Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com

Real-time traffic information for Toronto, GTA, and surrounding areas.

What's on this page?

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
THE QUEENSWAY
From HIGH ST to SOUTH KINGSWAY
2017-03-27 09:00 2017-12-28 16:00 Daily
One eastbound and one westbound lane will be occupied due to bridge rehabilitation.
RIVERSIDE DR
From RIVERSIDE CRES to SOUTH KINGSWAY
2017-04-10 00:01 2017-10-31 00:01 Continuous
Southbound one lane occupied due to construction
JANE ST @ COURAGE AVE
2017-05-04 09:00 2017-10-31 16:00 Daily
The northbound curb lane will be occupied due to new pole installation and underground conduit.
FIELDWAY RD @ ALLERTON RD
2016-04-15 00:01 2017-12-31 23:59 Continuous
Westbound boulevard and portion of the curb occupied due to construction.
OLD BURNHAMTHORPE RD
From ELMCREST RD to BURNHAMTHORPE RD
2017-05-15 07:00 2017-10-31 19:00 Daily
All lanes will be occupied alternately as required due to watermain replacements. This will be conducted by Rabcon Contractors Ltd.
LEGGETT AVE
At SCARLETT RD
2017-07-17 07:00 2017-12-31 19:00 Daily
Both lanes will be closed due to new watermain and road re-surfacing. This will be conducted by JV 2489960 Ont Inc.
WARRENDER AVE
From LLOYD AVE to LONGFIELD RD
2017-07-17 07:00 2017-12-31 19:00 Daily
Both lanes will be closed due to new watermain and road re-surfacing. This will be conducted by JV 2489960 Ont Inc.
ALHART DR
From CALSTOCK DR to THISTLE DOWN BLVD
2017-07-19 07:00 2017-12-01 19:00 Daily
Eastbound and westbound lane occupied due to water main and water service replacement.
BETHWIN PL
From BRAMPTON RD to LEARMONT DR
2017-07-27 07:00 2017-12-01 19:00 Daily
Eastbound and westbound lanes occupied due to sewer replacement.
CARLINGVIEW DR
From DIXON AVE to METEOR DR
2017-07-27 07:00 2017-11-30 16:00 Daily
Southbound curb lane occupied due to hydro duct bank and cable chamber installation.
MUNCEY AVE
From ELMHURST AVE to GOLFDOWN DR
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
ENDICOTT AVE
From ELMHURST AVE to GOLFDOWN DR
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
RONSON DR
From KIPLING AVE to MARTIN GROVE RD
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
STOFFEL DR @ KELFIELD ST
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
HAVENRIDGE DR
From FAIRHAVEN DR to DIXON RD
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
THE EAST MALL
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
STEVENHARRIS DR
From RICKSHAW AVE to RADWAY AVE
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
BLACKDOWN CRES
From LLOYD MANOR RD to FARNINGHAM CRES
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
BRIDGETOWN DR @ RENFORTH DR
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
ROSSBURN DR
From MOORESHEAD DR to MAYLAND AVE
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
RAVENSCREST DR @ RATHBURN RD
2017-07-31 07:00 2017-11-30 19:00 Daily
Repairs to culverts, ditching and driveway repairs.
REXTON RD
From RENFORTH DR to THE WEST MALL
2017-07-31 07:00 2017-11-30 19:00 Daily
Various locations - repairs to culverts, ditching and driveway repairs.
JETHRO RD
From WILSON AVE to MAYALL AVE
2017-08-01 07:00 2017-12-01 19:00 Daily
Occupying the north and southbound shoulder due to water main replacement by Rabcon Contractors Ltd.
GLENDONWYNNE RD @ MARGDON RD
2017-09-20 07:00 2017-11-11 19:00 Daily
The Eastbound curb lane will be occupied due to excavation works. The work will be carried out by Robert B. Somerville Co.
THE KINGSWAY
From KIPLING AVE to ISLINGTON AVE
2017-08-29 09:00 2017-10-31 16:00 Daily
1 Northbound and Southbound LANE CLOSED DUE TO ROAD CONSTRUCTION.
WARRENDER AVE
From LLOYD MANOR RD to LONGFIELD RD
2017-08-31 07:00 2017-10-31 19:00 Daily
Eastbound and Westbound lanes will be closed alternately due to Scarborough TS. Work will be carried out by Powerline Plus.
KIPLING AVE
From BYLAND RD to LONGFIELD RD
2017-08-29 09:00 2017-10-31 16:00 Daily
The Southbound curb lane will be occupied due to construction works. Work will be carried out by Powerline Plus.
SCARLETT RD
From ST CLAIR AVE W to BERNICE AVE
2017-09-06 00:01 2018-02-23 23:59 Daily
Northbound and southbound lanes occupied due to construction.
JOHN ST
From WESTON RD to SOUTH STATION ST
2017-08-09 07:00 2017-10-30 19:00 Daily
Northbound and Southbound lanes occupied due to construction.
SCARLETT RD @ 19
2017-09-08 00:01 2018-02-23 23:59 Daily
Northbound and southbound lanes occupied due to construction.
ROWNTREE MILL RD @ EMILY AVE
2017-09-12 07:00 2017-11-12 16:00 Daily
All lanes occupied due to new conduit placement.
HATHOR CRES @ ROWNTREE MILL RD
2017-09-12 07:00 2017-11-12 16:00 Daily
All lanes occupied due to new conduit placement.
RIVERTON DR @ DELLBROOK CRES
2017-09-12 07:00 2017-11-12 16:00 Daily
All lanes occupied due to new conduit placement.
DELLBROOK CRES
From LARCHMERE AVE to RIVERTON DR
2017-09-12 07:00 2017-11-12 16:00 Daily
All lanes occupied due to new conduit placement.
LARCHMERE AVE
From AVIEMORE DR to DELLBROOK CRES
2017-09-12 07:00 2017-11-12 16:00 Daily
All lanes occupied due to new conduit placement.
WARRENDER AVE
From LLOYD MANOR RD to LONGFIELD RD
2017-09-18 07:00 2017-12-01 19:00 Daily
East and West , North and South Bound Lane .Watermain and Water Service Replacement. M-F (7:00am to 7:00pm) Sat (9:00am to 7:00pm)
EGLINTON AVE W
From MARTIN GROVE RD to JANE ST
2017-09-18 11:59 2017-12-16 23:59 Continuous
Eastbound and Westbound lanes partially occupied due to road resurfacing
ATTWELL DR
From DISCO RD to CARLINGVIEW DR
2017-09-20 09:00 2017-12-30 16:00 Daily
All Lanes - One at a Time , City Landfill
CARLINGVIEW DR
From ENTRANCE RD to WORCESTER RD
2017-09-20 09:00 2017-12-30 16:00 Daily
All Lanes - One at a Time . Construction
ATTWELL DR
From DISCO RD to CARLINGVIEW DR
2017-09-20 07:00 2017-12-30 16:00 Daily
All lanes all directions occupied due to construction.
BLOOR ST W
From MARKLAND DR to BRIDLEWOOD BLVD
2017-09-21 09:00 2017-12-14 03:00 Daily
Eastbound and Westbound curb lanes occupied due to construction.
THE WEST MALL
From CIVIC CENTRE CRT to BLOOR ST W
2017-09-25 07:00 2017-12-18 19:00 Continuous
Chamber construction. NB and SB lanes closed
BLOOR ST W @ MARKLAND DR
2017-09-25 04:07 2017-12-08 07:07 Continuous
Bloor St. W.Bridge over Etobicoke Creek Structure Rehabilitation. EB and WB 1 lane occupied.
EGLINTON AVE W
From MARTIN GROVE RD to JANE ST
2017-09-18 11:59 2017-12-16 23:59 Continuous
Eastbound and Westbound lanes partially occupied due to road resurfacing
WINTERSET CRES @ 16
At WILLOWRIDGE RD
2017-09-25 08:00 2017-11-09 17:00 Daily
The Northbound and Southbound lane(s) will be occupied alternately due to cable excavation works on behalf of Bell Canada. Work will be carried out by Emcom Construction Ltd.
THE QUEENSWAY @ KIPLING AVE
2017-09-27 00:01 2017-10-31 23:59 Continuous
Westbound lane occupied due to construction.
ROYAL YORK RD
From CHAPMAN RD to SUMMITCREST DR
2017-09-27 09:00 2017-10-27 16:00 Daily
North left lane occupied for directional boring.
HORNER AVE
From BROWNS LINE to DELMA DR
2017-10-02 07:00 2017-12-31 19:00 Daily
One westbound lane occupied due to water main construction.
EGLINTON AVE W
From JANE ST to WESTON RD
2017-10-02 07:00 2017-12-31 19:00 Daily
Eastbound and westbound lanes occupied due to construction.
JANE ST @ EGLINTON AVE W
2017-10-02 07:00 2017-12-31 19:00 Daily
Northbound and southbound lanes occupied due to construction.
FENNIMORE CRES
From FRITH RD to FRITH RD
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
PARADELLE CRES
From BARTEL DR to FRITH RD
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
SHORTRIDGE CRT
At BARTEL DR
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
ROSEGLEN CRES
From FRITH RD to FRITH RD
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
GREYFRIAR CRT
At FRITH RD
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
FRITH RD
From JANE ST to ROSEGLEN CRES
2017-10-06 07:00 2017-12-06 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling.
BARTEL DR
From SHORTRIDGE CRT to BREWSTER CRES
2017-10-06 07:00 2017-12-06 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling.
JANE ST @ FRITH RD
2017-10-06 07:00 2017-12-06 19:00 Daily
The southbound curb lane will be occupied due to directional drilling.
BLOOR ST W
From GREEN LANES to RESURRECTION RD
2017-10-02 00:01 2017-11-03 23:59 Continuous
The westbound lanes will be occupied due to reconfiguration of existing interchange.
KIPLING AVE
From ST ALBANS RD to DUNDAS ST W
2017-10-02 00:01 2017-11-03 23:59 Continuous
The northbound curb lane will be occupied due to reconfiguration of existing interchange.
ISLINGTON AVE
From DIXON RD to WESTHAMPTON DR
2017-10-01 09:00 2017-11-01 16:00 Daily
Southbound and northbound lane occupied due to conduit installation.
WILSON HEIGHTS BLVD
From SHEPPARD AVE W to JOEL SWIRSKY BLVD
2017-10-03 07:00 2017-11-03 16:00 Daily
Southbound lanes occupied due to trenching and cable chamber construction.
DIXON RD @ GOLFWOOD HTS
2017-10-02 09:00 2017-10-23 16:00 Daily
Westbound curb lane occupied due to conduit placement.
HAVENRIDGE DR @ DIXON AVE
2017-10-02 07:00 2017-10-23 19:00 Daily
Southbound curb lane occupied due to conduit placement.
MADILL ST @ HAVENRIDGE DR
2017-10-02 07:00 2017-10-23 19:00 Daily
Eastbound curb lane occupied due to conduit placement.
MCARTHUR ST @ DIXON AVE
2017-10-02 07:00 2017-10-23 19:00 Daily
Southbound curb lane occupied due to conduit placement.
EVANS AVE
From THE WEST MALL to OURLAND AVE
2017-10-05 09:00 2017-11-03 16:00 Daily
Roadway crack filling and repair. EB and WB lane occupied/closed.
FOCH AVE @ 99
2017-10-11 07:00 2017-10-31 19:00 Daily
The Northbound curb lane will be occupied due to conduit placement works. Work to be carried out by Distinct Technical Services Inc.
BLOOR ST W @ 4333 BLOOR ST W
At MILL RD
2017-10-10 09:00 2017-10-31 16:00 Daily
Dig pit & clear blockage. WB curb lane occupied.
MILL RD @ 35 MILL RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit and GLB. NB curb lane occupied.
MILL RD @ 119 MILL RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit and GLB. NB curb lane occupied.
CONIFER DR @ MARKWOOD CRES
At MILL RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit and GLB. EB curb lane occupied.
DUNDAS ST W
From THE EAST MALL to CORDOVA AVE
2017-10-10 09:00 2017-10-24 16:00 Daily
Eastbound and westbound curb lanes occupied due to utility cuts.
PARK LAWN RD
From LORNE AVE to THE QUEENSWAY
2017-10-10 09:00 2017-10-31 16:00 Daily
The southbound curb lane will be occupied due to road work.
RENOWN RD
From DUNDAS ST W to TYRE AVE
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
PATIKA AVE
From PINE ST to MERRILL AVE
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
ORPINGTON CRES
From ADELINE CRT to MASSEYGROVE CRES
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
NORTH CARSON ST
From RIMILTON AVE to VALERMO DR
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
LLOYD MANOR RD @ 180 LLOYD MANOR RD
From WINTERTON DR to LONGFIELD RD
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
SAGAMORE CRES @ 8 SAGAMORE CRES
From ASHFIELD DR to GENTIAN DR
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
LA ROSE AVE @ 110 LA ROSE RD
From TIMOTHY CRT to GRIGGSDEN AVE
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
MADONNA GDNS @ 14 MADONNA GRDS
From PLUNKETT RD to ANTHIA DR
2017-10-09 08:00 2017-10-23 16:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
GLEN MEADOW CRT @ 22 GLEN MEADOW CRT
At KEANE AVE
2017-10-09 08:00 2017-10-23 16:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
LLOYD MANOR RD
From WINTERTON DR to LONGFIELD RD
2017-10-09 08:00 2017-10-23 17:00 Daily
Both direction lanes partially occupied due to construction.
CULNAN AVE @ 22 CULNAN AVE
From THE QUEENSWAY to WARNICA AVE
2017-10-09 08:00 2017-10-23 16:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
BRADBROOK RD @ 3 BRADBROOK RD
From ISLINGTON AVE to BRADFIELD AVE
2017-10-09 08:00 2017-10-23 16:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
WESTHAMPTON DR @ 68 WESTHAMPTON DR
From YORK RD to ISLINGTON AVE
2017-10-11 08:00 2017-10-26 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
WATERFORD DR @ 41 WATERFORD DR
From STRATHDEE DR to WINCOTT DR
2017-10-12 08:00 2017-10-27 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
WHALEY DR @ 7 WHALEY DR
From BROWNS LINE to GAIR DR
2017-10-12 08:00 2017-10-26 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
WARESIDE RD @ 12 WARSIDE RD
From CARSBROOKE RD to GROVERDALE RD
2017-10-12 08:00 2017-10-26 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
BIRMINGHAM ST
From FIFTEENTH ST to FOURTEENTH ST
2017-10-16 09:00 2017-10-31 16:00 Daily
The eastbound curb lane will be occupied due to place conduit.
FIFTEENTH ST @ LAKE SHORE BLVD W
2017-10-16 07:00 2017-10-31 19:00 Daily
The northbound curb lane will be occupied due to place conduit.
HOLYWELL DR
From TEMPLAR DR to KIPLING AVE
2017-10-13 07:00 2017-10-31 19:00 Daily
Parking only. Westbound curb lane occupied.
THE QUEENSWAY @ ETOBICOKE CREEK
At SHERWAY GARDENS RD
2017-10-10 07:00 2017-11-30 23:00 Continuous
Road Resurfacing, New sidewalks, and Partial Replacement of Curbs/Gutters and Sidewalks. both curb lanes and middle lanes in off peak times occupied.
FORTIETH ST
From JAMES ST to GARDEN PL
2017-10-16 07:00 2017-10-23 19:00 Daily
The Southbound curb lane(s) will be occupied due to pit digging and cable placement works. Work carried out by Distinct Technical Services Inc.
KIPLING AVE
From REX GT to JOHN GARLAND BLVD
2017-10-16 09:00 2017-11-16 16:00 Daily
Northbound curb lane occupied due to construction.
CARNARVON AVE
At WOODBOROUGH AVE
2017-10-17 08:00 2017-10-24 16:00 Daily
Hydro Installation
SANDWELL DR
At THE WESTWAY
2017-10-16 07:00 2017-10-31 19:00 Daily
Northbound curblane .Place Conduit & GLB. 53 Sandwell Rd
THE WESTWAY
From BRAMPTON RD to SANDWELL DR
2017-10-16 09:00 2017-10-31 16:00 Daily
Westbound curblane .Place Conduit & GLB. 53 Sandwell Rd
MARTIN GROVE RD
From LONGBOURNE DR to SANDWELL DR
2017-10-16 09:00 2017-10-31 16:00 Daily
Westbound curblane .Place Conduit & GLB. 53 Sandwell Rd
ECKER DR
From COULES CRT to GAIR DR
2017-10-16 07:00 2017-10-27 19:00 Daily
Westbound shoulder occupied due to construction for clearing blockage.
SCARLETT RD
From TILDEN CRES to RAYMORE DR
2017-10-18 09:00 2017-10-31 16:00 Daily
Northbound curblane occupied due to construction to clear blockage.
MARKLAND DR @ 102 MARKLAND DR
2017-10-17 07:00 2017-10-31 19:00 Daily
Eastbound curb lane closed due to placing conduit.
THICKET RD @ 85 THICKET RD
2017-10-17 07:00 2017-10-31 19:00 Daily
Northbound and southbound curb lanes closed due to placing conduit.
TOLEDO RD @ ARBROATH CRES
2017-10-17 07:00 2017-10-31 19:00 Daily
Southbound curb lane closed due to placing conduit.
STONEGLEN DR @ 21 STONEGLEN DR
2017-10-17 07:00 2017-10-31 19:00 Daily
Northbound curb lane closed due to placing conduit.
BLOOR ST W @ 3008
From ROYAL YORK RD to HUMBERVALE BLVD
2017-10-17 09:00 2017-10-23 16:00 Daily
Westbound lanes occupied due to road repairs.
ROYAL YORK RD @ 961
From BIRCHVIEW BLVD to VARLEY LANE
2017-10-17 09:00 2017-10-23 16:00 Daily
Northbound lanes occupied due to road repairs.
MABELLE AVE @ 57
2017-10-19 07:00 2017-10-24 19:00 Daily
The northbound curb lane will be occupied due to excavation.
JANE ST
From WHITE AVE to ST CLAIR AVE W
2017-10-19 09:00 2017-11-03 16:00 Daily
The southbound curb lane will be occupied due to road work.
RAY AVE
From INDUSTRY ST to NICKLE ST
2017-10-18 07:00 2017-10-28 19:00 Daily
Southbound curblane occupied due to conduit placement and pedestal.
INDUSTRY ST @ 121 INDUSTRY ST
From INDUSTRY ST to RAY AVE
2017-10-18 07:00 2017-10-28 19:00 Daily
Eastbound curblane occupied due to conduit placement and pedestal.
ISLINGTON AVE @ BLOOR ST W
2017-10-02 07:00 2017-11-03 18:30 Daily
Northbound and southbound lanes occupied due to replacement of existing overhead HV transmission lines.
KANE AVE @ KERSDALE AVE
2017-10-19 07:00 2017-10-23 19:00 Daily
Southbound curb lane occupied due to excavation and existing conduit repairs.
BLOOR ST W @ BEAMISH DR
2017-10-19 09:00 2017-10-27 16:00 Daily
The eastbound curb lane will be occupied due to manhole installation.
ISLINGTON AVE @ BLOOR ST W
2017-10-21 07:00 2017-10-26 18:30 Daily
Remove and replace existing overhead HV transmission lines. Nb LT lane occupied.
ISLINGTON AVE @ NORTH of BLOOR ST W
2017-10-21 07:00 2017-10-22 18:30 Daily
The northbound left lane will be closed to remove and replace existing overhead high voltage transmission lines.
MARTIN GROVE RD
From ALBION RD to STEELES AVE W
2017-10-20 09:00 2017-10-27 16:00 Daily
1 lane will be closed in both northbound and southbound directions for asphalt road work.
KEELE ST SB HWY 401 COLLECTOR EB RAMP
2017-10-21 00:01 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 eastbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
MARTIN GROVE RD
From FINCH AVE W to ALBION RD
2017-10-20 09:00 2017-10-27 16:00 Daily
Northbound and southbound lanes occupied due to hot asphalt placement.
KEELE ST
From VINE AVE to MAVETY ST
2017-10-21 23:29 2017-10-22 02:29 '
Road closed due police investigation.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HELENDALE AVE @ YONGE ST
2016-04-04 00:01 2017-12-31 23:59 Continuous
The eastbound and westbound lanes will be occupied due to staging of construction project equipment.
