE
2020-05-25 07:00 2020-07-03 19:00 Daily
Installation of Toronto Hydro Cables. Northbound curb lane and Southbound curb lane closed.
MCCOWAN RD
From PROGRESS AVE to CORPORATE DR
2020-05-21 07:00 2020-07-16 19:00 Daily
Borehole drilling. 1 Northbound lane closed.
MCCOWAN RD
From PROGRESS AVE to CORPORATE DR
2020-05-25 07:00 2020-07-16 19:00 Daily
Northbound lane partially occupied due to Geotechnical/Geo-Environmental investigation activities including BH Drilling & Hydrogeology.
MARINE APPROACH DR
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORT UNION RD
From LAWRENCE AVE E to BRIDGEND ST
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEPORT DR
From LAWRENCE AVE E to LAKERIDGE DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PORTSMOUTH DR
From LAWRENCE AVE E to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 11:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From MARINE APPROACH DR to SHOALHAVEN DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BRIDGEND ST
From PORT UNION RD to BRIDGEPORT DR
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MILITARY TRL
From BONSPIEL DR to HIGHCASTLE RD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HIGHCASTLE RD
From MILITARY TRL to SEALSTONE TER
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
TRUDELLE ST
From DANFORTH RD to CEDAR BRAE BLVD
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CEDAR BRAE BLVD
From TRUDELLE ST to BELLAMY RD N
2020-05-22 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
PHARMACY AVE
From ELLESMERE RD to HWY 401
2020-06-15 07:00 2020-08-03 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
NATAL AVE @ AYLESWORTH AVE
2020-06-02 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
NATAL AVE
From PARK ST to MCINTOSH AVE
2020-06-01 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BROADBENT AVE
From MIDLAND AVE to CHILLERY AVE
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
FRED BLAND CRES
From MCCOWAN RD to TRUDELLE ST
2020-06-05 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
MIDLAND AVE
From DANFORTH RD to LAWRENCE AVE E
2020-06-02 07:00 2020-12-31 21:00 Daily
Various multiple lane closures for water service replacement and full road reconstruction by Sanscon Construction. Two-way traffic will be maintained.
COMMONWEALTH AVE
From WOLFE AVE to EGLINTON AVE E
2020-05-26 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only
ELLESMERE RD
From CLEMENTINE SQ to GANDER DR
2020-06-15 09:00 2020-07-17 16:00 Daily
Northbound and southbound lanes partially occupied due to the rehabilitation of various sewer lines.
JOHN TABOR TRL
From BRENYON WAY to MCLEVIN AVE
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
FAWCETT TRL
From MCLEVIN AVE to JOHN STONER DR
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JOHN STONER DR
From FAWCETT TRL to MORNINGSIDE AVE
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BERNER TRL
From WASHBURN WAY to NEILSON RD
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BLACKWELL AVE
From BERNER TRL to TAPSCOTT RD
2020-06-05 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
KENNEDY RD
From PARK ST to DANFORTH RD
2020-06-15 07:00 2020-07-27 19:00 Daily
Northbound and southbound curb lanes alternately occupied due to sidewalk, curb, and boulevard improvement and restoration. Weekend hours: 7:00am-7:00pm
MCCOWAN RD
From BUSHBY DR to PROGRESS AVE
2020-06-08 07:00 2020-08-05 19:00 Daily
Northbound lane partially occupied due to Scarborough Subway Extension Project.
WISHING WELL DR
From PHARMACY AVE to PHARMACY AVE
2020-06-11 07:00 2020-08-10 19:00 Daily
Alternating curb lanes occupied for milling and paving of road surface, removal & replacement of deficient sidewalk, curb & gutter, asphalt driveway and boulevard improvement and restoration as required by Sanscon Construction.
PHARMACY AVE
From ELLESMERE RD to HWY 401
2020-06-08 07:00 2020-08-03 19:00 Daily
Alternating northbound and southbound curb lanes occupied for milling and paving of road surface, removal & replacement of deficient sidewalk, curb & gutter, asphalt driveway and boulevard improvement and restoration as required by Sanscon Construction.
PASSMORE AVE @ MARKHAM RD
2020-06-15 07:00 2020-07-03 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to the relocation of N{S 6 intermediate pressure steel gas main.
SURREY AVE @ WEXFORD BLVD
2020-06-10 09:00 2020-07-10 19:00 Daily
Rehabilitation of various sewer lines. 1 Westbound lane and 2 Southbound lanes closed.
GRANADA CRES @ 28-62
2020-06-15 07:00 2020-07-03 19:00 Daily
Rehabilitation of various sewer lines. Eastbound lane closed.
FORBES RD @ ELLENDALE DR
From ELLENDALE DR to KENNEDY RD
2020-04-06 19:00 2020-08-11 07:00 Daily
Eastbound curb lane occupied due to sewer rehabilitation work by Capital Sewer Services Inc.
KINGSTON RD
From OVERTURE RD to CELESTE DR
2020-06-17 07:00 2020-08-14 19:00 Daily
Westbound curb lane occupied for structural watermain rehabilitation by Fer-Pal Construction.
WEIR CRES
From GALLOWAY RD to SILVERTIP CRES
2020-02-03 07:00 2020-07-31 21:00 Daily
Northbound lane partially occupied due to water main and water service installation. Weekend hours: 9:00am-7:00pm
SHARBOT AVE @ South limit
From SHARBOT AVE to PAINTED POST DR
2020-02-03 07:00 2020-07-31 21:00 Daily
Southbound lane partially occupied due to water main and water service installation. Weekend hours: 9:00am-7:00pm
NUGGET AVE @ 191
From MCCOWAN RD to SHORTING RD
2020-06-22 07:00 2020-07-03 15:00 Daily
Eastbound curb lane occupied for sidewalk restoration by Grimsby Utility Contractors.
RAINBOW RIDGE AVE @ 21-48
2020-06-22 09:00 2020-07-18 19:00 Daily
Northbound and southbound lanes partially occupied due to rehabilitation of various sewer lines.
BRIMLEY RD
From BRITWELL AVE to DORCOT AVE
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Northbound lane closed.
THORNMOUNT DR @ 30
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Westbound lane closed.
BEECHGROVE DR @ COPPERFIELD RD
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Northbound lane closed.
MARKHAM RD @ 1810
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Northbound lane closed.
EGLINTON AVE E @ 2937
From TORRANCE RD to BELLAMY RD N
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Eastbound lane closed.
APPLEFIELD DR @ BRIMLEY RD
2020-06-18 09:00 2020-07-03 19:00 Daily
Construction work on behalf of Bell. Westbound/Southbound lane closed.
PHARMACY AVE @ SINGLETON RD
