Share your commuter tips when safe to do so: 416-384-2400, @CP24, breakingnews@cp24.com.

What's on this page?

Traffic Road Conditions

All currently active planned road restrictions.

Location Start Date End Date When
EGLINTON AVE W @ RENFORTH DR
2015-02-05 00:01 2016-12-30 23:59 Continuous
The westbound sidewalk will be occupied due to road construction.
THE EAST MALL @ 535 THE EAST MALL
2016-03-09 09:00 2016-12-09 16:00 Daily
The northbound curb lane will be occupied due to drill shot to complete work for Bell underground structure along the east sidewalk.
BURNHAMTHORPE RD
From SILVER SHADOW PATH to WINDUST GT
2016-07-11 00:01 2016-12-11 23:59 Continuous
Road will be reduced to one lane in both directions due to road resurfacing and pavement repairs, sidewalk and curb reconstruction on Burnhamthorpe Road from Etobicoke Creek to Windust Gate.
BROWNS LINE
From EVANS AVE to HOMER AVE
2016-07-01 09:00 2016-12-31 14:00 Daily
The northbound and southbound curb lane will be alternately occupied due to hydro power line work.
THE EAST MALL
From BLOOR ST W to DUNDAS ST W
2016-07-01 09:00 2016-12-31 14:00 Daily
The northbound and southbound curb lanes will alternatively be occupied due to hydro power line work.
DWIGHT AVE
From SYMONS ST to LAKE SHORE BLVD W
2016-07-25 07:00 2016-12-31 19:00 Daily
The westbound lanes will be occupied due to sewer and watermain replacement and road resurfacing.
FABIAN PL @ CHAPMAN RD
2016-08-02 07:00 2016-12-15 17:00 Weekdays
The northbound and southbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
PORTERFIELD RD
From BILLCAR RD to AMORO DR
2016-08-02 07:00 2016-12-15 17:00 Weekdays
The eastbound and westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
REDWATER DR
From KIPLING AVE to TOFIELD CRES
2016-08-02 07:00 2016-12-15 17:00 Weekdays
The eastbound and westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
HUN CRES @ SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
NORBROOK CRES @ WOOLENSCOTE CRCL
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lane will be occupied due to sewer rehabilitation.
ALMAYO CRES
From BUCKSBURN RD to SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
AVENING DR
From DUNTROON CRES to SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One eastbound lane will be occupied due to sewer rehabilitation.
DAMASCUS DR
From FINCH AVE W to HUN CRES
2016-08-02 07:00 2016-12-15 17:00 Continuous
One southbound lane will be occupied due to sewer rehabilitation.
SHALOM CRES
From STONECROP LANE to FOUR LEAF DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One southbound lane will be occupied due to sewer rehabilitation.
ALMAYO CRES @ SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One northbound and southbound lane will be occupied due to sewer rehabilitation.
HUN CRES @ ATTILA CRT
2016-08-02 07:00 2016-12-15 17:00 Continuous
One eastbound lane will be occupied due to sewer rehabilitation.
LITCHFIELD CRT @ SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One westbound lane will be occupied due to sewer rehabilitation.
MANFRED AVE
From BUCKSBURN RD to SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One westbound lane will be occupied due to sewer rehabilitation.
MIDHURST DR @ AVENING DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One eastbound lane will be occupied due to sewer rehabilitation.
NETHERLY DR @ SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Continuous
One westbound lane will be occupied due to sewer rehabilitation.
WOOLENSCOTE CRCL @ NORBROOK CRES
2016-08-02 07:00 2016-12-15 17:00 Continuous
One northbound lane will be occupied due to sewer rehabilitation.
SUMMERFIELD CRES @ ODESSA AVE
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
HOLLISTER RD @ FIRESTONE RD
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
INVERDON RD @ HOLLISTER RD
2016-08-02 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
MARGRATH PL @ ERINGATE DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
ARDUA ST @ THE WEST MALL
2016-08-02 07:00 2016-12-15 17:00 Daily
Westbound lane will be occupied due to sewer maintenance.
GROVERDALE RD
From CARSBROOKE RD to WARESIDE RD
2016-08-02 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
TORRINGTON DR @ BARVALE CRT
2016-08-02 07:00 2016-12-15 17:00 Daily
All lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
SUMMERFIELD CRES @ ODESSA AVE
2016-08-02 07:00 2016-12-15 17:00 Daily
All lanes will be occupied due to sewer maintenance. Traffic in both directions will be maintained.
