Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com.

Traffic Map and Cameras for Toronto, GTA, and surrounding areas.

What's on this page?

Traffic Road Conditions

Route Current Ideal Delay
404 SB
Stouffville Rd to Gardiner
46 MIN 21 MIN 25 MIN
404 NB
Gardiner to Stouffville Rd.
43 MIN 21 MIN 22 MIN
410 NB
Hwy. 401 to Steels Ave.
22 MIN 3 MIN 19 MIN
401 EB
Express. Hwy. 410 to Hwy. 404
34 MIN 17 MIN 17 MIN
DVP NB
Gardiner to 401
23 MIN 9 MIN 14 MIN
Gardiner EB
Hwy. 427 to Jameson Ave.
18 MIN 6 MIN 12 MIN
401 WB
COLLECTOR. HWY. 404 TO HWY 410
28 MIN 17 MIN 11 MIN
401 WB
Hwy. 410 to Winst. Church.
15 MIN 5 MIN 10 MIN
Allen Rd. SB
Hwy. 401 to Eglinton Ave.
12 MIN 4 MIN 8 MIN
427 NB
Hwy. 401 to Hwy. 7
13 MIN 7 MIN 6 MIN
401 WB
Winst. Church. To Hwy.25
14 MIN 8 MIN 6 MIN
DVP SB
401 to Gardiner
15 MIN 9 MIN 6 MIN
401 EB
Collector. Hwy 404 to Kingston rd.
13 MIN 9 MIN 4 MIN
404 NB
Hwy. 407 to Aurora Rd.
16 MIN 12 MIN 4 MIN
QEW EB
Trafalgar Rd. to Hwy. 427
18 MIN 14 MIN 4 MIN
Gardiner EB
427 to DVP
15 MIN 12 MIN 3 MIN
400 NB
Hwy. 401 to Mapleview Dr.
45 MIN 42 MIN 3 MIN
401 EB
Winst. Church. To Hwy 410
8 MIN 6 MIN 2 MIN
427 SB
Hwy. 7 to Hwy. 401
9 MIN 7 MIN 2 MIN
Gardiner WB
Jameson Ave. to Hwy. 427
6 MIN 5 MIN 1 MIN
410 NB
Steeles to Mayfield Rd.
7 MIN 6 MIN 1 MIN
401 EB
Express. Hwy. 404 to Kingston Rd.
10 MIN 9 MIN 1 MIN
401 WB
Collector. Kingston Rd. to Hwy. 404
10 MIN 9 MIN 1 MIN
400 SB
King Rd. to Hwy. 401
14 MIN 15 MIN -1 MIN
Gardiner EB
Jameson Ave. to DVP
6 MIN 7 MIN -1 MIN
407 WB
Brock Rd to Hwy. 404
13 MIN 14 MIN -1 MIN
407 EB
Hwy. 410 to Hwy. 400
11 MIN 12 MIN -1 MIN
407 WB
Hwy. 400 to Hwy. 410
11 MIN 12 MIN -1 MIN
404 SB
Aurora Rd. to Hwy. 407
11 MIN 12 MIN -1 MIN
407 EB
Hwy. 400 to Hwy. 404
9 MIN 10 MIN -1 MIN
404 SB
Green Ln. to Aurora Rd.
4 MIN 5 MIN -1 MIN
404 NB
Aurora Rd. to Green Ln.
3 MIN 4 MIN -1 MIN
Gardiner WB
DVP to Jameson Ave
5 MIN 7 MIN -2 MIN
400 SB
MAPLEVIEW DR. TO HWY. 401
40 MIN 42 MIN -2 MIN
QEW EB
Hwy. 427 to Trafalgar Rd.
13 MIN 16 MIN -3 MIN
400 NB
Hyy. 401 to King Rd.
13 MIN 13 MIN
Gardiner WB. DVP to Hwy. 427 (ID661) 13 MIN 13 MIN
401 EB
Hwy. 25 to Winst. Church.
8 MIN 8 MIN
407 WB
Hwy. 404 to Hwy. 400
9 MIN 9 MIN
STEELES AVE. TO HWY. 401 (ID2289) 3 MIN 3 MIN
400 SB
Hwy. 9 to King Rd.
7 MIN 7 MIN
400 NB
King Rd. to Hwy. 9
7 MIN 7 MIN
401 EB
Kingston Rd. to Salem Rd.
8 MIN 8 MIN
401 EB
Salem Rd. to Stevenson Rd.
7 MIN 7 MIN
401 WB
Stevenson Rd. to Salem Rd.
7 MIN 7 MIN
401 WB
Salem Rd to Kingston Rd
8 MIN 8 MIN
407 EB
Hwy. 404 to Brock Rd.
14 MIN 14 MIN
427 NB
Gardiner to Hwy. 401
4 MIN 4 MIN
Allen Rd. NB
Eglinton Ave. to Hwy. 401
3 MIN 3 MIN
401 WB
Express. Kingston Rd. to Hwy. 404
9 MIN 9 MIN
410 SB
Mayfield Rd. to Steeles Ave.
6 MIN 6 MIN
QEW EB
Guelph Line to Trafalgar Rd.
9 MIN 9 MIN
QEW EB
Trafalgar Rd. to guelph Line
9 MIN 9 MIN

All currently active planned road restrictions.