2020-06-17 07:00 2020-07-17 19:00 Daily
Rehabilitation of various sewer lines. 1 Northbound/Southbound lane closed.
PITFIELD RD
From HALLBANK TER to KEYWORTH TRL
2020-06-22 08:00 2020-07-03 20:00 Daily
BELL PED WORK 323 Pitfield Rd
KENILWORTH AVE
From O CONNOR DR to KEW BEACH CRES
2020-06-30 07:00 2020-07-10 19:00 Daily
Northbound lane partially occupied due to sanitary and water service installation.
PASSMORE AVE @ MARKHAM RD
2020-06-15 00:01 2020-07-03 23:59 Daily
Relocation of steel gas main. Westbound curb lane closed.
METROPOLITAN RD
At WARDEN AVE
2020-06-24 07:00 2020-07-03 19:00 Daily
BELL SIDEWALK RESTORATION - 1M WIDE, GRAVEL, TEMP SIDEWALK ADJACENT TO EXISTING SIDEWALK FOR PEDESTRIAN ACCESS.41 METROPOLITAN RD. Eastbound lane occupied
MAFEKING CRES
From CHANCELLOR DR to CHANCELLOR DR
2020-02-24 07:00 2020-08-31 21:00 Daily
Watermain and water service installation.
CHARLEMONT CRES
From WISHING WELL DR to WISHING WELL DR
2020-03-01 07:00 2020-08-31 21:00 Daily
Watermain and water service installation.
SESAME ST @ 37
From HUNTINGWOOD DR to PHARMACY AVE
2020-06-26 09:00 2020-07-10 19:00 Daily
One northbound lane blocked due to Bell ENC pit work by Grimsby Utility Contractors.
MIDLAND AVE @ TREEWOOD ST
From TREEWOOD ST to MIDWEST RD
2020-06-29 09:00 2020-07-10 19:00 Daily
One northbound lane occupied due to manhole reracking work by Grimsby Utility Contractors Inc.
FARMINGTON CRES
From FULBERT CRES to BELGREEN AVE
2020-06-29 09:00 2020-07-10 19:00 Daily
Southbound lane occupied due to road work.
FALMOUTH AVE
From LORRAINE AVE to ORDWAY RD
2020-06-29 07:00 2020-07-10 19:00 Daily
Northbound lane occupied due to Bell ped work.
WARDEN AVE @ 1135
From HANCOCK CRES to LAWRENCE AVE E
2020-06-29 09:00 2020-07-10 16:00 Daily
One northbound lane occupied due to road work.
LAWRENCE AVE E @ 2320
At KENNEDY RD
2020-06-29 09:00 2020-07-10 16:00 Daily
One westbound lane occupied due to bell manhole reracking.
CHEATHAM PL @ 17
At BERNER TRL
2020-06-29 07:00 2020-07-10 19:00 Daily
Eastbound lane occupied due to construction.
DANFORTH RD @ WARDEN AVE
2020-06-29 09:00 2020-07-31 19:00 Daily
Rehabilitation of various sewer lines. 2 Northbound/Southbound lanes closed.
MORNINGVIEW TRL @ 266
From WHITEWAY CRT to VALLEY CENTRE DR
2020-06-29 09:00 2020-07-10 16:00 Daily
Bell ENC Pit. Southbound lane closed.
LAWRENCE AVE E @ 2155
From LAWRENCE AVE E to MCGREGOR RD
2020-06-29 09:00 2020-07-10 19:00 Daily
One southbound lane occupied due to emergency Bell CBL pit work by Grimsby Utility Contractors Inc.
WARDEN AVE @ 1135
From HANCOCK CRES to LAWRENCE AVE E
2020-06-29 09:00 2020-07-10 16:00 Daily
One northbound lane occupied due to Bell BW pit work by Grimsby Utility Contractors Inc.
KENNEDY RD NB HWY 401 COLLECTOR WB RAMP @ KENNEDY RD
2020-07-01 17:00 2020-07-02 05:00 Continuous
On-ramp from Northbound Kennedy Rd to Highway 401 Westbound Collectors closed due to construction.
STALEY TER @ 26
From BOUNDY CRES to BOUNDY CRES
2020-06-29 09:00 2020-07-10 19:00 Daily
Bell Emergency Cable Placement. Westbound lane closed.
MILITARY TRL
From ELLESMERE RD to HIGHCASTLE RD
2020-06-29 07:00 2020-07-06 19:00 Daily
Alternating curb lanes in both directions will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
ELLESMERE RD
From ORTON PARK RD to NEILSON RD
2020-06-29 07:00 2020-07-06 19:00 Daily
Alternating eastbound and westbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
MARKHAM RD
From DUNELM ST to BLAKEMANOR BLVD
2020-06-30 07:00 2020-07-07 19:00 Daily
Alternating northbound and southbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
EGLINTON AVE E
From BELLAMY RD N to MASON RD
2020-06-30 07:00 2020-07-07 19:00 Daily
Alternating eastbound and westbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
SCARBOROUGH GOLF CLUB RD
From TILLINGHAST LANE to CONFEDERATION DR
2020-06-30 07:00 2020-07-07 19:00 Daily
Alternating northbound and southbound curb lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
MARKHAM RD
From BLAKEMANOR BLVD to EASTPARK BLVD
2020-06-30 07:00 2020-07-07 19:00 Daily
Alternating northbound and southbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ROSEHILL AVE @ AVOCA AVE
2018-05-09 07:00 2020-08-31 19:00 Daily
STRUCTURAL, CIVIL, ELECTRICAL AND MECHANICAL REHBILITATION WORKS AS PERT OF THE ROSEHILL RESERVOIR REHABILITATION WORKS PROJECT [ECS CONTRACT NO. 17ECS-MI-03WA].
ABBOTT AVE @ INDIAN RD
2019-09-17 07:00 2020-08-01 19:00 Daily
One Eastbound and Westbound lane occupied due to water main, water service and installation.
RIVERDALE AVE
From PAPE AVE to POUCHER ST
2019-09-23 09:00 2020-08-01 16:00 Daily
Watermain reconstruction, water service replacement and lane way reconstruction. Eastbound/Westbound lane on Riverdale Ave from Pape Ave to Poucher St.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-01 19:00 Daily
One Northbound and Southbound lane occupied due to water main reconstruction, water service replacement and road resurfacing,
VICTORIA PARK AVE
From DENTON AVE to CRESCENT TOWN RD
2019-09-23 07:00 2020-07-31 19:00 Daily
1 NB/SB lane occupied due to pedestrian bridge rehabilitation.
QUEENS QUAY E
From KNAPP LANE to DOCKSIDE DR
2019-09-26 07:00 2020-09-26 19:30 Continuous
Shaft and tunnel for Enwave western infrastructure expansion. (1) EB lane closed. Deleted By: pwu2; When: 09/27/2019 7:30:25 PM; Reason:
ROXBOROUGH DR
From MOUNT PLEASANT RD to HIGHLAND AVE
2019-10-01 00:01 2020-08-28 23:59 Continuous
EB/WB all lanes occupied due to sanitary force main.
AVENUE RD @ OXTON AVE
From HILLHOLM RD to CHAPLIN CRES
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
AVENUE RD @ CHAPLIN CRES
From TRANMER AVE to OXTON AVE
2019-09-25 09:00 2020-08-31 16:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CHESTNUT PK
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
ABBOTT AVE
From INDIAN RD to INDIAN RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
AVENUE RD
From HILLHOLM RD to CHAPLIN CRES
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
CARIBOO AVE
At OSLER ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
EUCLID PL @ EUCLID AVE
From ROXBOROUGH ST E to ROXBOROUGH ST E
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
FRONT ST E
From EASTERN AVE to CHERRY ST
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MACPHERSON AVE @ AVENUE RD
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB 1 lane occupied due to water main reconstruction.
MANNING AVE
From QUEEN ST W to ROBINSON ST
