Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com.

Real-time traffic information for Toronto, GTA, and surrounding areas.

What's on this page?

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
SHERWAY GARDENS RD @ SHERWAY GT
2016-12-01 00:01 2017-08-31 23:59 Continuous
The westbound curb lane will be occupied due to new 2 storey Nordstrom (retail store) being built on top if existing U/G parking structure.
ROYALEIGH AVE
From ROYAL YORK RD to ROXALINE ST
2017-01-16 07:00 2017-06-30 19:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
DUNDAS ST W @ West of Royal york RD
2017-01-26 07:00 2017-03-31 17:00 Daily
Westbound lanes will be occupied due to Road work.
FINCH AVE W @ WESTMORE DR
2017-01-26 07:00 2017-03-31 17:00 Daily
Eastbound lanes will be occupied due to Road work.
CLEARBROOKE CRCL @ 142 - 128 CLEARBROOKE CRCL
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
GLENADEN AVE E
From BALLACAINE DR to HAZELRIDGE DR
2017-01-27 07:00 2017-03-31 17:00 Daily
The westbound and eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
GLENADEN AVE E
From RIVERWOOD PKWY to HAZELRIDGE DR
2017-01-27 07:00 2017-03-31 17:00 Daily
The westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
PRECISION RD
From BETHRIDGE RD to VICE REGENT BLVD
2017-01-27 07:00 2017-03-31 17:00 Daily
The northbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
EGLINTON AVE W
From TIMES RD to OAKWOOD AVE
2017-01-30 09:00 2017-04-30 16:00 Daily
One eastbound and one westbound lane will be occupied due to installation of monitoring points for Eglinton Crosstown Construction.
DUNDAS ST W
From MICHAEL POWER PL to KIPLING AVE
2017-02-03 00:01 2017-03-31 23:59 Continuous
Two westbound lanes will be occupied due to road work.
FLORIDA CRES @ CORAL GABLE DR
2017-02-07 04:52 2017-08-31 07:52 Daily
The northbound and southbound lanes will be occupied due to construction.
LAKE PROMENADE @ LONG BRANCH AVE
2017-02-08 07:00 2017-06-02 17:00 Daily
The westbound and eastbound lanes will be occupied due to construction.
THIRTY FIFTH ST @ DOMINION RD
2017-02-08 07:00 2017-06-02 17:00 Daily
The northbound and southbound lanes will be occupied due to construction.
WILLOWRIDGE RD
At LONGBOURNE DR
2017-02-08 07:00 2017-04-08 19:00 Daily
The eastbound lanes will be occupied due to construction.
LA ROSE AVE @ 234 LA ROSE AVE TO 244 LA ROSE AVE
2017-02-09 07:00 2017-06-02 17:00 Daily
The westbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers. Traffic in both directions will be maintained. There is no road closure.
LLOYD MANOR RD
From EGLINTON AVE W to BLACKDOWN CRES
2017-02-13 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
WARRENDER AVE
From LLOYD MANOR RD to LONGFIELD RD
2017-02-13 07:00 2017-08-31 19:00 Daily
Both lanes in both directions will be occupied, one lane at a time, due to underground rebuild.
LONGFIELD RD
From LLOYD MANOR RD to KIPLING AVE
2017-02-13 07:00 2017-08-31 19:00 Daily
The eastbound and westbound lanes will be occupied, one lane at a time, due to underground rebuild.
RICHDALE CRT @ CUL-DE-SAC
At LONGFIELD RD
2017-02-13 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
STANTHORPE CRT @ CUL-DE SAC
At LONGFIELD RD
2017-02-13 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
BOWNESS CRT @ CUL-DE-SAC
At LONGFIELD RD
2017-02-13 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
BROCKMOUNT CRT @ CUL-DE-SAC
At LONGFIELD RD
2017-02-13 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
ASHFORD DR
From LONGFIELD RD to FARNINGHAM CRES
0945-02-01 07:00 2017-08-31 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to underground rebuild.
BURKSTON PL @ CUL-DE-SAC
At ASHFORD DR
2017-02-13 07:00 2017-08-31 19:00 Daily
The eastbound and westbound lanes will be occupied, one lane at a time, due to underground rebuild.
HARBOURVIEW CRES
From FLEECELINE RD to BLUEWATER CRT
2017-02-13 07:00 2017-04-13 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling. Weekend hours will be from 9:00 AM to 4:00 PM.
BLUEWATER CRT
From HARBOURVIEW CRES to HARBOURVIEW CRES
2017-02-13 07:00 2017-04-13 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling. Weekend hours will be from 9:00 AM to 4:00 PM.
GREYSTONE CRT @ FLEECELINE RD
2017-02-13 07:00 2017-04-13 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling. Weekend hours will be from 9:00 AM to 4:00 PM.
FLEECELINE RD @ HARBOURVIEW CRES
2017-02-13 07:00 2017-04-13 19:00 Daily
The northbound and southbound lanes will be occupied due to directional drilling. Weekend hours will be from 9:00 AM to 4:00 PM.
GRANITE CRT @ FLEECELINE RD
2017-02-13 07:00 2017-04-13 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling. Weekend hours will be from 9:00 AM to 4:00 PM.
REDGRAVE DR
From LONGBOURNE DR to CAVERLEY DR
2017-02-13 07:00 2017-04-13 19:00 Daily
The eastbound lanes will be occupied due to construction.
LANGDEN AVE @ JASPER AVE
2017-02-14 07:00 2017-06-02 17:00 Daily
Both lanes in both directions will be closed due to spot trenchless rehabilitation of existing sewers and sewer service connections.
CORBY AVE @ 4 CORBY AVE
At CALEDONIA RD
2017-02-23 07:00 2017-04-30 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
SYMONS ST @ 20 - 30 SYMONS ST
2017-02-23 07:00 2017-04-30 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
JASPER AVE @ 2 - 29 JASPER AVE
2017-02-23 07:00 2017-04-30 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
MACLEOD ST
From RUSTIC RD to FLORAL PKWY
2017-02-24 07:00 2017-04-24 19:00 Daily
The northbound and southbound curb lanes will be occupied due to directional drilling.
RUSTIC RD
From KEELE ST to MACLEOD ST
2017-02-24 07:00 2017-04-24 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to directional drilling.
KEELE ST
From RUSTIC RD to FALSTAFF AVE
2017-02-24 09:30 2017-04-24 15:30 Daily
The northbound and southbound curb lanes will be occupied due to directional drilling.
FLORAL PKWY
From MACLEOD ST to JAY ST
2017-02-24 07:00 2017-04-24 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to directional drilling.
ROYAL YORK RD
2017-02-28 07:00 2017-03-31 19:00 Daily
The southbound curb lane will be occupied due to Bell manhole rebuild.
COLWOOD RD
From EDGEVALLEY DR to EDGEHILL RD
2017-03-08 09:30 2017-03-28 15:30 Daily
Cable excavation for Bell Canada. Both directions, 'Yield to Oncoming' to be used.
LORENE DR
At HAMLYN CRES
2017-03-08 09:30 2017-03-28 15:30 Daily
Cable excavation for Bell Canada. Both directions to use 'Yield to Oncoming'. Partial lane closure.
COMAY RD
From GULLIVER RD to PARAMOUNT CRT
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada. Partial lane closure. 'Yield to Oncoming' to be used.
COURTSFIELD CRES @ NORTH DR
2017-03-07 09:30 2017-03-28 15:30 Daily
Cable Excavation for Bell Canada. Partial Lane Closure.
LOYALIST RD
From DONNYBROOK LANE to OLD OAK RD
2017-03-07 09:30 2017-03-28 15:30 Daily
34 Loyalist Rd. Cable Excavation for Bell Canada. Partial Lane Closure.
MONTGOMERY RD
From ALLANBROOKE DR to LOYALIST RD
2017-03-06 09:30 2017-03-27 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure. Yield to oncoming to be used.
PUTNEY RD
From NORFOLK AVE to WESTHEAD RD
2017-03-06 09:30 2017-03-28 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure. Yield to oncoming to be used.
ECHO VALLEY RD @ 19 ECHO VALLEY RD
2017-03-07 09:30 2017-03-28 15:30 Daily
Southbound and northbound lanes will be partially closed due to cable excavation for Bell Canada.
EDGEVALLEY DR
From EDGEHILL RD to COLWOOD RD
2017-03-07 09:30 2017-03-28 15:30 Daily
1 Edge valley Dr. Cable Excavation for Bell Canada. Partial Lane Closure
CHAUNCEY AVE
From ISLINGTON AVE to NORTHROP RD
2017-03-06 09:30 2017-03-27 03:30 Daily
12 Chauncey Ave. Cable excavation for Bell Canada, partial lane closure. Yield to Oncoming to be used.
TREMONT RD
From VICKSON CRT to PETERLEE AVE
2017-03-07 09:30 2017-03-28 15:30 Daily
26 Tremont Rd. Cable Excavation for Bell Canada. Partial Lane Closure
FIRENZA DR
From BENRUBIN DR to MILADY RD
2017-03-07 09:30 2017-03-28 15:30 Daily
36 Firenza Dr. Cable Excavation for Bell Canada. Partial Lane Closure
ELDERBERRY CRT @ YORK DOWNS DR
2017-03-07 09:30 2017-03-28 15:30 Daily
14 Elderberry Crt. Cable Excavation for Bell Canada. Partial Lane Closure
OLD OAK RD
From DONNYBROOK LANE to LOYALIST RD
2017-03-06 09:30 2017-03-27 15:30 Daily
16 Old Oak Rd. Cable excavation for Bell Canada. Partial lane closure. Both with Yield to Oncoming.
TILDEN CRES
From WATERTON RD to KINGDOM ST
2017-03-06 09:30 2017-03-27 15:30 Daily
58 Tilden Cres. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both to use: Yield to Oncoming.
BURNHAMTHORPE PARK BLVD
From BURNHAMTHORPE RD to WEMBLEY AVE
2017-03-06 09:30 2017-03-27 15:30 Daily
30 Burnhamthorpe Park Bl. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both to use: Yield to Oncoming.
BURNHAMTHORPE PARK BLVD @ WEMBLEY AVE
2017-03-06 09:30 2017-03-27 15:30 Daily
47 Burnhamthorpe Park Bl. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both directions to use 'Yield to Oncoming.'
TYLER PL
From WINCOTT DR to NUGENT RD
2017-03-06 09:30 2017-03-27 15:30 Daily
6 Tyler Place. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both directions to use; Yield to Oncoming.
PYLON PL @ NORFIELD CRES
2017-03-06 09:30 2017-03-27 15:30 Daily
114 Pylon Pl. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both directions to use; Yield to Oncoming.
ELMBROOK CRES
From LAFFERTY ST to MILLSBOROUGH CRES
2017-03-09 09:30 2017-03-30 15:30 Daily
29 Elmbrook Cres. Cable Excavation for Bell Canada. Partial Lane Closure.
BLACK CREEK DR
From TODD BAYLIS BLVD to EGLINTON AVE W
2017-03-06 09:00 2017-05-05 08:04 Daily
One southbound lane will be occupied due to relocation of existing hydro poles and duct bank.
ROYAL YORK RD @ LAMBETH RD
2017-03-03 07:00 2017-03-31 17:00 Daily
The northbound curb lane will be occupied due to hydro work.
MARKLAND DR
From TREELINE CRT to BLOOR ST W
2017-03-06 07:00 2017-04-14 17:00 Daily
CABLE PULLING
KITTIWAKE AVE @ 22 to 24 KITTIWAKE AVE
2017-03-07 09:30 2017-03-28 15:30 Daily
The eastbound and westbound lanes will be partially occupied due to cable excavation for Bell Canada.
DUNBLOOR RD
From BLOOR ST W to DUNDAS ST W
2017-01-16 07:00 2017-03-30 19:00 Daily
Dunbloor from Bloor to Dundas NB curb lane to be occupied due to duct installation.
TWYFORD RD
From BALLANTYNE CRT to SIR WILLIAMS LANE
2017-03-13 07:00 2017-03-29 19:00 Daily
Twyford Rd from Ballantyne Rd to Sir Williams Lane. Occupying the curblane of Twyford Rd on the eastbound direction. Work will consist of pit digging and conduit repair.
WOODBINE DOWNS BLVD
From CARRIER DR to WOODBINE DOWNS BLVD
2017-03-13 09:00 2017-03-31 16:00 Daily
Traffic Lane Occupied: NB curb lanes occupied due to dig pit. Traffic Lane Available: North & Southbound
KIPLING AVE
From BLOOR ST W to DUNDAS ST W
2017-01-12 07:00 2017-03-31 19:00 Daily
The northbound bus lane will be occupied due to manhole rebuild.
KIPLING AVE @ JUTLAND RD
2017-03-13 08:00 2017-04-28 16:00 Daily
The northbound and southbound curb lanes will be occupied due to installation of new traffic signals.
FINCH AVE W @ MARTIN GROVE RD
2017-03-10 09:00 2017-03-27 16:00 Daily
The eastbound and westbound curb and passing lane will be occupied due to gas main relocation.
LAXIS AVE
From BUTTONWOOD AVE to TYRONE AVE
2017-03-13 09:30 2017-03-27 15:30 Daily
cable excavation for bell Canada
WINGOLD AVE
From LANSDOWNE AVE to DUFFERIN ST
2017-03-15 07:00 2017-03-31 19:00 Daily
East bound curb lane blocked due to construction.
ORRELL AVE
From PERRY CRES to ISLINGTON AVE
2017-03-15 07:00 2017-03-29 19:00 Daily
WESTBOUND LANE OF ORRELL AVE CLOSED DUE TO CONDUIT AND GLB INSTALLATIONS.
THE WESTWAY
From TEMPLAR DR to WINCOTT DR
2017-03-15 09:00 2017-03-28 16:00 Daily
eastbound and westbound curb lanes occupied due to dig pits and repair conduits
WESTON RD
From ELSMERE AVE to JOHN ST
2017-03-20 09:00 2017-04-07 15:30 Daily
Trench, place Y, place conduit & place cable
SYMES RD @ HILLBORN AVE
2017-03-16 09:30 2017-03-30 15:30 Daily
Cable excavation for Bell Canada
KITTIWAKE AVE
At KISKADEE DR
2017-03-08 09:30 2017-03-29 15:30 Daily
cable excavation for Bell Canada
ELSMERE AVE
At WESTON RD
2017-03-20 09:00 2017-04-07 16:00 Daily
Trench, place Y, place conduit & place cable
CANTERBURY CRES
2017-03-15 07:00 2017-06-15 19:00 Daily
excavation on Canterbury cress. To install new Toronto Hydro duct bank, service pipe and vaults
DUNDAS ST W
From AVONHURST RD to BURNHAMTHORPE RD
2017-03-20 09:00 2017-04-03 16:00 Daily
Dundas st west closed in westbound direction from Avonhurst rd to Burnhamthorpe rd. Occupying the westbound curb lane.
MARIPOSA AVE
From ST CLAIR AVE W to MARIPOSA AVE
2017-03-20 07:00 2017-04-07 19:00 Daily
Dig pit, clear blockage & place cable. South bound curb lane
JOPLING AVE S
From DUNDAS ST W to BLOOR ST W
2017-03-17 07:00 2017-03-31 19:00 Daily
Dig pits, clear blockage & place conduit. Northbound curb lane
BLOOR ST W
From AUKLAND RD to JOPLING AVE S
2017-03-17 09:00 2017-03-31 16:00 Daily
Dig pits, clear blockage & place conduit. Eastbound curb lane
DUNDAS ST W
From DUNDAS ST W to CABOT CRT
2017-03-20 09:00 2017-04-03 16:00 Daily
Drill/Trench, Install Conduit, Place cable. Westbound curb lane of Dundas St W
CABOT CRT
From DUNDAS ST W to CABOT CRT
2017-03-20 07:00 2017-04-03 19:00 Daily
Drill/Trench, Install Conduit, Place cable. Northbound curb lane of Cabot Cart
FINCH AVE W @ MARTIN GROVE RD
2017-03-17 08:00 2017-03-27 16:00 Daily
Gas Main Relocation. Variable lane closures on both eastbound & westbound.
MONTERREY DR
From WALTHAM DR to BEAUMONDE HEIGHTS DR
2017-03-17 07:00 2017-03-31 19:00 Daily
Dig pits & repair conduits. East bound & West bound curb lanes
HARLOW CRES
From TODD BROOK DR to KINGSMOOR GT
2017-03-17 07:00 2017-03-31 19:00 Daily
Dig pits & repair conduits. East bound & West bound curb lanes
GLENELLEN DR W
From GLENELLEN DR W to GRENVIEW BLVD S
2017-03-20 09:00 2017-04-03 16:00 Daily
Drill/Trench, Install Conduit, Place cable. Westbound Glenellen Dr W of Glen Ellen Rd W
BELLEVUE CRES
From WESTON RD to HICKORY TREE RD
2017-03-20 09:00 2017-04-03 16:00 Daily
Southbound right lane closed due to construction
GOLDCREST BLVD
From LAWRENCE AVE W to SORLYN AVE
2017-03-20 07:00 2017-04-03 19:00 Daily
Northbound curb lane closed due to clearing of blockages.
SAMBA DR @ SHEPPARD AVE W
2017-03-19 07:00 2017-04-02 19:00 Daily
Excavation and repair conduit on northbound curb lane.
POPLAR AVE @ 38 Poplar Ave
From MONTESSON ST to DUNDAS ST W
2017-03-17 09:30 2017-03-31 15:30 Daily
Both directions closed due to construction
BECKETT AVE
From MAIDSTONE ST to FLEETWOOD AVE
2017-03-20 07:00 2017-03-30 19:00 Daily
Basement Flooding Protection Project for City of Toronto
WIDDICOMBE HILL
From EGLINTON AVE W to KIPLING AVE
2017-03-20 07:00 2017-09-14 16:00 Daily
Trenchless Rehabilitation (CIPP System) of Existing Water mains in Etobicoke, and Toronto Districts.
PARK LAWN RD
From THE QUEENSWAY to GARDINER EXPY
2017-03-21 09:30 2017-03-26 15:30 Daily
Southbound curb lane closed due to construction (the queensway to Gardiner on ramp)
THE QUEENSWAY
From HWY 427 to THE WEST MALL
2017-03-20 07:00 2017-07-01 16:00 Daily
The Queensway is closed from The West Mall to Highway 427 off ramp in the westbound direction. Occupying the westbound curb lane ( partial obstruction).
CHARNLEIGH CRT
From SILVERSTONE DR to CHARNLEIGH CRT
2017-03-20 07:00 2017-09-14 16:00 Daily
WESTBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
WOODWAY TRL
From IVY LEA CRES to RIVERWOOD PKWY
2017-03-22 07:00 2017-03-29 19:00 Daily
Woodway trl closed from Ivy Lea cres to Riverwood Parkway, alternating in the north then south bound directions. Occupying the north and south bound directions (alternating).
HUMBER COLLEGE BLVD
From FINCH AVE W to CARRIER DR
2017-03-20 07:00 2017-09-14 19:00 Daily
NORTHBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
THE WEST MALL
From WESTSIDE DR to THE QUEENSWAY E GARDINER EXPY RAMP
2017-03-20 07:00 2017-09-14 16:00 Daily
SOUTHBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
CARRIER DR
From HWY 27 NB to ALBION RD
2017-03-20 07:00 2017-09-14 19:00 Daily
Westbound and northbound curb lane closed due to construction
FINCH AVE W @ ISLINGTON AVE
2017-03-20 09:00 2017-09-14 16:00 Daily
East and westbound curb lane closed due to construction
MARS RD
From HWY 27 NB to BAYWOOD RD
2017-03-20 07:00 2017-09-14 16:00 Daily
WESTBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
WOODBINE DOWNS BLVD
From FINCH AVE W to WOODBINE DOWNS BLVD
2017-03-20 07:00 2017-09-14 19:00 Daily
Northbound curb lane closed due to construction
TIDEMORE AVE @ REXDALE BLVD
2017-03-20 07:00 2017-09-14 16:00 Daily
Northbound curb lane occupied due to construction.
NORTH HEIGHTS RD
From KIPLING AVE to APPLEDALE RD
2017-03-20 07:00 2017-09-14 16:00 Daily
WESTBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
LITCHFIELD CRT
At SILVERSTONE DR
2017-03-20 07:00 2017-09-14 16:00 Daily
Trenchless Rehabilitation (CIPP System) of Existing Water mains in Etobicoke, and Toronto Districts.
THE QUEENSWAY
From HWY 427 to SHERWAY GARDENS RD
2017-03-20 19:00 2017-09-14 07:00 Daily
Trenchless Rehabilitation (CIPP System) of Existing Water mains in Etobicoke, and Toronto Districts.
BENBOW RD
From SASKATOON DR to WINNIPEG RD
2017-03-22 09:00 2017-04-05 15:00 Daily
Southbound curb lane closed due to construction
KEELE ST
From HUMBERSIDE AVE to HUMBERSIDE AVE
2017-03-22 17:01 2017-03-29 20:01 Daily
road closed due to construction
THE WESTWAY @ 40 The Westway
2017-03-22 09:00 2017-04-05 16:00 Daily
SOUTHBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
WESTROYAL RD
From SASKATOON DR to LETHBRIDGE AVE
2017-03-22 07:00 2017-04-05 19:00 Daily
Westroyal rd closed from Saskatoon dr to Lethbridge ave in the southbound direction. Occuplying the southbound curb lane.
LAWRENCE AVE W
From PIMLICO RD to LAWRENCE AVE W
2017-03-23 09:00 2017-04-06 16:00 Daily
Westbound right lane closed due to construction(pimlico rd to 1522 lawrence ave w)
CHARNLEIGH CRT
From SILVERSTONE DR to CHARNLEIGH CRT
2017-03-20 07:00 2017-09-14 19:00 Daily
westbound curb lane occupied due to water mains repair
RHINESTONE DR
From BIRGITTA CRES to ODESSA AVE
2017-03-22 07:00 2017-04-05 19:00 Daily
Westbound curblane occupied due to dig pit repair
MULHAM PL
From GATEWOOD CRES to KNOWLAND DR
2017-03-20 07:00 2017-03-27 19:00 Daily
The southbound curb lane will be occupied due to excavation.
OAKFIELD DR @ ROYAL YORK RD
2017-03-23 07:00 2017-04-06 19:00 Daily
The eastbound curb lane will be occupied due to excavation.
HOLLISTER RD @ 23 to 21 HOLLISTER RD
2017-03-19 07:00 2017-04-02 19:00 Daily
The northbound curb lane will be occupied due to excavation.
MARS RD
From HWY 27 NB to BAYWOOD RD
2017-03-20 07:00 2017-09-14 19:00 Daily
The westbound curb lane will be partially obstructed due to watermain rehabilitation.
TIDEMORE AVE @ REXDALE BLVD
2017-03-20 09:00 2017-09-14 16:00 Daily
The northbound curb lane will be partially obstructed due to watermain rehabilitation.
EGLINTON AVE W @ LLOYD MANOR RD
2017-03-20 09:00 2017-09-14 16:00 Daily
The eastbound curb lane will be partially obstructed due to watermain rehabilitation.
KIPLING AVE @ WIDDICOMBE HILL
2017-03-20 09:00 2017-09-14 16:00 Daily
The southbound curb lane will be partially obstructed due to watermain rehabilitation.
WIDDICOMBE HILL BLVD
From EGLINTON AVE W to KIPLING AVE
2017-03-20 07:00 2017-09-14 19:00 Daily
The eastbound curb lane will be partially obstructed due to watermain rehabilitation.
REXDALE BLVD @ TIDEMORE AVE
2017-03-20 09:00 2017-09-14 16:00 Continuous