KEELE ST
From FOUR WINDS DR to TORO RD
2016-11-01 12:00 2017-11-02 23:59 Continuous
One northbound and one southbound lanes will be occupied due to road work by the Toronto Transit Commission.
KENTLAND CRES @ BESTVIEW DR
2016-11-28 07:00 2017-11-30 19:00 Continuous
One lane will be occupied due to basement flooding protection program city contract work. One lane will be used for two-way traffic.
HARRINGTON CRES
From BESTVIEW DR to MINTWOOD DR
2016-11-28 07:00 2017-11-30 19:00 Daily
All lanes, one at a time, will be occupied due to City of Toronto basement flooding protection program.
GOLDENWOOD RD
From BESTVIEW DR to SPARWOOD CRT
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
BESTVIEW DR
From KENTLAND CRES to GOLDENWOOD RD
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
LAWRENCE AVE E
From RAILSIDE RD to VICTORIA PARK AVE
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound curb lane and westbound centre and curb lane will be occupied due to installation of new watermain. Weekend work hours will be from 9:00 AM to 7:00 PM
OXBOW RD
From YORK MILLS RD to DALEBERRY PL
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
WYEGATE CRT
From WILKET RD to WILKET RD
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
WILKET RD
From WYEGATE CRT to BAYVIEW AVE
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
BERKINDALE DR
From HEATHCOTE AVE to HARRISON RD
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
RYKERT CRES @ RICHLEA CRCL
2017-01-27 07:00 2017-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
WILSON AVE @ LADY YORK AVE
2017-03-07 07:00 2017-11-04 17:00 Daily
Partial westbound lane closures for sewer services & maintenance.
HELENDALE AVE @ 2388 YONGE ST
2016-12-09 00:01 2017-12-30 23:59 Continuous
Northbound sidewalk occupied due to construction.
GILTSPUR DR
From JANE ST to NORTHOVER ST
2017-05-10 07:00 2017-10-26 19:00 Daily
The Eastbound and Westbound lanes will be occupied alternately as required for watermain replacement. This work will be conducted by JV2489960 Ontario Inc.
ROEHAMPTON AVE @ REDPATH AVE
2017-02-27 00:01 2018-10-31 23:59 Continuous
Southbound sidewalk occupied due to construction.
BROADVIEW AVE @ REDPATH AVE
2017-02-27 00:01 2020-03-31 23:59 Continuous
Eastbound sidewalk and portion of the lane occupied due to construction.
CENTRE AVE
From YONGE ST to CADMUS RD
2017-06-06 07:00 2017-10-31 19:00 Daily
The road will be occupied in both directions due to installation of a new watermain. One lane in each direction will be maintained. The weekend hours will be from 9:00 AM to 7:00 PM.
NORTHWOOD DR
From MAXOME AVE to CONACHER DR
2017-06-06 07:00 2017-10-31 19:00 Daily
The road will be occupied in both directions due to installation of a new watermain. One lane in each direction will be maintained. The weekend hours will be from 9:00 AM to 7:00 PM.
JANE ST
At HULLMAR DR
2017-06-06 09:00 2017-10-31 16:00 Daily
Northbound lane closed due to construction.
NORTON AVE
From DORIS AVE to LONGMORE ST
2017-06-16 07:00 2017-12-16 19:00 Daily
Eastbound and westbound curb lane occupied due to water services.
VARNA DR
At RANEE AVE
2017-06-19 07:00 2017-11-01 17:00 Daily
All lanes occupied due to sewer installation.
BAYVIEW AVE
From FIFESHIRE RD to SHEPPARD AVE E
2017-04-24 09:30 2017-11-30 15:30 Daily
One lane in each direction will be occupied due to bridge work.
BAYVIEW AVE
From FIFESHIRE RD to SHEPPARD AVE E
2017-04-24 22:00 2017-11-30 06:00 Daily
One lane in each direction will be occupied due to bridge work.
WILSON AVE @ 555
2017-07-05 06:30 2017-11-05 18:30 Daily
The Eastbound curb lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
THURSFIELD CRES @ 49
2017-07-26 06:30 2017-11-30 18:30 Daily
The Eastbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
KNIGHTON DR
From MURELLEN CRES to PRESTBURY ST
2017-06-16 07:00 2017-12-16 19:00 Daily
Westbound curb lane (partial obstruction) occupied due to construction.
KNIGHTON DR
From MURELLEN CRES to WYNDCLIFF CRES
2017-06-16 07:00 2017-12-16 19:00 Daily
Eastbound curb lane (partial obstruction) occupied due construction.
PRESTBURY ST
From SLOANE AVE to KNIGHTON DR
2017-06-16 07:00 2017-12-16 19:00 Daily
The northbound curb lane will be occupied due to water main work.
LESLIE ST @ 1132
From EGLINTON AVE E to OVERLAND DR
2017-06-27 09:30 2017-12-31 15:30 Daily
Southbound curb lane occupied due to park service entranceway.
FARMVIEW CRES
From PARFIELD DR to GEORGE HENRY BLVD
2017-06-16 07:00 2017-12-16 19:00 Daily
The northbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
FOREST MANOR RD @ PARKWAY FOREST DR
2017-06-16 07:00 2017-12-16 19:00 Daily
The northbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
GEORGE HENRY BLVD
From FOREST MANOR RD to SHAUGHNESSY BLVD
2017-06-16 07:00 2017-12-16 19:00 Daily
The westbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
HAVENBROOK BLVD
From DON MILLS RD to SHAUGHNESSY BLVD
2017-06-16 07:00 2017-12-16 19:00 Daily
The westbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
PARKWAY FOREST DR
From DON MILLS RD to SHEPPARD AVE E
2017-06-16 07:00 2017-12-16 19:00 Daily
The northbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
WILLOWDALE AVE
From FINCH AVE E to CUMMER AVE
2017-06-16 07:00 2017-12-16 19:00 Daily
1 NB curb lane will be partially obstructed due to water main repair
WILLOWDALE AVE
From WILLOWDALE AVE to BISHOP AVE
2017-06-16 09:00 2017-12-16 16:00 Daily
1 NB and 1 WB curb lane will be occupied due to water main repair
WILSON AVE
From CLAYSON RD to JETHRO RD
2017-07-10 00:01 2018-11-30 00:01 Daily
Eastbound and westbound lane occupied due bridge rehabilitation.
WILSON AVE
From CLAYSON RD to JETHRO RD
2017-07-10 07:00 2018-11-30 19:00 Weekdays
One lane will be occupied in each direction due to bridge work.
OVERLAND DR
From THE DONWAY E to BROADPATH RD
2017-07-17 07:00 2017-11-15 21:00 Continuous
Eastbound lane occupied due water main replacement.
BROOKVIEW DR
From LAWRENCE AVE W to RIDGEVALE DR
2017-07-17 07:00 2017-12-31 07:00 Daily
New water main and road resurfacing
COLLINSON BLVD
From INVERMAY AVE to LAURELCREST AVE
2017-07-17 07:00 2017-12-31 07:00 Daily
New water main and road resurfacing
ROBBIE AVE @ GRAYMAR AVE
2017-07-17 07:00 2017-12-31 07:00 Daily
New water main and road resurfacing
VARNA DR @ RANEE AVE
2017-07-17 07:00 2017-11-01 17:30 Daily
Northbound and southbound lane occupied due to installation of sewers, water main and road reconstruction for new TCHC building.
ORCHARDCROFT CRES @ DOVEHOUSE AVE
2017-07-19 07:00 2017-12-01 19:00 Daily
Eastbound and westbound lane occupied due to water main and water service replacement.
RIDGEVALE DR
From PRINCE CHARLES DR to LYNNHAVEN RD
2017-07-17 07:00 2017-12-31 07:00 Daily
New water main and road resurfacing
SILVERTON AVE
From INVERMAY AVE to LAURELCREST AVE
2017-07-17 07:00 2017-12-31 19:00 Daily
Northbound and southbound lanes occupied due to water main and road re-surfacing.
CALVINGTON DR
From EXBURY RD to KEELE ST
2017-07-19 07:00 2017-12-01 19:00 Daily
Eastbound and westbound lane occupied due to water main and water service replacement.
DON MILLS RD
From FAIRVIEW MALL DR to VAN HORNE AVE
2017-08-08 09:30 2017-12-16 15:30 Daily
The northbound curb lane will be occupied due to watermain work.
PICOLA CRT @ MCNICOLL AVE
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
MENTOR BLVD
From PICOLA CRT to MOGUL DR
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
MOGUL DR
From DON MILLS RD to MCNICOLL AVE
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
ROLLINGWOOD DR
From MOGUL DR to MCNICOLL AVE
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
MCNICOLL AVE
From ROLLINGWOOD DR to MOGUL DR
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
SEXTON CRES
From MCNICOLL AVE to HINES DR
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
LEBOS RD
From MCNICOLL AVE to SEXTON CRES
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
HINES DR
From MCNICOLL AVE to SEXTON CRES
2017-08-28 07:00 2017-10-28 19:00 Daily
One lane will be occupied in each direction due to utility work.
DON MILLS RD @ MOGUL DR
2017-08-28 09:00 2017-10-28 16:00 Daily
One lane will be occupied in each direction due to utility work.
EDITHVALE DR
From FINCH AVE W to HOLCOLM RD
2017-07-26 09:00 2017-12-08 16:00 Daily
The Southbound curb lane(s) will be occupied alternately due to water main rehabilitation. Work to be carried out by Fer-Pal Construction Ltd.
WILSON HEIGHTS BLVD
From TRANSIT RD to SHEPPARD AVE W
2017-08-24 09:00 2017-12-18 19:00 Daily
Southbound curb lane occupied due to construction.
KEMPFORD BLVD
From YONGE ST to BEECROFT RD
2017-06-26 07:00 2017-12-08 19:00 Daily
Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
CLAYWOOD RD
From HOLCOLM RD to HOUNSLOW AVE
2017-08-23 07:00 2017-12-08 19:00 Daily
Northbound curb lane occupied due to structural water main rehabilitation.
EDITHVALE DR
From FINCH AVE W to HOLCOLM RD
2017-08-23 09:00 2017-12-08 16:00 Daily
Northbound curb lane occupied due to structural water main rehabilitation.
FINCH AVE W @ EDITHVALE DR
2017-08-23 09:00 2017-12-08 16:00 Daily
Eastbound and westbound curb lane occupied due to structural water main rehabilitation.
HOLCOLM RD
From CLAYWOOD RD to SANTA BARBARA RD
2017-06-26 07:00 2017-12-08 19:00 Daily
West Bound Curb Lane .Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
SANTA BARBARA RD
From HOLCOLM RD to CLAYWOOD RD
2017-06-26 07:00 2017-12-08 19:00 Daily
The westbound curb lane will be occupied due to watermain rehabilitation work.
HOUNSLOW AVE
From WYNN RD to CLAYWOOD RD
2017-08-26 07:00 2017-12-08 19:00 Daily
The westbound curb lane will be occupied due to structural watermain rehabilitation.
BELMONT ST @ 85
From BELMONT ST to YONGE ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Eastbound & Westbound lanes occupied alternatively due to Bypass installation & Water main repair.
FRICHOT AVE
From MCMURRICH ST to YONGE ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Westbound lanes occupied due to Water main replacement.
PINTO DR
From CHEROKEE BLVD to CHIPWOOD CRES
2017-09-11 07:00 2017-11-03 19:00 Daily
Eastbound and westbound curb lane closed alternately due to Bell Smart City.
ERNEST AVE
From VICTORIA PARK AVE to EDMONTON DR
2017-09-11 07:00 2017-11-03 19:00 Daily
Eastbound and westbound curb lane closed alternately due to Bell Smart City.
CHALET RD
From CHEROKEE BLVD to ERNEST AVE
2017-09-11 07:00 2017-11-03 19:00 Daily
Eastbound and westbound curb lane closed alternately due to Bell Smart City.
COURVILLE COACHWAY
From PINTO DR to PINTO DR
2017-09-11 07:00 2017-11-03 19:00 Daily
Northbound and southbound curb lane closed alternately due to Bell Smart City.
LESLIE ST @ EQUESTRIAN CRT
2017-08-30 09:00 2017-10-30 16:00 Daily
Multi lane asphalt pathway and installation of pedestrian bridge. NB curb lane occupied.
PLEASANT BLVD
From AVOCA AVE to YONGE ST
2017-09-01 07:00 2017-11-17 19:00 Daily
The Westbound curb lane will be occupied due to structural water main replacement works. Work will be carried out by Fer-Pal Construction Ltd.
WILSON HEIGHTS BLVD
From TRANSIT RD to SHEPPARD AVE W
2017-08-24 09:00 2017-12-18 19:00 Daily
Southbound curblane.Duct and Chamber
DUNDEE DR @ CONAMORE CRES
2017-09-06 00:01 2017-10-31 23:59 Daily
Both directions lanes occupied due to construction.
LLOYDMINSTER CRES
From MAXOME AVE to CASWELL DR
2017-09-11 07:00 2017-10-23 19:00 Daily
Eastbound and westbound curb lanes occupied due to sidewalk and curb repairs.
CONCORDE PL
From WYNFORD HEIGHTS CRES to CONCORDE GT
2017-09-13 07:00 2017-11-14 16:00 Daily
The northbound and southbound lanes will be occupied due to maintenance work.
WHEELWRIGHT CRES @ HULLMAR DR
2017-09-20 20:23 2017-11-17 23:23 Daily
Storm sewer replacement. Full road closure.
STILLWATER CRES @ HIDDEN TRL
2017-09-18 07:00 2017-12-18 19:00 Daily
Trenching and duct bank installation. EB and WB 1 curb lane occupied.
BATHURST ST @ BLUE FLAG GT
2017-09-20 09:00 2017-10-22 16:00 Daily
SB curb lane occupied due to conduit work
BRADSTOCK RD
From WESTON RD to RIVALDA RD
2017-09-20 15:48 2018-03-21 18:48 Daily
Westbound curb lane (partial obstruction).Trenchless Rehabilitation (CIPP System) of Existing Watermains in Etobicoke, and Toronto Districts
RIVALDA RD
From SHEPPARD AVE W to RIVALDA RD
2017-09-20 07:00 2018-03-20 19:00 Daily
Northbound curb lane (partial obstruction)(partial obstruction).Trenchless Rehabilitation (CIPP System) of Existing Watermains in Etobicoke, and Toronto Districts
GILTSPUR DR
From CALICO DR to NORTHOVER ST
2017-09-22 07:00 2017-11-30 19:00 Daily
The Eastbound and Westbound lane(s) will be occupied due to Bell Smart City works. This will be carried out by Aecon Fibre.
CANNES CRCL
From SYMES RD to SYMES RD
2017-09-27 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
PARK HILL RD
From EGLINTON AVE W to CITIZENS LANE
2017-08-03 07:00 2017-12-31 17:00 Continuous
The road will be closed due to construction in regards to the Eglinton LRT construction.
EGLINTON AVE W @ OAKWOOD AVE
2017-09-04 00:01 2017-12-03 23:59 Continuous
The westbound curb lane will be occupied due to road work for the Eglinton LRT.
FERRAND DR @ DON MILLS RD
2017-10-02 07:00 2017-12-30 17:00 Daily
Eastbound and southbound lanes occupied due to duct bank installation.
FAIRVIEW MALL DR @ GODSTONE RD
2017-10-02 09:30 2017-11-17 15:30 Daily
Westbound lane on Fairview and Northbound lane on Godstone .Road closure for improvements to city infrastructure , including road widening along Fairview Mall and Godstone Rd, new curbs and upgrading signalized intersection.
WILSON HEIGHTS BLVD
From SHEPPARD AVE W to JOEL SWIRSKY BLVD
2017-10-10 00:01 2017-10-28 12:00 Daily
Two Southbound lanes and Centre turn lanes occupied due to trenching and cable chamber construction. Occupied on Saturday and Sunday from times 7:00 AM to 4:00 PM.
DON MILLS RD
From DUNCAN MILL RD to GRAYDON HALL DR
2017-10-04 09:30 2017-10-28 15:30 Daily
Northbound curb lane occupied due to new conduit and cable placement for Rogers Cable.
CARLUKE CRES @ FIFESHIRE RD
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
FIFESHIRE RD @ BAYVIEW AVE
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
CALDY CRT @ FIFESHIRE RD
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
UPPER CANADA DR
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
MONTRESSOR DR
From UPPER CANADA DR to LORD SEATON RD
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
TROON CRT @ MONTRESSOR DR
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
LEGACY CRT @ TOBA DR
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
TOBA DR
From MONTRESSOR DR to FIFESHIRE RD
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
ZAHARIAS CRT @ CHIEFTAIN CRES
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
CHIEFTAIN CRES @ FIFESHIRE RD
2017-10-02 09:00 2017-12-10 16:00 Daily
Bell Smart City construction. Both curb lanes occupied
EGLINTON AVE E
From BROWNLOW AVE to TAUNTON RD
2017-06-27 00:01 2017-12-31 23:59 Continuous
All westbound lanes will be closed and the eastbound lanes will be converted to a 2 way road.
MOUNT PLEASANT RD
From ROEHAMPTON AVE to EGLINTON AVE E
2017-06-27 00:01 2017-12-31 23:59 Continuous
All northbound lanes will be closed and the southbound lanes will be converted to a 2 way road.
SHEPPARD AVE W
From WILSON HEIGHTS BLVD to BLAIRVILLE RD
2017-06-26 09:00 2017-12-08 16:00 Daily
Westbound curblane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
HONITON ST
From WATERLOO AVE to SANDALE GDNS
2017-06-26 07:00 2017-12-08 19:00 Daily
North Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
SANDALE GDNS
From HONITON ST to WILMINGTON AVE
2017-06-26 07:00 2017-12-08 19:00 Daily
North Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
RIDLEY BLVD
From WILSON AVE to YONGE BLVD
2017-05-29 07:00 2017-12-08 19:00 Daily
The westbound curb lane will be occupied due to structural watermain rehabilitation.
DRIFTWOOD AVE
From GRANDRAVINE DR to FINCH AVE W
2017-05-24 07:00 2017-11-10 19:00 Daily
North Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
LEDBURY ST
From DOUGLAS AVE to CARIBOU RD
2017-06-26 07:00 2017-12-08 19:00 Daily
North Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
BATHURST ST
From KHEDIVE AVE to BROOKE AVE
2017-06-26 07:00 2017-12-08 19:00 Daily
North Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
EGLINTON AVE E
At DON VALLEY PARKWAY
2017-10-08 20:00 2017-12-31 06:00 Daily
3 east bound lanes switching to west bound as install continuesThe closure is required to facilitate traffic flip stage 5c2
BEECROFT RD
From SHEPPARD AVE W to PARK HOME AVE
2017-06-24 09:00 2017-12-22 16:00 Daily
The northbound and southbound curb lanes will be occupied due to structural watermain rehabilitation.
HARLANDALE AVE
From YONGE ST to BEECROFT RD
2017-10-09 07:00 2017-10-31 19:00 Continuous
Road resurfacing, and sidewalk reconstruction. WB and EB all lanes closed.
DERRYDOWN RD
From CONAMORE CRES to ROMFIELD DR
2017-10-06 07:00 2017-10-27 19:00 Daily
East and West curblanes Alternate times .Bell FTTH Project
FINCH AVE E
From WILLOWDALE AVE to LONGMORE ST
2017-10-10 21:00 2017-10-31 16:00 Daily
Westbound curblane.Dig a pit to clear a blockage
ERNEST AVE
At EDMONTON DR
2017-10-13 07:00 2017-10-27 19:00 Daily
Eastbound and westbound lanes occupied due to water main and water service replacement.
EGLINTON AVE W
From PEVERIL HILL N to BATHURST ST
2017-09-20 00:01 2018-01-31 23:59 Continuous
1 westbound and 2 eastbound lanes will be closed for construction related to the Eglinton LRT.
BATHURST ST @ EGLINTON AVE W
2017-09-20 00:01 2018-01-31 23:59 Continuous
1 northbound and southbound lane will be closed for construction related to the Eglinton LRT.
WHITBREAD CRES
From SORRENTO CRT to DOLORES RD
2017-10-11 08:00 2017-10-25 17:00 Daily
The curb lane in each direction will be occupied due to utility work.
WHITBURN CRES
From SKIPTON CRT to BLAYDON AVE
2017-10-11 08:00 2017-10-25 17:00 Daily
The curb lane in each direction will be occupied due to utility work.