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
ORMSKIRK CRT
At ORMSKIRK AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
EB/WB/NB/SB 1 lane occupied due to water main reconstruction.
OSLER ST
From DUPONT ST to CARIBOO AVE
2019-09-23 07:00 2020-08-31 19:00 Daily
NB/SB 1 lane occupied due to water main reconstruction.
GARDINER EXPY WB
From DON ROADWAY to YORK ST
2019-10-14 00:01 2021-01-31 23:59 Continuous
Westbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
LAKE SHORE BLVD E GARDINER EXPY RAMP
From DON ROADWAY to DON VALLEY PARKWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
1 lane closed at the top of the westbound Lake Shore on ramp to westbound Gardiner Expressway due to Gardiner Expressway Rehabilitation Project.
GARDINER EXPY EB
From YORK ST to DON ROADWAY
2019-10-14 00:01 2021-01-31 23:59 Continuous
Eastbound traffic will reduced to two lanes and will be detoured to the south half of the bridge.
JARVIS ST
From QUEEN ST E to FRONT ST E
2019-11-17 00:02 2020-08-22 23:59 Continuous
1 NB lane and 1 SB lane closed for Watermain and Water Service Installation.
COMMISSIONERS ST @ DON ROADWAY
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Westbound and Eastbound due to bridge construction.
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (Monday through Friday)
LAKE SHORE BLVD E
From CHERRY ST to JARVIS ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two westbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON ROADWAY @ COMMISSIONERS ST
2019-12-20 00:01 2022-05-16 23:59 Continuous
All lanes closed Northbound and Southbound due to bridge construction.
COMMISSIONERS ST
From MUNITION ST to DON ROADWAY
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Commissioners St.
DON ROADWAY
From VILLIERS ST to COMMISSIONERS ST
2020-01-07 00:01 2022-05-16 23:59 Continuous
This is to facilitate the creation of another outlet for Don River into the lake. It will also involve the construction of a bridge across the new outlet and the reconstruction of Don Roadway.
FRONT ST W
From BAY ST to YORK ST
2020-01-17 00:01 2020-07-31 23:59 Continuous
Hydro vault rehabilitation. Westbound drop off/pick-up parking zones closed.
WINDERMERE AVE
From LAKE SHORE BLVD W to GARDINER EXPY
2020-02-10 07:00 2020-12-31 16:00 Daily
Northbound intermittent lane closure due to staging of construction vehicles.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 09:00 2020-08-09 16:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
BOND ST @ GOULD ST
2020-03-06 07:00 2020-08-28 19:00 Daily
Full road closure due to emergency steam line replacement.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
2020-03-30 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
COXWELL BLVD
From O CONNOR DR to TAYLOR DR
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
BARBARA CRES @ COXWELL BLVD
From COXWELL BLVD to COXWELL BLVD
2020-03-23 07:00 2020-09-30 19:00 Daily
Southbound curb lane occupied due to structural watermain rehabilitation.
JOHN ST
From WELLINGTON ST W to KING ST W
2020-04-08 07:00 2020-07-13 19:00 Daily
Alternating closures of two southbound or two northbound lanes for hot water pipe installation by Aecon Utilities. Two way traffic will be maintained at all times.
GARDINER EXPY YONGE/BAY/YORK RAMP @ GARDINER EXPY WB
2020-04-19 00:01 2020-08-09 23:59 Continuous
Westbound Gardiner York-Bay-Yonge off ramp closed for the Gardiner Expressway Rehabilitation Project by Aecon Utilities.
LAKE SHORE BLVD E
From JARVIS ST to CHERRY ST
2020-04-07 22:00 2020-08-09 06:00 Weekdays
Two eastbound lanes occupied due to Gardiner Expressway rehabilitation project. (not including Friday & Saturday nights)
DON MILLS RD
From DON MILLS RD SB DVP NB RAMP to DON MILLS RD NB DVP SB RAMP
2020-04-27 00:01 2020-08-07 23:59 Continuous
Rehabilitation of the Don Mills Rd Bridge over the Don Valley Parkway. 1 Northbound and 1 Southbound lane closed on Don Mills Rd.
BLOOR ST W
From THOMPSON AVE to PRINCE EDWARD DR N
2020-05-11 10:00 2020-08-20 15:00 Daily
Removal and disposal of existing pedestrian light poles. Westbound and Eastbound curb lanes closed.
BOND ST @ DUNDAS ST E
From DUNDAS ST E to SHUTER ST
2020-05-04 07:00 2020-08-07 19:00 Daily
Northbound right lane and eastbound right lane blocked due to conduit and cable chamber work by Entera Utility Contractors.
DOVERCOURT RD @ NORTHUMBERLAND ST
2020-05-04 07:00 2020-09-05 19:00 Daily
Traffic Signals & Control Devices on all 4 corners of the intersection.
PICKERING ST
From KINGSTON RD to GERRARD ST E
2020-05-04 07:00 2020-08-15 19:00 Daily
Road re-constructions and paving. Alternating lane closures in both directions.
PAPE AVE
From GOWAN AVE to DANFORTH AVE
2020-05-11 07:00 2020-07-25 17:00 Continuous
Northbound and southbound lanes partially occupied due to trench restoration of concrete and line painting.
GERRARD ST E
From TED REEVE DR to LAWLOR AVE
2020-05-19 07:00 2020-07-31 19:00 Daily
Eastbound and westbound curb lanes occupied due to construction.
GREENWOOD AVE
From MORTIMER AVE to O CONNOR DR
2020-05-19 07:00 2020-07-31 19:00 Daily
Northbound and southbound curb lanes occupied due to construction.
LAKE SHORE BLVD W @ WINDERMERE AVE
From WINDERMERE AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
BAYVIEW AVE
From FRONT ST E to ROSEDALE VALLEY RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All lanes closed due to City of Toronto's ActiveTo Initiative, additionally River St west of Bayview Ave will be also be closed.
LAKE SHORE BLVD W @ ELLIS AVE
From ELLIS AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ COLBORNE LODGE DR
From COLBORNE LODGE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ PARKSIDE DR
From PARKSIDE DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ BRITISH COLUMBIA DR
From BRITISH COLUMBIA DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ ONTARIO DR
From ONTARIO DR to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ NEW BRUNSWICK WAY
From NEW BRUNSWICK WAY to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
LAKE SHORE BLVD W @ STRACHAN AVE
From STRACHAN AVE to STADIUM RD
2020-05-16 06:00 2020-08-03 23:00 Weekends
All eastbound lanes closed due to City of Toronto's ActiveTO Initiative.
GARDINER EXPY E LOWER JARVIS ST RAMP @ JARVIS ST
2020-05-18 00:01 2021-02-26 23:59 Continuous
Eastbound Jarvis on-ramp to be closed to facilitate the rehabilitation of the Gardiner Expressway including removal and replacement of bridge deck section alongside corresponding construction areas.