Location Start Date End Date When
MARKLAND DR
From MILL RD to SILVERTHORNE BUSH DR
2014-06-17 07:00 2014-12-23 19:00 Daily
The northbound and southbound lanes will be occupied due to underground from overhead conversion for Toronto Hydro. This will be conducted by Entera Utility Contractors.
PARK LAWN RD
From LAKE SHORE BLVD W to LEGION RD
2014-08-18 07:00 2014-12-31 17:30 Daily
Various lanes will be occupied due to road maintenance. This will be done by II Duca Contracting.
LAKE SHORE BLVD W
From BROOKERS LANE to PARK LAWN RD
2014-08-18 07:00 2014-12-31 17:30 Daily
Westbound curb lane will be occupied due to road widening/resurfacing, sidewalk construction and sanitary sewer replacement on Park Lawn Road, and on Lake Shore Blvd West. This will be done by Il Duca Contracting Inc.
KIPLING AVE @ BLOOR ST W
2014-08-05 07:00 2014-12-31 19:00 Daily
Westbound and eastbound curb lanes are occupied due to resurfacing.
KIPLING AVE
From PRINCESS MARGARET BLVD to ST ANDREWS BLVD
2014-09-02 00:01 2014-12-31 23:59 Continuous
All lanes will be occupied due to resurfacing and sidewalk replacement. One lane to remain open in each direction at all times.
DUNDAS ST W @ 4756 Dundas St w
2014-06-24 09:30 2014-12-31 15:00 Daily
All lanes are occupied due to site service to monitor wells.
GRACEDALE BLVD
From DUNCANWOODS DR to CRIMSCOTT RD
2014-10-02 00:01 2014-12-25 23:59 Daily
Southbound and northbound curb lanes are occupied due to sewer replacement and road reconstruction
HASBROOKE DR
From PEARLDALE AVE to GRACEDALE BLVD
2014-10-02 07:00 2014-12-25 19:00 '
Westbound and eastbound curb lanes are occupied due to road reconstruction
PARK LAWN RD @ LAKE SHORE BLVD W
2014-10-23 07:00 2015-05-30 19:00 Daily
The Northbound and Southbound passing and curb lanes will be occupied interchangeably due to Road Widening, Sidewalk Construction, and Sanitary Sewer Replacement on Park Lawn and Sidewalk Construction and Road Widening on Lake Shore Blvd.
ROSEMOUNT AVE
From QUEENS DR to JOHN ST
2014-11-12 00:01 2015-02-28 23:59 Continuous
All lanes will be occupied due to water main directional drilling. Residents access only.
ROSEMOUNT AVE
From QUEENS DR to JOHN ST
2014-11-12 07:00 2015-02-28 19:00 Daily
Eastbound curb lane will be occupied due to watermain directional drilling.
OLD WESTON RD
From KANE AVE to ROGERS RD
2014-11-07 09:00 2014-12-24 16:00 Daily
Two northbound lanes will be occupied due to the installation of sewers.
DISCO RD @ ATTWELL DR
2014-11-13 07:00 2015-11-13 17:00 Daily
The Eastbound and Westbound Lanes will be occupied due to Road Widening, Construction of Substructure of Disco/Goreway and Median Construction.
CRIMSCOTT RD
From CHERRYLAWN AVE to GRACEDALE BLVD
2014-11-15 00:01 2014-12-25 23:59 Continuous
Various lanes will be blocked due to rolling closure due to paving operation.
FIFTH ST
From LAKE SHORE BLVD W to LAKE SHORE DR
2014-11-26 00:01 2015-06-30 23:59 Continuous
The northbound and southbound lanes will be occupied due to road resurfacing and sewers replacement on Fifth Street.
JANE ST @ HWY 400 NB
2014-12-08 22:00 2015-01-16 05:00 Daily
Northbound and southbound lanes (alternating) are occupied due to inspection and scale structure
NORSEMAN ST @ 225 NORSEMAN ST
2014-12-16 07:00 2014-12-23 16:00 Daily
One lane will be blocked due to construction.
THE QUEENSWAY @ 165 The Queensway
2014-12-19 09:00 2014-12-20 16:00 Daily
Eastbound curb lane is occupied due to construction