ST LUCIE DR
From AZALEA CRT to FRANSON CRES
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
SNOWOOD CRT @ LAURA RD
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
QUEENS DR
From CULFORD RD to GRACEFIELD AVE
2017-10-11 08:00 2017-10-25 16:00 Daily
The curb lane will be occupied in each direction due to utility work.
PETERSON DR
From BRUBECK RD to ARCHWAY CRES
2017-10-11 07:00 2017-10-25 17:00 Daily
The curb lane will be occupied in each direction due to utility work.
GEORGE ANDERSON CRT @ 29 GEORGE ANDERSON CRT
At AMESBURY DR
2017-10-09 08:00 2017-10-23 16:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
EAST DR @ 95 EAST DR
From BEXLEY CRES to BRENDWIN RD
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
GRAYMAR AVE @ 21 GRAYMAR AVE
From ROBBIE AVE to DE QUINCY BLVD
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
DOLORES RD @ 95 DOLORES RD
From COURAGE AVE to WEDGE CRT
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
DENISON RD W @ 18 DENISON RD W
From DENISON RD E to SYKES AVE
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
CALVINGTON DR @ 183 CALVINGTON DR
From EXBURY RD to LEXFIELD AVE
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
DENBIGH CRES @ 15 DENBIGH CRES
From DORADO CRT to COLLEEN CRT
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
BRADY CRES @ 2 BRADY CRES
At YATESCASTLE DR
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
BOYD AVE @ 9 BOYD AVE
From RALPH ST to MACDONALD AVE
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
BOMBAY AVE @ 30 BOMBAY AVE
From MARCHWOOD DR to BIDEWELL AVE
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
FAIRGATE CS @ 17 FAIRGATE CS
At TILLINGHAM KEEP
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
CORTLEIGH BLVD @ 385 CORTLEIGH BLVD
From RUBY CRES to BATHURST ST
2017-10-09 08:00 2017-10-23 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
TILLPLAIN RD @ 15 TILLPLAIN RD
From COCKSFIELD AVE to CODSELL AVE
2017-10-02 08:00 2017-10-26 17:00 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
YONGE ST
From BISHOP AVE to STEELES AVE E
2017-10-10 07:00 2017-10-24 19:00 Daily
Northbound lane occupied due to construction.
PLEASANT VIEW DR @ 15
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
KATHROSE DR @ 7
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
BRIAN DR @ 95
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
BOWHILL CRES @ 9
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
CLIPPER RD @ 2
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
MARGARET AVE @ 2
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
THANE CRT @ 4
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
FLINTWOOD CRT @ 7
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
EDMONTON RD @ 6
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
MOUNT PLEASANT RD
From GLENFOREST RD to GOLFDALE RD
2017-10-16 09:00 2017-10-23 16:00 Daily
Northbound and Southbund curblane.Excavation to repair existing conduit on behalf of Bell Canada for Smart City Project.
TANGIERS RD @ FINCH AVE W
2017-10-16 09:00 2017-10-27 16:00 Daily
Northbound and southbound lanes occupied due to new conduit placement.
RUSTIC RD @ 124
2017-10-16 07:00 2017-10-30 19:00 Daily
Westbound curb lane occupied due to dig pit and cable transfer.
BEVERLY HILLS DR @ 61
2017-10-16 07:00 2017-10-30 19:00 Daily
The Eastbound curb lane will be occupied due to pit digging and cable placement works. Work carried out by Distinct Technical Services Inc.
BEVERLY HILLS DR @ 61
2017-10-16 07:00 2017-10-30 19:00 Daily
Eastbound curb lane occupied due to dig pit and conduit placement.
HULLMAR DR @ 258
At WHEELWRIGHT CRES
2017-10-10 09:00 2017-12-22 17:00 Daily
Eastbound lane occupied due to sewer replacement.
BATHURST ST
From FINCH AVE W to WILSON AVE
2017-10-11 07:00 2017-10-23 17:30 Daily
Northbound and Southbound curb lanes occupied due to construction.
PARKWOODS VILLAGE DR @ 57 PARKWOODS VILLAGE DR
2017-10-18 09:00 2017-10-24 16:00 Daily
Excavation of blockage pit. WB curb lane occupied.
BROADWAY AVE @ CARDIFF RD
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. South side occupied.
CARDIFF RD
From BROADWAY AVE to EGLINTON AVE E
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. West side occupied.
ROEHAMPTON AVE @ BANFF RD
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. North and South sides occupied.
FAIRFIELD AVE
From CARDIFF RD to RAWLINSON AVE
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. North and South sides occupied.
RAWLINSON AVE
From BROADWAY AVE to FAIRFIELD AVE
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. East side occupied.
LAWRENCE AVE E
From OTTER CRES to WELLAND AVE
2017-10-18 09:00 2017-10-25 16:00 Daily
The westbound curb lane will be occupied due to excavation to repair existing conduit.
DRIFTWOOD AVE
From YORKWOODS GT to GRANDRAVINE DR
2017-10-20 07:00 2017-10-27 19:00 Daily
The southbound boulevard will be occupied due to underground Hydro installation.
YORK MILLS RD
From LAURENTIDE DR to VICTORIA PARK AVE
2017-09-01 07:00 2017-12-20 18:00 Daily
Eastbound .Excavation, temporary water by-pass installations, CIPP lining of existing watermains, road cut restorations
GLENFOREST RD
From MOUNT PLEASANT RD to RONAN AVE
2017-10-16 07:00 2017-11-10 19:00 Continuous
The road will be occupied due to road resurfacing, including curb & sidewalk replacement.
SANDRINGHAM DR
From TRESILLIAN RD to BARWICK DR
2017-10-18 07:00 2018-06-30 19:00 Continuous
The road will be occupied due to road resurfacing, including curb & sidewalk replacement.
OAKWOOD AVE
From EGLINTON AVE W to HOLLAND PARK AVE
2017-10-17 07:00 2017-10-30 17:30 Daily
The northbound and southbound curb lanes will be occupied at various locations to conduct permanent repairs to utility cuts.
FENSIDE DR
From VERSEND DR to YORK MILLS RD
2017-10-19 09:00 2017-10-26 16:00 Daily
The southbound curb lane will be occupied to install an underground conduit.
UNDERHILL DR @ ROANOKE RD
2017-10-19 09:00 2017-10-23 16:00 Daily
Northbound lane closed due to excavation to place new conduit on behalf of Bell Canada for Smart City project.
LAWRENCE AVE W
From GREER RD to UNSWORTH AVE
2017-10-19 09:00 2017-10-23 16:00 Daily
Westbound curb lane closed due to clear blockage, access manhole and to place cable.
GREER RD
From DOUGLAS AVE to BEDFORD PARK AVE
2017-10-19 09:30 2017-10-31 15:30 Daily
Southbound curb lane closed due to digging pit.
CHEROKEE BLVD
From CHALET RD to PINTO DR
2017-10-18 09:00 2017-10-28 16:00 Daily
The northbound curb lane will be occupied to clear blockages on bell infrastructure.
GREER RD
From DOUGLAS AVE to BEDFORD PARK AVE
2017-10-18 09:30 2017-10-31 15:30 Daily
The southbound curb lane will be occupied due to excavation.
SKYE CRT @ HULLMAR DR
2017-10-17 07:00 2017-11-30 19:00 Continuous
The road will be closed due to storm sewer replacement. Local traffic only.
HISEY CRES
From HULLMAR DR to HULLMAR DR
2017-10-17 07:00 2017-11-30 19:00 Continuous
The road will be closed due to storm sewer replacement. Local traffic only.
BLACKSMITH CRES
From GOSFORD BLVD to GOSFORD BLVD
2017-10-17 07:00 2017-12-22 19:00 Continuous
The road will be closed due to storm sewer replacement. Local traffic only.
BAMFORD CRES @ 84 to 96
2017-10-17 07:00 2017-11-30 19:00 Continuous
The road will be closed due to storm sewer replacement. Local traffic only.
STEELES AVE W
From FOUNDERS RD to JANE ST
2017-10-20 09:00 2017-10-27 16:00 Daily
The westbound curb lane will be occupied to access manholes.
BLANEY CRES
From PICARO DR to PETIOLE RD
2017-10-18 07:00 2017-12-18 19:00 Daily
New conduit by directional drilling. Both sides occupied.
ELANA DR
From FIRGROVE CRES to FINCH AVE W
2017-10-18 07:00 2017-12-18 19:00 Daily
New conduit by directional drilling. Both sides occupied.
FINCH AVE W @ ELANA DR
2017-10-18 07:00 2017-12-18 19:00 Daily
New conduit by directional drilling. South side occupied.
FIRGROVE CRES
From PICARO DR to NEEDLE FIRWAY
2017-10-18 07:00 2017-12-18 19:00 Daily
New conduit by directional drilling. North side occupied.
PETIOLE RD
From FIRGROVE CRES to BLANEY CRES
2017-10-18 07:00 2017-12-18 19:00 Daily
New conduit by directional drilling. North side occupied.
LESLIE ST NB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
LESLIE ST SB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
BAYVIEW AVE NB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
BAYVIEW AVE SB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
YONGE ST NB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
YONGE ST SB HWY 401 COLLECTOR WB RAMP
2017-10-20 23:00 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 westbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
KEELE ST NB HWY 401 COLLECTOR EB RAMP
2017-10-21 00:01 2017-10-22 07:00 Daily
Full closure of the on-ramp nightly for construction on Highway 401 eastbound collectors. For real-time updates on these and other scheduled events in Central Region, please link to 'Traffic Reports' via the Ontario 511 website (http://www.ontario.ca/511).
LAWRENCE AVE W
From OTTER CRES to GLEN RUSH BLVD
2017-10-18 09:00 2017-10-25 16:00 Daily
Westbound curb lane occupied due to excavation and existing conduit repairs.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
WYE VALLEY RD
From GLAIVE DR to SHROPSHIRE DR
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new sewermain. Weekend work hours will be form 9:00 AM to 7:00 PM
MILITARY TRL @ ELLESMERE RD
2017-03-04 00:01 2017-11-04 12:00 Continuous
CIPP Lining of Watermainsand services
EGLINTON AVE E
From BIRCHMOUNT RD to KENNEDY RD
2017-06-26 09:00 2017-12-31 18:00 Daily
Westbound and eastbound lanes occupied due to Hydro installations.
EGLINTON AVE E
From BIRCHMOUNT RD to KENNEDY RD
2017-06-15 09:00 2017-12-31 18:00 Daily
Eastbound and westbound lanes occupied due to Hydro relocation.
MARKHAM RD @ 399
2017-07-26 06:30 2017-11-30 18:30 Daily
The Southbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
WOOD GLEN RD
From LYNNDALE RD to ANNDALE RD
2017-06-16 07:00 2017-12-16 19:00 Daily
Northbound curb lane (partial obstruction) due to construction.
FALLINGBROOK RD @ LYNNDALE RD
2017-06-16 07:00 2017-12-16 19:00 Daily
Eastbound curb lane (partial obstruction) occupied due to construction.
MILLBRIDGE GT
From MIDLAND AVE to OAKLEY BLVD
2017-07-12 09:00 2018-01-12 17:00 Continuous
Eastbound and Westbound curb and gutter reconstruction, sidewalk repairs, adjustments to c/b & m/h, boulevard improvements, roadway milling, base repairs, resurfacing & pavement markings.
WOOD GLEN RD
From LYNNDALE RD to ANNDALE RD
2017-06-16 07:00 2017-12-16 19:00 Daily
Northbound curb lane (partial obstruction) occupied due to construction.
LYNNDALE RD
From FALLINGBROOK RD to LYNNDALE RD
2017-06-16 07:00 2017-12-16 19:00 Daily
EB curb lane will be occupied for trench rehab
EGLINTON AVE E
From BIRCHMOUNT RD to KENNEDY RD
2017-06-26 07:00 2017-12-31 23:00 Daily
Eastbound and westbound lanes occupied due to underground duct bank and cable installation.
SUSAN ST
From LAWRENCE AVE E to SAMSON CRES
2017-08-14 09:00 2018-06-19 19:00 Daily
North and south bound lanes occupied for watermain and water service replacement.
TORRANCE RD
From EGLINTON AVE E to TRUDELLE ST
2017-08-14 09:00 2018-06-19 19:00 Daily
North and south bound lanes occupied for watermain and water service replacement.
ROSSANDER CRT
From MCCOWAN RD to PERIVALE CRES
2017-08-14 09:00 2018-06-19 19:00 Daily
East and west bound lanes occupied for watermain and water service replacement.
BRAMBLEBROOK AVE
From PORT ROYAL TRL to MCNICOLL AVE
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
BRETTON CRT @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
CAMPANIA CRES @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
GAGEVIEW CRT @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
JAMES PARK SQ @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
MCCOOL CRT @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
MOOREHOUSE DR @ PORT ROYAL TRL
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
PORT ROYAL TRL
From BRIMLEY RD to BRAMBLEBROOK AVE
2017-08-28 07:00 2017-10-27 19:00 Daily
Right shoulder lane occupied alternatively due to Bell Smart City project.
ELLESMERE RD
From ORTON PARK RD to MORNINGSIDE AVE
2017-08-14 07:00 2017-11-30 19:00 Daily
East and west bound lanes occupied for road resurfacing. One lane each direction will remain opened.
NEILSON DR @ ELLESMERE RD
2017-08-14 07:00 2017-10-31 19:00 Daily
North and south bound lanes occupied for road resurfacing. One lane each direction will remain opened.
MEADOWCLIFFE DR @ PINE RIDGE DR
2017-08-28 07:00 2017-12-31 19:00 Daily
One lane will be occupied in each direction due to watermain replacement.
STEELES AVE E @ FIREBRACE RD
2017-08-29 09:00 2017-10-27 16:00 Daily
The westbound curb lane will be occupied due to utility work.
PHARMACY AVE
From STEELES AVE E to GLENDINNING AVE
2017-08-29 09:00 2017-10-27 16:00 Daily
The northbound curb lane will be occupied due to utility work.
STEELES AVE E
From FIREBRACE RD to PHARMACY AVE
2017-08-29 09:00 2017-10-27 16:00 Daily
The eastbound curb lane will be occupied due to utility work.
LAWRENCE AVE E @ 2450
2017-09-01 07:00 2017-10-31 16:00 Daily
Eastbound and Westbound lanes will be closed alternately due to Scarborough TS. Work will be carried out by Powerline Plus.
PORT ROYAL TRL
From ASHCOTT ST to COPPERWOOD SQ
2017-05-15 07:00 2017-10-31 19:00 Daily
Northbound and Southbound lanes will be closed alternately due to Scarborough TS. Work will be carried out by Powerline Plus.
EAST AVE
From LAWRENCE AVE E to GOLDERS GREEN AVE
2017-09-09 19:00 2017-12-16 19:00 Daily
Northbound curb lane (partial obstruction) Trenchless Rehabilitation (CIPP System) of Existing Watermains in Toronto Districts.
TRUDELLE ST
From MCCOWAN RD to DANFORTH RD
2017-09-09 19:00 2017-12-16 19:00 Daily
Westbound curb lane (partial obstruction)Trenchless Rehabilitation (CIPP System) of Existing Watermains in Toronto Districts
BELLAMY RD N
From PORCHESTER DR to CEDAR BRAE BLVD
2017-09-09 07:00 2017-12-16 19:00 Daily
Northbound curb lane (partial obstruction) occupied due to construction.
BRIMLEY RD
From STEELES AVE E to SHEPPARD AVE E
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
FINCH AVE E
From KENNEDY AVE to MARKHAM AVE
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
BANMOOR BLVD
From BELLAMY RD N to BELLAMY RD N
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
PERIVALE CRES
From MCCOWAN RD to BENDALE BLVD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
ROSSANDER CRT
From MCCOWAN RD to PERIVALE CRES
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
GAGE AVE
From DANFORTH AVE to BRIMLEY RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
MCCOWAN RD
From ELLESMERE RD to LAWRENCE AVE E
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
JANRAY DR
From HISCOCK BLVD to CHANDLER DR
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
SEMINOLE AVE
From MCCOWAN RD to BRIMLEY RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
BLAKEMANOR BLVD
From NELSON RD to MARKHAM AVE
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
LORD ROBERTS DR
From MIDLAND AVE to MIDLAND AVE
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
BRIMLEY RD
From LAWRENCE AVE E to EGLINTON AVE E
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
FALLINGBROOK CRES
From KINGSTON RD to KINGSTON RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
SCARBORO CRES
From KINGSTON RD to KINGSTON RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
CLETA DR
From CORVETTE AVE to BRENDA CRES
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
CLETA DR
From CORVETTE AVE to BRENDA CRES
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
MIDLAND AVE
From KINGSTON RD to KINGSTON RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
BIRCHMOUNT RD
From DANFORTH AVE to KINGSTON RD
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
PHARMACY AVE
From ST CLAIR AVE E to DANFORTH AVE
2017-09-11 07:00 2017-11-03 19:00 Daily
Supply, replace, adjust various catch basins and manhole frames, covers and attached curb and sidewalk. 1 lane occupied.
PENNYHILL DR
From MCLEVIN AVE to HUPFIELD TRL
2017-09-11 07:00 2017-10-23 19:00 Daily
Northbound and southbound curb lanes occupied due to construction.
PENTLY CRES
From EARLTON RD to KENNEDY RD
2017-09-13 19:29 2017-10-23 22:29 Daily
Eastbound and westbound curb lanes occupied due to construction.
REDHEUGH CRES @ AMBERCROFT BLVD
2017-09-11 07:00 2017-10-23 19:00 Continuous
The east and west curb lanes will be occupied due to road work.
CHARLOTTETOWN BLVD
From CONFERENCE BLVD to MCCULLEY ST
2017-09-11 19:00 2017-10-31 19:00 Daily
NB,SB,EB,WB ALL LANES one at a time .W15740 Signet Garyray Rossdean.
SHEPPARD AVE E
From MCCOWAN RD to MARKHAM RD
2017-09-12 09:00 2017-10-31 16:00 Daily
Eastbound and westbound lanes occupied due to road repairs.
MCCOWAN RD
From SANDHURST CRCL to SANDHURST CRCL
2017-09-12 09:00 2017-12-16 19:00 Daily
The southbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
BELLAMY RD N
From PORCHESTER DR to CEDAR BRAE BLVD
2017-09-09 09:00 2017-12-16 15:30 Daily
Northbound curb lane occupied due to trenchless rehabilitation
TRUDELLE ST
From MCCOWAN RD to DANFORTH RD
2017-09-09 07:00 2017-12-16 19:00 Daily
The westbound curb lane will be occupied due to trenchless rehabilitation of existing watermains.
EAST AVE
From LAWRENCE AVE E to GOLDERS GREEN AVE
2017-09-12 09:00 2017-12-16 15:30 Daily
Northbound curb lane partially occupied due to trenchless rehabilitation of existing water mains.
KINGSTON RD
From BROOKLAWN AVE to DORSET RD
2017-09-12 09:00 2017-12-16 16:00 Daily
Northbound curb lane partially occupied due to trenchless rehabilitation of existing water mains.
KINGSTON RD
From DORSET RD to HAREWOOD AVE
2017-09-12 09:00 2017-12-16 16:00 Daily
Westbound curb lane partially occupied due to trenchless rehabilitation of existing water mains.
PHARMACY AVE
From SHEPPARD AVE E to FINCH AVE E
2017-09-12 00:01 2017-12-16 23:59 Daily
Northbound curb lane occupied due to trenchless rehabilitation of existing water mains.
KEELER BLVD
From NEILSON RD to TWEEDROCK CRES
2017-09-13 09:30 2017-10-31 15:30 Daily
Northbound lanes occupied due to conduit installation.
EDENMILLS DR
From KEELER BLVD to STEEPMAPLE GRV
2017-09-13 09:30 2017-10-31 15:30 Daily
Northbound lanes occupied due to conduit installation.
SKYRIDGE RD @ KEELER BLVD
2017-09-13 09:30 2017-10-31 15:30 Daily
Southbound lanes occupied due to conduit installation.
SANDRIFT SQ @ KEELER BLVD
2017-09-13 09:30 2017-10-31 15:30 Daily
Southbound lanes occupied due to conduit installation.
STEEPMAPLE GRV @ EDENMILLS DR
2017-09-13 09:30 2017-10-31 15:30 Daily
Northbound lane occupied due to conduit installation.