FABIAN PL @ CHAPMAN RD
2016-08-02 07:00 2016-12-15 17:00 Daily
Northbound curb lane at Fabian Pl. will be occupied due to trench work.
LITCHFIELD CRT @ SILVERSTONE DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
RIVERLEA DR @ FREEMONT AVE
2016-08-02 07:00 2016-12-15 17:00 Daily
Northbound curb lane at Riverlea Dr. will be occupied due to trench work.
RIVERDALE AVE @ JASON RD
2016-08-02 07:00 2016-12-15 17:00 Daily
Southbound curb lane at Riverdale Dr. will be occupied due to trench work.
PORTERFIELD RD @ AMORO DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Eastbound curb lane at Porterfield Rd. will be occupied due to trench work.
ROYALCREST RD @ CABERNET CRCL
2016-08-03 07:00 2016-12-15 17:00 Daily
Eastbound curb lane at Royalcrest Rd. will be occupied due to trench work.
SUMMERFIELD CRES @ ODESSA AVE
2016-08-03 07:00 2016-12-15 17:00 Daily
Curb lane at Summerfield Cres. Will be occupied due to trench work.
PARK HILL RD @ EGLINTON AVE W
2016-07-18 00:01 2016-12-31 23:59 Continuous
Full road closure of Park Hill from Eglinton to 40M north on Park Hill, due to construction.
WELLESWORTH DR
From LITTLEWOOD CRES to HARTLAND RD
2016-08-02 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
WOOLENSCOTE CRCL @ SARABAND ST
2016-08-03 07:00 2016-12-15 17:00 Daily
Eastbound and westbound curb lane will be occupied at Woolenscote Crcl due to trench work.
ROYALEIGH AVE @ ROXALINE ST
2016-08-02 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
FIRESTONE RD @ WELLESWORTH DR
2016-08-03 07:00 2016-12-15 17:00 Daily
Northbound and southbound curb lane at Firestone Rd. will be occupied due to trench work
PRINCESS ANNE CRES @ BOURNEMOUTH RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
PRINCESS ANNE CRES
From OLDHAM RD to RAVENSBOURNE CRES
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer maintenance.
PRINCESS ANNE CRES @ RAVENSBOURNE CRES
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
THELMERE PL
From CELESTINE DR to TYNEVALE DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
CROMER PL @ TOLLINGTON RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer maintenance.
MONTGOMERY RD
From OAK HAMPTON BLVD to LOYALIST RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer maintenance.
ABILENE DR
From TWYFORD RD to AYLESBURY RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The southbound and northbound lanes will be occupied due to spot trenchless rehabilitation (CIPP system) of existing sewers and sewer service connections.
LEARMONT DR
From ABNER PL to SABRINA DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
NORTH DR
From COURTSFIELD CRES to WHITECROFT PL
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer maintenance.
POPLAR HEIGHTS DR @ ROBALDON RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
POWBURN PL @ LEARMONT DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer maintenance.
STURTON RD
From BENBOW RD to SUN ROW DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer maintenance.
WIDDICOMBE HILL BLVD
From KIPLING AVE to EGLINTON AVE W
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer service work.
VANCHO CRES @ POPLAR HEIGHTS DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer service work.
SUN ROW DR
From SASKATOON DR to WINNIPEG RD
2016-08-03 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
MONTGOMERY RD
From WILGAR RD to BELVEDERE BLVD
2016-08-03 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
HOBDEN PL @ SANDWELL DR
2016-08-03 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service work.
TWENTY FIFTH ST
From CITY RD to LAKE PROMENADE
2016-08-04 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to rehabilitation of sewer.
CORONADO CRT
From WESTON RD to ST LUCIE DR
2016-08-09 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations.
CAMEO CRES @ DALRYMPLE DR
2016-08-24 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
WESTON RD @ DENNIS AVE
2016-08-24 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
FINCH AVE W
From WOODBINE DOWNS BLVD to HWY 27 SB
2016-09-01 07:00 2017-02-28 21:00 Daily
East and westbound lanes will be occupied due to watermain and sidewalk construction.