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
YORK MILLS RD
From GLENRIDGE AVE to BAYVIEW AVE
2014-01-13 09:30 2014-12-31 15:30 Off Peak Daily
The eastbound and westound passing lanes will be occupied due to site service. This will be conducted by Terrapex Environmental Ltd.
STEELES AVE W
From MURRAY ROSS PKWY to FOUNDERS RD
2014-03-07 00:01 2014-12-31 00:01 Continuous
The right curb lane in eastbound direction and left curb lane in westbound direction will be occupied for construction of cut and cover subway station under Steeles Ave at NW Gate. This will be conducted by Walsh Construction Company Canada.
KEELE ST @ FOUR WINDS DR
At MURRAY ROSS PKWY
2013-12-02 07:00 2014-12-31 19:00 Continuous
The lanes are occupied due to Toronto York Spadina Subway Extension. This will be conducted by OHL/FCC LP.
YORK MILLS RD @ 300 York Mills Rd
2014-01-13 09:30 2014-12-31 15:30 Daily
Intersection is occupied due to site servicing, monitoring and sampling of walls. This is being conducted by Terrapex Environmental Ltd.
KEELE ST
From CANON JACKSON DR to ARROWSMITH AVE
2014-08-11 09:00 2014-12-31 17:00 Continuous
Rolling closure for southbound and northbound lanes due to road resurfacing and rehabilitation by D. Martino Construction Ltd.
CULFORD RD
From WOOLTON CRES to HAWKINS DR
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane will be occupied due to basement flooding protection program.
LISCOMBE RD
From RUSTIC RD to MAPLE LEAF DR
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane will be occupied due to basement flooding protection program.
QUEENS DR
From BLUEBELL GT to CULFORD RD
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane will be occupied due to basement flooding protection program.
WOOLTON CRES @ CULFORD RD
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane will be occupied due to basement flooding protection program.
VANDERHOOF AVE
From BRIAN PECK CRES to LESLIE ST
2014-10-01 07:00 2014-12-31 19:00 Continuous
Westbound curb lane at 160 Vanderhoof Ave. will be occupied due to concrete pumping.
BRENTCLIFFE RD
From VANDERHOOF AVE to WICKSTEED AVE
2014-10-20 07:00 2014-12-31 19:00 Continuous
Full road closure at Brentcliffe Rd. due to rehabilitation of water mains.
SHAUGHNESSY BLVD
From HAVENBROOK BLVD to PARFIELD DR
2014-10-27 07:00 2015-02-27 19:00 Daily
All northbound then southbound lanes will be occupied one at a time due to THESL Underground Installation.
ROSEMOUNT AVE
From QUEENS DR to JOHN ST
2014-11-12 07:00 2015-02-28 19:00 Continuous
Both directions will be blocked due to watermain directional drilling.
CHERRYLAWN AVE
From DUNCANWOODS DR to CRIMSCOTT RD
2014-10-02 00:01 2014-12-25 23:59 Continuous
The northbound lane will be occupied due to sewer work. Westbound lane on Crimscott will then be occupied due to sewer work.
YORK MILLS RD @ CLAYLAND DR
2014-11-28 06:00 2014-12-31 06:00 Continuous
Westbound lane restrictions at York Mills Rd. due to emergency culvert repairs.
DUFFLAW RD
2014-11-25 09:00 2015-03-28 16:00 Daily
The northbound curb lane and the southbound curb lane will be occupied due to open trench, directional drill and hydro vac.
CALEDONIA RD
From CARTWRIGHT AVE to BENTWORTH AVE
2014-12-10 00:01 2014-12-20 23:59 Continuous
Southbound and northbound curb lanes are occupied due to basement flooding protection
ENGLEMOUNT AVE @ 101 Englemount Ave
2014-12-10 09:00 2014-12-20 16:00 Daily
Northbound curb lane is occupied due to placing a new conduit and fibre optic cables
BOGERT AVE
From YONGE ST to BEECROFT RD
2014-12-19 10:00 2014-12-21 23:59 Continuous
The eastbound and westbound curb lanes will be occupied due to the removal of a construction tower crane.
LAWRENCE AVE E @ LESLIE ST
2014-12-17 09:00 2014-12-24 16:00 Continuous
East and Westbound curb and passing lane will be occupied due to borehole drilling.
CHERRYLAWN AVE
From DUNCANWOODS DR to CRIMSCOTT RD
2014-12-19 00:01 2015-02-17 23:59 Daily
Northbound and southbound curb lanes are occupied due to sewer work
CRIMSCOTT RD
From CHERRYLAWN AVE to GRACEDALE BLVD
2014-12-19 00:01 2015-02-17 23:59 Continuous
Eastbound and westbound curb lanes are occupied due to sewer work
GRACEDALE BLVD
From DUNCANWOODS DR to GOLDSBORO RD
2014-12-19 00:01 2015-02-17 23:59 Continuous
Southbound and northbound curb lanes are occupied due to sewer work