TWEEDROCK CRES @ KEELER BLVD
2017-09-13 09:30 2017-10-31 15:30 Daily
Northbound lane occupied due to conduit installation.
EGLINTON AVE E @ MCCOWAN RD
2017-09-13 17:00 2017-12-31 23:59 Daily
Westbound curb and centre lanes closed for water main break repairs.
FAIRWOOD CRES @ OLD KINGSTON RD
2017-09-18 07:00 2017-11-18 18:00 Daily
Northbound lane occupied due to curb and sidewalk new construction.
MCCOWAN RD
At SANDHURST CRCL
2017-09-12 09:00 2017-12-16 19:00 Daily
Southbound curb lane (partial obstruction) Trenchless Rehabilitation (CIPP System) of Existing Watermains in Toronto Districts.
KINGSTON RD
From BROOKLAWN AVE to DORSET RD
2017-09-12 09:00 2017-12-16 16:00 Daily
Eastbound curb lane (partial obstruction) occupied due to construction.
KINGSTON RD
From ALLISTER AVE to HAREWOOD AVE
2017-09-12 09:00 2017-12-16 16:00 Daily
Westbound curb lane (partial obstruction) occupied due to construction.
BEECHGROVE DR
From MINNACOTE AVE to FLERIMAC RD
2017-09-20 07:00 2017-11-30 19:00 Daily
Northbound lane odd and even sides occupied due to construction.
LAWRENCE AVE E @ 4350
2017-09-20 09:30 2017-11-20 15:30 Daily
Northbound lanes occupied due to conduit installation.
MAY APPLE TER @ 2
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
PLUMROSE BLVD @ 17
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
KINGSTON RD @ 4659
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
GREEN ASH TER @ 6
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
FERN MEADOW RD @ 3
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
MEGAN AVE @ 5
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
FLERIMAC RD @ 3
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
ASTERFIELD DR @ 42
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
MINNACOTE AVE @ 8
2017-09-20 07:00 2017-11-20 19:00 Daily
Northbound lanes occupied due to conduit installation.
SHEPPARD AVE E
From HAVENVIEW RD to SCUNTHORPE RD
2017-05-29 09:00 2017-11-30 16:00 Daily
Scunthorpe E and D. EB curb lane occupied
COURTON DR @ SHERWOOD AVE
2017-10-02 07:00 2017-12-05 21:00 Daily
Inside lane occupied within the Northbound & Southbound lanes due to a water main replacement.
ELMONT DR @ REXLEIGH DR
2017-10-02 07:00 2017-12-05 21:00 Daily
Inside lane occupied within the Northbound & Southbound lanes due to a water main replacement.
PLATEAU CRES @ GREENLAND RD
2017-10-02 07:00 2017-12-05 21:00 Daily
Inside lane occupied within the Northbound & Southbound lanes due to a water main replacement.
AMETHYST RD
From CASS AVE to SHEPPARD AVE E
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and Westbound shoulders occupied alternately due to construction.
AMULET ST
From MALAMUTE CRES to AMETHYST RD
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and Westbound shoulders alternately occupied due to road work.
ARAGON AVE
From SHEPPARD AVE E to SCARDEN AVE
2017-09-27 07:00 2017-11-30 19:00 Daily
Northbound and Southbound right lane shoulder occupied alternately due to road work.
ARKONA DR
From ARAGON AVE to SCARDEN AVE
2017-09-27 07:00 2017-11-30 19:00 Daily
Northbound and Southbound right shoulder occupied due to road work.
CASS AVE
From WARDEN AVE to AMETHYST RD
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and Westbound right shoulders occupied alternately due to roadwork.
HEASLIP TER @ SCARDEN AVE
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and Westbound both shoulders occupied due to road work.
LYNN GATE CRES
From MALAMUTE CRES to AMULET ST
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and Westbound shoulders occupied alternately due to road work.
MALAMUTE CRES
From CASS AVE to AMETHYST RD
2017-09-27 07:00 2017-11-30 19:00 Daily
Northbound and Southbound shoulders occupied alternately due to road work
WARDENCOURT DR
From WARDEN AVE to DAVISBROOK BLVD
2017-09-27 07:00 2017-11-30 19:00 Daily
Eastbound and westbound lanes occupied due to Bell project.
WARDEN AVE
From HUNTINGWOOD DR to SHEPPARD AVE E
2017-09-26 07:00 2017-11-30 19:00 Daily
Northbound and southbound lanes occupied due to Bell project.
DAVISBROOK BLVD
From HUNTINGWOOD DR to BAY MILLS BLVD
2017-09-26 07:00 2017-11-30 19:00 Daily
The northbound and southbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
DUNMURRAY BLVD
From DAVISBROOK BLVD to EAGLESTONE RD
2017-09-26 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
KELLEN ST
From DAVISBROOK BLVD to NORTONVILLE DR
2017-09-26 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
MARBLEMOUNT CRES
From DAVISBROOK BLVD to DAVISBROOK BLVD
2017-09-26 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
NORTONVILLE DR
From WARDENCOURT DR to DAVISBROOK BLVD
2017-09-26 07:00 2017-11-30 19:00 Daily
The northbound and southbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
QUEENSCOURT DR
From DUNMURRAY BLVD to EAGLESTONE RD
2017-09-26 07:00 2017-11-30 19:00 Daily
The northbound and southbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
MOOREFIELD DR
From BRIMFOREST GT to TRELLANOCK AVE
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
ADENMORE RD
From BRIMFOREST GT to TRELLANOCK AVE
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
WINTER GARDENS TRL @ GOLDERS GREEN AVE
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
WHITEROCK DR @ GOLDERS GREEN AVE
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
GOLDERS GREEN AVE @ WHITEROCK DR
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
GRANDHALL CRT @ GOLDERS GREEN AVE
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
EAST AVE
From GOLDERS GREEN AVE to LAWRENCE AVE E
2017-09-28 09:00 2017-12-20 16:00 Daily
Northbound lane closed due to installation of conduit.
RAINSFORD RD @ 98-120
2017-10-02 17:48 2017-10-23 20:48 Daily
Southbound curb lane occupied due to conduit placement.
BONACRES AVE
From COLONEL DANFORTH TRL to JEAN DEMPSEY GT
2017-10-01 07:00 2017-11-01 19:00 Daily
The northbound and southbound lanes will be occupied one at a time due to road work.
COLONEL DANFORTH TRL
From HIGHLAND CREEK DR to JEAN DEMPSEY GT
2017-10-01 07:00 2017-11-01 19:00 Daily
The northbound and southbound lanes will be occupied one at a time due to road work.
KIMBOLTON CRT @ BONACRES AVE
2017-10-01 07:00 2017-11-01 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to road work.
JEAN DEMPSEY GT
From COLONEL DANFORTH TRL to MEADOWVALE RD
2017-10-01 07:00 2017-11-01 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to road work.
BRIGADIER PL @ BONACRES AVE
2017-10-01 07:00 2017-11-01 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to road work.
MUIRBANK BLVD
From MEADOWVALE RD to BLUENOSE CRES
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder due to conduit placement by telecon/expercom.
LAVERY TRL
From MEADOWVALE RD to BLUENOSE CRES
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder at 14 Lavery Trl, due to conduit placement by telecon/expercom.
BLUENOSE CRES @ MUIRBANK BLVD
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder at 1 Bluenose, due to conduit placement by telecon/expercom.
LITTLEBOROUGH CRT @ MUIRBANK BLVD
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder at 1 Littleborough, due to conduit placement by telecon/expercom.
ORLEANS DR @ MUIRBANK BLVD
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder at 1 Orleans dr, due to conduit placement by telecon/expercom.
ELLESMERE RD
2017-09-23 09:30 2017-10-30 15:30 Daily
Occupying the northbound shoulder at 3978 Ellesmere rd, due to conduit placement by telecon/expercom.
ANSON AVE
From BRIMLEY RD to RANDALL CRES
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
BRIMLEY RD
From OAKRIDGE DR to ANSON AVE
2017-10-16 09:00 2017-11-30 16:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
COMRIE TER
From BRIMLEY RD to BRIMLEY RD
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
FERMOY RD
From WILLAMERE DR to ST CLAIR AVE E
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
MACDUFF CRES
From OAKRIDGE DR to RANDALL CRES
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
MANDARIN RD
From WILLAMERE DR to BRIMLEY RD
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
NICOLAN RD
From WILLAMERE DR to ANSON AVE
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
OAKRIDGE DR
From BRIMLEY RD to MACDUFF CRES
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
PASTRANO CRT
At WILLAMERE DR
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
RANDALL CRES
From HORFIELD AVE to ANSON AVE
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
ST CLAIR AVE E
From BRIMLEY RD to FERMOY RD
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
WADENA CRT
At ANSON AVE
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
WILLAMERE DR
At FERMOY RD
2017-10-16 07:00 2017-11-30 19:00 Daily
Both directions , Right Lane - Shoulder- Not Simultaneously Bell Smart City
PROGRESS AVE
From PRODUCTION DR to CORPORATE DR
2017-10-05 09:00 2017-10-23 16:00 Daily
The westbound curb lane will be occupied due to directional drilling and hydro excavation.
GREENBRAE CRCT @ 110
From MARKHAM RD to SEDGEMOUNT DR
2017-10-10 07:00 2017-10-27 19:00 Daily
The Eastbound and Westbound curb lane(s) will be occupied alternately due to fibre optic conduit installation works. Work will be carried out by NX Utilities Inc.
BRIMORTON DR @ 463
From AMBERJACK BLVD to DOLLY VARDEN BLVD
2017-10-10 07:00 2017-10-27 15:00 Daily
The Eastbound and Westbound curb lane(s) will be occupied alternately due to fibre optic conduit installation works. Work will be carried out by NX Utilities Inc.
BELLAMY RD N
From PORCHESTER DR to CEDAR BRAE BLVD
2017-09-09 07:00 2017-12-16 03:30 Daily
Northbound curblane Trenchless Rehabilitation (CIPP System) of Existing Watermains in Toronto Districts.
PENNYHILL DR
From MCLEVIN AVE to PARSONAGE DR
2017-10-10 09:00 2017-10-30 21:00 Daily
Occupying the northbound shoulder due to conduit installation.
MCLEVIN AVE
From PENNYHILL DR to SEWELLS RD
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder due to conduit installation.
GREENLEAF TER
From PENNYHILL DR to PARSONAGE DR
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 1 Greenleaf Ter, due to conduit installation.
TROUTBECK AVE
From PENNYHILL DR to JACOB FISHER DR
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 3 Troutbeck ave, due to conduit installation.
REINDEER DR
From ROUGE RIVER DR to TRAILVIEW TER
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 3 Reindeer dr, due to conduit installation.
TRAILVIEW TER
From ROUGE RIVER DR to REINDEER DR
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 3 Trailveiew ter, due to conduit installation.
HALLBANK TER
From BROWNSPRING RD to PITFIELD RD
2017-10-10 07:00 2017-11-10 19:00 Daily
All lanes occupied alternately due to road work.
HAYWARD CRES
From KEYWORTH TRL to KEYWORTH TRL
2017-10-10 07:00 2017-11-10 19:00 Daily
All lanes occupied alternately due to road work.
PITFIELD RD
From BROWNSPRING RD to MCCOWAN RD
2017-10-10 07:00 2017-11-10 19:00 Daily
All lanes occupied alternately due to road work.
RED FOX PL
From ROUGE RIVER DR to MOUNTAIN LION TRL
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 1 Red Fox pl, due to conduit installation.
RED FOX PL
From ROUGE RIVER DR to MOUNTAIN LION TRL
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 1 Red Fox pl, due to conduit installation.
CHARTERHOUSE RD
From LAWNMERE CRES to PITFIELD RD
2017-10-10 07:00 2017-11-10 19:00 Daily
All lanes occupied alternately due to road work.
COYOTE CRES @ RED FOX PL
From TRUMPETER ST to ROUGE RIVER DR
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 6 Coyote cres, due to conduit installation.
KEYWORTH TRL
From CHARTERHOUSE RD to PITFIELD RD
2017-10-10 07:00 2017-11-10 19:00 Daily
All lanes occupied alternately due to road work.
SHEPPARD AVE E
From ECOPARK GT to DEAN PARK RD
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 8859 Sheppard ave, due to conduit installation.
MOUNTAIN LION TRL @ RED FOX PL
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder due to conduit installation.
SHEPPARD AVE E
From ECOPARK GT to DEAN PARK RD
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 8859 Sheppard ave, due to conduit installation.
BALD EAGLE AVE
From PANDA SQ to MILLCAR DR
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 3 Bald Eagle ave, due to conduit installation.
MILLCAR DR
From BALD EAGLE AVE to BOBCAT TER
2017-10-10 07:00 2017-11-10 19:00 Daily
Occupying the northbound shoulder at 7 Millcar dr, due to conduit installation.
MCCOWAN RD
2017-10-10 07:00 2017-12-10 17:00 Daily
Northbound and southbound lanes occupied due to sidewalk construction.
VICTORIA PARK AVE @ 2740
2017-10-10 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to conduit and GLB installation.
VICTORIA PARK AVE
From TIAGO AVE to FURNIVAL RD
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
HOMESTEAD RD @ 58
From DARLINGSIDE DR to CORONATION DR
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
BIRCHMOUNT RD
From STEELES AVE E to SILVER SPRINGS BLVD
2017-10-10 07:00 2017-12-15 23:00 Continuous
Major Road Resurfacing and Sidewalk Repair. 2 LANES CLOSED LOCAL TRAFFIC ONLY.
MIDLAND AVE
From ROMANA DR to SANDOWN AVE
2017-10-10 07:00 2017-12-15 19:00 Daily
Sidewalk Construction . All lanes closed. Local traffic only.
KINGSTON RD @ SANDOWN AVE
2017-10-12 07:00 2017-10-27 17:00 Daily
Bell Canada Manhole Construction Work. 1 or 2 Lanes (Curb Lane Permanent. Centre lane - As required).
LADY BOWER CRES @ 1
At HUPFIELD TRL
2017-10-12 07:00 2017-11-30 19:00 Daily
The Northbound lane(s) will be occupied due to conduit installation works. This will be carried out by Telecon/Expercom.
HUPFIELD TRL @ 101
At GLANVIL CRES
2017-10-12 07:00 2017-11-30 19:00 Daily
The Northbound lane(s) will be occupied due to conduit installation works. This will be carried out by Telecon/Expercom.
GLANVIL CRES @ 1
At HUPFIELD TRL
2017-10-12 07:00 2017-11-30 19:00 Daily
The Northbound lane(s) will be occupied due to conduit installation works. This will be carried out by Telecon/Expercom.
HORSESHOE CRES @ 2
At HUPFIELD TRL
2017-10-12 07:00 2017-11-30 19:00 Daily
The Northbound lane(s) will be occupied due to conduit installation works. This will be carried out by Telecon/Expercom.
MCCOWAN RD @ SHEPPARD AVE E
2017-10-13 07:00 2017-11-03 19:00 Daily
Northbound curb lane occupied due to gas main replacement.
LAWRENCE AVE E
From MEADOWVALE RD to PORT UNION RD
2017-10-16 09:00 2017-12-16 16:00 Daily
Eastbound and westbound curb lanes occupied due to pavement cores and drilling.
LAWRENCE AVE E
From MEADOWVALE RD to GOLDBERRY SQ
2017-10-18 09:00 2017-11-30 16:00 Daily
Westbound curb lane occupied due to construction.
WARDEN AVE
From DANFORTH AVE to DANFORTH RD
2017-10-18 00:01 2017-12-24 00:01 Daily
Northbound and southbound curb lanes occupied due to trenchless rehabilitation of existing water mains.
MEADOWVALE RD
From LAWRENCE AVE E to KINGSTON RD
2017-10-18 07:00 2017-11-30 19:00 Daily
Occupying the north and southbound curb lanes due to PDO Required at all signalized intersections.
MEADOWVALE RD
2017-10-18 07:00 2017-11-30 19:00 Daily
Occupying the north and southbound curb lanes due to PDO Required at all signalized intersections.
GREENCEDAR CRCT
From CRUSADER ST to DAPHNE RD
2017-10-16 07:00 2017-11-30 16:00 Daily
Occupying the north and southbound curb lanes in alteration due to construction work by Powerline Plus Ltd.
MIDLAND AVE
From KINGSTON RD to WOLFE AVE
2017-10-04 07:00 2017-11-30 18:00 Daily
The northbound and southbound lanes will be occupied due to watermain repairs.
FISHLEIGH DR
From GLEN EVEREST RD to LAKEWOOD AVE
2017-10-18 07:00 2017-10-31 19:00 Daily
Excavation of blockage pits to bring service to location. WB curb lane occupied.
FANFARE AVE
From PORT UNION RD to PENDERMERE PKWY
2017-10-19 07:00 2017-10-29 19:00 Daily
East and westbound curb lanes occupied due to conduit and cable placement.
EGLINTON AVE E @ 2850
2017-10-20 10:00 2017-10-30 15:00 Daily
Westbound lane occupied due to old sidewalk removal and new sidewalk installation.
SHEPPARD AVE E @ BRENYON WAY
2017-10-17 07:00 2017-10-25 19:00 Daily
INSTALLATION OF CONDUIT AND GLB. NB lane occupied.
WARDEN AVE @ 743
2017-10-20 09:00 2017-10-27 16:00 Daily
The northbound curb lane will be occupied to install gas service.
GENERATION BLVD @ 43
From DEAN PARK RD to BRIARCREEK RD
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lane occupied due to installation of Conduit and GLB.
RAINBOW RIDGE AVE @ 20
From GENERATION BLVD to LIONHEAD TRL
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
LIONHEAD TRL @ 98
From ROTARY DR to ROSCOE RD
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
ROTARY DR @ 2
From GENERATION BLVD to LEAMEADOW WAY
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
BRIARCREEK RD @ 2
From GENERATION BLVD to LEAMEADOW WAY
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
DERBYSHIRE PL @ 1
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
LEAMEADOW WAY @ 1
From ROTARY DR to DERBYSHIRE PL
2017-10-18 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied alternatively due to installation of Conduit and GLB.
SHEPPARD AVE E @ PHARMACY AVE
2017-10-20 07:00 2017-11-03 16:30 Daily
Concrete Curb & Sidewalk Repairs. EB and WB lanes occupied
MCCOWAN RD @ SANDHURST CRCL
2017-09-12 09:00 2017-12-16 19:00 Daily
Southbound lanes occupied due to trenchless rehabilitation of existing water mains.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
YONGE ST @ 1070 YONGE ST
2016-12-29 07:00 2017-12-31 13:15 Continuous
The northbound and southbound passing lane will be occupied due to emergency sewer main repair. Roxborough St E will also be closed from Yonge St to Cluny Ave duration of work.
EGLINTON AVE E
From SUTHERLAND AVE to DON AVON DR
2017-01-11 09:00 2017-12-31 16:00 Daily
One eastbound and westbound lane will be occupied due to monitoring instruments for Eglinton Crosstown Construction.
EGLINTON AVE W
From BRAEMAR AVE to ORIOLE PKWY
2017-01-11 09:00 2017-12-31 16:00 Daily
One eastbound and westbound lane will be occupied due to monitoring instruments for Eglinton Crosstown Construction.
WINNETT AVE
From EGLINTON AVE W to GLOUCESTER GRV
2016-01-01 07:00 2017-12-31 17:00 Daily
North bound and south bound lanes will be occupied due to road work.
QUEENS QUAY E @ BONNYCASTLE ST
2017-01-24 07:00 2017-12-31 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new water main.
GARDINER EXPY @ OFF RAMP YORK/BAY/YONGE
2017-04-17 00:01 2018-01-31 23:59 Continuous
Eastbound Gardiner off-ramp closure at York/Bay/Yonge. Ramp to be demolished and replaced with new ramp to Lower Simcoe St.
GARDINER EXPY
From BATHURST ST to YORK ST
2017-04-17 05:00 2017-12-31 23:59 Continuous
The eastbound curb lane will be closed due to the removal of the York Bay Yonge off ramp and the Simcoe St ramp build.
SCOTT ST
From COLBORNE ST to WELLINGTON ST E
2014-02-26 00:01 2018-01-01 23:59 Continuous
Westbound and Southbound sidewalk occupied due to conctruction.