Rexdale blvd and Tidemore ave closed in the westbound direction. Occupying the westbound curb lane.
BLOOR ST W
From OAKMOUNT RD to PACIFIC AVE
2017-03-24 08:00 2017-04-07 19:00 Daily
The westbound curb lane will be occupied due to new conduit cable install.
RIVALDA RD @ SHEPPARD AVE W
2017-03-20 07:00 2017-09-14 19:00 Daily
Closed in the northbound direction, occupying the curb lane due to rehabilitation work on watermains.
BRADSTOCK RD
From WESTON RD to RIVALDA RD
2017-03-20 09:00 2017-09-14 16:00 Daily
The westbound curb lane will be occupied due to trenchless rehabilitation.
HOMER AVE
From HECTOR AVE to ROCKCLIFFE BLVD
2017-03-24 07:00 2017-04-07 19:00 Daily
eastbound curb lane occupied due to road work
GUESTVILLE AVE
From GUESTVILLE AVE to LAMBTON AVE
2017-03-24 07:00 2017-04-07 19:00 Daily
north bound curb lane occupied due to road work Trench and place conduit
THE QUEENSWAY
From WOODFORD PARK RD to BURMA DR
2017-03-24 09:30 2017-04-07 16:00 Daily
WEST BOUND CURB LANE OCCUPIED DUE TO Dig blockage pit and repair conduit
NEILSON DR
From JEFF DR to NEILSON DR
2017-03-24 09:00 2017-04-14 16:00 Daily
west bound curb lane occupied due to Trench and place conduit
NEILSON DR @ 71 to 73 NEILSON DR
2017-03-24 09:00 2017-04-14 16:00 Daily
NORTH BOUND CURB LANE OCCUPIED DUE TO ROAD WORK
RICKSHAW AVE
From JEFF DR to STEVENHARRIS DR
2017-03-24 07:00 2017-04-14 19:00 Daily
eastbound curb lance occupied due to road work
TERRYELLEN CRES
From TERRYELLEN CRES to TERRYELLEN CRES
2017-03-24 07:00 2017-04-14 19:00 Daily
eastbound curb lane occupied due to road work
HOLMESDALE RD
From HOLMESDALE CRES to ENNERDALE RD
2017-03-24 09:00 2017-03-31 16:00 Daily
Placing conduit and fiber optic cable
THE WEST MALL
From CIVIC CENTRE CRT to EVA RD
2017-03-24 09:00 2017-03-31 16:00 Daily
Excavation to place new conduit and cabinet on behalf of Bell Canada
BURNHAMTHORPE RD @ THE EAST MALL
2017-03-23 09:00 2017-04-06 16:00 Daily
Trench and place conduit
THE EAST MALL @ BURNHAMTHORPE RD
2017-03-23 09:00 2017-04-06 16:00 Daily
Trench and place conduit
RONSON DR
2017-03-23 07:00 2017-03-31 17:00 Daily
Occupying curb of 1866 Ronson dr to 2 Ronson dr, alternating north/east/south/west directions (street curves into a "U").
WOODBINE DOWNS BLVD @ FINCH AVE W
2017-03-20 07:00 2017-09-14 19:00 Daily
The northbound curb lane will be occupied due to rehabilitation to existing watermain.
MICHAEL POWER PL @ RESURRECTION RD
2017-03-23 07:00 2017-04-07 19:00 Daily
The southbound curb lane will be occupied to clear blockages on bell infrastructure.
CARRIER DR
From HWY 27 NB to ALBION RD
2017-03-20 07:00 2017-09-14 19:00 Daily
The northbound and westbound curb lane will be occupied due to rehabilitation to existing watermain.
HUMBER COLLEGE BLVD
From FINCH AVE W to CARRIER DR
2017-03-20 07:00 2017-09-14 19:00 Daily
Northbound curb lane (partial obstruction)Existing Water mains
ROSE VALLEY CRES
From WOODGATE DR to STONEY BROOKE DR
2017-03-24 09:00 2017-04-04 16:00 Daily
Curb lane at 20 Rose Valley Cres occupied for placing conduit.
LAKE SHORE BLVD W
From MARINE PARADE DR to BROOKERS LANE
2017-03-24 00:01 2017-04-03 23:59 Continuous
The eastbound and westbound track lanes will be occupied due to replacement track work.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HELENDALE AVE @ YONGE ST
2016-04-04 00:01 2017-12-31 23:59 Daily
The eastbound and westbound lanes will be occupied due to staging of construction project equipment.
THE BRIDLE PATH
From SAINTFIELD AVE to POST RD
2016-08-15 07:00 2017-06-06 19:00 Daily
The northbound and southbound lanes will be occupied due to water main and water service replacement.
LAWRENCE AVE W
From DUFFERIN ST to WR ALLEN RD
2016-10-17 00:01 2017-05-31 23:59 Continuous
Eastbound and westbound lanes will be occupied maintaining one lane of traffic in each direction at all times due to road resurfacing.
KEELE ST
From FOUR WINDS DR to TORO RD
2016-11-01 12:00 2017-11-02 23:59 Continuous
One northbound and one southbound lanes will be occupied due to road work by the Toronto Transit Commission.
KENTLAND CRES @ BESTVIEW DR
2016-11-28 07:00 2017-11-30 19:00 Continuous
One lane will be occupied due to basement flooding protection program city contract work. One lane will be used for two-way traffic.
HARRINGTON CRES
From BESTVIEW DR to MINTWOOD DR
2016-11-28 07:00 2017-11-30 19:00 Daily
All lanes, one at a time, will be occupied due to City of Toronto basement flooding protection program.
GOLDENWOOD RD
From BESTVIEW DR to SPARWOOD CRT
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
BESTVIEW DR
From KENTLAND CRES to GOLDENWOOD RD
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
STEELES AVE W @ EAST of DUFFERIN ST
2016-12-21 09:30 2017-05-31 15:30 Daily
The eastbound curb lane will be occupied due to sanitary sewer realignment.
LAWRENCE AVE E
From RAILSIDE RD to VICTORIA PARK AVE
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
OXBOW RD
From YORK MILLS RD to DALEBERRY PL
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
WYEGATE CRT
From WILKET RD to WILKET RD
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
WILKET RD
From WYEGATE CRT to BAYVIEW AVE
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
BERKINDALE DR
From HEATHCOTE AVE to HARRISON RD
2017-01-30 07:00 2017-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to installation of new watermain. Weekend work hours will be form 9:00 AM to 7:00 PM
WEDGEWOOD DR
From MAXOME AVE to YONGE ST
2017-01-11 07:00 2017-06-30 19:00 Daily
The eastbound and westbound lane will be occupied due to watermain and water service replacement. Work hours on the weekend are the following: 9:00 am to 7:00 pm.
ROCKFORD RD
From BATHURST ST to STONEDENE BLVD
2017-01-16 07:00 2017-04-16 16:00 Dailiy
The eastbound and westbound curb lane will be occupied due to work done by Power Line Plus Ltd.
BATHURST ST @ DEWLANE DR
2017-01-16 09:00 2017-04-16 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
CEDARCROFT BLVD
From ROBINGROVE RD to BATHURST ST
2017-01-16 07:00 2017-04-16 16:00 Daily
The eastbound and westbound curb lane will be occupied due to road work.
PATRICIA AVE
From BATHURST ST to HOMEWOOD AVE
2017-01-16 07:00 2017-04-16 16:00 Daily
The eastbound and westbound curb lane will be occupied due to road work.
YORKLAND BLVD
From YORKLAND RD to CONSUMERS RD
2017-01-16 07:00 2017-04-16 16:00 Daily
The eastbound and westbound curb lanes will be occupied due to road work.
YORKLAND RD
From SHEPPARD AVE E to YORKLAND BLVD
2017-01-16 07:00 2017-04-16 16:00 Daily
The northbound and southbound curb lanes will be occupied due to road work.
DON MILLS RD
From FAIRVIEW MALL DR to GODSTONE RD
2017-01-19 09:00 2017-03-31 16:00 Daily
Northbound curb lane will be occupied due to repair of existing Bell structure.
CAVOTTI CRES
From SHAFTESBURY AVE to WILMINGTON AVE
2017-01-23 07:00 2017-04-28 17:00 Daily
The southbound lanes will be occupied due to construction work.
HURDMAN ST
From GULLIVER RD to PARAMOUNT CRT
2017-01-23 07:00 2017-05-20 17:00 Daily
The southbound lanes will be occupied due to construction work.
WHITBREAD CRES
2016-12-01 07:00 2017-04-28 17:00 Daily
South bound lanes will be occupied due to road work.
SPENVALLEY DR
2017-01-01 07:00 2017-04-28 17:00 Daily
East bound and west bound lanes will be occupied due to road work.
MARKAY ST @ CHARRINGTON CRES
2017-01-01 07:00 2017-04-28 17:00 Daily
South bound lanes will be occupied due to road work.
SORRENTO CRT
2017-01-01 07:00 2017-04-28 17:00 Daily
South bound lanes will be occupied due to road work.
GERALDTON CRES @ ALAMOSA DR
2017-01-01 07:00 2017-08-28 17:00 Daily
North bound and South bound lanes will be occupied due to road work.
CONAMORE CRES
From DERRYDOWN RD to DUNDEE DR
2017-01-24 00:01 2017-08-31 23:59 Daily
The full road will be closed due to city of Toronto Basement flooding contract.
NORTHCLIFFE BLVD
From CLOVERLAWN AVE to ROSECLIFFE AVE
2017-01-26 07:00 2017-04-28 17:00 Daily
Northbound and Southbound lanes will be occupied due to Road work.
ARLSTAN DR
From WILMINGTON AVE to EVANSTON DR
2017-01-26 07:00 2017-03-31 17:00 Daily
Northbound lanes will be occupied due to Road work.
VEERLAND DR
From MAPLE LEAF DR to BERRYTON AVE
2017-01-26 07:00 2017-03-31 17:00 Daily
Westbound lanes will be occupied due to Road work.
BAYVIEW AVE
From BLITHFIELD AVE to MCKEE AVE
2017-01-26 21:00 2017-03-31 05:00 Daily
Southbound lanes will be occupied due to Road work.
BLITHFIELD AVE
From BAYVIEW AVE to BURBANK DR
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
DREWRY AVE
From SUNFOREST CRT to CHELMSFORD AVE
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
GROVE PARK CRES
From NYMARK AVE to GLENTWORTH RD
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
RYKERT CRES @ RICHLEA CRCL
2017-01-27 07:00 2017-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
DON MILLS RD @ EGLINTON AVE E
2017-01-26 07:00 2017-03-31 17:00 Daily
The eastbound lanes on Eglinton and the southbound lanes on Don Mills will be occupied in the south-west corner due to construction of type 4THESL manhole and small portion of the ductbank connecting to the manholes.
DON MILLS RD @ EGLINTON AVE E
2017-01-26 07:00 2017-06-01 17:00 Daily
Single lane occupations in all directions of the intersection (500m West-East of Don Mills & 200m North-South of Eglinton) due to addition and relocation of Cogeco pipes and breakout/relocation of Bell structures.
MADRON CRES
From KILLAMARSH DR to HUCKNALL RD
2017-01-24 07:00 2017-08-31 18:00 Daily
All lanes will be occupied due to City of Toronto basement flooding contract.
EGLINTON AVE E @ BAYVIEW AVE
2017-02-06 09:00 2017-04-01 16:00 Daily
The right curb lane in all directions at intersection will be occupied due to the installation of monitoring points for Eglinton Crosstown Construction.
LAWNSIDE DR @ 52 to 64 lawnside dr
2017-02-08 07:00 2017-04-28 17:00 Daily
The westbound lanes will be occupied due to road work.
MAPLE LEAF DR @ STELLA ST
2017-02-07 07:00 2017-05-31 17:00 Daily
The eastbound lanes will be occupied due to road work.
WHITBREAD CRES
2017-02-08 07:00 2017-04-28 17:00 Daily
the southbound lanes will be occupied due to road work.
CORONADO CRT
From WESTON RD to ST LUCIE DR
2017-02-08 07:00 2017-04-28 17:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
WILMINGTON AVE @ 221 to 249 wilmington ave
2017-02-08 07:00 2017-04-28 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
WILMINGTON AVE @ 221 to 249 wilmington ave
2017-02-08 07:00 2017-04-28 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
GULLIVER RD @ 19 CULFORD
2017-02-08 07:00 2017-04-28 17:00 Daily
The westbound lanes will be occupied due to road work.
PARSON CRT @ CULFORD RD
2017-02-08 07:00 2017-05-20 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
FLAMBOROUGH DR @ AMESBURY DR
2017-02-08 07:00 2017-05-20 17:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
LANGHOLM DR @ CAMBORNE AVE
2017-02-08 07:00 2017-06-02 17:00 Daily
The eastbound and westbound lanes will be occupied due to construction.
GEORGE HENRY BLVD
From RINGWOOD CRES to PARFIELD DR
2017-02-10 07:00 2017-04-10 19:00 Daily
The eastbound lane will be occupied due to new conduit by directional drilling.
GEORGE HENRY BLVD
From QUINCY CRES to RINGWOOD CRES
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
PARFIELD DR
From MEADOWGLADE CRES to GEORGE HENRY BLVD
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
GEORGE HENRY BLVD @ DON MILLS RD
2017-02-10 07:00 2017-04-10 19:00 Daily
The eastbound curb lane will be occupied due to new conduit by directional drilling.
FARMVIEW CRES
From GEORGE HENRY BLVD to PARFIELD DR
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
MEADOWGLADE CRES
From SHAUGHNESSY BLVD to PARFIELD DR
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
SHAUGHNESSY BLVD
From PARFIELD DR to MEADOWGLADE CRES
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
SKYVIEW CRES
From HAVENBROOK BLVD to HAVENBROOK BLVD
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
HAVENBROOK BLVD
From SHAUGHNESSY BLVD to SKYVIEW CRES
2017-02-10 07:00 2017-04-10 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
EVANSTON DR @ CAVOTTI CRES
2017-02-14 07:00 2017-06-02 17:00 Daily
Both lanes in both directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
APACHE TRL @ PAWNEE AVE
2017-02-21 07:00 2017-03-31 19:00 Daily
The northbound and southbound curb lanes will be occupied, one at a time, due to Bell Smart City project work.
WILMINGTON AVE @ 221 to 259 WILMINGTON AVE
2017-02-21 07:00 2017-06-23 17:00 Daily
The northbound lanes will be occupied due to trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
APACHE TRL @ CHEROKEE BLVD
2017-02-21 07:00 2017-03-31 19:00 Daily
The northbound and southbound curb lanes will be occupied alternately due to road work for the Bell Smart City Project.
DON MILLS RD
From CLIFFWOOD RD to FRESHMEADOW DR
2017-02-20 09:30 2017-04-20 15:30 Daily
The northbound right lane will be occupied due to directional drilling. Weekend hours will be form 9:00 AM to 4:00 PM.
ROBINA AVE @ 21 ROBINA AVE
2017-02-27 07:00 2017-04-10 19:00 Daily
The northbound curb lane will be occupied to place new conduit and fiber optic cable.
DUFFERIN ST @ Eglinton Ave West
2017-03-01 07:00 2017-03-31 19:00 Daily
Northbound and Southbound & Eastbound and Westbound lanes will be occupied due to road work.
EGLINTON AVE E
From YONGE ST to DUNFIELD AVE
2017-02-27 07:00 2017-04-30 19:00 Daily
One lane in each direction at various times will be occupied due to cable pulling and chamber access work for ECLRT Eglinton Station.
HAWLEAF CRES
From CLIFFWOOD RD to CLIFFWOOD RD
2017-02-27 07:00 2017-04-27 19:00 Daily
Both lanes in both directions will be occupied due to new conduit installation by directional drilling.
CHAMBERLAIN AVE
From MIRANDA AVE to BOWIE AVE
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada. Partial lane closure, both directions - both directions to have 'Yield to Oncoming Traffic'.
FELBRIGG AVE
From ELM RD to AVENUE RD
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure - both directions to use Yield to Oncoming.
HARDING AVE
From RENFIELD ST to CHISWICK AVE
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada, both directions. 'Yield to oncoming' to be used. Partial lane closure.
HONOUR CRT
At BENJAMIN BOAKE TRL
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure both directions.
WILLIAM CRAGG DR
From REDFERN AVE to PALMER AVE
2017-03-07 09:30 2017-03-28 15:30 Daily
Cable Excavation for Bell Canada
BAINBRIDGE AVE
From BATHURST ST to YEOMANS RD
2017-03-03 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada, both directions. Partial lane closure. Both with 'Yield to oncoming'.
BESSBOROUGH DR
From ROLLAND RD to MILLWOOD RD
2017-03-09 09:30 2017-03-30 15:30 Daily
147 Bessborough Dr. Cable Excavation for Bell Canada. Partial Lane Closure.
MELROSE AVE
From ELM RD to AVENUE RD
2017-03-06 09:30 2017-03-27 15:30 Daily
334 Melrose Ave. Cable excavation for Bell Canada. Partial lane closure. Both directions. Both directions to use 'Yield to Oncoming.'
ELM RD
From BROOKE AVE to FELBRIGG AVE
2017-03-06 09:30 2017-03-27 15:30 Daily
403 Elm Rd. Cable excavation for Bell Canada. Partial ln closure. Both directions. Both directions to use 'Yield to oncoming'.
YONGE ST
From ORCHARD VIEW BLVD to HILLSDALE AVE E
2017-02-27 07:00 2017-04-30 19:00 Daily
One northbound and southbound lanes will be occupied alternately due to cable pulling and chamber access work for ECLRT Eglinton Station. Work will be completed at various times.
DUPLEX AVE
From ORCHARD VIEW BLVD to HILLSDALE AVE W
2017-02-27 07:00 2017-04-30 19:00 Daily
One northbound and southbound lanes will be occupied alternately due to cable pulling and chamber access work for ECLRT Eglinton Station. Work will be completed at various times.
HILLSDALE AVE W
From DUPLEX AVE to YONGE ST
2017-02-27 07:00 2017-04-30 19:00 Daily
One eastbound and westbound lanes will be occupied alternately due to cable pulling and chamber access work for ECLRT Eglinton Station. Work will be completed at various times.
ORCHARD VIEW BLVD
From DUPLEX AVE to YONGE ST
2017-02-27 07:00 2017-04-30 19:00 Daily
One eastbound and westbound lanes will be occupied alternately due to cable pulling and chamber access work for ECLRT Eglinton Station. Work will be completed at various times.
EGLINTON AVE W
From DUPLEX AVE to YONGE ST
2017-02-27 07:00 2017-04-30 19:00 Daily
One eastbound and westbound lanes will be occupied alternately due to cable pulling and chamber access work for ECLRT Eglinton Station. Work will be completed at various times.
MCNICOLL AVE
From LESLIE ST to MICHAEL DR
2017-03-06 08:00 2017-07-07 16:00 Daily
The eastbound and westbound curb lanes will be occupied to install Toronto Hydro duct bank.
DERRYDOWN RD
From KILLAMARSH DR to CATFORD RD
2017-02-06 08:45 2017-03-25 23:59 Daily
City of Toronto Basement Flooding - Contract 15ECS-LU-06FP
BREANNA CRT @ SADDLETREE DR
2017-03-11 09:00 2017-03-31 16:00 Daily
17 Breanna CRT. Right lane closure. 30m North of address to 30m South of address
WILSON AVE @ LADY YORK AVE
2017-03-07 07:00 2017-11-04 17:00 Daily
Partial westbound lane closures for sewer services & maintenance.
CALEDONIA RD
From CALEDONIA RD to NORMAN AVE
2017-03-13 09:00 2017-03-27 16:00 Daily
Caledonia Rd. From 120 Caledonia to Norman Ave. WB curb lane occupied due to digging.
WHITBURN CRES @ KEELE ST
2017-03-15 07:00 2017-03-27 19:00 Daily
Whitburn Cres. and Keele St. Eastbound direction. Occupying curb lane of Whitburn Cres. Work consists of pit digging, and a conduit will be installed.
FINCH AVE W
From YONGE ST to DUPLEX AVE
2017-03-14 09:00 2017-03-31 16:00 Daily
The westbound curb lane will be occupied for maintenance hole repairs.
ELLERSLIE AVE
From DIAGONAL RD to SENLAC RD
2017-03-13 09:00 2017-03-31 16:00 Daily
(241) Ellerslie Ave. from Diagonal Rd. to Senlac Rd.; EB curb lane to be closed due to excavation.
LADNER DR @ OLD SHEPPARD AVE
2017-03-13 09:00 2017-03-31 16:00 Daily
(69 ) Ladner Dr. 30m N of to 30m S of address. Ladner Dr. right lane SB to be occupied due to excavation.
OAKDALE RD
From EDDYSTONE AVE to FINCH AVE W
2017-03-15 07:00 2017-03-31 19:00 Daily
Oakdale rd closed from Eddystone ave to Finch ave w. Southbound direction. Occupying southbound curb lane.
SONATA CRES
From DENLOW BLVD to SAGEWOOD DR
2017-03-20 09:00 2017-03-31 16:00 Daily
9 Sonata Cr. EB Right lane closed due to excavation
CARAVAN DR @ DENLOW BLVD
2017-03-20 09:00 2017-03-31 16:00 Daily
48 Caravan Dr. EB Right lane closed due to excavation
BESTVIEW DR
2017-03-20 09:00 2017-03-31 16:00 Daily
170 Bestview dr right lane closure, westbound. Occupying the shoulder and road from 30m north to 30m south of 170 Bestview dr.
HOLLYBERRY TRL
2017-03-20 09:00 2017-03-31 16:00 Daily
362 Hollyberry Trl. Right lane closure westbound road and shoulder. Occupying 30m north and 30m south of 362 Hollyberry Trl.
SONATA CRES
From SONATA CRES to SONATA CRES
2017-03-20 09:00 2017-03-31 16:00 Daily
right lane closure EB due to cable trouble Bell Maintenance
BANBURY RD
2017-03-20 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE
BROADWAY AVE
From SUTHERLAND AVE to BESSBOROUGH DR
2017-03-16 09:00 2017-05-16 16:00 Daily
Underground hydro installation.
BARMAC DR
2017-03-16 09:30 2017-03-30 15:30 Daily
Cable Excavation for Bell Canada
BATHURST ST
From REGINA AVE to DELORAINE AVE
2017-03-17 09:00 2017-03-28 16:00 Daily
Placing new conduit and fiber optic cable
DELORAINE AVE
At BATHURST ST
2017-03-17 09:00 2017-03-28 16:00 Daily
Placing new conduit and fiber optic cable