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
KINGSTON RD
From BIRCHMOUNT RD to VICTORIA PARK AVE
2013-04-01 07:00 2014-12-31 19:00 Continuous
ONE WESTBOUND AND EASTBOUND TRAFFIC LANES CLOSED DUE TO ROADWAY CONSTRUCTION
LAWRENCE AVE E
From MARKHAM RD to KINGSTON RD
2014-07-07 18:29 2014-12-31 21:29 Daily
Rolling Closure. Curb lanes and middle lanes in all directions will be occupied in various stages due to road resurfacing and watermain structural lining by Furfari Paving Co. Ltd.
ADANAC DR
From GRANARD BLVD to COLONIAL AVE
2014-10-02 07:00 2015-02-28 19:00 Daily
Northbound curb lane will be occupied due to watermain replacement.
FARADAY DR
From BRIMORTON DR to BAYBROOK CRES
2014-09-02 07:00 2015-02-28 19:00 Daily
Northbound curb lane will be occupied due to watermain replacement.
GLEN MUIR DR
From BELLAMY RD S to LITTLE ROCK DR
2014-10-02 07:00 2015-02-28 19:00 Daily
Westbound curb lane will be occupied due to watermain replacement.
KENTISH CRES
2014-09-02 07:00 2015-02-28 19:00 Daily
Westbound curb lane will be occupied due to watermain replacement.
RELROY CRT
2014-09-02 07:00 2015-02-28 19:00 Daily
Various lanes will be occupied due to watermain replacement.
WARDEN AVE
From SCARDEN AVE to SHEPPARD AVE E
2014-10-08 07:00 2014-12-31 16:00 Daily
The northbound curb lane will be occupied for Full Length Trenchless Rehabilitation.
WARDEN AVE
From SCARDEN AVE to SHEPPARD AVE E
2014-10-08 09:00 2014-12-31 16:00 Daily
The northbound curb lane will be occupied for Full Length Trenchless Rehabilitation (CIPP) of Existing Water Mains.
GENNELA SQ @ MORNINGVIEW TRL
2014-10-07 07:00 2014-12-23 19:00 Daily
Alternating northbound, southbound, eastbound and westbound lanes will be occupied due to an underground installation. This will be done by Powerline Plus.
MCCOWAN RD
From MCNICOLL AVE to STEELES AVE E
2014-08-05 07:00 2014-12-31 19:00 Daily
The northbound and southbound curb and passing lanes will be occupied for Major road resurfacing .
MARKHAM RD @ DUNELM ST
2014-10-20 00:01 2015-04-13 23:59 Continuous
2 Southbound lanes will be blocked due to major bridge rehabilitation.
MILNE AVE
From MACK AVE to WOLCOTT AVE
2014-11-17 07:00 2015-02-25 19:00 Continuous
Eastbound, westbound and northbound curb lanes at Milne Ave. will be occupied due to overhead rebuild.
MILLIKEN BLVD
2014-11-10 07:00 2014-12-23 19:00 Daily
All lanes will be occupied from the cul-de-sac to 50 meter south due to watermain installation.
HIGHVIEW AVE
From KENNEDY RD to KINGSTON RD
2014-11-17 07:00 2015-01-31 19:00 Daily
The eastbound and then the westbound lanes will be occupied due to THESL overhead rebuild.
MIDLAND AVE @ 3660 MIDLAND AVE
2014-11-13 08:00 2015-01-13 16:00 Daily
Southbound right lane will be occupied due to directional drilling.
FERGUSON ST @ Various locations
2014-11-17 07:00 2014-12-24 18:00 Daily
The curb lane on the following streets will be occupied due to Toronto Hydro handwell replacements. (Locations: Ferguson St, Winkler Ter, Yates Ave, Howe Ave, Gerigs St, Ayers Cres, Mendelssohn St, and Pethick St)
BRIDGEPORT DR
From LAWRENCE AVE E to LAKERIDGE DR
2014-11-26 07:00 2015-03-30 19:00 Daily
The northbound then the southbound lanes will be occupied due to Toronto Hydro underground installation.
LAWRENCE AVE E
From BRIDGEPORT DR to PORT UNION RD
2014-11-28 07:00 2015-03-30 19:00 Continuous
Eastbound and westbound curb lane at Lawrence Ave E. will be occupied due to hydro underground installation.
LAKERIDGE DR
From BRIDGEPORT DR to ROCKPORT DR
2014-11-28 07:00 2015-03-30 19:00 Daily
Eastbound and westbound curb lanes are occupied due to Toronto Hydro Underground Installation
STEELES AVE E
From ASHCOTT ST to BRIMLEY RD
2014-12-01 09:00 2015-03-31 16:00 Daily
Eastbound curb lane will be will be occupied due to THESL underground installation.
FINCH AVE E @ WARDEN AVE
2014-12-06 09:00 2014-12-23 16:00 Daily
The eastbound curb lane on Finch Ave E and the southbound curb lane on Warden Ave will be occupied due to Toronto Hydro trenching and duct bank.
MORNINGSIDE AVE @ 1405 MORNINGSIDE AVE
2014-12-12 09:00 2015-06-01 17:00 Continuous
Northbound and Southbound curb lane will be occupied due to break and tie into existing ce ducts.
TAPSCOTT RD @ MCNICOLL AVE
2014-12-09 09:00 2014-12-30 19:00 Daily
The northbound and southbound lanes, as well as the westbound right lane will be occupied due to watermain and storm connection. (Time period: Monday to Friday 9 am - 4pm; Saturdays 9 am - 7:00 pm)
WARDEN AVE @ FIRVALLEY CRT
2014-12-10 09:00 2014-12-31 16:00 Daily
Northbound curb lane and southbound passing lane are occupied due to utilities installation
ELLESMERE RD @ 1990 Ellesmere Rd.
2014-12-15 09:00 2014-12-31 16:00 Continuous
The westbound curb lane will be occupied due to Rogers underground construction.
SHEPPARD AVE E @ MCCOWAN RD
2014-12-16 10:00 2015-03-31 19:00 Daily
The Westbound Curb lane will be occupied due to site access for material deliveries.
SCARBOROUGH GOLF CLUB RD @ DALE AVE
2014-12-19 07:00 2014-12-22 19:00 Daily
Northbound and southbound lane reduction at Scarborough Golf Club Rd. due to structuring of Bell lines.
MCLEVIN AVE @ 400 MCLEVIN AVE
2014-12-19 09:00 2015-01-10 16:00 Daily
Southbound curb lane will be occupied due to Rogers underground construction.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
STRATHMORE BLVD @ WOODBINE AVE
2014-03-10 07:00 2015-03-10 17:00 Daily
Road closure for Westbound traffic going West of Woodbine and Eastbound traffic going East of Woodbine due to TTC Woodbine Station expansion. This will be done by Aecon.
FRONT ST W @ BAY ST