PETER ST @ 97 PETER ST
2015-09-01 00:01 2018-03-31 23:50 Continuous
Eastbound sidewalk and curb lane occupied due to construction.
YONGE ST @ 197 YONGE ST
2015-10-01 00:01 2019-12-31 23:59 Continuous
Northbound curb lane occupied due to construction.
ADELAIDE ST E @ ONTARIO ST
2015-11-02 00:01 2017-12-31 23:59 Continuous
Northbound sidewalk and curb lane occupied due to construction.
BLEECKER ST
From SHERBOURNE ST to EARL ST
2015-11-11 00:01 2018-06-30 23:59 Continuous
Westbound sidewalk and parking lane occupied due to construction.
COLBORNE ST @ CHURCH ST
2015-11-11 00:01 2017-12-31 12:59 Continuous
Northbound sidewalk occupied due to construction.
WELLESLEY ST E
From YONGE BLVD to CHURCH AVE
2015-12-01 00:01 2017-10-31 23:59 Continuous
Northbound sidewalk and portion of the curb lane occupied due to construction.
WELLESLEY ST E @ YONGE ST
2015-12-01 00:01 2017-10-31 23:59 Continuous
Northbound sidewalk and portion of curb lane occupied due to construction
RICHARDSON ST @ 130-132 QUEENS QUAY E
2016-01-20 00:01 2018-12-31 23:59 Continuous
Westbound portion of the boulevard and portion of the street occupied due to construction
DOVERCOURT RD @ 1093 QUEEN ST W
2016-03-01 00:01 2018-02-28 23:59 Continuous
Westbound sidewalk and curb lane occupied due to construction
DUNDONALD ST
From YONGE ST to CHURCH ST
2016-01-01 00:01 2017-12-31 23:59 Continuous
Soutnbound curb lane occupied due to construction.
WALTON ST @ EAST of BAY STREET
2016-01-01 00:01 2017-12-31 23:59 Continuous
The sidewalk and curb lane on the north side will be occupied due to construction.
GERRARD ST W @ EAST of BAY ST
2016-01-01 00:01 2017-12-31 23:59 Continuous
The sidewalk and curb lane on the south side will be occupied due to construction.
GRENVILLE ST
From YONGE ST to ST LUKE LANE
2016-04-01 00:01 2018-02-28 23:59 Continuous
Southbound sidewalk and curb lane occupied due to construction
CHURCH ST
From DUNDAS ST E to BOND ST
2016-04-01 00:01 2018-07-31 23:42 Continuous
Westbound sidewalk and curb lane and Southbound public lane occupied due to construction.
CUMBERLAND ST @ BELLAIR ST
2016-04-01 00:01 2018-07-31 23:58 Continuous
Northbound sidewalk and curb lane occupied due to construction
YORKVILLE AVE @ YONGE STREET
2016-05-01 00:01 2019-06-30 23:59 Continuous
Southbound curb lane occupied due to construction.
YONGE ST @ YORKVILLE AVE
2016-09-01 00:01 2017-12-31 23:59 Continuous
Westbound lane occupied due to construction.
BONNYCASTLE ST @ QUEENS QUAY E
2016-06-01 00:01 2018-12-31 23:59 Continuous
Westbound curb lane occupied due to construction.
CAMDEN ST @ BRANT ST
2016-09-08 00:01 2018-06-30 23:59 Continuous
Southbound lane occupied due to construction.
BATHURST ST @ FRONT ST W
2016-09-08 00:01 2018-07-31 23:59 Continuous
Eastbound curb lane occupied due to construction.
FRONT ST W
From NIAGARA ST to BATHURST ST
2016-09-08 00:01 2018-07-31 23:59 Continuous
Northbound and Southbound curb lane occupied due to construction.
LOMBARD ST
From RICHMOND ST E to VICTORIA ST
2016-09-15 00:01 2019-12-31 23:59 Continuous
Northbound portion of street occupied due to construction.
VICTORIA ST @ RICHMOND ST E
2017-05-01 00:01 2019-12-31 23:59 Continuous
Southbound sidewalk occupied due to construction.
RICHMOND ST W @ 604-618 Richmond St W
2016-10-17 00:01 2018-03-31 23:59 Continuous
Northbound sidewalk, cycle track and curb lane occupied due to construction.
BATHURST ST @ Public Lane First
2016-09-01 00:01 2018-12-31 23:59 Continuous
Northbound street occupied due to construction
LAWREN HARRIS SQUARE
From BAYVIEW AVE to LOWER RIVER ST
2016-10-05 00:01 2018-04-27 23:59 Continuous
Northbound lane occupied due to construction.
BLUE JAYS WAY
From MERCER ST to KING ST W
2016-10-14 00:01 2018-08-31 23:59 Continuous
Eastbound curb lane occupied due to construction.
ROXBOROUGH ST E @ 1027 YONGE ST
2016-10-01 00:01 2017-12-31 23:59 Continuous
Southbound sidewalk and curb lane occupied due to construction.
JOHN ST
From ADELAIDE ST W to PEARL ST
2017-02-01 00:01 2019-01-31 23:59 Continuous
Eastbound sidewalk and curb lane occupied due to construction.
ADELAIDE ST W @ 602-620 KING ST W
From ADELAIDE PL to KING ST
2016-02-06 00:01 2018-01-28 23:59 Continuous
Southbound cycle track and curb lane occupied due to construction.
JEFFERSON AVE
From ATLANTIC AVE to LIBERTY ST
2017-03-31 00:01 2018-05-31 23:59 Continuous
Eastbound curb lane occupied due to construction.
LOWER JARVIS ST
From LAKE SHORE BLVD E to QUEENS QUAY E
2017-03-09 00:01 2019-02-28 23:59 Continuous
Eastbound sidewalk occupied due to construction
YORK ST
From LAKE SHORE BLVD to HARBOUR ST
2017-03-15 00:01 2018-07-31 23:59 Continuous
Southbound curb lane occupied due to construction
WABASH AVE
From SORAUREN AVE to LUKOW TER
2017-02-27 00:01 2018-10-31 23:59 Continuous
Southbound sidewalk and curb lane occupied due to construction.
BERWICK AVE @ DUPLEX AVE
2017-06-01 07:00 2018-01-31 17:00 Continuous
Westbound north curb lane closed due to material staging.
RICHMOND ST W
From BAY ST to SHEPPARD ST
2017-06-01 04:29 2018-03-01 07:29 Continuous
Westbound lane and sidewalk occupied due to pit dig.
QUEEN ST W
From SPADINA AVE to BATHURST ST
2017-06-19 09:00 2017-12-25 16:00 Continuous
All eastbound lanes will be occupied due to road work. Two way traffic maintained in the westbound lanes.
QUEEN ST W
From SPADINA AVE to BATHURST ST
2017-06-19 00:01 2017-12-25 23:59 Continuous
Eastbound and Westbound lanes occupied due to sidewalk reconstruction and streetscaping.
BOULTBEE AVE @ 108
2017-07-26 06:30 2017-11-30 18:30 Daily
The Westbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
MANNING AVE @ DUNDAS ST W
2017-07-26 06:30 2017-11-30 18:30 Daily
The Northbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
BATHURST ST @ LAKE SHORE BLVD
2017-07-26 06:30 2017-11-30 18:30 Daily
Two Northbound lanes will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
BROWNS LANE @ BATHURST ST
2017-07-26 06:30 2017-11-30 18:30 Daily
Two Northbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
WILLIS ST @ BATHURST ST
2017-07-26 06:30 2017-11-30 18:30 Daily
The Eastbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
HUBBARD BLVD @ GLEN MANOR DR
2017-07-26 06:30 2017-11-30 18:30 Daily
The Westbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
KENILWORTH AVE @ 221
2017-07-26 06:30 2017-11-30 18:30 Daily
The Northbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
GERRARD ST E @ 1792
2017-07-26 06:30 2017-11-30 18:30 Daily
Two Southbound lanes will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
RYKERT CRES @ 96
2017-07-26 06:30 2017-11-30 18:30 Daily
The Westbound lane will be occupied due to Structural rehabilitation works. This will be carried out by Empipe Solutions Ltd.
EVERDEN RD
At EGLINTON AVE W
2017-07-04 09:00 2017-12-26 17:00 Continuous
North and South bound lanes will be occupied due to Closure of Everden Road as per attached utility stage 1. This will be conducted by Crosslinx Transit Solutions - Constructors (CTSC).
KING ST W @ 645
From WATERLOO TER to BATHURST ST
2017-02-21 18:11 2017-11-21 21:11 Daily
Eastbound and southbound curb lane and sidewalk occupied due to conduit unblocking.
KING ST W @ 665
From WATERLOO TER to BATHURST ST
2017-02-21 00:01 2017-11-21 23:59 Daily
Eastbound and southbound curb lane occupied due to conduit unblocking.
KERR RD @ 1
2017-07-10 21:30 2017-11-14 00:30 Daily
Southbound lane occupied due to existing conduit repairs.
KERR RD @ 2
2017-07-10 21:30 2017-11-14 00:30 Daily
Southbound lane occupied due to existing conduit repairs.
RUMSEY RD
From EGLINTON AVE E to HEATH CRES
2017-09-04 07:00 2017-10-27 19:00 Daily
The southbound curb lane will be occupied due to watermain replacement.
DARTNELL AVE
From DAVENPORT RD to BRIDGMAN AVE
2017-04-24 07:00 2017-11-17 19:00 Daily
Northbound and southbound curb lanes occupied due to water work.
KENDAL AVE
From DAVENPORT RD to MACPHERSON AVE
2017-05-03 07:00 2017-11-17 19:00 Daily
Northbound and southbound curb lane occupied due to water work.
GAMBLE AVE
From BROADVIEW AVE to PAPE AVE
2017-04-10 09:00 2017-11-17 16:00 Daily
Eastbound and westbound lanes occupied due to water work.
DONLANDS AVE
At COSBURN AVE
2017-04-10 09:00 2017-11-17 16:00 Daily
Northbound and southbound curb lane occupied due to water services.
COSBURN AVE
From PAPE AVE to DONLANDS AVE
2017-04-17 09:00 2017-11-17 16:00 Daily
Westbound curb lane occupied due to water services.
BRIDGMAN AVE @ DARTNELL AVE
2017-04-24 07:00 2017-11-17 19:00 Daily
The eastbound curb lane will be occupied due to water main work.
MACPHERSON AVE
From SPADINA RD to KENDAL AVE
2017-07-24 07:00 2017-11-17 19:00 Daily
Eastbound curb lane (partial obstruction) occupied due to construction.
DUFFERIN ST
From BLOOR ST W to GEARY AVE
2017-07-24 09:00 2017-10-30 16:00 Daily
Northbound curb lane occupied due to structural water main rehabilitation.
DON MILLS RD
From LAWRENCE AVE E to WYNFORD DR
2017-07-31 07:00 2018-01-31 11:00 Continuous
Two northbound and southbound lanes occupied due to water main replacement. Only one lane will be occupied during rush hour.
GLENDONWYNNE RD @ MARGDON RD
2017-08-08 09:00 2017-11-11 16:00 Daily
The Eastbound curb lane will be occupied due to excavation works. The work will be carried out by Robert B. Somerville Co.
EGLINTON AVE E @ EAST of KENNEDY RD
2017-08-14 07:00 2017-12-31 23:00 Daily
Eastbound and westbound lanes occupied due to overhead and underground hydro lines relocation and replacement. Hydro lines will be relocated from the south side (TTC southwest Service Rd) to the north side (TTC northwest Service Rd) of Eglinton Ave E.
DUFFERIN ST
From EGLINTON AVE W to ROGERS RD
2017-08-22 09:00 2017-10-22 15:00 Daily
One southbound lane will be occupied due to replace UG conductor on poles.
FULTON AVE
2017-08-08 07:00 2017-12-14 19:00 Daily
Westbound laneway occupied due to Laneway Reconstruction.
ISABELLA ST
From SHERBOURNE ST to HUNTLEY ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Eastbound & Westbound lanes occupied due to Roadway repairs.
MC ALPINE ST
From DAVENPORT RD to MCMURRICH ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Eastbound & Westbound lanes occupied due to Water main replacement.
MC ALPINE ST
From DAVENPORT RD to MCMURRICH ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Eastbound & Westbound lanes occupied due to Water main replacement.
MCMURRICH ST
From BELMONT ST to DAVENPORT RD
2017-08-08 07:00 2017-12-14 19:00 Daily
Northbound & Southbound lanes occupied due to Water main replacement.
RODEN PL
From MCMURRICH ST to BELMONT ST
2017-08-08 07:00 2017-12-14 19:00 Daily
Eastbound lanes occupied due to Water main replacement.
SIMCOE ST
2017-08-28 00:01 2017-12-31 23:59 Daily
North and southbound centre lanes. Installation of 14inch insulated pipe from 220 Simcoe Street to 100 Simcoe Street.
EGLINTON AVE W
From KEELESDALE DR to BLACK CREEK DR
2017-09-01 09:00 2017-10-31 16:00 Daily
One Eastbound lane will be occupied due to repairs to sanitary manhole and sewer repair works. Work will be carried out Crosslinx Transit Solutions.
EGLINTON AVE E
From LESLIE ST to DON MILLS RD
2017-09-01 09:00 2017-10-31 14:00 Continuous
Two Northbound lane(s) will be occupied due to conduit extension works. Work will be carried out Crosslinx Transit Solutions.
BLACKBURN ST
From MOUNTSTEPHEN ST to BLACKBURN ST
2017-09-07 00:01 2017-12-22 12:00 Continuous
Southbound curblane will be occupied due to hydro work.
EGLINTON AVE W
From KEELESDALE DR to BLACK CREEK DR
2017-09-12 09:00 2017-10-31 16:00 Daily
Two eastbound lanes occupied due to repairs of sanitary manhole and sewer.
DUFFERIN ST
From PAR AVE to GEARY AVE
2017-05-01 09:00 2017-12-15 19:00 Daily
Northbound and Southbound curb lanes occupied due to construction.
PLEASANT BLVD
From AVOCA AVE to YONGE ST
2017-09-01 07:00 2017-11-17 19:00 Daily
Westbound curb lane (partial obstruction) occupied due to construction.
KIMBERLEY AVE @ LYALL AVE
2017-08-15 09:00 2018-02-15 15:00 Daily
One lane will be occupied in each direction due to road work.
UNIVERSITY AVE
From DUNDAS ST W to EDWARD ST
2017-09-19 00:01 2017-11-17 23:59 Continuous
Northbound and southbound lanes occupied due to construction.
THE ESPLANADE
From JARVIS ST to SHERBOURNE ST
2017-09-25 07:00 2017-10-27 19:00 Daily
Eastbound and Westbound all lanes occupied (local traffic only) due to construction.
VICTORIA ST
From ADELAIDE ST E to RICHMOND ST E
2017-09-25 07:00 2017-10-27 19:00 Daily
Northbound and Southbound all lanes occupied ( local traffic only) due to construction.
BERKELEY ST
From ADELAIDE ST E to KING ST E
2017-09-25 07:00 2017-10-27 19:00 Daily
Northbound and southbound lanes occupied due to road resurfacing.
TORONTO ST
From ADELAIDE ST E to KING ST E
2017-09-25 07:00 2017-10-27 19:00 Daily
Northbound and Southbound all lanes occupied ( local traffic only) due to construction.
DUNDAS ST E
From PARLIAMENT ST to ANNA HILLIARD LANE
2017-09-25 09:00 2017-10-27 19:00 Daily
EB lane closed due to construction
FRONT ST E
From PARLIAMENT ST to TRINITY ST
2017-09-25 09:00 2017-10-27 19:00 Daily
EB and WB lanes closed at times for road resurfacing
LAURIER AVE @ WELLESLEY ST E
2017-09-25 07:00 2017-10-27 19:00 Daily
NB and SB lanes closed for road resurfacing
SCOTT ST
From FRONT ST E to THE ESPLANADE
2017-09-25 07:00 2017-10-27 19:00 Daily
NB and SB lane occupied due to road resurfacing
PRINCESS ST
From LONGBOAT AVE to THE ESPLANADE
2017-09-25 07:00 2017-10-27 19:00 Daily
All lanes of the road will be closed due to road resurfacing works. Work will be carried out by Furfari Paving Co. Ltd.
SCADDING AVE
From PRINCESS ST to LOWER SHERBOURNE ST
2017-09-25 07:00 2017-10-27 19:00 Daily
All lanes of the road will be closed due to road resurfacing works. Work will be carried out by Furfari Paving Co. Ltd.
BAYVIEW AVE @ 1860
2017-10-09 09:00 2017-10-27 16:00 Continuous
Southbound lane occupied due to construction.
QUEEN ST E
From DON VALLEY PARKWAY to BROADVIEW AVE
2017-09-29 07:00 2017-10-29 19:00 Daily
Eastbound curb lane occupied to road repairs.
ST CLAIR AVE W
From MONDOVI GT to SYMES RD
2017-09-27 09:00 2017-11-30 16:00 Daily
Eastbound and westbound lanes occupied due to Bell project.
JANE ST @ EGLINTON AVE W
2017-10-02 07:00 2017-12-31 19:00 Daily
Northbound and southbound lanes occupied due to road repairs.
EGLINTON AVE W
From JANE ST to WESTON RD
2017-10-02 07:00 2017-12-31 19:00 Daily
Eastbound and westbound lanes occupied due to road repairs.
SYMES RD
From ST CLAIR AVE W to SYMES RD
2017-09-27 07:00 2017-11-30 19:00 Daily
The northbound and southbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
TARRAGONA BLVD
From SYMES RD to VIELLA ST
2017-09-27 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
VIELLA ST
From SYMES RD to TARRAGONA BLVD
2017-09-27 07:00 2017-11-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied at different times due to road work for the Bell Smart City project.
STRATHMORE BLVD
From WOODMOUNT AVE to GLEBEMOUNT AVE
2017-09-30 21:39 2017-11-30 00:39 Daily
Southbound lanes occupied due to conduit placement.
COXWELL AVE
From HANSON ST to CASCI AVE
2017-10-01 09:30 2017-10-31 15:30 Daily
The northbound and southbound lanes under the CN railroad bridge will be occupied due to asbestos testing and bridge inspection.
FRONT ST E
From PARLIAMENT ST to TRINITY ST
2017-09-28 04:00 2017-10-27 07:00 Continuous
2 eastbound and westbound lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times.
COLLEGE ST @ 253
From SPADINA AVE to HURON ST
2017-10-02 09:00 2017-10-27 15:00 Daily
1 eastbound lane will be occupied due to streetscaping.
BAY ST
From WELLESLEY ST W to PHIPPS ST
2017-10-01 09:00 2017-10-31 15:30 Daily
The northbound curb lane and sidewalk will be occupied due to hoisting.
COLLEGE ST
From YONGE ST to BAY ST
2017-09-28 09:00 2017-10-27 15:00 Daily
2 westbound lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times. Weekend hours will be from 7AM to 7PM.
DALHOUSIE ST
From DUNDAS ST E to FRANK NATALE LANE
2017-09-28 07:00 2017-10-27 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times.
DOUGLAS DR
From GLEN RD to ASTLEY AVE
2017-09-28 07:00 2017-10-27 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times.
DUNDAS ST E @ 127
From DALHOUSIE ST to MUTUAL ST
2017-09-28 09:00 2017-10-27 15:00 Daily
2 eastbound and westbound lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times. Weekend hours will be from 7AM to 7PM.
ELIZABETH ST
From DUNDAS ST W to FOSTER PL
2017-09-28 07:00 2017-10-27 19:00 Daily
2 northbound and southbound lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times.
SUMMERHILL AVE @ 446
2017-09-28 07:00 2017-10-27 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only and two lanes will be opened at all times.
GRENVILLE ST @ WEST of YONGE ST
2017-09-06 07:00 2017-10-25 19:00 Daily
The eastbound curb lane will be occupied due to maintenance hole work.
YONGE ST @ WOOD ST
2017-09-06 09:30 2017-10-25 15:30 Daily
The northbound and southbound curb lane will be occupied due to maintenance hole work.
WOOD ST
From YONGE ST to CHURCH ST
2017-09-06 07:00 2017-10-25 19:00 Daily
The eastbound curb lane will be occupied due to maintenance hole work.
CHURCH ST
From WOOD ST to CARLTON ST
2017-09-06 09:30 2017-10-25 15:30 Daily
The southbound curb lane will be occupied due to maintenance hole work.