STRATHNAIRN AVE @ CARNARVON ST
2016-08-27 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
KEELE ST @ HIRONS ST
2016-08-27 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
JANE ST @ BLACK CREEK DR
2016-08-27 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
LANGDEN AVE @ CLIFF ST
2016-08-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
BECKETT AVE @ MAIDSTONE ST
2016-08-30 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
PARSON CRT @ CULFORD RD
2016-08-30 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
HUXLEY RD @ CLAYSON RD
2016-09-06 07:00 2016-12-16 19:00 Daily
The westbound shoulder lane will be occupied due to watermain rehabilitation.
GLEN SCARLETT RD @ GUNNS RD
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
LAVENDER RD @ REGENT ST
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
PARKSIDE DR @ GARDEN AVE
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
WOOLTON CRES @ CULFORD RD
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
DUNDAS ST W
From HOWLAND AVE to HUMBER HILL AVE
2016-09-12 00:01 2017-02-17 23:59 Continuous
Two eastbound lanes will be occupied due to bridge wall construction, storm sewer modifications, slope stabilization, road resurfacing.
BORDEAUX CRCT @ CABERNET CRCL
2016-09-28 07:00 2016-12-31 17:00 Daily
The westbound lane will be occupied due to roadway crack filling.
BUCKSBURN RD
From SILVERSTONE DR to ALMAYO CRES
2016-09-28 07:00 2016-12-31 17:00 Daily
One northbound lane will be occupied due to roadway crack filling.
CHARNLEIGH CRT @ SILVERSTONE DR
2016-09-28 07:00 2016-12-31 17:00 Daily
One eastbound lane will be occupied due to roadway crack filling.
DAMASCUS DR
From HUN CRES to FINCH AVE W
2016-09-28 07:00 2016-12-31 17:00 Daily
One southbound lane will be occupied due to roadway crack filling.
ELMVALE CRES @ SILVERSTONE DR
2016-09-28 07:00 2016-12-31 17:00 Daily
One westbound lane will be occupied due to roadway crack filling.
FELAN CRES
From LAKELAND CRES to SANAGAN RD
2016-09-28 07:00 2016-12-31 17:00 Daily
One northbound lane will be occupied due to roadway crack filling.
FOUR LEAF DR
From LYNMONT RD to JOHN GARLAND BLVD
2016-09-28 07:00 2016-12-31 17:00 Daily
One eastbound lane will be occupied due to roadway crack filling.
GOODMARK PL @ STEINWAY BLVD
2016-09-28 07:00 2016-12-31 17:00 Daily
The westbound lane will be occupied due to roadway crack filling.
PLUNKETT RD
From MILLWICK DR to SATTERLY RD
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling by D.I. Bros. Ltd.
HUN CRES
From AVENING DR to SILVERSTONE DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound and eastbound lanes will be occupied due to roadway crack filling by D.I. Bros. Ltd.
LIGHTWOOD DR
From SANAGAN RD to LAKELAND CRES
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound and eastbound lanes will be occupied due to roadway crack filling by D.I. Bros. Ltd.
LAKELAND DR
From KIPLING AVE to LIGHTWOOD DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound and eastbound lanes will be occupied due to roadway crack filling by D.I. Bros. Ltd.
LANYARD RD
From LINDYLOU RD to WESTON RD
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lanes will be occupied due to roadway crack filling by D.I. Bros. Ltd.
NEAMES CRES
From CHALKFARM DR to CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The east/north bound lane will be occupied due to roadway crack filling.
MARTIN GROVE RD
From LEXINGTON AVE to ALBION RD
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
MARTIN GROVE RD
From GIHON SPRING DR to ROYALCREST RD
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
MARTIN GROVE RD
From ROYALCREST RD to LEXINGTON AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
MARTIN GROVE RD
From STEELES AVE W to GIHON SPRING DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
JOHN GARLAND BLVD
From KISKADEE DR to HUMBER COLLEGE BLVD
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
JANE ST
From SHEPPARD AVE W to CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
JANE ST
From CHALKFARM DR to WILSON AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound lanes will be occupied due to roadway crack filling.
FINCH AVE W
From KIPLING AVE to ISLINGTON AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
One westbound lane will be occupied due to roadway crack filling.
MARLINGTON CRES @ CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lane will be occupied due to roadway crack filling.
SAMBA DR
From BRADSTOCK RD to SHEPPARD AVE W
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
SANAGAN RD
From FELAN CRES to LAKELAND DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
SHEPPARD AVE W
From WESTON RD to ARROW RD
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lanes will be occupied due to roadway crack filling.