LAKE SHORE BLVD W
From WINDERMERE AVE to STADIUM RD
2020-05-23 06:00 2020-08-03 23:00 Weekends
Full closure of eastbound lanes for ActiveTO initiative. Closure will be in effect every weekend. During long weekends, closure will end on Monday at 11 pm. Deleted By: mamutha; When: 05/20/2020 11:13:02 AM; Reason: duplicate
NASSAU ST
From LEONARD AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
AUGUSTA AVE
From COLLEGE ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only.
EMERSON AVE
From DUPONT ST to BLOOR ST W
2020-05-19 00:01 2020-09-30 15:29 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BALDWIN ST
From AUGUSTA AVE to SPADINA AVE
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only. Local taffic only
BROCK AVE
From BLOOR ST W to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
COWAN AVE
From SPRINGHURST AVE to QUEEN ST W
2020-05-19 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
KENSINGTON AVE
From BALDWIN ST to DUNDAS ST W
2020-05-14 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
WINONA DR
From EGLINTON AVE W to DAVENPORT RD
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
CRAWFORD ST
From MONTROSE AVE to QUEEN ST W
2020-05-15 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MONTROSE AVE
From BLOOR ST E to CRAWFORD ST
2020-05-20 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local taffic only
LANSDOWNE AVE @ BLOOR ST W
2020-06-01 07:00 2020-08-27 19:00 Daily
One northbound curb lane occupied due to TTC cable chamber rebuild work by Hastings Utilities Cotnracting Ltd.
BICKNELL AVE @ ROGERS RD
From ROGERS RD to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
LAUGHTON AVE
From DAVENPORT RD to HOUNSLOW AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BLACKTHORN AVE @ CAMERON AVE
From CAMERON AVE to EGLINTON AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTo Quiet Streets initiative by the City of Toronto. Local traffic only.
HOUNSLOW HEATH RD
From LAUGHTON AVE to ST CLAIR AVE W
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
HAVERSON BLVD @ DONALD AVE
From DONALD AVE to CAMERON AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
SILVERTHORN AVE
From ST CLAIR AVE W to DONALD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
DONALD AVE @ SILVERTHORN AVE
From SILVERTHORN AVE to HAVERSON BLVD
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
MONARCH PARK AVE
From SAMMON AVE to FELSTEAD AVE
2020-05-21 00:01 2020-09-30 23:59 Continuous
Full closure due to the ActiveTO Quiet Streets initiative by the City of Toronto. Local traffic only.
BOULTBEE AVE
From KISWICK ST to JONES AVE
2020-06-15 07:00 2020-08-03 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
BOULTON AVE
From DUNDAS ST E to GERRARD ST E
2020-05-27 07:00 2020-07-10 19:00 Daily
Northbound and southbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HARRIET ST
From LESLIE ST to HASTINGS AVE
2020-06-12 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
PARKHURST BLVD
From DONEGALL DR to CAMERON CRES
2020-06-05 07:00 2020-07-20 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
SELKIRK ST @ WOODYCREST AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Eastbound and westbound alternating curb lanes partially occupied due to the restoration of sidewalks, curbs, gutters, and boulevards. Weekend hours: 7:00am-7:00pm
HERRICK ST
From BATHURST ST to MARKHAM ST
2020-06-05 07:00 2020-07-21 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
MARKHAM ST
From DUNDAS ST W to COLLEGE ST
2020-06-05 07:00 2020-07-21 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
BARTON AVE
From HOWLAND AVE to ALBANY AVE
2020-06-09 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
BARTON AVE
From BATHURST ST to WILLOWVALE LANE
2020-05-28 07:00 2020-07-13 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
ALBANY AVE
From BARTON AVE to BLOOR ST W
2020-06-10 07:00 2020-07-27 19:00 Daily
Roadway maintenance work. All Northbound and Southbound curb lanes closed alternatively.
MC ALPINE ST
From MCMURRICH ST to DAVENPORT RD
2020-06-01 07:00 2020-07-20 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
EARL ST
From HUNTLEY ST to SHERBOURNE ST
2020-05-25 07:00 2020-07-13 19:00 Daily
Roadway maintenance work. All Westbound and Eastbound curb lanes closed alternatively.
BATHURST ST
From FRONT ST W to FORT YORK BLVD
2020-05-25 00:01 2021-01-31 23:59 Continuous
Full closure of all northbound and southbound lanes for City of Toronto project No. 20ECS-TI-02BE by Grascan/Torbridge Construction.
LAIRD DR
From ESANDAR DR to CANVARCO RD
2020-05-29 08:00 2020-08-15 16:00 Daily
Southbound and westbound shoulder lanes partially occupied due to the construction of manholes and conduit.
LAIRD DR
From ESANDAR DR to CANADA BLVD
2020-05-29 07:00 2020-08-15 19:00 Continuous
Southbound and westbound curb lane partially occupied due to the construction of manholes and conduit.
AVENUE RD
From LONSDALE RD to ST CLAIR AVE W
2020-06-03 07:00 2020-07-03 19:00 Daily
Northbound and southbound curb lanes partially occupied due to directional bore, and placement of conduit and fibre.
BAY ST
From BLOOR ST W to CHARLES ST W
2020-06-08 00:01 2020-07-07 23:59 Continuous
Replacement of landscaping. 1 Northbound lane closed.
ADELAIDE ST W
From JOHN ST to DUNCAN ST
2020-06-01 07:00 2020-07-31 17:00 Daily
Eastbound curb lane partially occupied due to construction.
LAKE SHORE BLVD E
From LESLIE ST to KEW BEACH CRES
2020-05-23 06:00 2020-08-03 23:00 Weekends
All eastbound lanes occupied for City of Toronto's ActiveTO initiative.
HAMMERSMITH AVE @ QUEEN ST E
2020-06-01 07:00 2020-07-24 07:00 Daily
Northbound all lanes blocked due to UNDERGROUND HYDRO INSTALLATION
EASTDALE AVE
From SECORD AVE to LUMSDEN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
LUMSDEN AVE
From EASTDALE AVE to MAIN ST
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
RIDLEY BLVD
From DELORAINE AVE to YONGE BLVD
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
MAIN ST
From HAMSTEAD AVE to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
HAMSTEAD AVE
From MAIN ST to WESTLAKE AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
JEDBURGH RD
From DELORAINE AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
DUPLEX AVE
From MONTGOMERY AVE to LAWRENCE AVE W
2020-05-28 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTVIEW BLVD
From HOLLAND AVE to ST CLAIR AVE E