BANBURY RD
From CARAVAN DR to LARKFIELD DR
2017-03-21 09:00 2017-03-28 16:00 Daily
Northbound lane closed due to construction
BROADWAY AVE
From SUTHERLAND AVE to BESSBOROUGH DR
2017-03-16 07:00 2017-06-16 16:00 Daily
Westbound right lane closed due to construction
BUCKINGHAM AVE @ DINNICK CRES
2017-03-21 07:00 2017-03-28 19:00 Daily
Eastbound lane closed due to construction
STEELES AVE W @ JANE ST
2017-03-20 09:30 2017-03-28 15:30 Daily
Westbound curb lane occupied for new conduit and fiber optic cable placement.
SONGWOOD DR
At ARDWICK BLVD
2017-03-17 08:30 2017-03-31 15:30 Daily
Partial Law Closure due to Cable Excavation for Bell Canada
DERRYDOWN RD
From KILLAMARSH DR to CATFORD RD
2017-03-20 07:00 2017-08-31 18:00 Daily
NB AND SB SINGLE LANES CLOSED DUE TO WORK BEING DONE.
FINCH AVE W @ SENTINEL RD
2017-03-23 09:00 2017-04-21 16:00 Daily
The eastbound and westbound curb and passing lanes will be occupied due to gas main install.
ERSKINE AVE
From YONGE ST to MOUNT PLEASANT RD
2017-03-22 09:30 2017-04-07 15:30 Daily
Eastbound right lane closed due to construction
YONGE ST
From ERSKINE AVE to KEEWATIN AVE
2017-03-22 09:30 2017-04-07 15:30 Daily
Northbound right lane closed due to construction
YORKDALE RD @ 401
2017-03-22 09:00 2017-04-07 11:59 Continuous
Site service removal of existing CB and replacement w/new to suit new curb line
BATTERSEA CRES
From BATTERSEA CRES to BATTERSEA CRES
2017-03-23 07:00 2017-04-06 19:00 Daily
Westbound curblane occupied due to Trench and Place conduit
PIMLICO RD
From PIMLICO RD to BATTERSEA CRES
2017-03-23 19:00 2017-04-06 19:00 Daily
Southbound curblane occupied due to Trench and Place conduit
DEMARIS AVE
From YELLOWSTONE ST to TOPCLIFF AVE
2017-03-22 08:30 2017-03-31 17:00 Daily
The eastbound and westbound curb and passing lanes will be occupied alternately due to borehole drilling.
DEBLYN DR @ BELLBROOK RD
2017-03-22 08:30 2017-03-31 17:00 Daily
The northbound and southbound curb and passing lanes will be occupied alternately due to borehole drilling.
NYMARK AVE
From LESLIE ST to SHAUGHNESSY BLVD
2017-03-22 08:30 2017-03-31 17:00 Daily
The eastbound and westbound curb and passing lanes will be occupied alternately due to borehole drilling.
ADRA VILLAWAY @ 1 ADRA VILLAWAY
2017-03-22 07:00 2017-03-31 19:00 Daily
The northbound and southbound lanes will be reduced to one lane in each direction due to water servicing.
ADRA VILLAWAY
2017-03-22 07:00 2017-03-31 19:00 Daily
Road reduced to one lane for water servicing.
THORNCLIFFE PARK DR
2017-03-24 08:00 2017-03-31 19:00 Daily
Closed from 71 to 79 Thorncliffe Park northbound direction, occupying the curb lane, due to construction by Rogers.
LESLIE ST @ 1127 LESLIE ST
2017-03-23 09:00 2017-04-20 15:30 Daily
The northbound lanes will be occupied due to The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
SHEPPARD AVE W @ BRYANT AVE
2017-03-23 09:00 2017-03-31 15:30 Daily
The westbound curb lane will be occupied due to Bell strand install.
BROADWAY AVE
From SUTHERLAND DR to BESSBOROUGH DR
2017-03-16 07:00 2017-06-16 18:00 Daily
The westbound curb lane will be occupied due to underground hydro installation.
BAYVIEW AVE
From KILGOUR RD to SUNNYDENE CRES
2017-03-22 09:00 2017-03-27 16:00 Daily
Curb lane North bound, 1 Curb lane South bound occupied due to road work
CLIPPER RD
From VAN HORNE AVE to BOWHILL CRES
2017-03-23 09:00 2017-03-27 16:00 Daily
The southbound curb lane will be occupied due to directional drilling. Work will not be conducted on March 26, 2017.
GAIL GRV @ ARROW RD
2017-03-20 07:00 2017-09-14 19:00 Daily
The westbound curb lane will be partially obstructed due to rehabilitation to existing watermain.
LILLIAN ST @ OTONABEE AVE
2017-03-25 07:00 2017-03-25 19:00 Daily
Excavation to place new conduit on behalf of Bell Canada
OLD ORCHARD GRV @ BATHURST ST
2017-03-24 09:00 2017-03-31 16:00 Daily
Dig pit, install conduit, place pedestal, place cable
HILDA AVE
At DREWRY AVE
2017-03-25 07:00 2017-03-25 19:00 Daily
Excavation to place new conduit on behalf of Bell Canada
GREENWIN VILLAGE RD
From PECKHAM AVE to BATHURST ST
2017-03-24 09:00 2017-03-31 16:00 Daily
Access manholes & place underground cables
FINCH AVE W @ ISLINGTON AVE
2017-03-20 09:00 2017-09-14 16:00 Daily
The eastbound and westbound curb lanes will be occupied due to rehabilitation to existing watermain.
SENTINEL RD
From STILECROFT DR to FREDRICK MOWAT LANE
2017-03-24 09:00 2017-03-31 16:00 Daily
The northbound and southbound curb lanes will be alternately occupied due to bell fibre cable installation.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
SCARBOROUGH GOLF CLUB RD
From ELLESMERE RD to PAINTED POST DR
2016-09-19 09:00 2017-03-30 16:00 Daily
One northbound and one southbound lanes will be occupied due to cable chamber excavation by Thirau Inc.
BEECHGROVE DR @ 51 BEECHGROVE DR
From MINUK ACRES to COPPERFIELD RD
2016-11-08 07:00 2017-06-30 17:00 Daily
The road will be reduced to one lane due to shoring installation by Graham Construction and Engineering LP.
WYE VALLEY RD
From GLAIVE DR to SHROPSHIRE DR
2017-01-30 07:00 2017-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to installation of new sewermain. Weekend work hours will be form 9:00 AM to 7:00 PM
MCCOWAN RD
From HWY 401 to ELLESMERE RD
2017-01-23 09:30 2017-03-31 15:30 Daily
North bound and South bound lanes will be occupied due to road work.
TIDESWELL BLVD
From RYLANDER BLVD to HUXTABLE LANE
2017-01-19 09:00 2017-03-31 19:00 Daily
The northbound curb lane will be occupied due to trench and CSP/GLB placement.
LOCHLEVEN DR
From GREENDOWNS DR to RIANT ST
2017-01-23 07:00 2017-04-28 17:00 Daily
The northbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
RHYDWEN AVE
From BIRCHCLIFF AVE to BIRCHMOUNT RD
2017-01-23 07:00 2017-04-28 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers.
ADANAC DR
From COLONIAL AVE to LITTLE ROCK DR
2017-01-23 07:00 2017-04-28 17:00 Daily
The northbound and southbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers.
MONTVALE DR
From GIDLEY RD to CHINE DR
2017-01-23 07:00 2017-04-28 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
LOCHLEVEN DR
From GREENDOWNS DR to RIANT ST
2017-01-23 07:00 2017-04-28 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
BRINLOOR BLVD
From SERVICE RD to DUNCOMBE BLVD
2017-01-23 07:00 2017-04-28 17:00 Daily
South bound will be occupied due to road work.
BELLAMY RD S @ ADANAC DR
From SILVERSTONE DR to BUCKSBURN RD
2017-01-01 07:00 2017-04-28 17:00 Daily
South bound lanes will be occupied due to road work.
BLUE POND PL @ GOLDHAWK TRL
2017-01-26 07:00 2017-05-20 19:00 Daily
East bound lane will be occupied due to road work.
GOLDHAWK TRL
From PHALEN CRES to WENLOCK GT
2017-01-26 07:00 2017-05-20 19:00 Daily
Northbound lane will be occupied due to road work.
WENLOCK GT
From GOLDHAWK TRL to BRIMLEY RD
2017-01-26 07:00 2017-05-20 19:00 Daily
Eastbound will be occupied due to road work.
SADLEE COVE CRES @ GOLDHAWK TRL
2017-01-26 07:00 2017-05-20 19:00 Daily
The eastbound lane will be occupied due to the installation of Bell Fibre optic network.
CRAYFORD DR @ 100m south of GLENCOYNE CRES
2017-01-26 07:00 2017-03-31 17:00 Daily
South bound lane occupied due to Road work.
CRAYFORD DR
From CRAYFORD DR to GLENCOYNE CRES
2017-01-26 07:00 2017-03-31 17:00 Daily
South bound lane occupied due to Road work.
MORBANK DR @ 89 to 47 MORBANK DR
2017-01-26 07:00 2017-03-31 17:00 Daily
East bound lane occupied due to Road work.
CRAYFORD DR @ 45 to 69 Crayford Drive
2017-01-26 07:00 2017-03-31 17:00 Daily
North bound lane occupied due to Road work.
CHARLES TUPPER DR
From CENTENNIAL RD to LANGEVIN CRES
2017-01-26 07:00 2017-03-31 17:00 Daily
Westbound lanes will be occupied due to Road work.
BENNETT RD @ RAVENVIEW DR
2017-01-27 08:00 2017-08-31 17:00 Daily
Northbound and Southbound lanes will be occupied due to Road work.
BAYVIEW AVE
From FERNSIDE CRT to PARKVIEW AVE
2017-01-25 07:00 2017-05-20 17:00 Daily
Southbound lanes will be occupied due to Road work.
SHEPPARD AVE E
From CHICHESTER PL to PHARMACY AVE
2017-01-27 09:30 2017-03-31 15:30 Daily
The eastbound and southbound lanes will be occupied due to road work.
SHEPPARD AVE E
From KENNEDY RD to GORDON AVE
2017-01-27 09:00 2017-03-31 15:00 Daily
Partial lane closures for sewer services & maintenance.
O HENRY GRV @ SNOWBALL CRES
2017-01-27 07:00 2017-03-31 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
OAKRIDGE DR
From ROCKWOOD DR to CREE AVE
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to road work.
WOODBINE AVE
From KINGSTON RD to QUEEN ST E
2017-02-06 10:00 2017-03-31 15:30 Daily
The southbound curb lane will be occupied due to ttc new pole installation.
MIDDLEFIELD RD
From ORATOR GT to SCOTTFIELD DR
2017-01-30 07:00 2017-03-31 19:00 Daily
South bound lane will be occupied due to road work.
MILITARY TRL @ 75m to 200m Bonspiel Dr
2017-02-06 08:00 2017-03-31 16:00 Daily
Eastbound and Westbound lanes will be occupied due to road work.
KENHATCH BLVD @ 84/95 Kenhatch Blvd to 42/53 Kenhatch Blvd
2017-02-08 07:30 2017-03-31 19:00 Daily
The northbound and southbound curb lane will be occupied due to the installation of conduits for fibre build.
ROOKSNEST TRL @ 100/109 Rooksnest Trl to 32/61 Rooksnest Trk
2017-02-08 08:30 2017-03-31 18:00 Daily
The eastbound/westbound and northbound/southbound curb lanes will be occupied due to the installation of conduits for fibre build.
PARKCREST DR
2017-02-08 07:00 2017-04-28 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
SARATOGA DR @ STANWELL DR
2017-02-08 07:00 2017-04-28 17:00 Daily
The southbound lanes will be occupied due to road work.
TAMORA CRT
2017-02-08 07:00 2017-04-28 17:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
SARATOGA DR @ ELLESMERE RD
2017-02-08 07:00 2017-04-28 17:00 Daily
The southbound lanes will be occupied due to road work.
ROUGHFIELD CRES @ PLACENTIA BLVD
2017-02-13 15:45 2017-05-20 18:45 Daily
The northbound curb lane will be occupied due to road work.
SANDHURST CRCL
From SILBURY DR to WHITE HEATHER BLVD
2017-02-21 09:00 2017-04-29 16:00 Daily
The northbound and southbound lanes will be occupied due to road work.
SANDHURST CRCL
From PATH HILL PL to SILBURY DR
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
SANDHURST CRCL @ LYSANDER CRT
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
SANDHURST CRCL @ THUNDER GRV
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
BRILLIANT CRT @ SANDHURST CRCL
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
WHITE HEATHER BLVD
From SANDHURST CRCL to DRAGOON CRES
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
PATH HILL PL @ Sibury Dr
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
WHITLEY CASTLE CRES
From SILBURY DR to BETHANY LEIGH DR
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
BETHANY LEIGH DR
From SILBURY DR to ARBOR LOW GT
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
WESSEX PL @ SILBURY DR
2017-02-21 07:00 2017-04-29 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
WINTERMUTE BLVD @ AMBERCROFT BLVD
2017-02-21 07:00 2017-03-31 19:00 Daily
The eastbound and westbound curb lanes will be occupied, one at a time, due to Bell Smart City project work.
TRIANGLE VILLAS DR @ AMBERCROFT BLVD
2017-02-21 07:00 2017-03-31 19:00 Daily
Both lanes in both directions will partially be occupied due to Bell Smart City project work.
SYLVESTRE SQ @ WINTERMUTE BLVD
2017-02-21 07:00 2017-03-31 19:00 Daily
Both lanes in both directions will partially be occupied, one at a time, due to Bell Smart City project work.
FIELDSIDE DR @ 4 FIELDSIDE DR
2017-02-23 07:00 2017-04-30 19:00 Daily
The northbound curb lane will be occupied due to installation of new Bell Fibre network.
REDHEAD CRES @ 6 REDHEAD CRES
2017-02-23 07:00 2017-04-30 19:00 Daily
The northbound curb lane will be occupied due to installation of new Bell Fibre network.
BRIMSTONE CRES @ 2 BRIMSTONE CRES
2017-02-23 07:00 2017-04-30 19:00 Daily
The eastbound curb lane will be occupied due to installation of new Bell Fibre network.
GARSTON PL @ LANSBURY DR
2017-02-23 07:00 2017-04-30 19:00 Daily
The eastbound curb lane will be occupied due to installation of new Bell Fibre network.
LANSBURY DR @ 2 LANSBURY DR
2017-02-23 07:00 2017-04-30 19:00 Daily
The northbound curb lane will be occupied due to installation of new Bell Fibre network.
LONGSWORD DR
From BETHANY LEIGH DR to FIELDSIDE DR
2017-02-23 07:00 2017-04-30 19:00 Daily
The northbound curb lane will be occupied due to installation of new Bell Fibre network.
RICHMOND PARK BLVD
From MIDDLEFIELD RD to REDHEAD CRES
2017-02-23 07:00 2017-04-30 19:00 Daily
The eastbound curb lane will be occupied due to installation of new Bell Fibre network.
ROOKSNEST TRL
From KENHATCH BLVD to PLACENTIA BLVD
2017-02-22 08:30 2017-03-31 18:30 Daily
The eastbound and westbound curb lanes will be occupied due to installation of conduits for fiber build. Weekend hours will be from 9:00 AM to 5:00 PM.
BUSHCROFT GRV @ ROOKSNEST TRL
2017-02-22 08:30 2017-03-31 18:30 Daily
The northbound and southbound curb lanes will be occupied due to installation of conduits for fiber build. Weekend hours will be from 9:00 AM to 5:00 PM.
NASHDENE RD
From TIFFIELD RD to DYNAMIC DR
2017-02-22 07:00 2017-04-28 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to underground hydro re-hab.
PAINTED POST DR
From MARKHAM RD to SCARBOROUGH GOLF CLUB RD
2017-02-27 07:00 2017-03-30 16:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
WELLPARK BLVD @ 18 WELLPARK BLVD
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied due to installation of new Bell fibre optic network.
BROOKMILL BLVD @ DARNBOROUGH WAY
2017-02-27 07:00 2017-03-31 19:00 Daily
Both lanes will be occupied one lane at a time due to Bell Smart city project work.
BROOKMILL BLVD @ LA PEER BLVD
2017-02-27 07:00 2017-03-31 19:00 Daily
Both lanes in both directions will be occupied, one lane at a time, due to Bell Smart city project work.
HUNTSMILL BLVD @ MANILOW ST
2017-02-28 07:00 2017-03-31 19:00 Daily
The northbound and southbound curb lanes will be occupied alternately due to road work for the Bell Smart City Project.
HUNTSMILL BLVD @ CARL CRES
2017-02-28 07:00 2017-03-31 19:00 Daily
The northbound and southbound curb lanes will be occupied alternately due to road work for the Bell Smart City Project.
BRIDLEY DR
From BRIMWOOD BLVD to ARDGOWAN CRES
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied due to road work.
BRIMWOOD BLVD
From BRIDLEY DR to SANDHURST CRCL
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied due to road work.
DELBURN DR
From BRIMWOOD BLVD to WELLPARK BLVD
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied due to road work.
PLACENTIA BLVD @ PLACENTIA BLVD
2017-03-01 07:00 2017-03-31 19:00 Daily
The westbound and eastbound lanes will be occupied due to fibre placement for Bell Canada. Work will be done on the following streets: Placentia Blvd, Shooter Cres, Statesman Sq, Buckhurst Cres, Orator Gt, Croach Cres and Rouchfield Cres. Weekend work hours are 9am - 7pm.
ALANBULL SQ @ GOLDHAWK TRL
2017-03-01 07:52 2017-03-31 19:00 Daily
INSTALLATION OF NEW BELL FIBRE NETWORK. North and South lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
BARNWELL DR @ GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. North and South lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
BRIDPORT CRES
From HUTCHCROFT AVE to GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. North and South lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
DANILACK CRT @ GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. East and West lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
GOLDHAWK TRL
From DANILACK CRT to PHALEN CRES
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. East and West lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
HUTCHCROFT AVE
From MCNICOLL AVE to GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. North and South lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
MCNICOLL AVE
From HUTCHCROFT AVE to MCCOWAN RD
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. West Curb lane will be occupied. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
PONDTAIL DR @ GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Installation of new Bell Fibre network. North and South lanes will be occupied but not at the same time. Lanes will always remain open to emergency vehicles. Combination of traffic plans will be used as required as per site conditions.
WHARTON SQ @ GOLDHAWK TRL
2017-03-03 07:00 2017-03-31 19:00 Daily
Northbound and Southbound lanes will be alternately occupied due to Bell Fibre network installation.
BERNER TRL
From WASHBURN WAY to NEILSON AVE
2017-03-06 07:00 2017-03-30 19:00 Daily
Installation of new Bell Fibre network.
DANFORTH RD @ 1346 DANFORTH RD
2017-03-07 09:00 2017-03-29 16:00 Continuous
One northbound and southbound lane will be occupied due to sewer and water maintenance.
TOWN HAVEN PL @ MIDLAND AVE
2017-03-06 07:00 2017-04-06 19:00 Daily
Town Haven PI - UG Rebuild As per book 7, PDO Required at signalized intersections
MIDLAND AVE @ TOWN HAVEN PL
2017-03-06 09:00 2017-04-06 16:00 Daily
Town Haven PI - UG Rebuild As per Book 7. PDO required at signalized intersections
BLUE POND PL @ GOLDHAWK TRL
2017-01-26 07:00 2017-05-20 19:00 Daily
The eastbound lanes will be occupied to install a new Bell fibre optic network.
SADLEE COVE CRES @ GOLDHAWK TRL
2017-01-26 07:00 2017-05-20 19:00 Daily
The eastbound and westbound lanes will be occupied to install a new Bell fibre optic network.
PHALEN CRES @ GOLDHAWK TRL
2017-01-26 07:00 2017-05-20 19:00 Daily
The eastbound and westbound lanes will be occupied to install a new Bell fibre optic network.
SANDHURST CRCL @ 1500 SANDHURST CRCL
2017-01-26 07:00 2017-05-20 19:00 Daily
The westbound lanes will be occupied to install a new Bell fibre optic network.
MELVA CRES @ 12 MELVA CRES
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied to install a new Bell fibre optic network.
MCCOWAN RD @ SANDHURST CRCL
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied to install a new Bell fibre optic network.
MACKLINGATE CRT
From BRIMWOOD BLVD to MELVA CRES
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied to install a new Bell fibre optic network.
ARDGOWAN CRES @ 75 ARDGOWAN CRES
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied to install a new Bell fibre optic network.
AMANDA DR @ 15 AMANDA DR
2017-03-06 07:00 2017-05-20 19:00 Daily
The northbound lanes will be occupied to install a new Bell fibre optic network.
YORKSHIRE RD @ 27 YORKSHIRE RD
2017-03-06 21:00 2017-03-28 16:00 Daily
Eastbound curb lane will be occupied due to excavation.
ORTON PARK RD @ 90 ORTON PARK RD
2017-03-06 09:00 2017-03-28 16:00 Daily
Southbound right lane closed due to excavation
DANMARY RD
From ASCOLDA BLVD to CEDAR BRAE BLVD
2017-03-08 08:00 2017-03-31 19:00 Daily
5 Danmary rd. Excavation of a Bell Pit in a residential area to maintain/provide Bell service. Works expected to be completed in 2 day period, 4 hours each day.
DUNMAIL DR @ BLUE EAGLE TRL
2017-03-13 09:00 2017-03-31 16:00 Daily
One westbound lane occupied due to excavation.
CROWFOOT PL
2017-03-13 09:00 2017-03-31 16:00 Daily
12 Crowfoot Pl. SB right lane to be occupied due to excavation.
ELLINGTON DR
2017-03-13 09:00 2017-03-31 04:00 Daily
(150) Ellington Dr. From 30m North of 50 Ellington to 30m South of 50 Ellington. SB right lane to be closed due to excavation.
MILLHOUSE CRES @ 25 MILLHOUSE CRES
2017-03-13 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE
MCCOWAN RD
At SANDHURST CRCL
2017-03-09 07:00 2017-04-09 19:00 Daily
Installation of fiber optics for bell
KINGSTON RD @ PARKCREST DR
2017-03-12 09:30 2017-04-25 15:30 Daily
Directional drilling 2-4'' conduits for new Rogers plant from NW/PL of 3311 Kingston Road to NE/PL of 45 Parkcrest including road crossing (2) at Parkcrest and Kingston
SHEPPARD AVE E
From KINGSTON RD to BOYDWOOD LANE
2017-03-15 09:30 2017-04-15 15:30 Daily
The westbound curb lane will be occupied due to installation of new Bell Fibre network.
SCARBOROUGH GOLF CLUB RD
From LAWRENCE AVE E to ELLESMERE RD
2017-03-10 07:00 2017-06-13 16:00 Daily
Northbound right lane blocked due to the construction.
COPTHORNE AVE
From MIDLAND AVE to PORT ROYAL TRL
2017-03-15 07:00 2017-04-15 19:00 Daily
Eastbound and Westbound All lanes closed due to Construction.
DUXBURY DR
From MIDLAND AVE to PORT ROYAL TRL
2017-03-15 07:00 2017-04-15 19:00 Daily
All directions all lanes closed due to construction.
MIDLAND AVE
From ARTILLERY ST to STEELES AVE E
2017-03-15 09:00 2017-04-15 16:00 Daily
Northbound and southbound all lanes closed due to construction
PORT ROYAL TRL
From ASHCOTT ST to COPPERWOOD SQ
2017-03-15 07:00 2017-04-15 19:00 Daily
All Directions all lanes closed due to construction
MIDCROFT DR @ SONMORE DR
2017-03-20 09:00 2017-03-31 16:00 Daily
14 Midcroft Dr. NB right lane closed due to excavation
MACKLINGATE CRT @ MELVA CRES
2017-03-20 09:00 2017-03-31 16:00 Daily
44 Macklingate Crt. Right lane closed due to excavation.
MUIRBANK BLVD @ LAVERY TRL
2017-03-20 09:00 2017-03-31 16:00 Daily
33 Muirbank BL. Right lane closure due to excavation
FAIRFAX CRES
2017-03-13 09:00 2017-03-31 16:00 Daily
45 Fairfax Cr. SB Right lane closed due to excavation
TUDOR GLEN CRES
From EAST AVE to HIGHLAND AVE
2017-03-13 09:00 2017-03-31 16:00 Daily
64 Tudor Glen Cr SB right lane closed due to excavation.
KERBAR RD @ PUMA DR
2017-03-20 09:00 2017-03-31 16:00 Daily
50 Kerbar Rd. NB right lane closed due to excavation.
ROSITA CRES
From PHARMACY AVE to DORINE CRES
2017-03-20 09:00 2017-03-31 16:00 Daily
6 Rosita Cr. EB right lane closed due to excavation.
MCINNES CRES @ KENGATE DR
2017-03-20 09:00 2017-03-31 16:00 Daily
54 McInnes Cr. Right lane closed due to excavation
PICOLA CRT
From HINES DR to MENTOR BLVD
2017-03-20 09:00 2017-03-31 16:00 Daily
21 Picola Crt. WB Right lane closed due to excavation
ELLINGTON DR
2017-03-20 09:00 2017-03-31 16:00 Daily
154 Ellington dr, right lane and shoulder lane closure, northbound. Occupying 30 metres south and 30 metres north of 154 Ellington dr.
MEGAN AVE
2017-03-20 09:00 2017-03-31 16:00 Daily
94 Megan ave closure of right lane, northbound. Occupying 30m north and 30m south of 94 Megan ave.
BEECH AVE
From BALSAM AVE to PINE AVE
2017-03-16 08:30 2017-06-16 16:00 Daily
SOUTHBOUND LANES CLOSED DUE TO BELL INSTALLATIONS.(MOVING OPERATION)
BAYLAWN DR
2017-03-20 09:00 2017-03-31 16:00 Daily
82 Baylawn dr right lane and shoulder closure (northbound). Occupying 30m north and 30m south of 82 Baylawn dr.
LITTLELEAF DR
From GREENSPIRE RD to SHADEMASTER CRT
2017-03-20 08:00 2017-03-31 19:00 Daily
11 Littleleaf dr closed on the southbound lane, from Greenspire rd to Shademaster crt.
ORCHARD PARK DR
From LAWRENCE AVE E EB to KINGSTON RD
2017-03-20 09:00 2017-03-31 16:00 Daily
NPORTHBOUND LANE CLOSED DUE TO OPM BELL MAINTENANCE.
MAJOR OAK TER @ 25 MAJOR OAK TER
2017-03-20 09:00 2017-03-31 16:00 Daily
ONE LANE CLOSED BOTH EB AND WB DUE TO OPM BELL MAINTENANCE WORK .
GREYABBEY TRL @ 128 GREYABBEY TRL
2017-03-20 09:00 2017-03-31 16:00 Daily
WB RIGHT LANE CLOSEURE DUE TO OPM BELL MAINTENANCE.
ROSITA CRES
2017-03-20 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE
LITTLELEAF DR
From GREENSPIRE RD to SHADEMASTER CRT
2017-03-20 08:00 2017-03-31 19:00 Daily
Excavation of a Bell Pit in a residential area to maintain/provide Bell service. Works expected to be completed in 2 day period, 4 hours each day.
MORNINGVIEW TRL
2017-03-20 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE NORTHBOUND 154 MORNINGVIEW TRL, AT GENNELA SQ TO RANGLEY DR
MUIRBANK BLVD @ LAVERY TRL
2017-03-20 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE
ST CLAIR AVE E
From BIRCHMOUNT RD to MIDLAND AVE
2017-03-16 07:00 2017-04-17 16:00 Daily
construct conduit and vault
MIDWEST RD
At MIDLAND AVE
2017-03-17 07:00 2017-04-17 19:00 Daily
Scarborough TS
MIDLAND AVE
From LAWRENCE AVE E to PROGRESS AVE
2017-03-17 09:00 2017-04-17 16:00 Daily
Scarborough TS
LAWRENCE AVE E
2017-03-17 01:58 2017-04-17 04:58 Daily
Scarborough TS
BELLAMY RD N @ TRUDELLE ST
2017-03-20 20:00 2017-03-31 17:00 Daily
Repair natural gas main.
BONACRES AVE @ COLONEL DANFORTH TRL
2017-03-18 07:00 2017-04-18 19:00 Daily
E16174 Bonacres
JEAN DEMPSEY GT @ COLONEL DANFORTH TRL
2017-03-18 07:00 2017-04-18 19:00 Daily
E16174 Bonacres
HAVENDALE RD
From AGINCOURT DR to MARYDON CRES
2017-03-20 07:00 2017-06-20 19:00 Daily
Installation of new Bell Fibre network.
MIDLAND AVE
From STUBBSWOOD SQ to DONALDA CRES
2017-03-20 07:00 2017-06-20 19:00 Daily
Installation of new Bell Fibre network.
SCOTLAND RD
From EMMELINE CRES to HAVENDALE RD
2017-03-20 07:00 2017-06-20 19:00 Daily
Installation of new Bell Fibre network.
KIMBOLTON CRT @ BONACRES AVE
2017-03-18 07:00 2017-04-18 19:00 Daily
E16174 Bonacres
BRIGADIER PL @ BONACRES AVE
2017-03-18 07:00 2017-04-18 19:00 Daily
E16174 Bonacres
SEABURN PL
At STAINFORTH DR
2017-03-20 07:00 2017-06-20 19:00 Daily
Installation of new Bell Fibre network.
STAINFORTH DR
From HAVENDALE RD to SCOTLAND RD
2017-03-20 07:00 2017-06-20 19:00 Daily
Installation of new Bell Fibre network.
MIDLAND AVE
From STUBBSWOOD SQ to MIDLAND AVE
2017-03-20 09:00 2017-06-20 16:00 Daily
Installation of new Bell Fibre network.
OLD BURNHAMTHORPE RD @ BURNHAMILL PL
2017-03-20 07:00 2017-04-30 19:00 Daily
Excavation trench and duct bank installation for Toronto Hydro at private property complex 65 to 73
ELLESMERE RD @ 2100 ellesmere rd
2017-03-21 09:00 2017-03-28 16:00 Daily
Southbound and westbound right lanes closed due to directional drilling
ELLESMERE RD @ MARKHAM RD
2017-03-20 09:00 2017-03-27 16:00 Daily
Westbound curb lane occupied for directional drilling.
LAWRENCE AVE E
From CENTENNIAL RD to PORT UNION RD
2017-03-20 07:00 2017-03-26 23:00 Daily
WEST ROUGE TWINNED SANITARY SEWAGE FORCEMAIN & CUMBER FORCEMAIN AND PUMPING STATION ALONG LAWRENCE AVE E
AUTO MALL DR
From MILNER AVE to CONLINS RD
2017-03-22 07:00 2017-04-07 19:00 Daily
Northbound right lane closed due to construction
BONIS AVE
From CARABOB CRT to KENNEDY RD
2017-03-23 09:00 2017-03-30 16:00 Daily
Westbound right lane closed due to construction
BONNIEWOOD RD
From BIRCHMOUNT RD to WOODFERN DR
2017-03-22 07:00 2017-03-31 19:00 Daily
Eastbound and westbound (alternating) closed due to construction
CROW TRL
From LORADEEN CRES to BALDOON RD
2017-03-22 19:00 2017-03-25 19:00 Daily
The eastbound and westbound lanes will be occupied due to fiber installation for Bell.
GLAMORGAN AVE
From DUNDALK DR to KENNEDY RD
2017-03-21 07:00 2017-03-31 19:00 Daily
The eastbound curb lane will be occupied due to dig pit, clear blocked conduit, place cable.
WARDEN AVE
From MARBLE ARCH CRES to ASHTONBEE RD
2017-03-21 09:00 2017-03-31 16:00 Daily
Warden ave closed from Marble Arch cres to Ashtonbee rd in the southbound direction. Occupying the south bound curb lane.
KENNEDY RD
From ANTRIM CRES to GLAMORGAN AVE
2017-03-21 09:00 2017-03-31 16:00 Daily
The southbound curb lane will be occupied due to dig pit, clear blocked conduit, place cable.
MARKHAM RD
From ROCHMAN BLVD to LAWRENCE AVE E
2017-03-21 17:05 2017-03-31 20:05 Daily
SOUTHBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
MILNER AVE
From AUTO MALL DR to CONLINS RD
2017-03-22 07:00 2017-04-07 19:00 Daily
East and westbound right lane closed due to construction
SHEPPARD AVE E @ 3760 sheppard ave east
2017-03-22 09:00 2017-03-31 16:00 Daily
Westbound curb lane closed due to construction.
SHEPPARD AVE E
From KENNEDY RD to SHEPPARD AVE E
2017-03-22 09:00 2017-03-31 16:00 Daily
Eastbound lane closed due to construction
SHROPSHIRE DR
From WYE VALLEY RD to GILROY DR
2017-03-21 09:00 2017-03-31 16:00 Daily
149 Shorpshire dr closed from Wye Vally rd to Gilroy dr in the east and westbound direction. Occupying the curb lane.
PHARMACY AVE @ 460 Pharmacy Ave
From FLORENS AVE to ST BEDES RD
2017-03-21 09:00 2017-03-28 16:00 Daily
Southbound curb lane closed due to construction
MIDDLEFIELD RD @ FINCH AVE E
2017-03-22 09:00 2017-03-27 16:00 Daily
Repairing existing bell structure
ELLESMERE RD
From BRIMLEY RD to BIRKDALE RD
2017-03-23 09:00 2017-03-27 16:00 Daily
Northbound right and centre lane closed due to construction
DANFORTH RD
From FURLONG CRT to HOLLYHEDGE DR
2017-03-23 09:00 2017-04-20 15:30 Daily
NORTHBOUND AND SOUTHBOUND LANES CLOSED DUE TO CONSTRUCTION.
LAIRD DR
At COMMERCIAL RD
2017-03-23 09:00 2017-03-31 16:00 Daily
Laird dr closed form Commercial rd to Stickney ave in the right lane, southbound direction. Occupying the southbound curb.
BRIDGEPORT DR
From LAWRENCE AVE E to LAKERIDGE DR
2017-03-22 07:00 2017-04-22 19:00 Daily
NORTH AND SOUTHBOUND LANES OCCUPIED DUE TO CONSTRUCTION.
PHARMACY AVE
From GALSWORTHY AVE to LAWRENCE AVE E
2017-03-23 07:00 2017-04-30 19:00 Daily
Right lane closed in all directions due to Bell Fibre Project
SHROPSHIRE DR @ 65 SHROPSHIRE DR
From MAXIM CRES to LEWISTON RD
2017-03-21 09:00 2017-03-31 16:00 Daily
The eastbound and westbound lanes will be occupied alternately to place new conduit and fiber optic cable.
ATKINSON AVE
From LAWRENCE AVE E to BEECHGROVE DR
2017-03-23 19:10 2017-03-29 22:10 Daily
The southbound curb lane will be occupied due to placing CSP/Bore new duct.
KINGSTON RD @ 2965 KINGSTON RD
2017-03-22 09:00 2017-03-31 16:00 Daily
The eastbound curb lane will be occupied due to road work.
D ARCY MAGEE CRES
From CENTENNIAL RD to CONFERENCE BLVD
2017-02-10 07:00 2017-04-10 19:00 Daily
The eastbound and westbound curb lanes will be alternately occupied due to road work.
HAVILAND DR
From D ARCY MAGEE CRES to TILLEY DR
2017-02-10 07:00 2017-04-10 19:00 Daily
The northbound and southbound curb lanes will be alternately occupied due to road work.
COCKBURN DR
From CONFERENCE BLVD to CONFERENCE BLVD
2017-02-10 07:00 2017-04-10 19:00 Daily
The eastbound and westbound curb lanes will be alternately occupied due to road work.
CENTENNIAL RD
From LAWSON RD to CONFERENCE BLVD
2017-02-10 07:00 2017-04-10 16:00 Daily
The northbound curb lane will be alternately occupied due to road work.
CONFERENCE BLVD
From CENTENNIAL RD to D ARCY MAGEE CRES
2017-02-10 07:00 2017-04-10 19:00 Daily
The eastbound and westbound curb lanes will be alternately occupied due to road work.
KENNEDY RD @ EGLINTON AVE E
2017-03-23 07:00 2017-04-13 23:59 Daily
The southbound turning and curb lane will be occupied to abandon gas lines for future subway.
ASHWICK DR @ CHELWOOD RD
2017-03-24 07:00 2017-03-30 19:00 Daily
Excavation to place new conduit and cabinet on behalf of Bell Canada
PORT UNION RD
From LAWRENCE AVE E to BRIDGEND ST
2017-03-24 09:00 2017-05-24 16:00 Daily
Installation of new Bell Fibre network.
BRIDGEND ST
At SHOALHAVEN DR
2017-03-24 07:00 2017-05-24 19:00 Daily
Installation of new Bell Fibre network. East and West lanes occupied.
BIRCHMOUNT RD
From EGLINTON AVE E to EGLINTON AVE E
2017-03-24 09:00 2017-03-28 16:00 Daily
Northbound curb lane closed due to construction (Eglinton Ave to 50 m North)
SHOALHAVEN DR
From PORT UNION RD to BRIDGEND ST
2017-03-24 07:00 2017-05-24 19:00 Daily
The eastbound and westbound curb lanes will be occupied alternately due to installation of new Bell Fibre network.
SCHOONER LANE @ SHOALHAVEN DR
2017-03-24 07:00 2017-05-24 19:00 Daily
The northbound and southbound curb lanes will be occupied alternately due to installation of new Bell Fibre network.
PROVINCETOWN RD
From SCHOONER LANE to SHOALHAVEN DR
2017-03-24 07:00 2017-05-24 19:00 Daily
Installation of new Bell Fibre network.
LAWRENCE AVE E @ 6223 LAWRENCE AVE E
2017-03-24 09:00 2017-05-24 16:00 Daily
The eastbound curb lane will be occupied due to installation of new Bell Fibre network.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
AVONDALE RD @ PARK RD
2016-08-26 07:00 2017-06-06 19:00 Daily
Northbound, southbound and westbound lanes will be occupied due to watermain and water service replacement.
DUPONT ST
From BEDFORD RD to AVENUE RD
2016-11-14 00:01 2017-04-28 23:59 Continuous
The westbound lanes will be temporarily closed due to water main replacement.
LOGAN AVE @ LAKE SHORE BLVD E
2016-11-27 07:00 2017-03-31 09:58 Daily
The southbound lane fronting #20 Logan Ave and #801 Lake Shore Blvd E on Logan, will be occupied due to replacement of sewer and permanent restorations.
DUPONT ST @ 70 DUPONT ST
From BERNARD AVE to BEDFORD RD
2016-11-28 07:00 2017-04-28 13:00 Continuous
The eastbound and westbound traffic will be reduced to one lane in each direction due to watermain replacement.
CASSANDRA BLVD
From UNDERHILL DR to VICTORIA PARK AVE
2016-11-28 07:00 2017-03-30 19:00 Daily
Eastbound and westbound lanes will be occupied due to watermain and water service replacement.
EGLINTON AVE W
From DUPLEX AVE to HOLLY ST
2016-12-12 09:00 2017-03-31 23:59 Daily
Both westbound lanes will be occupied due to Cut permit for relocating water main.
DAWES RD
From COLEMAN AVE to DANFORTH AVE
2017-01-03 09:00 2017-03-31 16:00 Daily
The northbound and southbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
DENTONIA PARK AVE
From DAWES RD to MARYLAND BLVD
2017-01-03 09:00 2017-03-31 16:00 Daily
The eastbound and westbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
DENTONIA PARK AVE @ THYRA AVE
2017-01-03 09:00 2017-03-31 16:00 Daily
The northeast and northwest corner of the intersection will be occupied due to installation of conduits, fibre cables and manholes.
DENTONIA PARK AVE
From BRYANT AVE to THYRA AVE
2017-01-03 09:30 2017-03-31 15:30 Daily
The westbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
BRYANT AVE
From DENTON AVE to DENTONIA PARK AVE
2017-01-03 09:30 2017-03-31 15:30 Daily
The northbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
DENTON AVE
From VICTORIA PARK AVE to BRYANT AVE
2017-01-03 09:30 2017-03-31 15:30 Daily
The westbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
VICTORIA PARK AVE
From DANFORTH AVE to DENTON AVE
2017-01-03 09:30 2017-03-31 15:30 Daily
The northbound and southbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
DANFORTH AVE
From VICTORIA PARK AVE to PHARMACY AVE
2017-01-03 09:30 2017-03-31 15:30 Daily
The eastbound and westbound lanes will be occupied due to installation of conduits, fibre cables and manholes.
YONGE ST @ 1070 YONGE ST
2016-12-29 07:00 2017-12-31 13:15 Continuous
The northbound and southbound passing lane will be occupied due to emergency sewer main repair. Roxborough St E will also be closed from Yonge St to Cluny Ave duration of work.
EGLINTON AVE E
From SUTHERLAND AVE to DON AVON DR
2017-01-11 09:00 2017-12-31 16:00 Daily
One eastbound and westbound lane will be occupied due to monitoring instruments for Eglinton Crosstown Construction.
EGLINTON AVE W
From BRAEMAR AVE to ORIOLE PKWY
2017-01-11 09:00 2017-12-31 16:00 Daily
One eastbound and westbound lane will be occupied due to monitoring instruments for Eglinton Crosstown Construction.
NASSAU ST
From BATHURST ST to LEONARD AVE
2017-01-24 07:00 2017-04-14 19:00 Daily
Southbound curb lane will be occupied for duct and chamber service work.
THURSFIELD CRES
From RYKERT CRES to BRENTCLIFFE RD
2017-01-23 07:00 2017-05-20 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers.
RUSHBROOKE AVE @ 83 to 51 RUSHBROOKE AVE
2017-01-01 07:00 2017-04-28 17:00 Daily
North bound lanes will be occupied due to road work.
ASQUITH AVE @ 88 ASQUITH AV to CHURCH ST
2016-01-01 21:00 2017-04-28 05:00 Daily
East bound lanes will be occupied due to road work.
WINNETT AVE
From EGLINTON AVE W to GLOUCESTER GRV
2016-01-01 07:00 2017-12-31 17:00 Daily
North bound and south bound lanes will be occupied due to road work.
SHEPPARD AVE E
From CHICHESTER PL to PHARMACY AVE
2017-01-26 07:00 2017-03-31 17:00 Daily
West bound lane occupied due to Road work.
OLD WESTON RD
From ROWNTREE AVE to ROGERS RD
2017-01-26 07:00 2017-03-31 17:00 Daily
Northbound and Southbound lanes will be occupied due to Road work.
ASQUITH AVE @ CHURCH ST
2017-01-26 21:00 2017-03-31 05:00 Daily
Eastbound lanes will be occupied due to Road work.
JARVIS ST
From SHUTER ST to QUEEN ST E
2017-01-26 07:00 2017-03-31 17:00 Daily
Northbound and southbound lanes will be occupied due to Road work.
YORK ST
From QUEEN ST W to RICHMOND ST W
2017-01-26 21:00 2017-03-31 05:00 Daily
Northbound lanes will be occupied due to Road work.
ADELAIDE ST W
From MORRISON ST to BRANT ST
2017-01-26 21:00 2017-03-31 05:00 Daily
Eastbound lanes will be occupied due to Road work.
FINCH AVE W
From ALBION RD to KENDLETON DR
2017-01-26 07:00 2017-03-31 17:00 Daily
Southbound lanes will be occupied due to Road work.
BAYVIEW AVE
From BELSIZE DR to MILLWOOD RD
2017-01-26 09:30 2017-03-31 15:30 Daily
Northbound lanes will be occupied due to Road work.
BLUE FOREST DR
From ELDER ST to CANDIS DR
2017-01-26 07:00 2017-03-31 17:00 Daily
Eastbound lanes will be occupied due to Road work.
DREWRY AVE
From HILDA AVE to NORWIN ST
2017-01-26 07:00 2017-03-31 17:00 Daily
Westbound lanes will be occupied due to Road work.
ALBION RD @ FINCH AVE W
2017-01-26 07:00 2017-07-31 17:00 Daily
Northbound Southbound lanes will be occupied due to Road work.
FOXBAR RD @ 5 FOXBAR RD
2017-01-27 09:00 2017-03-31 15:00 Daily
The northbound and southbound lanes will be occupied due to road work.
UNIVERSITY AVE
From FRONT ST W to HEENAN PL
2017-01-30 18:30 2017-03-31 06:00 Daily
North bound will be occupied due to road work.
SIMCOE ST
From PEARL ST to KING ST W
2017-01-30 18:30 2017-03-31 06:00 Daily
South bound will be occupied due to road work.
KING ST W
From YONGE ST to JORDAN ST
2017-01-30 18:30 2017-03-31 06:00 Daily
West bound will be occupied due to road work.
CRANFIELD RD
From WATERMAN AVE to DOHME AVE
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
GOURLAY CRES
From ETHEL AVE to RYDING AVE
2017-01-27 07:00 2017-03-31 17:00 Daily
The westbound and eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
NIAGARA ST
From WELLINGTON ST W to KING ST W
2017-01-27 07:00 2017-03-31 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
WITHROW AVE @ 276 WITHROW AVE
2017-01-27 07:00 2017-03-31 17:00 Daily
The westbound and eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
ST PATRICK ST @ DUNDAS ST W
2017-01-27 07:00 2017-03-31 17:00 Daily
The northbound and southbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto. Traffic in both directions will be maintained. There is no road closure.
ADELAIDE ST W
From JOHN ST to SIMCOE ST
2017-02-03 09:00 2017-04-07 16:00 Daily
The eastbound curb lane on the north side of the street will be occupied due to new pole installation and removal for TTC.
KING ST W
From YORK ST to BAY ST
2017-02-06 10:00 2017-03-31 15:30 Daily
The eastbound curb lane will be occupied due to ttc new pole installation.
MUTUAL ST @ 77 MUTUAL ST
2017-01-31 07:00 2017-03-31 16:00 Daily
The northbound and southbound curb lanes will be occupied due to work done by Power Line Plus Ltd.
STANDISH AVE
From ASTLEY AVE to DOUGLAS DR
2017-02-02 07:00 2017-05-31 17:00 Daily
North bound and south bound lanes will be occupied due to road work.
PETER ST
From BLUE JAYS WAY to KING ST W
2017-02-06 19:00 2017-03-31 06:00 Daily