At UNIVERSITY AVE
2014-01-01 00:01 2014-12-31 23:59 Continuous
The south side of front street will be occupied due to construction/traffic staging on Fron St and Bay St in connection with the Union Station second platform project.
LAKE SHORE BLVD W
From REES ST to VAN DE WATER CRES
2014-04-22 09:00 2015-02-22 23:59 Continuous
The westbound passing lane will be occupied due to installation of a tunnel. This will be conducted by C & M Mcnally Engineering.
FRONT ST W @ 65 Front St W
From BAY ST to UNIVERSITY AVE
2014-01-01 12:01 2014-12-31 23:59 Daily
Street occupied due to construction and traffic staging in connection with the Union Station secodn platform project. This is being conducted by Ellis-Don Construction Ltd.
WELLESLEY ST W
From YONGE ST to QUEENS PARK CRES W
2014-07-21 00:01 2014-12-31 23:59 Continuous
All lanes will be occupied due to watermain work and road reconstruction by Midome Construction Services Ltd.
RICHMOND ST W
From CHURCH ST to YORK ST
2014-07-28 00:01 2014-12-31 23:59 Continuous
Eastbound two lanes will be occupied due to watermain replacement being completed by the City of Toronto.
RICHMOND ST W
From YONGE ST to CHURCH ST
2014-07-28 07:00 2014-12-31 19:00 Daily
Westbound curb lane is occupied due to a watermain replacement. This is being conducted by Tedescon Infrastructure Ltd.
DEARBOURNE AVE
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Continuous
Eastbound and westbound curb lane at at Dearbourne Ave. will be occupied due to overhear rebuild.
QUEENS QUAY W
From YO-YO MA LANE to YONGE ST
2014-09-02 07:00 2014-12-23 19:00 Daily
All lanes will be occupied (one direction at a time) due to THESL underground duct installation.
ADELAIDE ST W @ ADELAIDE ST W
From SIMCOE ST to YORK ST
2014-09-12 09:00 2014-12-31 16:00 Daily
Eastbound on Adelaide, 3 lanes will be occupied due to Watermain, Road and Sidewalk Reconstruction and TTC Track Removal.
UNIVERSITY AVE @ UNIVERSITY AVE
From KING ST to RICHMOND ST W
2014-09-12 09:00 2014-12-31 16:00 Daily
3 Northbound and 2 Southbound lanes will be occupied due to Watermain, Road and Sidewalk Reconstruction.
FRICHOT AVE @ FRICHOT AVE
From FRICHOT AVE to YONGE ST
2014-09-25 07:00 2014-12-31 19:00 Daily
The lane will be occupied due to New Conduct and Cable Installation. One lane will be maintained on each direction on Yonge St.
VANDERHOOF AVE @ VANDERHOOF AVE
2014-10-01 07:00 2014-12-31 19:00 Daily
The eastbound curblane will be occupied due to Road Closure for Concrete Pumping.
SPADINA RD
From RUSSELL HILL DR to ST CLAIR AVE W
2014-09-29 10:00 2014-12-23 06:00 Continuous
The southbound lanes at Spadina Rd. will have intermittent closures due to bridge rehabilitation.
CAVERN CRT @ GOTHAM CRT
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane local traffic will be occupied due to basement flooding protection program.
BATTERSEA CRES @ WYNDALE DR
2014-10-01 07:00 2015-06-30 19:00 Daily
One lane will be occupied due to basement flooding protection program.
JANE ST
From BECKETT AVE to FALSTAFF AVE
2014-10-01 09:00 2015-06-30 17:00 Daily
Both directions various and multiple lanes will be occupied due to basement flooding protection program.
CALEDONIA RD
From CARTWRIGHT AVE to BENTWORTH AVE
2014-10-14 09:00 2014-12-20 17:00 Continuous
Southbound curb lane will be occupied due to basement flooding protection.
CARTWRIGHT AVE
From PAUL DAVID ST to CALEDONIA RD
2014-10-14 07:00 2014-12-20 19:00 Continuous
Eastbound and Westbound single lane will be blocked due to basement flooding protection.
ROSEDALE VALLEY RD
From BAYVIEW AVE to BLOOR ST E
2014-10-27 21:00 2015-01-30 06:00 Daily
The northbound lane will be partially occupied due to full length trenchless rehabilitation of existing water mains
BAYVIEW AVE
From MERTON ST to MILLWOOD RD
2014-10-24 09:00 2014-12-31 16:00 Daily
Northbound and southbound curb lane at Bayview Ave. will be occupied due to overheard rebuild.
BELLE AYRE BLVD
From DAVISVILLE AVE to MILLWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Continuous
Northbound curb lane at Belle Ayre Blvd. will be occupied due to overheard rebuild.
BALLIOL ST
From MOUNT PLEASANT RD to BAYVIEW AVE
2014-10-24 07:00 2014-12-31 19:00 Continuous
Eastbound curb lane at Balliol St. will be occupied due to overheard rebuild.
CHESTON RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lane at Cheston Rd. will be occupied due to pole and anchor replacement.
FORMAN AVE
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lane at Forman Ave. will be occupied due to pole and anchor replacement.
BELCOURT RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lane at Belcourt Rd. will be occupied due to pole and anchor replacement.
MERTON ST
From MOUNT PLEASANT RD to BAYVIEW AVE
2014-10-24 07:00 2014-12-31 19:00 Daily
Westbound curb lane at Merton St. will be occupied due to overheard rebuild.
LE MAY RD
From DAVISVILLE AVE to MILLWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Daily
Southbound curb lane at Le May Rd. will be occupied due to overhead build.
HARWOOD RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lane at Harwood Rd. will be occupied due to pole and anchor replacement.
DAVISVILLE AVE
From MOUNT PLEASANT RD to BAYVIEW AVE
2014-10-24 07:00 2014-12-31 19:00 Daily
The eastbound curb lane will be occupied due to thesl overhead rebuild.
TILSON RD
From HARWOOD RD to BOYTON RD
2014-10-24 07:00 2014-12-31 19:00 Daily
The eastbound then westbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement.
MANOR RD E
From BAYVIEW AVE to SERVINGTON CRES
2014-10-24 07:00 2014-12-31 19:00 Daily