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WESTLAKE AVE
From HAMSTEAD AVE to COSBURN AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
COSBURN AVE
From WESTLAKE AVE to OAK PARK AVE
2020-05-27 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
AVENUE RD @ 455
From FOXBAR RD to LYNWOOD AVE
2020-06-03 07:00 2020-07-31 17:00 Daily
Northbound curb lane partially occupied due to sidewalk and road construction. Weekend hours: 9:00am-7:00pm
WELLINGTON ST W @ TECUMSETH ST
From TECUMSETH ST to BATHURST ST
2020-05-29 07:00 2020-08-30 19:00 Continuous
Left westbound lane occupied due to geotechnical work by Thurber Engineering Ltd for Metrolinx.
DUPONT ST @ 740
From SHAW ST to CHRISTIE ST
2020-06-08 07:00 2020-10-23 23:00 Continuous
One northbound curb lane occupied due to watermain and service connection replacement by R.V. Anderson Associated Ltd.
SCOTT ST
From COLBORNE ST to THE ESPLANADE
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
THE ESPLANADE
From YONGE ST to PRINCESS ST
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
MILL ST
From PARLIAMENT ST to BAYVIEW AVE
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SACKVILLE ST
From QUEEN ST E to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SUMACH ST
From KING ST E to DUNDAS ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SUMACH ST
From GERRARD ST E to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
SPRUCE ST
From SACKVILLE ST to RIVER ST
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
WELLESLEY ST E
From PARLIAMENT ST to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
BLEECKER ST
From HOWARD ST to WELLESLEY ST E
2020-06-04 00:01 2020-09-30 23:59 Continuous
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
EARL ST
From SHERBOURNE ST to BLEECKER ST
2020-06-04 00:01 2020-09-30 23:59 Daily
Full closure due to City of Toronto's Active TO Initiative. Local traffic only.
YORK ST
From FRONT ST W to BREMNER BLVD
2020-06-10 00:01 2020-08-24 23:59 Continuous
Construction work. Center lane in both direction closed.
ST CUTHBERTS RD
From BERNEY CRES to BESSBOROUGH DR
2020-06-24 07:00 2020-08-03 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
CLINTON ST
From HARBORD ST to BLOOR ST W
2020-06-08 07:00 2020-07-20 19:00 Daily
Northbound and southbound curb lanes partially occupied due to the improvement of sidewalks, curbs, and boulevards. Weekend hours: 7:00am-7:00pm
CLAREMONT ST
From DUNDAS ST W to MANSFIELD AVE
2020-06-08 07:00 2020-07-20 19:00 Daily
Northbound and southbound curb lanes partially occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
EARL ST
From HUNTLEY ST to SHERBOURNE ST
2020-06-15 07:00 2020-07-20 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
CLINTON ST @ COLLEGE ST
2020-06-08 07:00 2020-07-20 19:00 Daily
Northbound and southbound curb lanes partially occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
ELGIN AVE
From AVENUE RD to BEDFORD RD
2020-06-15 07:00 2020-07-04 19:00 Daily
Eastbound and westbound curb lanes partially occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
WHEELER AVE
From QUEEN ST E to NORWAY AVE
2020-06-15 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Westbound/Eastbound curb lanes closed alternately.
LEUTY AVE
From ALFRESCO LWN to QUEEN ST E
2020-06-10 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Westbound/Eastbound curb lanes closed alternately.
BELLEFAIR AVE
From QUEEN ST E to JUNIPER AVE
2020-06-10 07:00 2020-07-27 19:00 Daily
Road improvement and restorations. All Northbound/Southbound curb lanes closed alternately.
ALDERGROVE AVE
From MOBERLY AVE to MOBERLY AVE
2020-06-08 07:00 2020-07-20 19:00 Daily
Road improvement and restorations. All Westbound/Eastbound curb lanes closed alternately.
COLGATE AVE
From LOGAN AVE to BUSY ST
2020-06-15 07:00 2020-07-30 07:00 Continuous
Northbound and southbound lanes partially occupied due to the construction of man holes and conduit.
WELLINGTON ST E @ 18
At SCOTT ST
2020-06-15 07:00 2020-07-06 19:00 Continuous
Westbound curb and passing lanes occupied due to gas installation work by NPL Canada.
DUPONT ST @ BRUNSWICK AVE
2020-06-17 07:00 2020-07-10 19:00 Daily
Alternating eastbound and westbound, 1-2 lanes occupied for water and sanitary service upgrades by CG Construction Services. Two-way traffic will always be maintained.
YORK ST @ 15
2020-01-04 09:00 2020-08-14 17:00 Weekends
Two eastbound lanes partially occupied due to the construction of ICE-MLS path tunnel.
SHUTER ST @ 79
From MUTUAL ST to HARBOUR LIGHT LANE
2020-06-17 07:00 2020-07-08 19:00 Daily
One alternating eastbound and westbound lane blocked due to a water service installation by OJCR Construction Ltd.
CHANDOS AVE @ 19
At DUFFERIN ST
2020-06-22 07:00 2020-07-03 19:00 Daily
One eastbound lane occupied due to trenchless sewer rehabilitation.
MOUNT PLEASANT RD @ ELM AVE
2020-06-18 19:30 2020-07-15 07:00 Daily
Southbound curb lane occupied for fire hydrant replacement by Toronto Water.
FIR AVE
From FERNWOOD PARK AVE to BEECH AVE
2020-06-29 07:00 2020-07-02 16:00 Daily
Full road closure due to construction work.
FRONT ST E
From BERKELEY ST to PARLIAMENT ST
2020-06-18 07:00 2020-07-03 19:00 Daily
Drilling boreholes. Westbound lane closed.
FRONT ST E
From BERKELEY ST to PARLIAMENT ST
2020-06-18 07:00 2020-07-03 19:00 Daily
Westbound lane partially occupied due to geotechnical investigation.
NORTHRIDGE AVE @ 20
From COSBURN AVE to PLAINS RD
2020-06-25 07:00 2020-07-05 19:00 Daily
Sanitary and Water Service Installation. 1 Southbound lane closed.
QUEEN ST E
From GEORGE ST to LOWER SHERBOURNE ST
2020-06-19 09:00 2020-07-10 21:00 Daily
Drilling boreholes; eastbound right lane closed.
ST CLAIR AVE E
From MOUNT PLEASANT RD to CLIFTON RD
2020-06-29 07:00 2020-07-10 19:00 Daily
Water and Sanitary Service Installation- Contract # 19TW-DC-305OCS PERMIT # 85568001. 262 St Clair Ave E. x W/B and 1 x E/B at all times
BLOOR ST E
From YONGE ST to CHURCH ST
2020-06-22 07:00 2020-07-10 19:00 Daily
Geotechnical Investigation in support of Bloor Yonge Station Improvements. Boreholes to be advanced through the road and monitoring wells installed in accordance with O-Reg 903. Eastbound lanes occupied
LAKE SHORE BLVD E
From LOWER SHERBOURNE ST to CHERRY ST
2020-06-16 07:00 2020-08-09 19:00 Daily
2 Eastbound lanes on Lake Shore Blvd E closed during night time and day time off-peak hours due to the Gardiner Expressway Rehabilitation Project.
LAKE SHORE BLVD E
From LOWER SHERBOURNE ST to CHERRY ST