North bound lanes will be occupied due to road work.
KING ST W
From SIMCOE ST to DUNCAN ST
2017-02-06 19:00 2017-03-31 06:00 Daily
West bound lanes will be occupied due to road work.
UNIVERSITY AVE
From FRONT ST W to HEENAN PL
2017-02-06 19:00 2017-03-31 06:00 Daily
North bound lanes will be occupied due to road work.
WELLAND AVE
From ST CLAIR AVE E to GLENROSE AVE
2017-02-06 19:00 2017-03-31 06:00 Daily
South bound lanes will be occupied due to road work.
DAVENPORT RD
From HILLSBORO AVE to BELMONT ST
2017-02-06 19:00 2017-03-31 06:00 Daily
South bound lanes will be occupied due to road work.
LYNDHURST AVE
From CONNABLE DR to NINA ST
2017-02-06 07:00 2017-03-31 19:00 Daily
South bound lanes will be occupied due to road work.
KING ST W
From SIMCOE ST to DUNCAN ST
2017-02-06 19:00 2017-03-31 06:00 Daily
West bound lanes will be occupied due to road work.
COE HILL DR @ Ellis grdns
2017-02-08 07:00 2017-05-20 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
PAPE AVE @ LIPTON AVE
2017-02-08 07:00 2017-04-28 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
BERKSHIRE AVE
2017-02-08 07:00 2017-04-28 17:00 Daily
The northbound lanes will be occupied due to road work.
CHESTNUT PK @ ROXBOROUGH ST E
2017-02-08 07:00 2017-05-20 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
KING ST W
From YONGE ST to JORDAN ST
2017-02-07 18:30 2017-03-31 06:00 Daily
The westbound lanes will be occupied due to road work.
KING ST W
From SPADINA AVE to BRANT ST
2017-02-07 19:00 2017-03-31 06:00 Daily
The westbound lanes will be occupied due to road work.
KING ST W
From BRANT PL to PORTLAND ST
2017-02-07 19:00 2017-03-31 06:00 Daily
The westbound lanes will be occupied due to road work.
LANGDEN AVE @ CLIFF ST
2017-02-08 07:00 2017-06-02 17:00 Daily
The eastbound and westbound lanes will be occupied due to construction.
PALMERSTON AVE @ HARBORD ST
2017-02-08 07:00 2017-06-02 17:00 Daily
The northbound lanes will be occupied due to construction.
RICHMOND ST E @ BAY ST
2017-02-08 07:00 2017-06-02 17:00 Daily
The westbound lanes will be occupied due to construction.
HARBORD ST @ LIPPINCOTT ST
2017-02-09 07:00 2017-06-02 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
EGLINTON AVE E
From COWBELL LANE to HOLLY ST
2017-02-13 07:00 2017-03-31 19:00 Daily
The eastbound curb lane will be occupied due to cable and conduit relocation.
BATHURST ST @ ST CLAIR AVE W
2017-02-09 07:00 2017-06-02 17:00 Daily
The northbound and southbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
YORK MILLS RD
From DON MILLS RD to LAURENTIDE DR
2017-02-20 19:00 2017-03-31 18:00 Daily
Eastbound curb lane will be occupied due to road work.
MAPLE AVE
From POWELL AVE to DALE AVE
2017-02-16 02:24 2017-03-31 05:24 Daily
The southbound lane will be occupied due to road work.
METCALFE ST
From SALISBURY AVE to AMELIA ST
2017-02-13 07:00 2017-03-31 19:00 Daily
The northbound lane will be occupied due to road work.
METCALFE ST
From CARLTON ST to ARTHUR GOSS LANE
2017-02-13 07:00 2017-03-31 19:00 Daily
The northbound lane will be occupied due to road work.
QUEENS QUAY E @ BONNYCASTLE ST
2017-01-24 07:00 2017-12-31 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new water main.
QUEEN ST E
From ONTARIO ST to PARLIAMENT ST
2017-02-16 07:00 2017-04-16 16:00 Daily
The eastbound and westbound lanes will be occupied due to construction.
MUTUAL ST @ 77 MUTUAL ST
At DUNDAS ST E
2017-01-31 07:00 2017-03-31 16:00 Daily
The northbound and southbound curb lanes will be occupied due to work done by Power Line Plus Ltd.
GEORGE ST @ 24 GEORGE ST
2017-02-23 07:00 2017-04-30 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
MAIDSTONE ST
From RAVEN RD to LAWNSIDE DR
2017-02-15 07:00 2017-03-31 19:00 Daily
The northbound and southbound lanes will be occupied due to road work.
LENNOX ST
From MARKHAM ST to EUCLID AVE
2017-02-28 09:00 2017-03-31 16:00 Daily
The westbound curb lane will be occupied due to digging pit, trench conduit and directional drill.
DUFFERIN ST @ BRIDGELAND AVE
2017-03-06 09:00 2017-04-14 03:30 Daily
U/G Hydro Instalment / Realignment. On Dufferin st, Sounthbound, on Bridgeland Ave.
EGLINTON AVE E
From COWBELL LANE to HOLLY ST
2017-02-13 07:00 2017-03-31 07:00 Daily
cut permit for bale and conduit THESL relocation work along Eglinton ave East for ECLRT Eglinton station book 7 traffic plans to be utilized will be blocking the north end of cowbell lane on
POPLAR AVE
From MONTESSON ST to DUNDAS ST W
2017-03-07 09:30 2017-03-28 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure.
ST CLAIR AVE W @ BATHURST ST
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable Excavation for Bell Canada. Partial lane closure both directions. Ln N St. Claire E, West of Bathurst.
BEVERLEY ST
From SULLIVAN ST to SULLIVAN ST
2017-03-08 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada. Both directions. Yield to Oncoming to be used.
DOUGLAS CRES @ GOVERNORS RD
2017-03-09 09:30 2017-03-30 15:30 Daily
14 Douglas Cres. Cable Excavation for Bell Canada. Partial Lane Closure.
BATHURST ST
From NASSAU ST to NASSAU ST
2017-03-13 09:00 2017-03-27 16:00 Daily
Bathurst St. New service and duct chamber. Curb lane closed - one way traffic each way.
EGLINTON AVE E
From BRAEMAR AVE to ORIOLE AVE
2017-03-08 09:00 2017-03-29 23:00 Daily
Installation of In ground Monitoring Points . (GIMP)
HIGHCROFT RD
From EASTWOOD AVE to WRENSON RD
2017-03-15 07:00 2017-03-29 19:00 Daily
Highcroft Rd.- Construction - Dig pits & repair conduits.
GERRARD ST E
From KINGSWOOD RD to BLANTYRE AVE
2017-03-01 00:01 2017-05-01 23:59 Continuous
Work will involve road saw cutting, removal of concrete road base, and asphalt as well as permanent road restoration. Occupying two Westbound lanes.
SHERBOURNE ST N
From ELM AVE to BLOOR ST E
2017-03-06 07:00 2017-04-30 16:00 Continuous
One northbound and southbound lane will be occupied due to rehabilitation of Sherbourne St bridge over Rosedale Valley Rd.
MOUNT PLEASANT RD
From BROADWAY AVE to KEEWATIN AVE
2017-03-13 09:00 2017-03-29 16:00 Daily
Mount Pleasant Rd. from Broadway Ave to Keewatin Ave. North and Southbound direction. Dig pit, Place Y, Place conduit & Cable.
CAMERON ST
From QUEEN ST W to NAPANEE CRT
2017-03-13 07:00 2017-03-30 19:00 Daily
Cameron St. NB curb lane to be occupied. Dig pit, repair conduit, place cable.
OSSINGTON AVE @ 1145 OSSINGTON AVE
2017-03-13 07:00 2017-03-31 19:00 Daily
1 NB & 1 SB lane will be occupied - right lane. Water & sewer installation
LOWER SPADINA AVE @ LAKE SHORE BLVD
2017-03-16 09:00 2017-03-30 18:00 Daily
Lower Spadina and Lake Shore Blvd. Southbound direction. Alternating curb and median lanes. Abandoning a section of main in median, Relaying new service to # 20 Lower Spadina.
EGLINTON AVE E
From COWBELL LANE to HOLLY ST
2017-02-13 07:00 2017-03-31 19:00 Daily
Eglinton Ave. E; EB curb lane occupied. One lane in each direction to remain open at all times. Works: Cut permit for cable and conduit THESL relocation work along Eglinton Ave E. for ECLRT Eglinton station.
WOODMOUNT AVE
From DUNKIRK RD to BARKER AVE
2017-03-22 07:00 2017-04-05 19:00 Daily
Woodmount Ave. from Dunkirk rd to Barker Ave. Southbound Direction, Occupying southbound curb lane of Woodmount. Work will consist of : Pit Digging, repairing conduit.
DUNKIRK RD
From GLEBEMOUNT AVE to WOODMOUNT AVE
2017-03-22 07:00 2017-04-05 19:00 Daily
Dunkirk Ave. From Glebemount to Woodmount EB curb lane of Dunkirk will be occupied due to conduit repair.
EGLINTON AVE E
From COWBELL LANE to HOLLY ST
2017-02-13 07:00 2017-03-31 19:00 Daily
Eglinton Ave East From Cowbell Ln to Holly St. EB curb lane to be closed for conduit work.
BOULTON DR
From COTTINGHAM RD to COTTINGHAM RD
2017-03-13 07:00 2017-06-01 19:00 Daily
Southbound Road closed due to underground hydro duct and cable chamber installations
KINGSMOUNT PARK RD
From GERRARD ST E to FAIRMOUNT CRES
2017-03-13 07:00 2017-03-27 19:00 Continuous
SB curb lane of Kingsmount Park Rd blocked due to construction.
GERRARD ST E
From NORMANDY BLVD to KINGSMOUNT PARK RD
2017-03-13 07:00 2017-03-27 19:00 Daily
EB curb lane of Gerrard St E closed due to contruction.
LAKE SHORE BLVD W @ YORK ST
2017-03-10 09:30 2017-03-31 14:30 Daily
The westbound left lane will be occupied due to primary electric cable repairs in cable chamber.
QUEEN ST E
From CONNAUGHT AVE to QUEEN ST E
2017-03-13 09:00 2017-03-27 19:00 Daily
Dig pit, repair conduit
CRAVEN RD @ GERRARD ST E
From CRAVEN RD to GERRARD ST E
2017-03-13 07:00 2017-03-27 19:00 Daily
Dig pit , repair conduit
CONNAUGHT AVE
From QUEEN ST E to EASTERN AVE
2017-03-13 07:00 2017-03-27 19:00 Daily
Dig pit, repair conduit
LONGSPUR RD @ HACKBERRY ST
2017-03-20 09:00 2017-03-31 16:00 Daily
25 Longspur Rd. Right lane closed due to excavation.
CAMBRIDGE AVE
From THORNCLIFFE AVE to EASTMOUNT AVE
2017-03-20 07:00 2017-04-03 19:00 Daily
NORTHBOUND CURB LANE CLOSED DUE TO CONDUIT REPAIR.
HAYDEN ST
From YONGE ST to CHURCH ST
2017-03-25 09:00 2017-03-30 19:00 Daily
eb curb lanes blocked due to cable placement
CARAVAN DR
2017-03-20 09:00 2017-03-31 16:00 Daily
48 Caravan dr right lane closure eastbound. Affecting 30m north and 30m south of 48 Caravan dr.
DONLANDS AVE
2017-03-17 09:00 2017-04-17 16:00 Daily
331 Donland ave closed eastbound, from Gamble ave to Torrens ave. Occupying the East shoulder lane.
COXWELL AVE @ 695 COXWELL AVE
2017-03-17 09:00 2017-03-31 16:00 Daily
LEFT LANE CLOSED DUE TO WATER SERVICE
WILLOW AVE
From BALSAM AVE to PINE AVE
2017-03-16 08:30 2017-06-16 16:00 Daily
Southbound occupied for bell fiber installation network
ELMSDALE RD
From WOODVILLE AVE to O CONNOR DR
2017-03-17 09:00 2017-04-17 16:00 Daily
Installation of new Bell Fibre network.
TORRENS AVE
From PAPE AVE to DONLANDS AVE
2017-03-17 09:00 2017-04-17 16:00 Daily
Installation of new Bell Fibre network.
LONGSPUR RD
2017-03-20 09:00 2017-03-31 16:00 Daily
OPM Bell Maintenance, EXCAVATING ALONG BOULEVARD FOR BELL TO ACCESS CABLE TROUBLE
HARBOUR ST @ YORK ST
2017-03-22 22:00 2017-03-30 05:00 Daily
All EB lanes blocked at different times due to installation of new conduit and fiber.
QUEEN ST W
2017-03-22 09:00 2017-04-05 16:00 Daily
water and sewer service
HURON ST
From COLLEGE ST to CECIL ST
2017-03-15 09:00 2017-03-29 16:00 Daily
CLEAR BLOCKAGES ON BELL INFRASTRUCTURE
HARPER AVE
From ROSEDALE HEIGHTS DR to INGLEWOOD DR
2017-03-15 09:30 2017-03-29 15:30 Daily
Cable excavation for Bell Canada
DUNDAS ST W
From UNIVERSITY AVE to CENTRE AVE
2017-03-20 09:30 2017-04-06 15:30 Daily
Dig pit, Clear blockage, Place Y & conduits & Place cable
YORK ST
From LAKE SHORE BLVD to HARBOUR ST
2017-03-23 09:30 2017-03-31 15:30 Daily
York st closed southbound direction from Lakeshore Blvd west to Harbour st.
WELLESLEY ST W
From ST JOSEPH ST to BAY ST
2017-03-25 07:00 2017-03-26 21:00 Daily
Hoisting - Permission for full road closure for the purpose of removing a tower crane with 350 ton mobile crane. 955 Bay Street at Wellesley St W to Phipps St
NORMANDY BLVD
From GERRARD ST E to FAIRMOUNT CRES
2017-03-20 09:00 2017-04-03 16:00 Daily
Dig pit, Repair Conduit
MUTUAL ST
From MAITLAND ST to ALEXANDER ST
2017-03-20 07:00 2017-04-03 19:00 Daily
SB CURB LANE CLOSED DUE TO BLOCKAGE ON BELL INFRASTRUCTURE.
RONCESVALLES AVE
From HIGH PARK AVE to WESTMINSTER AVE
2017-03-20 09:00 2017-04-03 16:00 Daily
Roncesvalles ave closed between High Park blvd and Westminster ave in the southbound direction. Occupying the southbound curb lane.
ADELAIDE ST W @ WIDMER ST
2017-03-20 23:00 2017-04-03 05:00 Daily
Eastbound two north lanes closed due to construction; 100m W of Widner St to 20m E of Wider St
ADELAIDE ST E
From FREDERICK ST to SHERBOURNE ST
2017-03-20 09:00 2017-03-27 16:00 Daily
UNDERGROUND CONSTRUCTION WITH DIRECTIONAL DRILL AND HYDRO VAC
BROCK AVE
From MAPLE GROVE AVE to QUEEN ST W
2017-03-22 09:00 2017-04-01 16:00 Daily
Southbound right lane closed due to construction
EDNA AVE @ DUNDAS ST W
2017-03-21 07:00 2017-04-21 19:00 Daily
NORTH BOUND LANE AT EDNA TO BE CLOSED DUE TO CONSTRUCTION.
UNIVERSITY AVE
From ARMOURY ST to DUNDAS ST W
2017-03-22 00:01 2017-04-21 23:59 Continuous
375 University ave closed from Armoury st to Dundas st west in the southbound direction. Occupying the median lane.
QUEEN ST W
From COWAN AVE to ELM GROVE AVE
2017-03-22 10:00 2017-04-01 15:00 Daily
Queen st east closure from Cowan ave to Elm Grove ave in the eastbound direction. Occupying the east bound curb lane.
GARDINER EXPY WB @ YONGE/BAY/YORK
2017-03-24 23:00 2017-03-27 09:00 Daily
The off ramp will be closed a short duration to due surveying on FGG; Jarvis to Cherry. Sunday night closure reopens at 5 AM Monday.
GARDINER EXPY WB @ SHERBOURNE LAKE SHORE
2017-03-24 23:00 2017-03-27 09:00 Daily
The off ramp will be closed for a short duration due to surveying on FGG; Jarvis to Cherry. Sunday night closure reopens at 5 AM Monday.
GARDINER EXPY EB @ JARVIS ST
2017-03-24 23:00 2017-03-27 09:00 Daily
The off ramp will be closed for a short duration due to surveying on FGG; Jarvis to Cherry. Sunday night closure reopens at 5 AM Monday.
GARDINER EXPY
From CHERRY ST to JARVIS ST
2017-03-24 23:00 2017-03-27 09:00 Daily
One eastbound and westbound lane will be occupied due to surveying on FGG; Jarvis to Cherry. Sunday night closure reopens at 5 AM Monday.
QUEEN ST E
From PARLIAMENT ST to POWER ST
2017-03-22 09:00 2017-03-31 16:00 Daily
The eastbound curb lane will be occupied due to natural gas main replacement.
JARVIS ST @ WELLESLEY ST E
2017-03-23 09:00 2017-04-07 16:00 Daily
The northbound curb lane will be occupied due to road work.
QUEEN ST E
From KIPPENDAVIE AVE to KENILWORTH AVE
2017-03-20 09:00 2017-03-31 16:00 Daily
The eastbound curb lane will be occupied due to dig pit to repair conduit blockage.
SIMCOE ST @ MICHAEL SWEET AVE
2017-03-24 07:00 2017-04-21 17:00 Daily
Occupying the northbound direction and east curb lanes due to rebuilding of steam chamber for Enwave.
QUEENS QUAY E
From LOWER SHERBOURNE ST to FREELAND ST
2017-03-23 19:00 2017-03-31 05:00 Daily
Westbound curb lane occupied due to maintenance.
SACKVILLE ST
From SPRUCE ST to GERRARD ST E
2017-03-23 07:00 2017-04-08 19:00 Daily
Occupying south bound curb lane, due to pit digging and conduit repair.
SPRUCE ST
From SACKVILLE ST to GIFFORD ST
2017-03-23 07:00 2017-04-08 19:00 Daily
Occupying east bound curb lane due to digging and conduit repair.
DUNDAS ST W
From CENTRE AVE to CHESTNUT CRES
2017-03-23 09:30 2017-03-27 15:30 Daily
The westbound curb lane will be occupied due to excavation.
MONARCH PARK AVE
From DANFORTH AVE to STRATHMORE BLVD
2017-03-23 07:00 2017-03-27 19:00 Daily
The northbound curb lane will be occupied due to excavation.
DANFORTH AVE
From MONARCH PARK AVE to PARKMOUNT RD
2017-03-23 07:00 2017-03-27 16:00 Daily
The eastbound curb lane will be occupied due to excavation.
LESLIE ST
From LAKE SHORE BLVD E to UNWIN AVE
2017-03-23 07:00 2017-03-27 19:00 Daily
The northbound curb lane will be occupied due to excavation.
DANFORTH AVE
From BOWDEN ST to JACKMAN AVE
2017-03-23 09:00 2017-04-02 19:00 Daily
The westbound curb lane will be occupied due to excavation.
BOWDEN ST
From DANFORTH AVE to DEARBOURNE AVE
2017-03-23 07:00 2017-04-02 19:00 Daily
The southbound curb lane will be occupied due to excavation.
CHAPLIN CRES
From EGLINTON AVE W to DUNCANNON DR
2017-03-23 09:00 2017-03-31 16:00 Daily
The southbound curb lane will be occupied due to excavation.
GLENAVON RD
From DOWLING AVE to KING ST W
2017-03-23 09:30 2017-03-30 15:30 Daily
Cable excavation for Bell Canada
WOODBINE AVE @ GERRARD ST E
2017-03-23 07:00 2017-03-27 19:00 Daily
Sewer
CHESTER AVE
From BROWNING AVE to DANFORTH AVE
2017-03-24 07:00 2017-03-31 19:00 Daily
Drill/Trench, install conduit, place cable
BAY ST @ FRONT ST W
2017-03-25 10:00 2017-03-27 13:00 Daily
To replace frame and covers for Hydro chamber
VARSITY RD
From GRAND PARK CRT to VARSITY RD
2017-03-23 09:30 2017-03-31 15:30 Daily
Both lanes occupied due cable excavation.
ADELAIDE ST W @ 618 ADELAIDE ST W
2017-03-24 09:00 2017-03-31 16:00 Daily
South curb of Portugal Square and east curb of Adelaide one lane occupied due to construction
WELLESLEY ST W
From BAY ST to ST NICHOLAS ST
2017-03-25 07:00 2017-03-26 21:00 Continuous
All lanes and North sidewalk will be closed due to Crane Hoist.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
MARTIN GROVE RD @ Rexdale
2017-05-24 09:00 2017-05-25 16:00 Daily
South bound lanes will be occupied due to road work.
FINCH AVE W
From KIPLING AVE to ISLINGTON AVE
2017-04-03 07:00 2017-08-03 15:00 Continuous
gas main installation / relocation
SIMCOE ST @ STATION RD
2017-03-26 08:00 2017-03-26 14:00 Daily
Simcoe st and Station rd closed in the northbound direction. Occupying the northern shoulder lane.
MICHAEL POWER PL
From RESURRECTION RD to MICHAEL POWER PL
2017-04-01 07:00 2017-04-13 19:00 Daily
SOUTHBOUND CURB LANE OCCUPIED DUE TO BELL CONSTRUCTION.
EVANS AVE
From EASTWICK RD to ARNOLD AVE
2017-04-03 09:00 2017-04-14 16:00 Daily
The full length trenchless rehabilitation of existing gravity sewers - Various locations within Toronto (Area bound by Eglington, Lake Ontario, HWY 427 & Markham Road -
MORNINGSIDE AVE
From KENNEDY AVE to RUNNYMEDE RD
2017-03-27 07:00 2017-03-31 19:00 Continuous
Eastbound lane closed due to construction
STEVENSON RD @ SILVERSTONE DR
From STEVENSON RD to SILVERSTONE DR
2017-03-27 07:00 2017-03-31 19:00 Continuous
westbound lane occupied due to bell Maintenance
SUPERIOR AVE @ LAKE SHORE BLVD
2017-03-27 09:00 2017-03-31 16:00 Continuous
Occupying the westbound direction. Closed due to construction by Bell Canada.
YORKDALE RD
2017-04-10 09:00 2017-04-18 23:59 Continuous
Northbound curb lane blocked due to maintenance.
GLENVALLEY DR
From WESTON RD to PEAREN ST
2017-03-31 07:00 2017-04-15 19:00 Daily
SOUTHBOUND CURB LANE OCCUPIED DUE TO CONSTRUCTION.
THE QUEENSWAY
From HWY 427 to THE EAST MALL
2017-07-01 09:00 2017-09-14 16:00 Daily
Trenchless Rehabilitation (CIPP System) of Existing Water mains in Etobicoke, and Toronto Districts.
WESTON RD
From AVON CRES to ROGERS RD
2017-03-27 09:30 2017-04-07 15:30 Daily
Drilling of five boreholes with monitoring wells on Weston Rd and Rogers rd.
GOLFDOWN DR
From SHENDALE DR to ISLINGTON AVE
2017-03-27 09:00 2017-03-31 16:00 Continuous
Install new conduit for Bell Canada. With directional drilling
BURNHAMTHORPE CRES @ HWY 427
2017-03-27 09:30 2017-03-27 15:30 Daily
Occupation of the city ROW to proof existing Bell Infrastructure
THE QUEENSWAY
From STEPHEN DR to THE QUEENSWAY
2017-03-27 09:30 2017-03-31 15:30 Daily
Westbound curb lane closed due to construction (Stephen Drive to 125 the Queensway)
OAKMOUNT RD
From BLOOR ST W to GLENLAKE AVE
2017-03-29 08:00 2017-04-14 19:00 Daily
Occupying the south bound curb, due to conduit and cable installation by Rogers.
OLD WESTON RD @ ROGERS RD
2017-03-27 09:00 2017-03-27 16:00 Continuous
Occupying curb lane from intersection to 100m south of intersection due to monitoring of wells by Santac.
PANORAMA CRT @ KIPLING AVE
2017-03-31 07:00 2017-04-14 19:00 Daily
Occupying curb in the west bound direction due to infrastructure maintenance by Bell.
PHEASANT LANE
From BALLANTYNE CRT to SIR WILLIAMS LANE
2017-03-31 07:00 2017-04-14 19:00 Daily
Eastbound curb lane of Pheasant Lane occupied due to Drill/trench, install conduit
THE WEST MALL
From EVA RD to THE WEST MALL
2017-03-27 09:00 2017-03-30 16:00 Daily
1 SB shoulder will be occupied due to construction.
LAWRENCE AVE W
From LAWRENCE AVE W to SCARLETT RD
2017-03-29 09:00 2017-03-30 19:00 Daily
EB&SB lane occupied due to Sewer rehabilitation