The eastbound and westbound curb lane will be occupied due to pole and anchor replacement.
MARTIN RD
From DAVISVILLE AVE to BALLIOL ST
2014-10-24 07:00 2014-12-31 19:00 Daily
The northbound curb lane will be occupied due to THESL overhead rebuild.
BAYVIEW AVE
From MANOR RD E to BELSIZE DR
2014-10-24 09:00 2014-12-31 15:30 Daily
The northbound and then the southbound curb lanes will be occupied due to pole and anchor replacement (OH switch replacement).
SERVINGTON CRES
From MANOR RD E to THURLOE AVE
2014-10-24 07:00 2014-12-31 19:00 Daily
The northbound and then southbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement.
PENROSE RD
From DE SAVERY CRES to MOUNT PLEASANT RD
2014-10-24 07:00 2014-12-31 19:00 Daily
The eastbound and then westbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement
THURSTON RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
The northbound and then southbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement.
DE SAVERY CRES
From MANOR RD E to PENROSE RD
2014-10-24 07:00 2014-12-31 19:00 Daily
The northbound and then southbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement.
MOUNT PLEASANT RD
From MANOR HAVEN RD to BELSIZE DR
2014-10-24 08:00 2014-12-31 16:00 Daily
The northbound and then southbound curb lane will be occupied for Pole and Anchor Replacement - OH Switch Replacement.
MOUNT PLEASANT RD
From BALLIOL ST to MILLWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Daily
The northbound and southbound curb lanes will be occupied for THESL overhead Rebuild.
BELLE AYRE BLVD
From DAVISVILLE AVE to MILLWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Daily
Southbound curb lane is occupied due to THESL overhead rebuild
BELSIZE DR
From BAYVIEW AVE to MOUNT PLEASANT RD
2014-10-24 07:00 2014-12-31 19:00 Daily
Eastbound and westbound curb lanes are occupied due to pole and anchor replacements
BOYTON RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lanes are occupied due to pole and anchor replacements
CLEVELAND ST
From MERTON ST to MILLWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lanes are occupied due to THESL overhead rebuild
CLEVELAND ST
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lanes are occupied due to pole and anchor replacements
FORSYTH CRES @ DAVISVILLE AVE
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound curb lane is occupied due to THESL overhead rebuild
GRESHAM RD
From MANOR RD E to BELSIZE DR
2014-10-24 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lanes are occupied due to pole and anchor replacements
MILLWOOD RD
From MOUNT PLEASANT RD to WHITEWOOD RD
2014-10-24 07:00 2014-12-31 19:00 Daily
Eastbound curb lane is occupied due to THESL overhead rebuild
LOWER SHERBOURNE ST
From FRONT ST E to THE ESPLANADE
2014-11-06 07:00 2014-12-23 17:30 Continuous
Two Northbound lanes and the Southbound Passing lane will be occupied due to Resurfacing/Reconstruction of Lower Sherbourne, Separated Bike Lanes.
BOWDEN ST
From HOGARTH AVE to DANFORTH AVE
2014-06-30 07:00 2015-01-30 19:00 Daily
The northbound and southbound curb lanes will be occupied due to overhead rebuild.
WOLFREY AVE
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
FAIRVIEW AVE
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
TENNIS CRES
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
SPARKHALL AVE
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
MILLBROOK CRES
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
HOGARTH AVE
From BROADVIEW AVE to BOWDEN ST
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to overhead rebuild.
DANFORTH AVE
From BROADVIEW AVE to PAPE AVE
2014-06-30 07:00 2015-01-30 19:00 Daily
The eastbound curb lane will be occupied due to splicing - OH switching.
BROADVIEW AVE
From DANFORTH AVE to SPARKHALL AVE
2014-06-30 07:00 2015-01-30 19:00 Daily
The northbound and southbound curb lanes will be occupied due to splicing - OH switching. (NB will be occupied bet. 7am to 3:30pm; SB will be occupied bet. 9:30 am to 7pm)
MONTCREST BLVD
From BROADVIEW AVE to MONTCREST BLVD
2014-11-11 09:00 2014-12-31 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to break and ties duct installation.
D ARCY ST
From MC CAUL ST to BEVERLEY ST
2014-11-06 00:01 2014-12-31 23:59 Continuous
The eastbound and westbound lanes will be closed due to constructing Chamber #2 and restoration of the area.
ELM ST @ ELIZABETH ST
2014-11-06 07:00 2015-03-31 17:00 Daily
The northbound curb lane on Elizabeth Street and the eastbound curb lane on Elm Street will be occupied due to constructing a chamber and installing the bend, as well as, restoration of the area.
PHILPOTT GDNS
From ENROUTES ST to BELLEVILLE ST
2014-11-17 07:00 2014-12-24 19:00 Daily
The southbound curb lane of Philpott Gardens and of Carnahan Terrace will be occupied due to Toronto Hydry handwell replacement.
MUNRO ST @ Matilda St & resident parking access near Kintyre Ave
From DUNDAS ST E to THOMPSON ST
2014-11-17 07:00 2014-12-24 19:00 Daily
The curb lane at various directions will be occupied due to Toronto Hydro handwell replacement.
QUEEN ST W @ CHESTNUT ST
2014-11-17 00:01 2014-12-19 23:59 Continuous
The westbound curb lane will be occupied due to conduit installation for Toronto Hydro.
BLACKTHORN AVE
From ROWNTREE AVE to ROGERS RD
2014-11-13 00:01 2014-12-24 23:59 Continuous
Alternating northbound and southbound lanes will be occupied due to installation of sewers.
SILVERTHORN AVE
From ROWNTREE AVE to ROGERS RD
2014-11-13 00:01 2014-12-24 23:59 Daily
Northbound and southbound curb lanes are occupied due to installation of sewers