ROSELAWN AVE
From MARLEE AVE to DUFFERIN ST
2017-09-29 09:00 2017-10-31 16:00 Daily
Northbound shoulder lane occupied due to fiber optic cable installation.
BATHURST ST @ DUPONT ST
2017-10-02 09:00 2017-11-03 15:00 Daily
2 northbound lanes will be occupied due to road resurfacing.
BELLWOODS AVE
From QUEEN ST W to DUNDAS ST W
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
BROCK AVE
From COLLEGE ST to QUEEN ST W
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
SOUDAN AVE
From BAYVIEW AVE to HOYLE AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
East/Westbound .Road resurfacing
TRANBY AVE
From BEDFORD RD to AVENUE RD
2017-10-02 07:00 2017-11-03 19:00 Daily
East/West.Road resurfacing
BRUCE PARK AVE
From EGLINTON AVE E to ROEHAMPTON AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
DEVONSHIRE PL @ 100m SOUTH of BLOOR ST W
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
DUPONT ST
From ST RAYMOND HTS to CHRISTIE ST
2017-10-02 09:00 2017-11-03 15:00 Daily
2 eastbound and westbound lanes will be occupied due to road resurfacing. Local traffic only.
DUPONT ST
From BRUNSWICK AVE to WALMER RD
2017-10-02 09:00 2017-11-03 15:00 Daily
2 eastbound and westbound lanes will be occupied due to road resurfacing. Local traffic only.
FOREST HILL RD
From SPADINA RD to ORMSBY CRES
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
HOYLE AVE
From EGLINTON AVE E to SOUDAN AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
INDIAN RD
From ANNETTE ST to HUMBERSIDE AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
INDIAN TRL
From INDIAN RD to ALHAMBRA AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
LONSDALE RD
From RUSSELL HILL RD to WARREN RD
2017-10-02 07:00 2017-11-03 19:00 Daily
All lanes will be occupied due to road resurfacing. Local traffic only.
OSSINGTON AVE
From COLLEGE ST to DEWSON ST
2017-10-02 09:00 2017-11-03 15:00 Daily
North/South 2 lanes closed, Road resurfacing
GRANBY ST @ EAST of CHURCH ST
2017-10-03 07:00 2017-10-27 17:00 Daily
The westbound south lane will be occupied to rebuild hydro vault roof.
HILLDALE RD @ YONGE ST
2017-10-03 07:00 2017-12-31 19:00 Daily
NB/SB West Curb Lane .THESL Duct Structure and Cable Chamber Installation on Hillsdale and Yonge from Hillsdale to Lola
PALMERSTON AVE
From DUNDAS ST W to QUEEN ST W
2017-10-02 07:00 2017-11-03 19:00 Daily
Northbound and southbound lanes occupied due to road resurfacing.
QUEEN ST W
From BATHURST ST to EUCLID AVE
2017-10-02 09:00 2017-11-03 15:00 Weekdays
Eastbound and westbound curb lanes occupied due to road resurfacing.
ROBINSON ST
From BATHURST ST to BELLWOODS AVE
2017-10-02 07:00 2017-11-03 19:00 Weekdays
Eastbound and westbound curb lanes occupied due to road resurfacing.
ROEHAMPTON AVE
From BAYVIEW AVE to BRUCE PARK AVE
2017-10-02 07:00 2017-11-03 19:00 Daily
Road resurfacing. All lanes closed, local traffic only.
MILLWOOD RD @ LAIRD DR
2017-10-02 07:00 2017-11-30 23:00 Daily
Sidewalks, curbs, electrical work and road re-surfacing.
CHURCH ST
From GERRARD ST E to GOULD ST
2017-10-02 09:30 2017-11-06 15:30 Daily
The northbound and southbound curb lanes will be occupied due to gas main installation.
EGLINTON AVE W
From BLACKTHORN AVE to CROHAM RD
2017-10-02 00:01 2017-10-22 23:59 Continuous
constructing the Eglinton Cross-town LRT. WB and EB right turn lane occupied.
ST CLAIR AVE E @ YONGE ST
2017-10-04 02:00 2017-10-23 05:00 Daily
The westbound street car lane will be occupied due to maintenance hole work.
MORTIMER AVE
From GREENWOOD AVE to LINSMORE CRES
2017-10-11 07:00 2017-10-29 19:00 Daily
The Eastbound curb lane will be occupied due to conduit placement works. Work to be carried out by Distinct Technical Services Inc.
GREENWOOD AVE
From SAMMON AVE to MORTIMER AVE
2017-10-11 07:00 2017-10-29 19:00 Daily
The Northbound curb lane will be occupied due to conduit placement works. Work to be carried out by Distinct Technical Services Inc.
OLD ORCHARD GRV
From BATHURST ST to ELM RD
2017-10-08 07:00 2017-12-31 21:00 Daily
Waterman and Water Service replacement. 1 lane occupied in each direction.
DUFFERIN ST
From EGLINTON AVE W to HUNTER AVE
2017-10-04 00:01 2017-12-31 23:59 Continuous
Crosslinx Transit Solutions is constructing the Eglinton Cross-town LRT. Fairbank is working for shoring and Piling in the north side in Eglinton and West side of Dufferin. SB 1 lane occupied
DUFFERIN ST
From EGLINTON AVE W to LIVINGSTON RD
2017-10-04 00:01 2017-12-31 23:59 Continuous
Crosslinx Transit Solutions is constructing the Eglinton Cross-town LRT. Fairbank is working for shoring and Piling in the north side in Eglinton and West side of Dufferin. NB 1 lane occupied
EGLINTON AVE W
From DUFFERIN ST to NORTHCLIFFE BLVD
2017-10-04 00:01 2017-12-31 23:59 Continuous
Crosslinx Transit Solutions is constructing the Eglinton Cross-town LRT. Fairbank is working for shoring and Piling in the north side in Eglinton and West side of Dufferin. EB 1 lane occupied
EGLINTON AVE W
From DUFFERIN ST to SHORTT ST
2017-10-04 00:01 2017-12-31 23:59 Continuous
Crosslinx Transit Solutions is constructing the Eglinton Cross-town LRT. Fairbank is working for shoring and Piling in the north side in Eglinton and West side of Dufferin. WB 1 lane occupied
YARROW RD
From EGLINTON AVE W to AVON AVE
2017-10-05 09:00 2018-03-29 17:00 Continuous
Construction on sidewalks and curb lanes. EB and WB road closed
EGLINTON AVE W
From BLACK CREEK BLVD to WESTON RD
2017-10-05 07:00 2017-12-31 17:00 Daily
Sidewalk construction
BERTAL RD
At INDUSTRY ST
2017-07-24 07:00 2017-11-10 19:00 Daily
South Bound Curb Lane.Structural Watermain Rehabilitation - Contract No.17TW-OS-01CWD
KING ST W
From YORK ST to BAY ST
2017-10-01 09:00 2017-10-31 16:00 Daily
The eastbound curb lane will be occupied due to removal and replacement of ttc poles
KING ST W
From YORK ST to BAY ST
2017-10-01 20:00 2017-10-31 05:00 Daily
The eastbound curb lane will be occupied due to removal and replacement of ttc pole
YONGE ST @ DAVENPORT RD
2017-10-14 09:00 2017-10-28 19:00 Daily
Road resurfacing. NB and SB 2 lanes occupied, Local traffic only.
RUSHTON RD @ 24 RUSHTON RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. NB curb lane occupied
HARRISON ST @ 123 HARRISON ST
At LAKEVIEW AVE
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. EB curb lane occupied
DOVERCOURT RD @ 337 DOVERCOURT RD
At HARRISON ST
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. NB curb lane occupied
DOVERCOURT RD @ HEYDON PARK RD
At ST ANNES RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. NB curb lane occupied
CHURCHILL AVE
From DOVERCOURT RD to OSSINGTON AVE
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. EB curb lane occupied
DON AVON DR @ 214 DON AVON DR
At BRENTCLIFFE RD
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. EB curb lane occupied
BRENTCLIFFE RD
From DON AVON DR to KILLDEER CRES
2017-10-10 07:00 2017-10-31 19:00 Daily
Place conduit. NB curb lane occupied
HAMSTEAD AVE @ 52 HAMSTEAD AVE
From CHISHOLM AVE to MAIN ST
2017-10-10 09:00 2017-10-30 21:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
DANFORTH AVE @ MAIN ST
At DONCASTER AVE
2017-10-10 09:00 2017-10-30 21:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
DONCASTER AVE
From MAIN ST to DANFORTH AVE
2017-10-10 07:00 2017-10-30 19:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
BARRINGTON AVE
At LUMSDEN AVE
2017-10-10 07:00 2017-10-30 19:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
LUMSDEN AVE @ 371 LUMSDEN AVE
From MAIN ST to BARRINGTON AVE
2017-10-10 07:00 2017-10-30 19:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
MAIN ST @ 312 MAIN ST
At DANFORTH AVE
2017-10-10 09:00 2017-10-30 16:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
QUEEN ST W
From YORK ST to UNIVERSITY AVE
2017-10-16 09:00 2017-11-03 16:00 Daily
Eastbound and westbound lanes occupied due to road resurfacing.
DONCASTER AVE @ 71 DONCASTER AVE
From MAIN ST to DONCASTER AVE
2017-10-10 07:00 2017-10-30 19:00 Daily
INSTALLATION OF CONDUIT AND GLB. Odd and even sides NB occupied.
DANFORTH AVE
From RHODES AVE to COXWELL AVE
2017-10-16 09:00 2017-11-03 16:00 Daily
Two lanes will be occupied due to road resurfacing.
CHURCH ST @ DUNDAS ST E
2017-10-16 09:30 2017-11-03 15:30 Daily
Two lanes will be occupied due to road resurfacing.
GLOUCESTER ST
From CHURCH ST to YONGE ST
2017-10-16 07:00 2017-11-03 19:00 Daily
Full closure due to road resurfacing.
MAITLAND ST
From CHURCH ST to YONGE ST
2017-10-16 07:00 2017-11-03 19:00 Daily
Road resurfacing. All lane closed. Local traffic only.
LUMSDEN AVE
From OAK PARK AVE to CHISHOLM AVE
2017-10-16 09:00 2017-11-03 16:00 Daily
Road resurfacing. All lanes closed, local traffic only.
LAKE SHORE BLVD E
From OAK PARK AVE to CHISHOLM AVE
2017-10-16 07:00 2017-11-03 19:00 Weekends
Road resurfacing. All lanes closed, local traffic only.
SCOLLARD ST @ Yonge St
2017-10-14 09:00 2017-10-28 19:00 Daily
Eastbound and Westbound lanes occupied due to construction.
ABBEY LANE
From SHERBOURNE ST to PRINCESS ST
2017-10-10 07:00 2017-10-26 19:00 Daily
Eastbound curb lane occupied due to conduit placement.
LYTTON BLVD
From BATHURST ST to FOREST WOOD
2017-10-10 07:00 2017-12-31 19:00 Daily
Eastbound and westbound lanes occupied due to water main and water service replacement.
MELROSE AVE
From ELM RD to AVENUE RD
2017-10-11 08:00 2017-10-25 17:00 Daily
The curb lane will be occupied in each direction due to utility work.
MACAULAY AVE @ 8 MACAULAY AVE
From PERTH AVE to WALLACE AVE
2017-10-09 09:30 2017-10-23 16:30 Daily
Cable Excavation for Bell Canada. Both direction partial lane closure.
EGLINTON AVE W
From PEVERIL HILL N to BATHURST ST
2017-09-20 09:00 2018-01-31 17:00 Continuous
Eastbound lanes occupied due to drilling and piles installation.
TIAGO AVE @ 121
From GLENBURN AVE to VICTORIA PARK AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
GLENBURN AVE @ 29
From ST CLAIR AVE E to HOLLAND AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
FURNIVAL RD @ 104
From GLENBURN AVE to VICTORIA PARK AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
PEARD RD @ 16
From GLENBURN AVE to SQUIRES AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
SQUIRES AVE @ 67
From FURNIVAL RD to PEARD RD
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
ADAIR RD @ 1
From GLENBURN AVE to SQUIRES AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
BARRON RD
From YARDLEY AVE to TIAGO AVE
2017-10-10 09:00 2017-11-30 16:00 Daily
Northbound lane will be occupied each side at a time due to installation of new conduit and GLB.
KENNEDY RD
From LANDSEER RD to BERTRAND AVE
2017-10-11 09:00 2017-11-11 16:00 Daily
Northbound curb lane occupied due to construction of a conduit and hydro vault.
AVA RD
From ATLAS AVE to WINONA DR
2017-10-12 09:00 2017-10-31 15:00 Daily
Westbound lanes occupied due to dig pit and conduit repairs.
EGLINTON AVE E
From DUPLEX AVE to HOLLY ST
2017-05-30 07:00 2017-12-15 19:00 Daily
Southbound Lane of Eglinton Ave occupied due to construction.
ROSEDALE VALLEY RD
From MOUNT PLEASANT RD to BLOOR ST E
2017-10-10 09:00 2017-10-31 15:30 Daily
Westbound and Eastbound lanes occupied due to construction.
LAKE SHORE BLVD W @ LOWER SIMCOE ST
2017-10-13 09:30 2017-10-27 15:30 Daily
The westbound south lane will be closed due to Harbour St improvements, reconstruction and widening.
LAKE SHORE BLVD E
From RICHARDSON ST to LOWER SHERBOURNE ST
2017-10-14 07:00 2017-11-03 09:00 Weekends
2 westbound and eastbound will be closed due to road resurfacing.
DUFFERIN ST
From MELBOURNE AVE to KING ST W
2017-10-10 07:00 2017-10-25 19:00 Continuous
2 southbound lanes will be occupied due to road repairs.
QUEEN ST W @ MC CAUL ST
2017-10-16 00:01 2017-10-30 23:59 Continuous
TTC Track Allowance and Sidewalk Reconstruction. All directions closed.
DUNDAS SQ
From YONGE ST to VICTORIA ST
2017-10-11 07:00 2017-10-30 19:00 Daily
Trench and place conduit. East Bound Curb lane occupied.
YONGE ST
From SHUTER ST to QUEEN ST W
2017-10-15 09:30 2017-11-16 15:30 Daily
Eastbound curb lane occupied due to trench and conduit placement.
GOWAN AVE @ 274
At COSBURN AVE
2017-10-16 07:00 2017-10-30 19:00 Daily
The Northbound and Southbound curb lane(s) will be occupied due to pit digging and cable placement works. Work carried out by Distinct Technical Services Inc.
QUEENS QUAY E @ 261 QUEENS QUAY E
2017-10-17 08:00 2017-10-25 18:00 Daily
Eastbound curb lane (at driveway) occupied due to construction.
LAKE SHORE BLVD W
From DAN LECKIE WAY to SPADINA AVE
2017-10-15 08:00 2017-10-25 17:00 Daily
All directions alternatively occupied right and left lanes due to construction.
BANFF RD
From EGLINTON AVE E to ROEHAMPTON AVE
2017-10-12 07:00 2017-11-15 19:00 Daily
New conduit by directional drilling. West side occupied.
LAWRENCE AVE W
From GREER RD to DUPLEX AVE
2017-10-14 09:00 2017-10-28 16:00 Daily
Eastbound and westbound curb lanes occupied due to manhole access and cable placement.
LAWRENCE AVE W
From LORINDALE AVE to UNSWORTH AVE
2017-10-14 09:00 2017-10-28 16:00 Daily
Westbound curb lanes occupied due to manhole access and cable placement.
HELENDALE AVE
From YONGE ST to DUPLEX AVE
2017-10-16 09:00 2017-10-23 16:00 Daily
One westbound lane occupied due to man hole installation.
DOVERCOURT RD
From BLOOR ST W to NORTHUMBERLAND ST
2017-10-17 09:00 2017-10-25 16:00 Daily
Northbound curb lane occupied due to construction.
ST JOSEPH ST
From ST NICHOLAS ST to BAY ST
2017-10-16 09:00 2017-10-23 16:00 Daily
One Westbound lane occupied due to Vac truck use and Boring holes maintenance.
ALEXANDER ST
From YONGE ST to MAITLAND PL
2017-10-13 07:00 2017-10-31 19:00 Daily
Westbound lane occupied due to Site servicing maintaining Sewer and Water connections.
MAITLAND ST
From MAITLAND TER to YONGE ST
2017-10-13 07:00 2017-10-31 19:00 Daily
Eastbound lane occupied due to Site servicing maintaining Sewer and Water connections.
YONGE ST
From GROSVENOR ST to BREADALBANE ST
2017-10-16 09:00 2017-10-31 16:00 Daily
Northbound and Southbound curb lane occupied due to Site servicing maintaining Sewer and Water connections.
BREMNER BLVD
From GRAND TRUNK CRES to YORK ST
2017-10-18 07:00 2017-10-27 16:00 Daily
One lane will be occupied in each direction due to sewer and water work.
BROADWAY AVE
From RAWLINSON AVE to CORINTH GDNS
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
BROADWAY AVE
From CARDIFF RD to BANFF RD
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
CARDIFF RD @ BROADWAY AVE
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
RAWLINSON AVE
From FAIRFIELD AVE to BROADWAY AVE
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
FAIRFIELD AVE
From RAWLINSON AVE to CARDIFF RD
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
ROEHAMPTON AVE
From RAWLINSON AVE to CARDIFF RD
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
BANFF RD
From ROEHAMPTON AVE to BROADWAY AVE
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
EGLINTON AVE E
From RAWLINSON AVE to FALCON ST
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
EGLINTON AVE E
From CARDIFF RD to BANFF RD
2017-10-12 07:00 2017-12-07 19:00 Daily
New conduit by directional drilling. Lane 1 occupied
JAMESON AVE
From LAXTON AVE to LEOPOLD ST
2017-10-16 07:00 2017-10-31 17:00 Daily
The southbound curb lane will be occupied due to excavation.
ADELAIDE ST W
From JOHN ST to SIMCOE ST
2017-10-17 10:00 2017-11-13 15:00 Daily
1 eastbound lane will be occupied to remove overhead wires and poles.
TRINITY ST
From FRONT ST E to MILL ST
2017-10-16 07:00 2017-11-03 19:00 Daily
All lanes closed due to road resurfacing
AVENUE RD @ 21 to 25
From CUMBERLAND ST to YORKVILLE AVE
2017-10-18 09:30 2017-11-18 15:30 Daily
The northbound curb lane will be occupied due to drain and water servicing.
CUMBERLAND ST @ AVENUE RD
2017-10-18 07:00 2017-11-18 19:00 Daily
1 eastbound lane will be occupied due to drain and water servicing.
ROANOKE RD @ EAST of MARTHCLARE AVE
2017-10-19 07:00 2017-10-23 19:00 Daily
The eastbound lane will be occupied due to excavation.
CHURCH ST @ 411
2017-10-19 09:30 2017-10-23 15:30 Daily
The northbound curb lane will be occupied due to hydro servicing.
WOOD ST @ EAST of CHURCH ST
2017-10-19 09:30 2017-10-23 15:30 Daily
The eastbound curb lane will be occupied due to hydro servicing.
UNIVERSITY AVE @ 600
2017-10-19 09:30 2017-10-23 15:30 Daily
The southbound middle lane will be occupied due to excavation.
PARKSIDE DR @ 11
At GARDEN AVE
2017-10-21 19:00 2017-10-22 19:00 Daily
Northbound lanes occupied due to road repairs.
JOHN ST
From STEPHANIE ST to QUEEN ST W
2017-10-17 21:00 2017-11-30 05:00 Daily
Northbound and southbound lanes occupied due to sewer service, cleaning and repairs.
CHRISTIE ST
From ESSEX ST to FOLLIS AVE
2017-10-20 21:00 2017-11-30 05:00 Daily
Northbound and southbound lanes occupied due to sewer service, cleaning and repairs.
LESLIE ST @ 403-418
2017-10-20 21:00 2017-11-30 05:00 Daily
Northbound and southbound lanes occupied due to sewer service, cleaning and repairs.
FOLLIS AVE @ CLINTON ST
2017-10-18 07:00 2017-10-24 19:00 Weekdays
The north and south curb lanes will be occupied due to road work for Bell Smart City.
MANNING AVE @ FOLLIS AVE
2017-10-18 07:00 2017-10-24 19:00 Weekdays
The east curb lane will be occupied due to road work for Bell Smart City.