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
DON VALLEY PARKWAY SB @ YORK MILLS RD
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from York Mills will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ LAWRENCE AVE E EB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from EB Lawrence Ave E will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ DON MILLS RD NB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from NB Don Mills will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ LAWRENCE AVE E WB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from WB Lawrence Ave E will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ YORK MILLS RD
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from York Mills will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ DON MILLS RD SB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from SB Don Mills will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ HWY 404 SB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from SB Highway 404 will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ HWY 401 WB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from WB Highway 401 will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ EGLINTON AVE E WB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from WB Eglinton Ave E will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ EGLINTON AVE E EB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from EB Eglinton Ave E will be closed due to spring maintenance.
FINCH AVE W @ TALBOT RD
2017-03-27 09:00 2017-03-30 16:00 Daily
The westbound curb lane will be occupied due to excavate pits to clear blockages.
YORKLAND BLVD @ 165 YORKLAND BLVD
2017-03-27 07:00 2017-04-05 19:00 Daily
Eastbound and Westbound lanes will be occupied alternately due to watermain maintenance. (165 Yorkland Blvd and 229 Consumers Road)
YONGE ST
From AVONDALE AVE to FINCH AVE W
2017-03-27 21:00 2017-04-22 05:00 Daily
alternating between Middle, Median, and curb lanes in he north and south bound direction, due to investigation for "re-imaging Yonge st."
CALEDONIA RD
From CALEDONIA RD to CALEDONIA RD
2017-03-27 09:30 2017-03-27 15:30 Daily
Northbound curblane of Caledonia Rd occupide due to Placing fibre on existing hydro poles.
FINCH AVE E
From PAGE AVE to ALAMOSA DR
2017-03-27 09:00 2017-07-07 16:00 Daily
East bound curb lane occupied due to road work
LYMPSTONE AVE
From ST EDMUNDS DR to WEYBOURNE CRES
2017-03-27 07:00 2017-03-31 19:00 Daily
2 way traffic to be maintained at all times. Excavation to place new conduit.
LAWRENCE AVE W @ CALEDONIA RD
2017-03-27 09:30 2017-03-27 15:30 Daily
Road closed from 1007 Caledonia rd. to 1135 Caledonia rd.
BROADWAY AVE @ MONTGOMERY AVE
2017-03-27 09:00 2017-04-01 16:00 Daily
Westbound curb lane on Broadway Ave closed due to constructing.
WILMINGTON AVE
From KENNARD AVE to OVERBROOK PL
2017-04-01 09:00 2017-04-08 19:00 Daily
North bound and south bound curb lanes
LONGMORE ST
From SHEPPARD AVE E to MAPLEHURST AVE
2017-03-27 07:00 2017-04-07 19:00 Daily
North and South Curb lane will be occupied for construction
LAWRENCE AVE W
From ELM RD to AVENUE RD
2017-03-27 09:00 2017-03-31 15:30 Daily
Occupying westbound curb due to excavation by Bell.
YONGE ST
2017-03-27 09:30 2017-03-29 15:30 Daily
Occupying southbound lane at 5200 Yonge st due to walkway install by Sobara Dev.
YONGE ST
2017-03-27 09:30 2017-03-29 15:30 Daily
Road closure to install covered walkway , 5200 Yonge Street

