24 Sussex Drive, the official residence of the prime minister, in Ottawa. Prime Minister Mark Carney will announce plans to “restore” the heritage building on Friday. (CTV News Ottawa)
More than $700,000 has been donated to restore 24 Sussex Drive since Prime Minister Mark Carney unveiled plans to renovate the official residence of the prime minister in Ottawa just over a month ago.
On June 26, Carney launched a national design-and-build competition to rehabilitate and modernize 24 Sussex Drive, which is located overlooking the Ottawa River.
The Rideau Hall Foundation is leading the national fundraising campaign to cover the cost of the project, with the fundraising goal set at $50 million.
As of July 27, 3,336 Canadians have donated to the campaign to restore 24 Sussex Drive, with a total of $735,000 in donations.
The Rideau Hall Foundation tells CTV News Ottawa the average donation amount is $220, and the support has come from “every province and territory cross Canada.” A list of donors has also been released.
No one has lived at the official residence of the prime minister in Ottawa since June 2015, and the National Capital Commission (NCC) closed the historic building to the public in 2022 due to health and safety concerns.
0 of 155
24 Sussex Drive The front door of the official residence of the Prime Minister of Canada at 24 Sussex Dr. is seen in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive The entranceway is seen during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Tape hangs from ventilation tubes in a hallway at the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A warning sign is seen indicating asbestos danger in the living room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Doors are wrapped and stored in the living room at the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Water damage is seen on a window ledge in the living room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A fireplace is covered by plywood in the living room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A warning sign is seen indicating asbestos danger in the living room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A warning sign is seen indicating asbestos danger in the living room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive The kitchen area is seen during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive The kitchen area is seen during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Hardwood flooring is seen during a tour of the kitchen at the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A member of the media records images of the kitchen during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Walls are seen stripped down to the studs during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Pieces are stored in the dining room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A camera man records images in the dining room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Door and window casings are seen wrapped and stored in the dining room during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive The staircase to the second floor is seen during a tour of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A window is seen at the official residence of the Prime Minister of Canada at 24 Sussex Dr., in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Flaking paint is seen on a window at the official residence of the Prime Minister of Canada at 24 Sussex Dr., in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive The rear of the official residence of the Prime Minister of Canada, 24 Sussex Dr. in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive Tape is seen marking the edges of crown moulding in the living room during a tour of 24 Sussex Dr. during a tour in Ottawa, Friday, June 26, 2026. THE CANADIAN PRESS/Adrian Wyld
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive A glimpse of the work completed inside 24 Sussex Drive, with the flooring, plaster, and mechanical and electrical systems removed. (April 2024) (National Capital Commission)
24 Sussex Drive was built in 1867-68 and has been home to 10 prime ministers. The main building includes 34 rooms, as well as another small home at 10 Sussex Drive, a pool house and two RCMP guard houses.
The NCC completed abatement and decommissioning work in 2024 to address health and safety issues and remove “obsolete mechanical, heating and electrical systems.”
The Rideau Hall Foundation said earlier this month it would launch a public fundraising appeal in the fall to restore 24 Sussex Drive.
According to the foundation, the maximum donation one person can provide is $5 million, representing 10 per cent of the total fundraising goal.
24 Sussex Drive in Ottawa The Peace tower is seen in the distance behind the building at 24 Sussex in Ottawa, Wednesday, June 24, 2026. THE CANADIAN PRESS/Adrian Wyld