SHEILA CRT
From SILVERSTONE DR to SILVERSTONE DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound lane will be occupied due to roadway crack filling.
STEELES AVE W @ 407 BRIDGE TO HWY 427
2016-09-28 07:00 2016-12-31 17:00 Daily
One eastbound lane will be occupied due to roadway crack filling.
STEINWAY BLVD
From SIGNAL HILL AVE to STEELES AVE W
2016-09-28 07:00 2016-12-31 17:00 Daily
The westbound lane will be occupied due to roadway crack filling.
FARR AVE
From KIPLING AVE to TAYSHAM CRES
2016-09-28 07:00 2016-12-31 17:00 Daily
The north/west bound lane will be occupied due to roadway crack filling.
STONECROP LANE
From FOUR LEAF DR to MILKWOOD AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
RABTON CRT @ NEAMES CRES
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound and southbound lanes will be occupied due to roadway crack filling.
HEAVITREE DR @ CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound and westbound lanes will be occupied due to roadway crack filling.
RADWINTER DR
From FELAN CRES to LAKELAND CRES
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lanes will be occupied due to roadway crack filling.
SUNSET TRL
From WESTON RD to HIGHBURY DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The westbound lanes will be occupied due to roadway crack filling.
TALENT CRES
At SAMBA DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound lanes will be occupied due to roadway crack filling.
WALLASEY AVE
From STRATHBURN BLVD to HIGHBURY DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound lanes will be occupied due to roadway crack filling.
WALLASEY AVE
From WESTON RD to STRATHBURN BLVD
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lanes will be occupied due to roadway crack filling.
WESTON RD
From LILAC AVE to WALSH AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
The northbound lanes will be occupied due to roadway crack filling.
WESTON RD
From SHEPPARD AVE W to LILAC AVE
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
WESTON RD
From HABITANT DR to SHEPPARD AVE W
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lanes will be occupied due to roadway crack filling.
FINCH AVE W
From ARDWICK BLVD to DUNCANWOODS DR
2016-07-18 09:00 2016-12-31 16:00 Daily
The eastbound and westbound curb lane will be occupied due to work done by Power Line Plus Ltd.
VARSITY RD @ OLD DUNDAS ST
2016-10-05 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to construction.
ALLANBROOKE DR
From ELMVIEW CRT to CEDARCREST DR
2016-10-17 00:01 2016-12-17 23:59 Continuous
Road closed in both directions due to replacement of sanitary sewer and services.
EGLINTON AVE W
From KEELESDALE DR to WESTON RD
2016-10-18 17:00 2016-12-29 09:10 Daily
The westbound lanes will be occupied due to traffic control installation and removal of adjacent structure.
FINCH AVE W
From HWY 27 COLLECTOR N to TANGIERS RD
2016-10-27 09:00 2016-12-31 16:00 Daily
The eastbound and westbound lanes will be occupied due to construction.
EGLINTON AVE W
From YARROW RD to KEELE ST
2016-11-07 18:00 2016-12-30 09:00 Continuous
The eastbound and westbound lanes will be occupied due to shoring and piling.
EGLINTON AVE W
From GLENHOLME AVE to OAKWOOD AVE
2016-11-07 07:00 2016-12-07 16:00 Daily
The westbound curb lane will be occupied due to road work.
DALESFORD RD @ 280 DALESFORD RD
2016-11-07 07:00 2016-12-07 19:00 Daily
The westbound lane will be occupied due to directional drilling, hydro vac.
SENTINEL RD
From LAMBERTON BLVD to HUCKNALL RD
2016-11-14 07:00 2016-12-23 18:00 Daily
Will be reduced to one lane for city basement flooding.
BARKWIN DR
From BATAWA CRES to ISLINGTON AVE
2016-11-16 07:00 2016-12-07 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to trenching and cable placement.
BATAWA CRES @ BARKWIN DR
2016-11-16 07:00 2016-12-07 19:00 Daily
The southbound curb lanes will be occupied due to trenching and cable placement.
ISLINGTON AVE @ DISAN CRT
2016-11-16 07:00 2016-12-07 19:00 Daily
The northbound curb lanes will be occupied due to trenching and cable placement.