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
MCNICOLL AVE @ HWY 404 NB
2017-04-16 00:01 2017-08-01 23:59 Continuous
The westbound curb lane will be occupied due to bridge rehabilitation.
JAGUAR ST @ `
From ROUGE RIVER DR to MUSKOX DR
2017-03-27 07:30 2017-05-30 17:30 Daily
Directional boring of the fiber cable placement. Located in the subdivion at jaguar st.
LAWRENCE AVE E @ 2380 Lawrence Ave
From MIDLAND AVE to KENNEDY RD
2017-03-27 09:00 2017-04-07 16:00 Daily
Westbound curb lane closed due to construction
WARDEN AVE @ 517 WARDEN AVE
2017-03-31 09:00 2017-04-14 16:00 Daily
NORTHBOUND LANE OCCUPIED DUE TO BELL MAINTENANCE WORK.
BRIMLEY RD @ LAWRENCE AVE E
2017-03-29 09:00 2017-03-30 17:00 Daily
The southbound curb lane and westbound passing lane will be occupied due to repair valve chamber.
EGLINTON AVE E @ LANDMARK BLVD
2017-03-27 10:00 2017-03-29 15:00 Daily
Gas service install
MIDLAND AVE
From PITFIELD RD to SALOME DR
2017-03-31 09:00 2017-04-14 16:00 Daily
1 northbound and 2 southbound lanes will be open. Bell maintenance.
MARINE APPROACH DR @ LAWRENCE AVE E
2017-03-27 09:00 2017-06-30 19:00 Daily
Directional bore conduit , dig pits , place GLB/CSP, 8 Marine Approach Dr.
PORT UNION RD @ LAWRENCE AVE E
2017-03-27 09:00 2017-06-30 19:00 Daily
Directional bore conduit , dig pits , place GLB/CSP, 21 Port Union Road at Lawrence Ave E
WYNNECASTLE RD @ SHOALHAVEN DR
2017-03-27 07:00 2017-06-30 19:00 Daily
Directional bore conduit , dig pits , place GLB/CSP,Wynnecastle Rd at Shoalhaven Dr.
COLINROY ST @ SHOALHAVEN DR
2017-03-27 09:00 2017-06-30 19:00 Daily
Directional bore conduit , dig pits , place GLB/CSP, 3 Colinroy St at Shoalhaven Dr
DANFORTH RD
From TRUDELLE ST to WETHERBY DR
2017-03-27 09:00 2017-03-27 16:00 Daily
Southbound 2nd lane will be occupied due to construction.
WESTBOURNE AVE
At DONSIDE DR
2017-03-28 09:00 2017-04-04 16:00 Daily
Northbound curb lane closed due to construction
FAIRFAX CRES @ WARDEN AVE
2017-03-27 07:00 2017-04-07 17:00 Daily
Alternating from east to westbound lanes due to water service by Trisan.
BRIAR DALE BLVD @ HUNT CLUB DR
2017-03-27 07:00 2017-04-30 16:00 Daily
Clonmore PH 2 - Elec
FAIRFAX CRES
At WARDEN AVE
2017-03-27 11:19 2017-04-07 17:00 Daily
EB & WB lanes Occupied DUE TO Water and sewer service: Period: Schematic Drawing
HUNT CLUB DR
From BRIAR DALE BLVD to CLONMORE DR
2017-03-27 07:00 2017-04-30 16:00 Daily
sb curb lane occupied due to road work