ROWNTREE AVE
From OLD WESTON RD to BLACKTHORN AVE
2014-11-13 00:01 2014-12-24 23:59 Daily
Westbound and eastbound curb lanes are occupied due to installation of sewers
ROSETHORN AVE
From ROWNTREE AVE to ROGERS RD
2014-11-13 00:01 2014-12-24 23:59 Daily
Northbound and southbound curb lanes are occupied due to installation of sewers
ROSEDALE VALLEY RD
From BAYVIEW AVE to BLOOR ST E
2014-10-27 21:00 2015-01-30 06:00 Daily
The Westbound Curb lanes will be occupied due to Full Length Trenchless Rehabilitation (CIPP) of Existing Water Mains.
BLOOR ST W @ PERTH AVE
2014-11-25 00:01 2015-01-31 23:59 Continuous
The eastbound curb lane in each direction will be occupied due to work on Metrolinx bridges (painting, steel repairs etc).
BLOOR ST W @ ELLIS PARK RD
2014-11-05 07:00 2015-02-28 19:00 Daily
Eastbound curb lane will be occupied due to force main work.
RIVER ST @ OAK ST
2014-10-06 07:00 2014-12-30 23:00 Daily
Northbound curb lane will be blocked due to Toronto Hydro chamber rebuilds.
WILFRID AVE
From SERVINGTON CRES to BELSIZE DR
2014-11-10 07:00 2015-02-05 19:00 Daily
Southbound curb lane will be occupied due to road work.
BLOOR ST W @ PERTH AVE
2014-11-26 07:00 2014-12-31 19:00 Daily
Eastbound curb lane is occupied due to Metrolinx bridge work
GARRISON RD @ GARDINER EXPY
2014-12-01 06:00 2014-12-31 18:00 Daily
One southbound lane will be occupied for Deck Replacement of the F.G Gardiner Expressway CNE to Grand Magazine St.
STRACHAN AVE
From EAST LIBERTY ST to FLEET ST
2014-12-01 07:00 2014-12-31 17:00 Daily
Southbound and northbound curb lanes are occupied due to deck replacement
JONES AVE @ 416 Jones Ave
2014-12-02 09:00 2014-12-20 19:00 Daily
Two southbound lanes are occupied due to sewer repairs
ST CLAIR AVE W @ WELLS HILL AVE
2014-12-01 07:00 2014-12-24 18:00 Daily
Northbound curb lane is occupied due to Toronto Hydro hand well replacement
ST CLAIR AVE W @ WELLS HILL AVE
2014-12-01 09:00 2014-12-24 16:00 Daily
The northeast corner curb lane will be occupied due to Toronto Hydro handwell replacements.
CHURCH ST
From GRATTAN ST to ROSEMOUNT AVE
2014-11-29 00:01 2014-12-22 11:59 Continuous
Both directions will be occupied due to watermain installation.
ARROW RD @ SHEPPARD AVE W
From SHEPPARD AVE W to LIDO RD
2014-12-01 09:00 2014-12-23 16:00 Daily
The Southbound Curb Lane will be occupied due to Rogers Cable Underground Construction.
EGLINTON AVE W @ BLACK CREEK DR
From BLACK CREEK DR to YONGE ST
2014-12-01 09:00 2015-06-30 21:00 Daily
The Eastbound and Westbound Lanes will be occupied due to Site Service - Surveying and Measurements of Monitoring Instruments. One lane closure in each direction; closures will be short duration.
EGLINTON AVE E
From YONGE ST to LESLIE ST
2014-12-01 09:00 2015-06-30 21:00 Daily
The eastbound lane and the westbound lane will be occupied due to site service, surveying and measurements of monitoring instruments.
LONBOROUGH AVE
From BERTRAM ST to KEELE ST
2014-12-08 00:01 2014-12-24 23:59 Continuous
Westbound lane will be occupied due to sewer replacement.
YORE RD
2014-12-08 00:01 2015-02-27 23:59 Continuous
Westbound lane will be occupied due to sewer installation.
GARDINER EXPY EB
From JAMESON AVE to BATHURST ST
2014-12-01 00:01 2015-06-01 23:59 Continuous
The centre median has been reconfigured. F.G.G. reduced down to two lanes between West of Jameson Ave and West of Bathurst St due to on-going expressway repairs.
GARDINER EXPY WB
From BATHURST ST to JAMESON AVE
2014-12-01 00:01 2015-06-01 23:59 Continuous
The centre median has been reconfigured. F.G.G. reduced down to two lanes between West of Bathurst St and West of Jameson Ave due to on-going expressway repairs.
QUEENS QUAY E @ BONNYCASTLE ST
2014-12-08 07:00 2014-12-23 19:00 Daily
Eastbound curb lane and centre lane are occupied due to installation of sewers
MASSEY ST
From ADELAIDE ST W to KING ST W
2014-12-10 09:00 2014-12-23 16:00 Daily
Southbound curb lane is occupied due to placing a new conduit and fibre optic cable
LAKE SHORE BLVD E @ PARLIAMENT ST
2014-12-09 10:00 2014-12-23 15:00 Daily
Eastbound curb lane is occupied due to removal and repair of sidewalk and curb
OAKWOOD AVE @ O LEARY AVE
2014-12-11 07:00 2014-12-20 16:00 Daily
2 lanes will be blocked at a time due to maintenance.
PARKWOOD AVE @ 6 PARKWOOD AVE
2014-12-10 09:00 2014-12-24 15:00 Daily
Left lane will be blocked due to water and sewer installation.
QUEENS QUAY E
From YONGE ST to JARVIS ST
2014-12-01 07:00 2015-02-28 19:00 Daily
The eastbound curb lane and the westbound curb lane will be occupied due to road work.
O LEARY AVE
From GLENHOLME AVE to OAKWOOD AVE
2014-12-15 00:01 2014-12-23 23:59 Daily
Westbound curb lane is occupied due to construction
QUEENS QUAY E @ COOPER ST
2014-12-16 09:00 2015-01-10 16:00 Daily
The westbound centre lane will be occupied due to open trench.
O CONNOR DR
From AMSTERDAM AVE to BERMONDSEY RD
2014-12-16 09:00 2014-12-29 16:00 Daily
The northbound and southbound curb lanes will be occupied due to directional drilling.
MERTON ST @ 112 MERTON ST
2014-12-17 08:00 2014-12-24 17:00 Daily
Westbound curb lane will be occupied due to new manhole and duct installation.
PAPE AVE @ 311 Pape Ave
2014-12-18 07:00 2014-12-20 19:00 Daily
Northbound curb lane is occupied due to water and sewer repairs
EGLINTON AVE E @ HOLLY ST
2014-12-19 07:00 2014-12-31 19:00 Daily
Northbound and southbound curb lanes are occupied due to utility relocation and daylighting
YONGE ST
From EGLINTON AVE E to ROEHAMPTON AVE
2014-12-18 09:00 2014-12-23 16:00 Daily
Northbound curb lane is occupied due to borehole drilling