EASTERN AVE
From MOSLEY ST to EASTERN AVE DIVERSION
2017-04-24 07:00 2017-12-22 19:00 Continuous
The eastbound and westbound curb lanes will be occupied due to structural watermain rehabilitation.
MOSLEY ST
From EASTERN AVE to LESLIE ST
2017-04-24 07:00 2017-12-22 19:00 Continuous
The eastbound and westbound curb lanes will be occupied due to structural watermain rehabilitation.
SUNLIGHT PARK RD
From DON VALLEY PARKWAY to EASTERN AVE
2017-04-24 07:00 2017-12-22 19:00 Continuous
The eastbound and westbound curb lanes will be occupied due to structural watermain rehabilitation.
EDNA AVE @ 1
From DORVAL RD to DUNDAS ST W
2017-10-18 00:01 2017-11-15 23:59 Continuous
The eastbound lanes will be occupied due to rehabilitation of subway ventilation shaft and grating.
PARKSIDE DR @ 11 to 17
2017-10-21 19:00 2017-10-22 19:00 Continuous
The northbound lanes will be closed due to road work.
BAY ST
From INKERMAN ST to IRWIN AVE
2017-10-20 09:30 2017-10-27 15:30 Daily
The southbound curb lane will be occupied to clear blockages on bell infrastructure.
TECUMSETH ST
From NIAGARA ST to KING ST W
2017-10-19 07:00 2017-10-27 19:00 Daily
The northbound curb lane will be occupied to remove aerial cable.
BATHURST ST
From KING ST W to WELLINGTON ST W
2017-10-19 23:00 2017-10-27 06:00 Daily
The southbound curb lane will be occupied to place cables.
HIGH PARK BLVD @ SUNNYSIDE AVE
2017-10-19 07:00 2017-10-27 16:00 Daily
Westbound curb lane (parking lane)occupied due to construction.
BAY ST
From QUEEN ST W to DUNDAS ST W
2017-10-21 11:00 2017-10-22 20:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
HAGERMAN ST
From BAY ST to ELIZABETH ST
2017-10-21 11:00 2017-10-22 20:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
ELIZABETH ST
From HAGERMAN ST to DUNDAS ST W
2017-10-21 11:00 2017-10-22 20:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
JAMES ST
From QUEEN ST W to ALBERT ST
2017-10-21 11:00 2017-10-22 20:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
ALBERT ST
From JAMES ST to BAY ST
2017-10-21 11:00 2017-10-22 20:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
HIGH PARK BLVD
From RONCESVALLES AVE to SUNNYSIDE AVE
2017-10-19 07:00 2017-10-27 19:00 Daily
The westbound and eastbound curb lanes will be closed alternately to clear blockages on Bell infrastructure.
UNIVERSITY AVE
From GERRARD ST W to ORDE ST
2017-10-20 09:30 2017-10-24 15:30 Daily
Westbound and Eastbound lanes occupied due to construction.
UNWIN AVE
From CHERRY ST to LESLIE ST
2017-10-21 07:00 2017-11-15 17:00 Daily
Eastbound lane only occupied due to construction.
JACK COOPER LANE @ PETER ST
2017-10-19 09:30 2017-10-25 15:30 Daily
BORING ,TRENCHING , VAC TRUCK WORK. 1 WB LANE OCCUPIED.
YONGE ST
From SHUTER ST to DUNDAS SQ
2017-10-21 09:30 2017-11-03 15:00 Daily
The northbound and southbound centre lanes will be closed for trenching to place a conduit.
HWY 401 WB @ KEELE ST
2017-10-22 00:01 2017-10-23 05:00 Daily
Full closure of Highway 401 westbound collectors at Keele St is scheduled to occur from midnight on Sunday, Oct 22nd to 5:00 am on Monday, Oct 23rd, 2017. For real-time updated on these and other scheduled events in Central Region, please link to "Traffic Reports" via the 511 website (http://www.ontario.ca/511)
HWY 401 WB @ HWY 400 NB
2017-10-22 00:01 2017-10-23 05:00 Daily
Full closure of Highway 401 westbound collectors at Keele St is scheduled to occur from midnight on Sunday, Oct 22nd to 5:00 am on Monday, Oct 23rd, 2017. For real-time updated on these and other scheduled events in Central Region, please link to "Traffic Reports" via the 511 website (http://www.ontario.ca/511)

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
DUNDAS ST W
From WINDERMERE AVE to WILLARD AVE
2017-10-23 09:00 2017-10-27 04:00 Continuous
Westbound lane occupied due to construction.
BLOOR ST W
From RIVERSIDE DR to OLD MILL TRL
2017-10-23 09:00 2017-10-27 16:00 Daily
Westbound lane(s) will be occupied alternately due to conduit unblocking works on behalf of Bell Canada. Work to be carried out by TRJ Telecom.
CALLOWHILL DR
From PARKVIEW GDNS to CLENDENAN AVE
2017-10-23 09:00 2017-10-27 16:00 Daily
Westbound lane(s) will be occupied alternately due to conduit unblocking works on behalf of Bell Canada. Work to be carried out by TRJ Telecom.
DIXON RD
From MCARTHUR ST to MAPLEBRANCH PATH
2017-10-23 09:00 2017-10-27 16:00 Daily
One Westbound lane occupied due to unblocking of conduit for Bell Canada.
ENTERPRISE RD
From ENTERPRISE RD to RONSON DR
2017-10-23 09:00 2017-10-27 16:00 Continuous
Unblock conduit for Bell Canada. WB 1 lane occupied.
OLD MILL TRL
From OLD MILL RD to BLOOR ST W
2017-10-23 09:00 2017-10-27 16:00 Continuous
Unblock conduit for Bell Canada. WB 1 lane occupied.
BLOOR ST W
From RIVERSIDE DR to OLD MILL TRL
2017-10-23 09:00 2017-10-27 16:00 Continuous
Unblock conduit for Bell Canada. WB 1 lane occupied.
REXDALE BLVD
From ISLINGTON AVE to BERGAMOT AVE
2017-10-23 09:00 2017-10-27 16:00 Continuous
Unblock conduit for Bell Canada. WB /EB 1 lane occupied.
ENTERPRISE RD @ RONSON DR
2017-10-23 09:00 2017-10-27 16:00 Daily
Westbound lane occupied due to construction.
ISLINGTON AVE @ DIXON RD
2017-10-23 09:30 2017-10-24 16:00 Daily
The northbound and southbound curb lanes and westbound centre lane will be occupied due to groundwater monitoring and sampling. Closures will occur at separate times.
JANE ST
From GRANDRAVINE DR to EDDYSTONE AVE
2017-10-23 09:00 2017-10-27 16:00 Continuous
The southbound curb lane will be occupied to unblock conduit.
EGLINTON AVE W @ 1374 Eglinton ave W
2017-10-23 10:00 2017-10-27 15:00 Daily
One eastbound lane closed due to maintenance hole repairs
KIPLING AVE @ DIXON RD
2017-10-26 09:00 2017-10-26 16:00 Daily
Southbound lanes of Kipling Ave and Eastbound and Westbound lanes of Dixon Rd occupied due to construction.
BLOOR ST W @ 2474
From RIVERVIEW GDNS to MOSSOM RD
2017-10-22 08:00 2017-10-22 16:00 Daily
The westbound curb lane will be occupied due to crane hoisting.
DIXON RD
From ISLINGTON AVE to ROYAL YORK RD
2017-10-23 09:00 2017-10-27 16:00 Daily
2 eastbound lanes will be occupied to install conduit.
GWYNNE AVE
From KING ST W to MELBOURNE AVE
2017-10-23 08:00 2017-10-27 18:00 Daily
One northbound lane occupied due to existing duct repair.
FONDY CRT @ 19 Fondy Crt
2017-10-23 07:00 2017-10-27 18:30 Daily
Northbound lane occupied due to cleaning of sewer pipe.
FONDY CRT @ 16 FONDY CRT TO 19 FONDY CRT
2017-10-23 07:00 2017-10-27 18:30 Daily
Northbound shoulder occupied due to cleaning of sewer pipe.
ROYAL YORK RD
From THE QUEENSWAY to TENBY ST
2017-10-23 09:00 2017-11-27 16:00 Daily
Northbound curb lane occupied due to construction.
FONDY CRT @ 12 NEEDHAM DR
2017-10-23 07:00 2017-10-27 18:30 Daily
Northbound shoulder occupied due to cleaning of sewer pipe.
FONDY CRT @ 2 FONDY CRT
2017-10-23 07:00 2017-10-27 18:30 Daily
Northbound shoulder occupied due to cleaning of sewer pipe.
BELFIELD RD
From MCCULLOCH AVE to MARTIN GROVE RD
2017-10-23 09:00 2017-11-03 16:00 Daily
Eastbound and westbound curb lanes occupied due to construction.
BATHURST ST
From ST CLAIR AVE E to MELGUND RD
2017-10-23 09:30 2017-10-30 15:30 Daily
Northbound curb lane occupied for clearing blockage.
ISLINGTON AVE @ NORTH of BLOOR ST W
2017-10-22 09:00 2017-10-27 16:00 Daily
The northbound left lane will be closed to remove and replace existing overhead high voltage transmission lines.
GLENDONWYNNE RD @ NORTH of MARGDON RD
2017-10-25 07:00 2017-10-28 19:00 Daily
The northbound right lane will be closed for excavation to repair existing conduit.
FINCH AVE W @ SIGNET DR
2017-10-23 19:00 2017-12-04 05:00 Daily
The westbound and eastbound left lanes will be closed to install a gas main. Weekend hours will be from 7AM to 11PM.
TESTON BLVD @ OUTLOOK AVE
2017-10-25 07:00 2017-11-02 19:00 Daily
The southbound right lane will be closed for excavation to repair an existing conduit.
HAVENRIDGE DR @ DIXON RD
2017-10-23 07:00 2017-11-10 19:00 Daily
The northbound right lane will be closed to place a conduit.
JAMES ST
From FORTIETH ST to FORTY FIRST ST
2017-10-23 07:00 2017-10-28 07:00 Daily
Westbound curb lane occupied due to construction.
SUMMITCREST DR @ 18 Summitcrest Dr
At KINGSGATE CRES
2017-10-23 07:00 2017-11-18 19:00 Daily
Westbound curb lane occupied due to placement of a conduit
SELLMAR RD @ 50 Sellmar Rd
At SUMMITCREST DR
2017-10-23 07:00 2017-11-18 19:00 Daily
Southbound curb lane occupied due to placement of a new conduit.
RUSSELL RD
From MANORHAMPTON DR to LA ROSE AVE
2017-10-23 07:00 2017-11-18 19:00 Daily
Southbound curb lane occupied due to placement of a new conduit.
BURNHAMILL PL @ 51 Burnhamill PL
From CUSTEAD CRT to MILL RD
2017-10-24 08:00 2017-11-07 17:00 Daily
Partial lane closure for cable excavation
SCARLETT RD
From SAXONY CRES to CHAPMAN RD
2017-10-23 09:00 2017-10-25 16:00 Daily
Northbound lane occupied due to culvert restoration and concrete works.
MARTIN GROVE RD
From RATHBURN RD to BURNHAMTHORPE RD
2017-10-25 09:00 2017-10-27 16:00 Daily
Northbound and southbound lanes occupied due to hot asphalt placement.
LOCKPORT AVE @ 25 LOCKPORT AVE
2017-10-23 19:00 2017-10-27 07:00 Daily
Eastbound lane occupied due to rehabilitation of existing maintenance hole.
KIPLING AVE
From BELFIELD RD to BETHRIDGE RD
2017-10-23 09:00 2017-10-27 16:00 Daily
Southbound and Northbound curb lanes are occupied alternately due to bridge repair.
MARTIN GROVE RD
From DIXON RD to LAVINGTON DR
2017-10-23 09:00 2017-10-27 16:00 Daily
Southbound and Northbound lanes occupied alternately due to bridge repairs.
ISLINGTON AVE
From DIXON RD to KINGSVIEW BLVD
2017-10-23 09:00 2017-10-27 16:00 Daily
Southbound curblanes occupied due to excavation of blockage pit.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
JANE ST
From BEVERLY HILLS DR to WILSON AVE
2017-11-24 09:00 2017-11-24 16:00 Daily
Two southbound lanes occupied due to monitoring and sampling water wells.
PEWTER RD @ JOHNSTON AVE
2017-10-23 09:00 2017-11-03 16:00 Daily
The northbound and southbound curb lanes will be occupied due to conduit installation.
LAWRENCE AVE E @ CARNFORTH RD
2017-10-25 09:00 2017-10-30 16:00 Daily
Westbound curb lane closed due to excavation to repair existing conduit on behalf of Bell Canada for Smart City project.
CASSANDRA BLVD @ 143 CASSANDRA BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
LYTTON BLVD @ 246 LYTTON BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
DAWLISH AVE @ 250 DAWLISH AVE
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
BAYVIEW AVE @ 2636-2638 Bayview Ave
From BAYTREE CRES to FIFE RD
2017-11-01 09:00 2017-11-11 21:00 Daily
Water and Sewer Service. (2 x South Bound Lanes) SAT (2 x South and 2 x North) on Baytree Ave East and West bound lane occupied.
CASTLEGROVE BLVD @ ROYAL DOULTON DR
2017-10-23 07:00 2017-10-27 19:00 Daily
Excavation to repair existing conduit on behalf of Bell Canada. NB and SB curb lane occupied alternating.
FINCH AVE W @ TALBOT RD
2017-10-23 09:00 2017-10-27 16:00 Daily
Excavation to place new conduit on behalf of Bell Canada. EB and WB curb lane occupied alternating.
RONAN AVE
From WANLESS AVE to ROSLIN AVE
2017-10-23 07:00 2017-10-27 19:00 Daily
The northbound and southbound curb lanes will be alternately occupied due to excavation.
BAYVIEW AVE @ 3351
From ARGONNE CRES to CUMMER AVE
2017-10-23 10:00 2017-10-24 15:00 Daily
The southbound and northbound curb lane will be occupied to monitor road wells.
SHEPPARD AVE W
From KEELE ST to SENTINEL RD
2017-10-23 09:00 2017-10-27 16:00 Daily
1 westbound lane will be partially closed to install cables.
BAYVIEW AVE
From ROEHAMPTON AVE to BROADWAY AVE
2017-10-24 09:30 2017-10-31 15:30 Daily
Northbound curb lane occupied due to asphalt repairs
BAYVIEW AVE
From ROEHAMPTON AVE to BROADWAY AVE
2017-10-24 09:30 2017-10-31 15:30 Daily
Southbound curb lane occupied due to asphalt repairs
WYNFORD DR
From GERVAIS DR to GARAMOND CRT
2017-10-23 09:00 2017-11-01 16:00 Daily
Westbound curb lane occupied due to accessing manholes
VICTORIA PARK AVE
From LYNVALLEY CRES to CLINTWOOD GT
2017-10-23 09:00 2017-11-01 15:00 Daily
Northbound curb lane occupied due to accessing manholes
ERSKINE AVE
From YONGE ST to REDPATH AVE
2017-10-23 09:00 2017-11-01 15:30 Daily
Eastbound Curb lane occupied due to construction.
WESTON RD
From MAINSHEP RD to SHEPPARD AVE W
2017-10-24 07:00 2017-10-25 17:00 Daily
Install a new 1650mm storm outfall to the Humber river includes Relocation of Existing Sanitary Sewers and Storm Relocation/Upgrades by Open Cut method and Micro-tunneling. Utility Investigation are necessary before the actual shaft excavation. NB curb lane occupied.
WIGMORE DR @ 18 WIGMORE DR
From BELPER CRT to DRAYCOTT DR
2017-10-23 07:00 2017-10-28 19:00 Daily
Water and Sewer Service. NB and SB lane occupied.
GLENALLAN RD @ 44 GLENALLAN RD
From DANESWOOD RD to MILDENHALL RD
2017-10-24 07:00 2017-10-25 19:00 Daily
Water and Sewer Service. NB and SB lane occupied.
DUNFIELD AVE
From EGLINTON AVE E to SOUDAN AVE
2017-10-23 07:00 2017-11-24 19:00 Daily
Northbound narrowed lane (one way street) occupied due to construction.
SCARSDALE RD @ 30 to 41
2017-10-25 09:00 2017-10-31 15:00 Daily
The southbound curb lane will be closed to install a new conduit and coax cables.
LORINDALE AVE @ LAWRENCE AVE W
2017-10-23 07:00 2017-11-10 19:00 Daily
The southbound right lane will be closed to place conduit.
EGLINTON AVE E @ 790
2017-10-23 09:00 2017-10-24 15:00 Daily
2 westbound centre lanes will be closed for sanitary sewer repairs. 1 lane eastbound and westbound will be opened.
ELWOOD BLVD @ EAST of AVENUE RD
2017-10-23 09:00 2017-10-27 16:00 Daily
The eastbound and westbound right lanes will be closed for excavation to repair existing conduit.
PATRICIA AVE
From CACTUS AVE to HILDA AVE
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
CONNAUGHT AVE
From CHELMSFORD AVE to CACTUS AVE
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
CONNAUGHT AVE
From CACTUS AVE to MANADON DR
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
CAINES AVE
From CACTUS AVE to SHETLAND ST
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
SHETLAND ST
From CONNAUGHT AVE to NORWIN ST
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
AVONHILL CRT @ CAINES AVE
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
NORWIN ST @ DREWRY AVE
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
DREWRY AVE
From BURKE ST to NORWIN ST
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
BURKE ST
From DREWRY AVE to NEWTONBROOK BLVD
2017-10-30 07:30 2018-04-30 15:30 Daily
All lanes occupied due to pole replacement and new overhead lines installation.
PEMBER DR @ 11 Pember Dr
From DORSEY CRT to RUSTIC RD
2017-10-25 08:00 2017-11-18 16:00 Daily
Partial lane closure for Cable Excavation for both directions
GILTSPUR DR
From CALICO DR to BUCKLAND RD
2017-10-23 08:00 2017-11-16 17:00 Daily
Eastbound and westbound lanes occupied due to cable excavations for Bell Canada.
HOLLYWOOD AVE @ 18-28
2017-10-23 07:00 2017-11-03 19:00 Daily
Eastbound and westbound lanes occupied due to nee fibre cable installation.
YONGE ST
From BISHOP AVE to STEELES AVE E
2017-10-23 07:00 2017-10-31 07:00 Continuous
Northbound curb lane occupied due to maintenance work.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
STAINES RD @ HOPTREE AVE
2017-10-30 08:00 2017-10-30 16:00 Daily
Westbound lane occupied due to construction.
STAINES RD @ HOPTREE AVE
2017-10-30 08:00 2017-10-30 16:00 Daily
Westbound lane occupied due to construction.
PROGRESS AVE
From GRANGEWAY AVE to BELLAMY RD N
2017-11-16 09:00 2017-11-16 16:00 Daily
Eastbound lane occupied due to construction.
PROGRESS AVE
From GRANGEWAY AVE to BELLAMY RD N
2017-10-30 09:00 2017-10-30 16:00 Continuous
Eastbound lanes occupied for maintenance holes inspection flow monitoring, and calibration.
VICTORIA PARK AVE
From BIGGIN CRT to JONESVILLE CRES
2017-10-23 09:00 2017-12-31 16:00 Daily
Multi-Use Trail in the Gatineau Hydro Corridor. SB 1 Curb lane occupied.
KINGSTON RD
From WHITE AVE to HEARTH PL
2017-10-23 00:01 2017-11-10 23:59 Continuous
The road will be closed due to installation of site servicing for new construction. Detour route will be in effect.
KINGSTON RD
From QUEENSBURY AVE to WOODLAND PARK RD
2017-10-24 09:00 2017-10-24 11:00 Daily
Westbound curb lane occupied due to lifting 2 couches from the ground to 6th floor condo balcony.
ARTILLERY ST
From MIDLAND AVE to PORT ROYAL TRL
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
BECCA HALL TRL @ PORT ROYAL TRL
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
BELLROCK DR @ PORT ROYAL TRL
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
BRAMBLEBROOK AVE
From CAPTAIN HALL CRT to PORT ROYAL TRL
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
CAPTAIN HALL CRT @ BRAMBLEBROOK AVE
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
PORT ROYAL TRL
From RADWELL CRES to BRAMBLEBROOK AVE
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
RADWELL CRES @ PORT ROYAL TRL
2017-10-25 07:00 2017-12-22 19:00 Daily
Bell Smart City. Right Lane - Shoulder occupied
CAVEHILL CRES @ 44
2017-10-23 08:00 2017-10-27 19:00 Daily
1 westbound lane will be occupied due to excavation.