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
DON VALLEY PARKWAY
From GARDINER EXPY to HWY 401
2017-04-21 23:00 2017-04-24 05:00 Continuous
DVP full closure due to spring maintenance.
DON VALLEY PARKWAY NB @ GARDINER EXPY EB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from EB Gardiner will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ DON ROADWAY
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Don Roadway will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ EASTERN AVE
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Eastern Ave will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ DUNDAS ST E
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Dundas St E will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ DANFORTH AVE
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Danforth Ave will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ BAYVIEW AVE BLOOR ST DVP NB RAMP
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Bayview/Bloor will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ LAWRENCE AVE E
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from WB Lawrence Ave E will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ DON MILLS RD NB
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from NB Don Mills will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ EGLINTON AVE E
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from WB Eglinton Ave E will be closed due to spring maintenance.
DON VALLEY PARKWAY SB @ BAYVIEW AVE / BLOOR ST E
2017-04-21 23:00 2017-04-24 05:00 Continuous
Southbound DVP on-ramp from Bayview/Bloor will be closed due to spring maintenance.
DON VALLEY PARKWAY NB @ WYNFORD DR
2017-04-21 23:00 2017-04-24 05:00 Continuous
Northbound DVP on-ramp from Wynford Dr will be closed due to spring maintenance.
GARDINER EXPY @ OFF RAMP YORK/BAY/YONGE
2017-04-17 00:01 2018-01-31 23:59 Continuous
Eastbound Gardiner off-ramp closure at York/Bay/Yonge. Ramp to be demolished and replaced with new ramp to Lower Simcoe St.
SIMCOE ST @ FRONT ST W
2017-03-26 08:00 2017-03-26 20:00 Daily
Southbound left lane on Simcoe; Westbound right lane on front closed due to construction
YORK ST @ FRONT ST W
2017-03-26 08:00 2017-03-26 20:00 Daily
Inspecting Cable Chambers / Splicing Cable
REDPATH AVE
From EGLINTON AVE E to SOUDAN AVE
2017-03-27 07:00 2017-04-07 16:00 Daily
Occupying the curb lane on north and southbound directions (alternating). Due to construction by Powerline Plus.
AVENUE RD
From PRINCE ARTHUR AVE to CUMBERLAND ST
2017-03-31 09:30 2017-04-14 15:30 Daily
SOUTH BOUND CURB LANE OCCUPIED DUE TO BELL INFRASTRUCTURE
PRINCE ARTHUR AVE
From AVENUE RD to BEDFORD RD
2017-03-31 07:00 2017-04-14 19:00 Daily
CLEAR BLOCKAGES ON BELL INFRASTRUCTURE
GERRARD ST E
From CARLAW AVE to PRUST AVE
2017-04-01 07:00 2017-04-14 16:00 Daily
Carlow - poles
PARKSIDE DR @ BLOOR ST E
2017-05-08 19:23 2017-05-26 22:23 Daily
Occupying southbound curb from intersection to 110m south of intersection due to tank cleaning by Toronto Water.
EGLINTON AVE W
From TIMES RD to OAKWOOD AVE
2017-03-27 09:00 2017-05-31 16:00 Daily
1 Eastbound, 1 Westbound lane occupied due to road work
UNIVERSITY AVE @ RICHMOND ST W
2017-03-28 09:30 2017-03-28 12:30 Daily
Left curb lane on south side of intersection of University and Richmond St. West closed for broken pole replacement.
COTTINGHAM RD
From BOULTON DR to POPLAR PLAINS RD
2017-03-27 07:00 2017-04-01 19:00 Daily
Westbound curb lane closed due to conduit repair.
POPLAR PLAINS RD
From COTTINGHAM RD to POPLAR PLAINS CRES
2017-03-27 07:00 2017-04-01 19:00 Daily
Northbound curb lane on Poplar Plains rd. closed due to conduit repairs.
YONGE ST
From EGLINTON AVE E to SOUDAN AVE
2017-03-29 09:00 2017-04-12 16:00 Daily
Northbound curb lane on Yonge St. occupied.
SHERBOURNE ST
From WELLESLEY ST E to SHERBOURNE ST
2017-03-27 09:00 2017-03-31 16:00 Daily
Southbound lanes will be occupied due to construction.
LAKE SHORE BLVD W @ PARKSIDE DR
2017-03-27 09:30 2017-03-27 12:30 Daily
The eastbound curb lane will be occupied due to hydro pole replacement.
WELLESLEY ST W @ BAY ST
2017-03-27 07:00 2017-04-07 19:00 Daily
Partial closure of eastbound traffic. Full closure of bike lane and sidewalk due to rotary drill rig.
ADELAIDE ST W @ SHEPPARD STREET
2017-03-27 10:00 2017-04-01 15:00 Daily
Install new chamber . 77 Adelaide St WEST
HARBOUR ST
From LOWER SIMCOE ST to YORK ST
2017-03-27 07:00 2017-03-28 17:00 Daily
Occupying 2 eastbound lanes due to installation of sewer pipes by Grascan.
LEE AVE @ Long Cres
2017-04-03 08:00 2017-04-14 19:00 Daily
Excavation of a Bell Pit in a residential area to maintain/provide Bell service. Works expected to be completed in 2 day period, 4 hours each day.
BROADWAY AVE
From REDPATH AVE to MOUNT PLEASANT RD
2017-04-05 07:00 2017-03-24 19:00 Daily
WESTBOUND CURB LANE occupied due to BELL INFRASTRUCTURE
COMMISSIONERS ST
From LESLIE ST to CARLAW AVE
2017-03-27 07:00 2017-03-31 19:00 Daily
West bound curb lane occupied due to placed underground cables

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York

There are no emergency road restrictions at this moment.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

Get a first car or motorcycle licence, renew an old one, browse the online driver's handbook, book a road test, register your vehicle, and more.

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Information from the Ontario Ministry of Transportation about impaired driving, the Vehicle Impoundment program, driving safely, seat belts, child safety seats, school buses, emergency vehicles, and much more.

Information about the world's first all-electronic open access toll highway, which extends 108 kilometres east-west, just north of Toronto. Learn about the road's special features, tolls, and more.


More Commuter Coverage on CP24

Watch CP24's auto show every Sunday at 8:00 p.m. to learn about your vehicle, the car industry, and much more.

News, updates, and important information about transit systems for Toronto & the GTA.

News, updates, wait times, and traveller information about Ontario border crossings.

News, updates, important links, traveller information, and Billy Bishop arrival and departure times.