WARDLAW CRES @ 12 to 26 WARDLAW CRES
2016-11-16 07:00 2016-12-07 19:00 Daily
The northbound curb lane will be occupied due to trenching and cable placement.
SCARLETT RD
From CHAPMAN RD to SAXONY CRES
2016-11-16 09:00 2016-12-16 16:00 Daily
The northbound curb lane will be occupied due to unloading/loading of materials.
RENFORTH DR @ 159 to 161 RENFORTH DR
2016-11-17 09:00 2016-12-09 16:00 Daily
The northbound curb lane will be occupied due to construction - trench and conduit placement.
COLLINGDALE RD @ JOHN GARLAND BLVD
2016-11-14 00:01 2016-12-23 23:59 Continuous
The northbound and southbound lanes will be occupied due to road resurfacing.
HOBDEN PL @ SANDWELL DR
2016-11-21 07:00 2016-12-21 19:00 Daily
The southbound westbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
GRACEDALE BLVD
From NAVENBY CRES to GOLDSBORO RD
2016-10-21 09:00 2016-12-31 16:00 Daily
The northbound and southbound curb lanes will be occupied due to hydro repair.
GIBSON AVE @ ELLIS AVE
2016-11-23 07:00 2016-12-07 19:00 Daily
The southbound curb lane will be occupied due to conduit placement.
BROWNVILLE AVE
2016-11-23 07:00 2016-12-07 19:00 Daily
Westbound curb lane will be occupied for trench and conduit placement.
THE WESTWAY @ 163 the westway
2016-11-24 09:00 2016-12-08 16:00 Daily
Eastbound curb lane will be occupied due to construction of conduit and place GLB & CSP.
SUN ROW DR
From THE WESTWAY to SUN ROW DR
2016-11-24 07:00 2016-12-08 19:00 Daily
Eastbound and Westbound curb lanes occupied to place GLB & CSP and place conduit.
SUN ROW DR @ 79 Sun Row dr
From THE WESTWAY to SUN ROW DR
2016-11-24 07:00 2016-12-08 19:00 Daily
Eastbound and Westbound curb lanes occupied to replace Trench, place GLB and Csp, and also place conduit.
CASTLEBAR RD @ ROYAL YORK RD
2016-11-25 07:00 2016-12-09 19:00 Daily
The eastbound curb lane will be occupied due to road work
PRINCE EDWARD DR N @ THE KINGSWAY
2016-11-24 09:00 2016-12-09 16:00 Daily
Southbound curb lane will be occupied due to cable installation.
STRATH AVE
From QUEEN MARYS DR to PRINCE EDWARD DR N
2016-11-24 07:00 2016-12-09 19:00 Daily
Southbound and northbound curb lanes will be occupied due to cable installation.
QUEEN MARYS DR
From DUNEDIN DR to PRINCE EDWARD DR N
2016-11-24 07:00 2016-12-09 19:00 Daily
Eastbound and westbound curb lanes will be occupied due to cable installation.
QUEEN ANNE RD
From DUNEDIN DR to PRINCE EDWARD DR N
2016-11-24 07:00 2016-12-09 19:00 Daily
Eastbound and westbound curb lanes will be occupied due to cable installation.
DUNEDIN DR
From QUEEN ANNE RD to QUEEN MARYS DR
2016-11-24 07:00 2016-12-09 19:00 Daily
Northbound and southbound curb lanes will be occupied due to cable installation.
THE KINGSWAY @ PRINCE EDWARD DR N
2016-11-24 09:00 2016-12-09 16:00 Daily
Westbound curb lane will be occupied due to cable installation.
BRAECREST AVE @ Royal York Rd to 51 Braecrest Ave
2016-11-25 07:00 2016-12-09 19:00 Daily
The eastbound curb lane will be occupied due to Trench, place GLB/CSP and place conduit.
BRAECREST AVE @ 33 Braecrest Ave to Roxaline St
2016-11-25 07:00 2016-12-09 19:00 Daily
The eastbound curb lane will be occupied due to Trench, place GLB/CSP and place conduit.
KIPLING AVE @ 728 Kipling Ave to N Queen St
2016-11-25 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to dig pit and clear blocked conduit.
LAMBETH RD
From ROYAL YORK RD to THE KINGSWAY
2016-11-28 07:00 2017-01-28 18:00 Daily
The eastbound lane will be occupied due to Toronto Hydro work.