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
ST CLAIR AVE W @ OLD WESTON RD
2014-12-22 19:00 2014-12-22 22:00 Daily
Eastbound curb and centre lane will be occupied due to purge well in public right of way.
DUNDAS ST W
From SUBWAY CRES to WILMAR RD
2014-12-22 09:00 2014-12-22 16:00 Daily
The Eastbound Curb Lane and Centre Turning Lane will be occupied due to Monitoring Existing Wells.
DAVENPORT RD @ 1142 Davenport Rd
From OSSINGTON AVE to ALBERT AVE
2014-12-20 09:00 2014-12-20 15:00 Daily
The eastbound lane and right turn lane will be occupied due to hoisting using a 40 ton crane.
GARDINER EXPY WB @ LAKE SHORE BLVD OFF-RAMP AT BROOKERS LANE
2014-12-19 23:00 2014-12-20 11:00 Continuous
The ramp will be closed due to under side repair work.
GARDINER EXPY
From PARK LAWN RD to HUMBER RIVER
2014-12-19 23:30 2014-12-20 05:00 Continuous
Alternating Westbound lanes will be occupied due to a rolling closure to touch-up line paintings.
GARDINER EXPY
From GRAND AVE to KIPLING AVE
2014-12-19 23:00 2014-12-20 08:00 Daily
The westbound express lanes will be occupied due to the installation and removal of various overhead signs.
GARDINER EXPY
From GRAND AVE to KIPLING AVE
2014-12-20 23:00 2014-12-21 08:00 Weekends
The westbound collectors lanes will be occupied due to the installation and removal of various overhead signs.
GARDINER EXPY
From THE EAST MALL to ISLINGTON AVE
2014-12-21 23:00 2014-12-22 05:00 Weekends
The eastbound collector lanes will be occupied due to the installation and removal of various overhead signs.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
CANTERBURY PL
From ELLERSLIE AVE to CHURCHILL AVE
2014-12-21 14:00 2014-12-21 15:00 Continuous
Full closure due to Chanukah at the Police Stn event.
YONGE ST
From BOGERT AVE to POYNTZ AVE
2015-01-05 09:00 2015-02-03 23:59 Continuous
Southbound curb lane will be occupied due to construction of a TTC tunnel connection.
WR ALLEN RD @ SHEPPARD AVE W
2014-12-19 23:00 2014-12-20 12:00 Daily
The Southbound lanes will be occupied due to Road Resurfacing.
THE DONWAY W @ LAWRENCE AVE E
2014-12-20 09:00 2014-12-20 16:00 Continuous
Southbound curb lane will be occupied due to new conduit and cable for Rogers.
SCARSDALE RD @ 105 SCARSDALE RD
2014-12-20 07:00 2014-12-20 19:00 Continuous
Southbound curb lane will be occupied due to blocking pit structure tie in.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
LAWRENCE AVE E
From BROCKLEY DR to MARCOS BLVD
2014-12-22 09:00 2014-12-24 16:00 Daily
Eastbound and westbound curb lane at Lawrence Ave E. will be occupied due to pole grounding.
MCCOWAN RD @ BRIMORTON DR
2014-12-22 09:00 2014-12-23 18:00 Daily
The Northbound Curb Lane will be occupied due to 1 Borehole Drilling for water sampling.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
UNIVERSITY AVE
From ELM ST to DUNDAS ST W
2014-12-20 08:00 2014-12-20 19:00 '
Southbound curb lane at University Ave. will be occupied due to crane hoisting.
BAY ST
From DUNDAS ST W to QUEEN ST W
2014-12-31 23:00 2015-01-01 00:30 Continuous
All lanes will be occupied due to the New Year's Eve Show at Nathan Phillips Square.
STRACHAN AVE
From EAST LIBERTY ST to FLEET ST
2015-01-01 06:00 2015-01-31 18:00 Daily
Northbound and southbound curb lanes are occupied due to deck replacement of the Gardiner
ASQUITH AVE
From YONGE ST to PARK RD
2014-12-23 07:00 2014-12-23 12:00 '
EASTBOUND CURB LANE AT 15 ASQUITH AVE WILL BE OCCUPIED DUE TO HOISTING OF CRANE.
AVENUE RD
From GLENGARRY AVE to DOUGLAS AVE
2014-12-23 09:30 2014-12-23 15:30 '
Southbound curb lane at 1542 Avenue Rd. occupied due to hoisting of signs.
COSBURN AVE @ 895 COSBURN AVE
2014-12-22 09:00 2014-12-22 15:00 Continuous
Eastbound right lane will be occupied due to gas service installation.
AUGUSTA AVE
2014-12-21 18:30 2014-12-21 20:15 Weekends
The following roads will be occupied due to the Red Pepper Spectacle Arts - Winter Solstice Parade. The following locations are: Augusta Ave. between College St. and Oxford St. S/B Augusta, E/B Baldwin St., S/B Kensington Ave., W/B Dundas St. W. dispersing in Alexandra Park.
DONLANDS AVE
From ELMSDALE RD to WOLVERTON AVE
2014-12-22 09:30 2014-12-22 15:00 Continuous
Northbound and southbound passing lanes will be occupied due to sewer relining.
PRINCE EDWARD VIADUCT
2014-12-22 10:00 2014-12-22 15:00 Daily
Two eastbound lanes are occupied due to the structural rehabilitation of the Prince Edward Viaduct
YONGE ST @ 454 YONGE ST
2014-12-22 09:30 2014-12-22 15:00 Continuous
Southbound right lane will be occupied due to gas service disconnection.
UNIVERSITY AVE @ 500 Unviersity Ave
2014-12-20 07:00 2014-12-20 19:00 Daily
All lanes are occupied due to hoisting with 300 ton mobile crane
DON VALLEY PARKWAY NB @ PRINCE EDWARD VIADUCT
2014-12-22 23:00 2014-12-23 05:00 Continuous
Alternating northbound lanes will be occupied due to structural rehabilitation of the Prince Edward Viaduct.
HOWLAND AVE @ DUPONT ST
2014-12-22 06:30 2014-12-24 14:30 Daily
Northbound and southbound curb lanes under rail road bridge will be occupied due to chipping of loose concrete on underpass walls.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

Get a first car or motorcycle licence, renew an old one, browse the online driver's handbook, book a road test, register your vehicle, and more.

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Information from the Ontario Ministry of Transportation about impaired driving, the Vehicle Impoundment program, driving safely, seat belts, child safety seats, school buses, emergency vehicles, and much more.

Information about the world's first all-electronic open access toll highway, which extends 108 kilometres east-west, just north of Toronto. Learn about the road's special features, tolls, and more.


More Commuter Coverage on CP24

Watch CP24's auto show every Sunday at 8:00 p.m. to learn about your vehicle, the car industry, and much more.

News, updates, and important information about transit systems for Toronto & the GTA.

News, updates, wait times, and traveller information about Ontario border crossings.

News, updates, important links, traveller information, and Billy Bishop arrival and departure times.