2020-06-16 20:00 2020-08-09 06:00 Daily
2 Eastbound lanes on Lake Shore Blvd E closed during night time and day time off-peak hours due to the Gardiner Expressway Rehabilitation Project.
ST CLAIR AVE W
From DEER PARK CRES to ORIOLE RD
2020-06-23 08:00 2020-07-10 19:00 Daily
Westbound lane blocked due to Directional bore & place conduit & fibre
WALLACE AVE
From RANKIN CRES to WARD ST
2020-06-22 07:00 2020-07-04 19:00 Daily
East and westbound side walk blocked due to utility relocations.
WAKUNDA PL @ O CONNOR DR
2020-06-29 07:00 2020-12-31 21:00 Continuous
Watermain and water service replacement
HOLLAND AVE
From VICTORIA PARK AVE to WESTVIEW BLVD
2020-06-29 07:00 2020-12-31 21:00 Continuous
Watermain and water service replacement
FOUR OAKS GT @ 84
From O CONNOR DR to AIRLEY CRES
2020-06-26 07:00 2020-07-05 19:00 Daily
Eastbound and westbound lanes partially occupied due to sanitary and water service installation.
SPRINGDALE BLVD
From GLEBEMOUNT AVE to WOODBINE AVE
2020-06-22 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Westbound and Eastbound curb lanes closed alternately.
KINGSMOUNT PARK RD
From EASTWOOD RD to FAIRMOUNT CRES
2020-06-22 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Northbound and Southbound curb lanes closed alternately.
LONG CRES @ LEE AVE
2020-06-26 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Eastbound and Westbound curb lanes closed alternately.
COATSWORTH CRES @ HANSON ST
2020-06-25 07:00 2020-08-17 19:00 Daily
Milling and paving road surface. Northbound and Southbound curb lanes closed alternately.
ELM RIDGE DR @ OLD PARK RD
From OLD PARK RD to MARLEE AVE
2020-06-25 07:00 2020-07-10 17:00 Daily
Westbound curb lane occupied due to side walk repairs by PTR Paving.
MANNING AVE @ LONDON ST
From LONDON ST to BLOOR ST W
2020-06-24 09:00 2020-07-10 16:00 Daily
Eastbound curb lane occupied due to directional bore & place conduit work by Azimuth Three Enterprises Inc.
PEPLER AVE
From PAPE AVE to O CONNOR DR
2020-06-29 07:00 2020-07-04 19:00 Daily
Sanitary and water service installation. 1 Southbound lane closed.
MINTON PL @ PAPE AVE
2020-06-25 09:30 2020-07-24 15:30 Daily
Northbound and southbound lanes partially occupied due to geotechnical investigation.
WINDERMERE AVE @ 757
2020-06-26 07:00 2020-07-10 19:00 Daily
Northbound lanes occupied due to permanent surface reinstatement work by Sunrise Contracting Inc.
BAY ST
From ALBERT ST to QUEEN ST W
2020-06-24 21:00 2020-07-15 05:00 Daily
Geotechnical investigation and borehole drilling. Southbound right lane closed.
ROSEDALE VALLEY RD
From PARK RD to BAYVIEW AVE
2020-06-29 07:00 2020-07-03 19:00 Daily
Geotechnical borehole investigation. Eastbound shoulder/boulevard closed.
DALE AVE
From MAPLE AVE to GLEN RD
2020-06-29 07:00 2020-07-03 19:00 Daily
Geotechnical borehole investigation.
TEMPERANCE ST @ 40
2020-06-26 07:00 2020-07-03 19:00 Daily
Construction work. 2 westbound curb lanes closed.
SPADINA AVE @ 57
2020-06-29 19:00 2020-07-03 05:00 Continuous
Installation of hydro ducts. Northbound curb lane closed.
PATON RD @ CAMPBELL AVE
2020-05-11 07:00 2020-07-31 19:00 Daily
Construction of access point. Lane restrictions in place.
PARK RD
From CHURCH ST to BLOOR ST E
2020-06-29 08:00 2020-07-02 15:30 Daily
Northbound and southbound lanes partially occupied due to chamber investigations.
ASQUITH AVE
From YONGE ST to PARK RD
2020-06-29 08:00 2020-07-02 15:30 Daily
Eastbound and westbound lanes partially occupied due to chamber investigation.
CHURCH ST
From COLLIER ST to PARK RD
2020-06-29 08:00 2020-07-02 15:30 Daily
Eastbound and westbound lanes partially occupied due to chamber investigation.
HAYDEN ST
From YONGE ST to CHURCH ST
2020-06-29 08:00 2020-07-02 15:30 Daily
Eastbound and westbound lanes partially occupied due to chamber investigation.
ERSKINE AVE
From MOUNT PLEASANT RD to YONGE ST
2020-06-25 07:00 2020-07-24 18:00 Daily
Eastbound and westbound lanes partially occupied due to sidewalk and road repairs.
WOODBINE AVE @ GERRARD ST E
From GERRARD ST E to CASSELS AVE
2020-06-30 07:00 2020-07-03 19:00 Daily
Northbound curb lane occupied due to directional bore work and conduit installation by Cybertec Communications Corp.
SCOTT ST
From FRONT ST E to THE ESPLANADE
2020-06-28 22:00 2020-07-02 05:00 Daily
Complete chamber investigation. Northbound and Southbound curb lanes and center lanes closed alternately.
YONGE ST
From THE ESPLANADE to QUEENS QUAY E
2020-06-28 22:00 2020-07-02 05:00 Daily
Complete chamber investigation. Northbound and Southbound curb lanes and center lanes closed alternately.
DOVERCOURT RD
From QUEEN ST W to HUMBERT ST
2020-06-30 09:00 2020-07-19 16:00 Daily
Directional bore hole drilling. Northbound and Southbound lane restrictions.
BAY ST @ 1260
From CUMBERLAND ST to YORKVILLE AVE
2020-06-30 09:00 2020-07-02 16:00 Daily
Construction work. Southbound curb lane closed.
EGLINTON AVE E
From LAIRD DR to DON AVON DR
2020-05-24 00:01 2020-07-31 23:59 Daily
Sidewalk closed due to construction.
WOODWARD AVE
From QUEEN ST E to EASTERN AVE
2020-06-28 08:00 2020-11-01 15:00 Daily
Southbound curb lane occupied for the parking of vendor vehicles for the Leslieville Farmers' Market every Sunday.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
LITTORAL PL
At SCARLETT RD
2020-07-09 07:00 2020-12-31 21:00 Daily
Watermain and water service replacement per contract
BURNHAMTHORPE RD @ HWY 427 COLLECTOR N
From HWY 27 COLLECTOR N to THE WEST MALL
2020-07-02 19:00 2020-09-05 06:00 Daily
Two westbound lanes occupied due to watermain relining work by Robert B Somerville Co. Ltd.
BURNHAMTHORPE RD
From HWY 427 to THE WEST MALL
2020-07-02 19:00 2020-09-05 06:00 Daily
Watermain re-lining project. 2 Westbound lanes closed.
OLD MILL TER @ 51-69
2020-07-06 07:00 2020-07-15 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
GWYNNE AVE @ 48-58
2020-07-06 07:00 2020-07-15 19:00 Daily
Trenchless Sewer Rehabilitation. Southbound lane closed.
SUBWAY CRES @ 95
2020-07-02 07:00 2020-07-03 19:00 Daily
Southbound curb lane occupied for gas service installation by NPL Canada.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
LOMAR DR @ SHEPPARD AVE E
2020-07-21 07:00 2020-10-15 19:00 Daily
Basement Flooding Protection Program. 1 Northbound lane closed.
DON MILLS RD @ 1450
2020-07-06 10:00 2020-07-08 15:00 Daily
Sidewalk reconstruction. 2 Southbound lanes and curb closed.
DON VALLEY PARKWAY
From HWY 401 COLLECTOR EB to LAKE SHORE BLVD E