PARSBOROUGH CRT @ TIDESWELL BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
BLACKWATER CRES @ 5 BLACKWATER CRES
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
FAWNDALE CRES @ HUNTSMILL BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
SANDY HAVEN DR @ 9 SANDY HAVEN DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
APPLEMORE RD @ 9 APPLEMORE RD
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
PINEDALE RD @ 12 PINEDALE RD
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
JANELLAN TER @ 14 JANELLAN TER
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
ORLEANS DR @ MUIRBANK BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
DEERBROOK TRL @ 29 DEERBROOK TRL
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
FLERIMAC RD @ 30 FLERIMAC RD
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
WISHFORD DR @ 30 WISHFORD DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
DAVISBROOK BLVD @ 32 DAVISBROOK BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
BRADSTONE SQ @ 33 BRADSTONE SQ
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
HAGLEY RD @ 9 HAGLEY RD
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
WINTER GARDENS TRL @ 33 WINTER GARDENS TRL
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
CEDAR DR @ 34 CEDAR DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The southbound lane will be occupied due to excavation pit.
GATESVIEW AVE @ 38 GATESVIEW AVE
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
CHARLES TUPPER DR @ 44 CHARLES TUPPER DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
SPRINGHOUSE SQ @ 46 SPRINGHOUSE SQ
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
GLENCOYNE CRES @ 58 GLENCOYNE CRES
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
WITHYCOMBE CRES @ 61 WITHYCOMBE CRES
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
SANDY HAVEN DR @ 70 SANDY HAVEN DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
SANDY HAVEN DR @ 103 SANDY HAVEN DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
LINDERWOOD DR @ YULEWOOD GT
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
DUNDALK DR @ 69 DUNDALK DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
DUNELM ST @ 75 DENELM ST
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
ROXANNE CRES @ 87 ROXANNE CRES
2017-10-23 08:00 2017-10-27 19:00 Daily
The westbound lane will be occupied due to excavation pit.
SANDYHOOK SQ @ 145 SANDYHOOK SQ
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
BRAYMORE BLVD @ 227 BRAYMORE BLVD
2017-10-23 08:00 2017-10-27 19:00 Daily
The eastbound lane will be occupied due to excavation pit.
ROUGE HIGHLANDS DR @ 289 ROUGE HIGHLANDS DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
ROUGE HIGHLANDS DR @ 419 ROUGE HIGHLANDS DR
2017-10-23 08:00 2017-10-27 19:00 Daily
The northbound lane will be occupied due to excavation pit.
WARDEN AVE @ 1104 WARDEN AVE
2017-10-23 09:00 2017-10-27 16:00 Daily
One southbound lane will be occupied due to excavation pit.
ELLESMERE RD @ 4045 ELLESMERE RD
2017-10-23 09:00 2017-10-27 16:00 Daily
One westbound lane will be occupied due to excavation pit.
KINGSTON RD @ GALLOWAY RD
2017-10-23 09:00 2017-10-27 16:00 Daily
One eastbound lane will be occupied due to excavation pit.
ELLESMERE RD
From MCCOWAN RD to BRIMLEY RD
2017-10-23 09:00 2017-10-27 13:00 Daily
The westbound and eastbound left lane will be occupied to prepare centre median gardens.
PHARMACY AVE
From LINDAL AVE to BOLSTER AVE
2017-10-30 10:00 2017-10-30 15:00 Daily
The southbound curb lane will be closed to work on overhead cables.
ST CLAIR AVE E
From ARDEN CRES to VICTORIA PARK AVE
2017-10-31 10:00 2017-10-31 15:00 Daily
The westbound curb lane will be closed to work on overhead cables.
MIDLAND AVE @ LOCKIE AVE
2017-10-24 09:00 2017-10-24 16:00 Daily
Westbound right curb lane of Lockie Ave @SW corner of Midland and Lockie occupied due to construction.
BIRCHMOUNT RD @ LAURA SECORD WALK
2017-10-25 09:00 2017-10-25 16:00 Daily
The southbound right lane will be closed to repair a broken valve.
COMMANDER BLVD
From NORTH WIND PL to HUNTINGWOOD DR
2017-10-23 09:00 2017-10-27 16:00 Daily
The northbound right lane will be closed for excavation of blockage pits.
WARDEN AVE
From ST CLAIR AVE E to BELL ESTATE RD
2017-10-23 09:00 2017-10-27 16:00 Daily
The southbound right lane will be closed for excavation of blockage pits.
BELLAMY RD N
From CEDAR BRAE BLVD to GRACE ST
2017-10-23 09:00 2017-10-23 16:00 Daily
One lane will be closed alternately in both directions at various locations along Bellamy Rd N for core hole drilling.
FAIRFAX CRES @ MONASTERY LANE
2017-10-23 09:00 2017-10-30 16:00 Daily
Westbound lanes occupied due to hydro installation.
OXHORN RD @ 1
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
MABERLEY CRES @ 3
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
LAWRENCE AVE E @ 6400
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
WHEELING DR @ 1
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
OLD KINGSTON RD @ WEST HILL DR
2017-10-23 07:00 2017-10-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
BRADWORTHY CRT @ 4
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
BUSHWOOD CRT @ 4
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
CAMBERLEY CRT @ BRADWORTHY CRT
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
DUNTHORNE CRT @ HENBURY PL
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
FOREGATE AVE
From BRENYON WAY to SCOTNEY GRV
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
HIGGINS PL @ JOHN TABOR TRL
From BRENYON WAY to SCOTNEY GRV
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
JOHN TABOR TRL
From WARWICK CASTLE CRT to DUFFORT CRT
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
SCOTNEY GRV @ 2
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
WISHFORD DR @ JOHN TABOR TRL
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
SCOTNEY GRV @ 2
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
JACOB FISHER DR
From PENNYHILL DR to TROUTBECK AVE
2017-10-23 07:00 2017-12-05 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
HUPFIELD TRL
From LADY BOWER CRES to SEWELLS RD
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
TROUTBECK AVE @ PENNYHILL DR
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
ROVINELLI RD
From PENNYHILL DR to HUPFIELD TRL
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
PENNYHILL DR
From JACOB FISHER DR to HUPFIELD TRL
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
MIDDLEPORT CRES
From ROVINELLI RD to PENNYHILL DR
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
OVERLORD CRES @ HUPFIELD TRL
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
COURTLANDS DR
From HUPFIELD TRL to HALFWAY AVE
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
HALFWAY AVE
From HUPFIELD TRL to MORNINGSIDE AVE
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
CARISBROOKE SQ @ HALFWAY AVE
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
FEENEY AVE @ COURTLANDS DR
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
BRENYON WAY @ JOHN TABOR TRL
2017-10-23 07:00 2017-11-30 19:00 Daily
Northbound lanes occupied due to conduit and GLB installation.
BRIMLEY RD @ 2098 BRIMLEY RD
2017-10-23 09:00 2017-10-23 16:00 Daily
Right curb lane blocked due to leak investigation.
VICTORIA PARK AVE
From VICTORIA PARK AVE to FURNIVAL RD
2017-10-23 09:00 2017-10-30 16:00 Daily
Northbound lanes occupied due to installation of conduit and GLB.
FURNIVAL RD
From GLENBURN AVE to VICTORIA PARK AVE
2017-10-23 07:00 2017-10-30 19:00 Daily
Northbound lanes occupied due to installation of conduit and GLB.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
CHURCH ST
From GOULD ST to GERRARD ST E
2017-10-27 09:30 2017-11-17 15:30 Daily
Northbound and southbound curb lane occupied due to gas main installation.
GOULD ST
From BOND ST to DALHOUSIE ST
2017-10-27 07:00 2017-11-17 19:00 Daily
Northbound and southbound curb lane occupied due to gas main installation.
OSTEND AVE
From WILLARD AVE to WINDERMERE AVE
2017-10-27 07:00 2017-10-28 19:00 Daily
Eastbound and westbound lanes occupied due to trenchless rehabilitation of existing gravity sewers.
COSBURN AVE
From GLEBEMOUNT AVE to WOODMOUNT AVE
2017-10-23 09:00 2017-11-03 16:00 Daily
Two lanes will be occupied due to road resurfacing.
COSBURN AVE @ EAST OF CEDARVALE AVE
2017-10-23 09:00 2017-11-03 16:00 Daily
All lanes will be closed due to road resurfacing.
MARKHAM ST
From FOLLIS AVE to BARTON AVE
2017-10-27 17:00 2017-10-27 20:00 Daily
Street play Halloween Finale. Road closure.
FOLLIS AVE
From PALMERSTON AVE to MANNING AVE
2017-10-27 17:00 2017-10-27 20:00 Daily
Street play Halloween Finale. Road closure.
CLINTON ST
From BARTON AVE to BLOOR ST W
2017-10-31 16:00 2017-10-31 20:00 Continuous
Street Play Halloween Finale. Full road closure.
MOUNT PLEASANT RD @ SOUTH of ERSKINE AVE
2017-10-23 09:00 2017-10-25 15:00 Daily
The southbound curb lane will be occupied due to excavation.
BATHURST ST
From SANDRINGHAM DR to TIMBERLANE DR
2017-10-26 10:00 2017-10-26 15:00 Daily
The northbound curb lane will be occupied due to overhead cable work.
CHURCH ST @ 100 CHURCH ST
From ADELAIDE ST E to LOMBARD ST
2017-10-23 09:30 2017-10-27 19:00 Daily
Southbound curb lane occupied due to construction for placement of conduit
QUEEN ST E
From VICTORIA ST to JARVIS ST
2017-10-23 09:00 2017-10-27 16:00 Daily
The eastbound and westbound curb lanes will be occupied to place new conduit and fibre optic cable.
ST NICHOLAS ST
From PHIPPS ST to WELLESLEY ST W
2017-10-23 07:00 2017-11-06 19:00 Daily
The southbound curb lane will be occupied to place cables.
BATHURST ST
From BRUYERES MEWS to GARDINER EXPY
2017-10-23 09:00 2017-10-27 16:00 Daily
1 northbound lane will be occupied due to excavation.
YORK AVE
From QUEENS QUAY W to LAKE SHORE BLVD
2017-10-23 10:00 2017-10-25 14:00 Daily
Southbound curb lane occupied from 300m north of Queens Quay to 200m South of Lakeshore Blvd .E. due to construction, to remove road plate and install thermal tag identifier.
DUNDAS ST E @ 1201 Dundas St E
From CARLAW AVE to BOSTON AVE
2017-10-23 09:00 2017-10-30 16:00 Continuous
Eastbound and Westbound curb lane occupied due to placement of new conduit and fiber optic cable.
DALHOUSIE ST @ SHUTER ST
2017-10-23 09:00 2017-10-30 16:00 Daily
Southbound curb lane (parking lane) occupied due to construction.
STADIUM RD @ LITTLE NORWAY CRES
2017-10-28 06:00 2017-10-28 20:00 Daily
The road will be closed in connection with taking members boats out of the water.
QUEEN ST W
From BAY ST to YONGE ST
2017-11-06 10:00 2017-11-11 15:00 Daily
The eastbound curb lane will be occupied to trench and place conduit.
BAY ST
From LAKE SHORE BLVD W to QUEEN ST W
2017-10-22 04:00 2017-10-22 16:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
QUEEN ST W
From UNIVERSITY AVE to YONGE ST
2017-10-22 04:00 2017-10-22 16:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
UNIVERSITY AVE
From KING ST W to DUNDAS ST W
2017-10-22 04:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
ARMOURY ST
From CHESTNUT ST to CENTRE AVE
2017-10-22 04:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
LAKE SHORE BLVD W
From WINDERMERE AVE to BATHURST ST
2017-10-22 05:00 2017-10-22 13:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information. The eastbound curb lane will be opened from Windermere Ave to Oarsman Dr to allow access to Boulevard Club.
LAKE SHORE BLVD E
From BATHURST ST to DON ROADWAY
2017-10-22 06:00 2017-10-22 13:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
BAY ST
From LAKE SHORE BLVD W to QUEENS QUAY W
2017-10-22 06:00 2017-10-22 13:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
FRONT ST E
From CHURCH ST to LOWER JARVIS ST
2017-10-22 06:00 2017-10-22 15:30 Continuous
The eastbound lanes will be fully closed for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
WELLINGTON ST E
From CHURCH ST to BAY ST
2017-10-22 06:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
CHURCH ST
From THE ESPLANADE to FRONT ST E
2017-10-22 06:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
QUEEN ST W
From SIMCOE ST to YONGE ST
2017-10-22 06:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
RICHMOND ST W
From SIMCOE ST to YONGE ST
2017-10-22 06:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
ADELAIDE ST W
From SIMCOE ST to YONGE ST
2017-10-22 06:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
QUEENS QUAY E
From BAY ST to PARLIAMENT ST
2017-10-22 07:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
CHERRY ST
From LAKE SHORE BLVD E to MILL ST
2017-10-22 07:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
MILL ST
From CHERRY ST to BAYVIEW AVE
2017-10-22 07:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
BAYVIEW AVE
From MILL ST to RIVER ST
2017-10-22 07:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
UNIVERSITY AVE
From BLOOR ST W to DUNDAS ST W
2017-10-22 08:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
BLOOR ST W
From AVENUE RD to BATHURST ST
2017-10-22 08:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
BATHURST ST
From BLOOR ST W to LAKE SHORE BLVD W
2017-10-22 08:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
FORT YORK BLVD
From BATHURST ST to LAKE SHORE BLVD W
2017-10-22 08:00 2017-10-22 11:00 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
LAKE SHORE BLVD E
From CARLAW AVE to WOODBINE AVE
2017-10-22 08:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
EASTERN AVE
From CARLAW AVE to JARVIS ST
2017-10-22 08:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
QUEEN ST E
From WOODBINE AVE to BALSAM AVE
2017-10-22 08:00 2017-10-22 15:30 Continuous
The road will be fully closed in both directions for the Scotiabank Toronto Waterfront Marathon, Half-Marathon and 5K Race. Visit http://www.torontowaterfrontmarathon.com/the-weekend/road-closures/ for more information.
DIVADALE DR @ 21 DIVADALE DR
From HANNA AVE to WINSLOE AVE
2017-10-27 07:00 2017-10-28 19:00 Daily
Water and Sewer Service. NB and SB lane occupied.
CLAXTON BLVD
2017-10-23 09:00 2017-10-27 16:00 Daily
Southbound curb lane of Claxton Blvd occupied due to construction.
KEEWATIN AVE @ 66-68 KEEWATIN AVE
From YONGE ST to MOUNT PLEASANT RD
2017-10-25 07:00 2017-10-26 19:00 Daily
Water and Sewer Service. EB and WB lane occupied.
TRUMAN RD @ 70 TRUMAN RD
From GERALD ST to NORTHDALE BLVD
2017-10-23 07:00 2017-10-24 19:00 Daily
Water and Sewer Service. EB and WB lane occupied.
SOUDAN AVE
From DUNFIELD AVE to LILLIAN ST
2017-10-23 07:00 2017-11-24 19:00 Daily
Westbound lane occupied due to construction.
QUEEN ST E
From BALSAM AVE to NURSEWOOD RD
2017-10-23 08:00 2017-10-26 16:00 Daily
Installing new conductors. 1 WB curb lane occupied.
LILLIAN ST
From EGLINTON AVE E to SOUDAN AVE
2017-10-23 07:00 2017-11-24 19:00 Daily
Southbound lane occupied due to construction.
DUNDAS SQ
From YONGE ST to VICTORIA ST
2017-10-31 07:00 2017-11-18 19:00 Daily
The eastbound curb lane will be closed for trenching to place a conduit.
ADELAIDE ST E
From BERKELEY ST to PARLIAMENT ST
2017-10-24 07:00 2017-11-03 16:00 Daily
The eastbound right lane will be closed for construction.
PARLIAMENT ST
From RICHMOND ST E to ADELAIDE ST E
2017-10-24 09:00 2017-11-03 16:00 Daily
The southbound right lane will be closed for construction.
JARVIS ST
From DUNDAS ST E to GERRARD ST E
2017-10-23 09:00 2017-10-28 16:00 Daily
North and southbound curb lanes occupied due to placement of conduit and cables.
MORTIMER AVE
From DONLANDS AVE to MARLOW AVE
2017-10-23 09:00 2017-11-05 16:00 Daily
Eastbound curb lane occupied due to construction for clearing blockage.
DINGWALL AVE @ 2 DINGWALL AVE
From PAPE AVE to DINGWALL AVE
2017-10-23 07:00 2017-11-01 19:00 Daily
Westbound curb lane occupied due to conduit placement
EASTERN AVE @ 18
2017-10-23 18:31 2017-10-23 21:31 Daily
Westbound curb lane occupied due to crew onsite disconnecting the gas service.
SPADINA AVE
From BREMNER BLVD to BLUE JAYS WAY
2017-10-23 06:00 2017-10-25 23:59 Daily
Northbound and southbound lanes occupied due to accessing manholes and catch basins.
CRESCENT RD
From CLUNY DR to WRENTHAM PL
2017-10-23 09:00 2017-10-25 15:00 Daily
Eastbound and westbound lanes occupied due to bore holes and core holes within the road allowance.
GLENCAIRN AVE
From BATHURST ST to ALEXANDRA WOOD
2017-10-23 09:00 2017-10-25 15:00 Daily
Eastbound and westbound lanes occupied due to bore holes and core holes within the road allowance.
MANNING AVE
From ROBINSON ST to QUEEN ST W
2017-10-23 08:00 2017-10-24 16:30 Daily
Full closure of southbound lanes due to asphalt coring and staking boreholes.
HASTINGS AVE @ 37 Hastings Ave
2017-10-23 19:00 2017-10-27 07:00 Daily
NB lanes will be occupied due to construction.
DUNDAS ST W @ 2819 DUNDAS
2017-10-23 19:00 2017-10-27 07:00 Daily
1 Eastbound and 1 Westbound lane occupied due to rehabilitation of existing maintenance holes.
BROCK AVE @ MIDDLETON ST
2017-10-23 19:00 2017-10-27 07:00 Daily
Northbound occupied due to rehabilitation of existing maintenance holes.
LAKE SHORE BLVD W
From SPADINA AVE to DAN LECKIE WAY
2017-10-24 09:00 2017-11-06 15:30 Daily
1 Westbound lane will be occupied due to construction.
YONGE ST
From CHURCH ST to FRICHOT AVE
2017-10-23 07:00 2017-10-25 15:00 Daily
Northbound curb lane occupied due to construction.
RICHMOND ST W
From NIAGARA ST to BATHURST ST
2017-10-23 08:00 2017-10-24 16:30 Daily
Alternating lanes occupied due to asphalt corind and staking boreholes.
ST MATHIAS PL @ 5 ST MATHIAS PL
At ROBINSON ST
2017-10-23 08:00 2017-10-24 16:30 Daily
Alternating lanes occupied due to asphlat coring and staking boreholes.
DUPLEX AVE
From DUPLEX CRES to CHAPLIN CRES
2017-10-23 09:00 2017-10-27 16:00 Daily
Southbound curb lane occupied for placing new conduit and fibre optic cable.
CANNIFF ST @ 21 CANNIFF ST
From STAFFORD ST to STRACHAN AVE
2017-10-28 07:00 2017-10-28 19:00 Daily
Westbound curb lane occupied for hoisting.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Location Start Date End Date When
MARKHAM AVE @ BRIMORTON DR
2017-10-22 00:30 2017-10-22 03:30 '
All southbound lanes closed due to police investigation.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

Get a first car or motorcycle licence, renew an old one, book a road test, register your vehicle, and more.

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Information from the Ministry of Transportation about impaired driving, seat belts, child safety seats, school buses, emergency vehicles and more.

Information about the open access toll highway, which extends 129 kilometres east-west, just north of Toronto.


More Commuter Coverage on CP24

Watch CP24's auto show every Sunday at 8:00 p.m. to learn about your vehicle, the car industry, and much more.

News, updates and important information about transit systems for Toronto & the GTA.

News, updates, wait times and traveller information about Ontario border crossings.

News, updates, important links, traveller information and Billy Bishop arrival and departure times.