2020-07-02 09:30 2020-07-03 14:30 Daily
Grass cutting operations. Rolling closure of 1 Northbound lane and 1 Southbound lane.
BAYVIEW AVE @ 2968
2020-07-07 09:00 2020-07-09 16:00 Daily
Gas service installation. Northbound and Southbound curb lanes closed.
FOREST MANOR RD
From HELEN LU RD to PARKWAY FOREST DR
2020-07-02 07:00 2020-07-10 19:00 Daily
Sanitary Repair. 1 Southbound lane closed.
NORELCO DR @ 40
2020-07-02 07:00 2020-07-10 17:00 Daily
Southbound curb lane occupied for water and drain installation by Gio Contracting.
THE BRIDLE PATH @ 50
From LAWRENCE AVE E to POST RD
2020-07-06 07:00 2020-07-20 19:00 Daily
Northbound curb lane occupied for utility construction by Grimsby Utility Contractors.
SENTINEL RD
From FOUR WINDS DR to FINCH AVE W
2020-07-02 09:00 2020-07-02 16:00 Daily
Northbound curb lane occupied for placement of mulch and clean-up of planter bed by Bam Bam Construction.
BROADOAKS DR @ KEELE ST
From KEELE ST to DERRYDOWN RD
2020-07-02 09:00 2020-07-02 16:00 Daily
Westbound lane partially occupied due to planter bed cleanup by Bam Bam Construction Inc.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
QUEEN ST E @ 3015
From BLANTYRE AVE to COURCELETTE RD
2020-07-02 07:00 2020-07-16 17:00 Daily
Scarborough General Maintenance. Eastbound curb lane closed.
KINGSTON RD @ 3463
2020-07-02 07:00 2020-07-16 17:00 Daily
Scarborough General Maintenance. Northbound curb lane closed.
EGLINTON AVE E
From MIDLAND AVE to COMMONWEALTH AVE
2020-07-02 07:00 2020-07-31 19:00 Daily
Geotechnical and environmental borehole investigation. Westbound and Eastbound curb lane closed.
SCARBORO CRES
From ROMANA DR to UNDERCLIFF DR
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
SCARBORO CRES
From HIGHCLIFF CRES to CLIFFCREST DR
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
SCARBORO CRES
From KELSONIA AVE to CLIFFCREST CRES
2020-07-02 07:00 2020-08-02 19:00 Daily
Rehabilitation of various sewer lines. 1 Southbound lane closed.
PHARMACY AVE @ 1628
2020-07-03 07:00 2020-07-06 19:00 Daily
Southbound curb lane partially occupied due to gas service installation.
STELLARTON RD
From PHARMACY AVE to STAMFORD SQ
2020-07-06 09:00 2020-07-20 16:00 Daily
Southbound lanes partially occupied due to maintenance.
BELLAMY RD S
From KINGSTON RD to ADANAC DR
2020-07-06 09:00 2020-07-20 16:00 Daily
Northbound and southbound lanes partially occupied due to maintenance.
HUNTINGWOOD DR
From BIRCHMOUNT RD to WARDEN AVE
2020-07-06 09:00 2020-07-20 16:00 Daily
Eastbound and westbound lanes partially occupied due to maintenance.
KENNEDY RD
From MCNICOLL AVE to FINCH AVE E
2020-07-06 09:00 2020-07-20 16:00 Daily
Northbound and southbound lanes partially occupied due to maintenance.
LITTLE ROCK DR
From BELLAMY RD S to COLONIAL AVE
2020-07-06 09:00 2020-07-20 16:00 Daily
Eastbound and westbound lanes partially occupied due to maintenance.
ROSALIND CRES
From KNIGHTSBRIDGE RD to DELWOOD DR
2020-07-06 09:00 2020-07-20 16:00 Daily
Eastbound and westbound lanes partially occupied due to maintenance.
STEELES AVE E
From MARKHAM RD to MCCOWAN RD
2020-07-06 09:00 2020-07-20 16:00 Daily
Eastbound and westbound lane partially occupied due to maintenance.
PORT ROYAL TRL
From BELLROCK DR to BRAMBLEBROOK AVE
2020-07-02 07:00 2020-07-08 19:00 Daily
Eastbound curb lane occupied for underground hydro installation by Powerline Plus Ltd.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
SUTHERLAND DR
From BESSBOROUGH DR to ASTOR AVE
2020-07-02 07:00 2020-08-17 19:00 Daily
Eastbound and westbound curb lanes alternately occupied due to the improvement and restoration of sidewalks, cubs, and boulevards. Weekend hours: 7:00am-7:00pm
JARVIS ST
From WELLESLEY ST E to MAITLAND PL
2020-07-02 08:30 2020-07-02 17:00 Daily
1 Southbound lane closed for ODSP Payment Distribution.
MARGUERETTA ST @ 321
2020-07-02 07:00 2020-07-10 19:00 Daily
Water Service Installation. Southbound lane closed.
WELLESLEY ST W @ 77
2020-07-07 09:00 2020-07-08 16:00 Daily
Eastbound and westbound lanes partially occupied due to gas service installation.
SHAW ST @ DUNDAS ST W
2020-07-14 12:00 2020-10-27 20:00 Daily
Occupying the curb lanes for the Trinity Bellwoods Farmers' Market. Closures will ONLY occur every Tuesday until October 27 2020.
WELLINGTON ST W
From BATHURST ST to TECUMSETH PL
2020-07-06 07:00 2020-07-24 19:00 Daily
Eastbound lane partially occupied due to geotechnical investigation.
MCCONNELL AVE
From FENWICK AVE to CARLAW AVE
2020-07-04 09:00 2020-10-17 13:00 Daily
Eastbound curb lane occupied for the parking of vendor vehicles for the Withrow Farmers' Market every Saturday.
BEVERLEY ST @ PHOEBE ST
From PHOEBE ST to QUEEN ST W
2020-07-06 09:00 2020-07-19 16:00 Daily
One northbound and southbound lane occupied due to direction bore and place conduit work by Azimuth Three Enterprises Inc.
JORDAN ST @ MELINDA ST
From MELINDA ST to KING ST W
2020-07-06 07:00 2020-08-21 19:00 Continuous
Road fully closed due to manhole rebuilding work by Avertex Utility Solutions Inc.
ADELAIDE ST W @ YORK ST
From YORK ST to SHEPPARD ST
2020-07-04 07:00 2020-07-04 19:00 Daily
One eastbound lane occupied due to glass installation and crane work by Flynn Group of Companies.
SYMINGTON AVE
From DUPONT ST to ADRIAN AVE
2020-07-02 07:00 2020-07-07 19:00 Daily
Alternating northbound and southbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
DAVENPORT RD
From WILTSHIRE AVE to CALEDONIA PARK RD
2020-07-02 07:00 2020-07-07 19:00 Daily
Alternating eastbound and westbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
KEELE ST
From VINE AVE to JUNCTION RD
2020-07-02 07:00 2020-07-07 19:00 Daily
Alternating northbound and southbound 1-2 right lanes will be occupied for flushing and washing of the bridge by Aqua Tech Solutions.
WESTON RD @ LAWRENCE AVE W
From LAWRENCE AVE W to ST PHILLIPS RD
2020-07-06 07:00 2020-07-10 19:00 Daily
One northbound and southbound lane occupied due to storm and sewer replacement work by Grascan Construction Ltd.
WALLACE AVE
From RANKIN CRES to WARD ST
2020-07-04 20:00 2020-07-05 06:00 Daily
Eastbound curb lane partially occupied for utility relocations by Graham Commuter Rail Solutions.
DUFFERIN ST @ ROGERS RD
From ROGERS RD to EGLINTON AVE W
2020-07-02 07:00 2020-07-17 19:00 Daily
All eastbound, westbound, northbbound, and southbound curb lanes occupied due to permanent utility cut repairs by A&F Di Carlo Construction Inc.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

A parking ticket is affixed to the windshield of a vehicle on Wednesday June 9, 2010. (CP24/Mathew Reid)

Transportation Services

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

toronto traffic, rush hour, commute

Vehicle and Licencing

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Wasaga Beach tourism

Ontario Travel Tips

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Insurance paper

Insuring a vehicle in Ont.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Traffic file photo

Road Safety

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Highway 407

407 ETR

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.


Transit Twitter Stream

Service advisories from the Toronto Transit Commission

Service updates from GO Transit

Service advisories from York Region Transit

Service updates and news from Durham Region Transit

Service updates from Brampton Transit

Greater Toronto and Hamilton Area transportation updates

Latest news about Ontario's public transit smartcard

Transit Systems Servicing Toronto and the GTA

GO train
Transit announcement in York Region

Bus lines offering service throughout Ontario

Greyhound bus

Greyhound

Greyhound Canada is the largest provider of intercity bus transportation in Canada, serving nearly 1,100 locations.

Coach Canada Bus (Coach Canada Facebook page)

Coach Canada

Information on scheduled bus routes, convenient door-to-door airport van transfers, fun city sightseeing tours, and first class charter service.

Ontario Northland Bus. Gravelle says planned investments in ONTC infrastructure include more than $23 million over three years to purchase new motor coaches for its bus line and to refurbish rail coaches for the Polar Bear Express. (ontarionorthland.ca)

Ontario Northland

Ontario Northland's operations encompass more than 1,100 km of track, including bus service to 56 communities.


Information for Canadians crossing the United States border

In this June 2, 2009 file photo, the Statue of Liberty is seen in New York harbor.(AP Photo/Richard Drew, File)

Travelling to the U.S.

Everything citizens of Canada travelling to the United States need to know before going through customs.

Traffic makes its way to Ambassador Bridge that connects Canada to the United States in Windsor Ont. on Friday June 15, 2012. (The Canadian Press/Mark Spowart)

Tips for border crossing

CBSA provides travel tips, frequently asked questions and helpful hints for crossing the border.

To carry out the scheme, when the surrogate got to the testing centre, they presented a fake passport showing their picture along with the identification details of the person who hired them.

Get or renew a passport

Find information on getting or renewing a Canadian passport. Download and complete all related forms.

Border Crossing Twitter Stream

News from the Canada Border Services Agency

Traffic Updates for Rainbow, Peace, Lewiston Queenston & Whirlpool

Traffic Updates from Blue Water Bridge, Crossing between Canada & USA

Traffic Updates from Sault Ste. Marie International Bridge