BELFIELD RD
From KIPLING AVE to SHAFT RD
2016-11-28 09:00 2016-12-09 16:00 Daily
The westbound curb lane will be occupied due to directional bore 144m, trench, and place cable.
DEETH DR
2016-11-28 07:00 2017-01-11 19:00 Daily
Westbound lanes will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
RIVERLEA DR @ LAWRENCE AVE W
2016-11-30 09:00 2016-12-12 16:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
RIVERLEA DR @ SCARLETT RD
2016-11-28 09:00 2016-12-29 16:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
DUFFERIN ST
From ST CLAIR AVE W to MACKAY AVE
2016-11-30 09:00 2016-12-09 16:00 Daily
The northbound and southbound centre lanes will be occupied due to conduit installation.
AVONHURST RD
From DUNDAS ST W to BURNHAMTHORPE CRES
2016-11-28 07:00 2016-12-12 19:00 Daily
The northbound curb lane will be occupied due to road work.
ALBION RD @ MARTIN GROVE RD
2016-11-28 09:00 2016-12-12 16:00 Daily
The eastbound curb lane will be occupied due to road work.
WATERBURY DR
From REDGRAVE DR to MARTIN GROVE RD
2016-11-28 07:00 2016-12-07 19:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
DUNDAS ST W
From OLD OAK DR to NOTTINGHAM DR
2016-11-28 09:00 2016-12-12 16:00 Daily
The eastbound lanes will be occupied due to road work.
VERONA AVE @ 14 VERONA AVE
2016-12-01 09:30 2016-12-08 15:30 Daily
Northbound and southbound lanes will be occupied due to cable excavation.
THE WEST MALL
From EVA RD to REXTON RD
2016-11-29 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to cable placement.
STATION RD @ CAVELL AVE
2016-11-28 07:00 2016-12-13 19:00 Daily
Southbound curb lane will be occupied due to directional drilling.
CAVELL AVE @ STATION RD
2016-11-28 07:00 2016-12-13 19:00 Daily
Westbound curb lane will be occupied due to directional drilling.
LAKE SHORE BLVD W
From THIRTY SECOND ST to THIRTY FIFTH ST
2016-12-05 07:00 2017-01-23 04:00 Daily
The westbound bike lane will be occupied due to street-sculpting and road widening, consisting of new curb, sidewalk and tree pit installation.
BIRMINGHAM ST
From FIFTH ST to FOURTH ST
2016-11-28 09:00 2016-12-12 16:00 Daily
The westbound curb lane will be occupied due to clearing of blockages on Bell infrastructure.
FOURTH ST
From BIRMINGHAM ST to LAKE SHORE BLVD W
2016-11-28 09:00 2016-12-12 16:00 Daily
The southbound curb lane will be occupied due to clearing of blockages on Bell infrastructure.
ARMADALE AVE
From BLOOR ST W to WEATHERELL ST
2016-11-30 09:00 2016-12-07 16:00 Daily
The northbound curb lane will be occupied due to clearing of blockages on Bell infrastructure.
SYMONS ST @ LAKE SHORE BLVD W
2016-11-28 09:00 2016-12-16 16:00 Daily
The westbound curb lane will be occupied due to road resurfacing.
ELMCREST RD @ RATHBURN RD
2016-11-29 07:00 2016-12-13 16:00 Daily
Northbound lane will be occupied due to cable installation.
RATHBURN RD @ MELBERT RD
2016-11-29 07:00 2016-12-13 16:00 Daily
The eastbound lanes will be occupied due to road work.
RATHBURN RD @ CANEROUTH DR
2016-11-29 07:00 2016-12-13 16:00 Daily
The eastbound lanes will be occupied due to road work.
ROYALAVON CRES
From DUNDAS ST W to TYRE AVE
2016-11-30 09:30 2016-12-14 15:30 Daily
The northbound and southbound lanes will be occupied due to road work.
CENTENNIAL PARK BLVD
From EGLINTON AVE W to RATHBURN RD
2016-11-29 07:00 2016-12-13 16:00 Daily
The southbound centre lane will be occupied due to cable placing.
CENTENNIAL PARK BLVD
From EGLINTON AVE W to RATHBURN RD
2016-11-29 07:00 2016-12-13 16:00 Daily
The northbound centre lane will be occupied due to cable placing.
CENTENNIAL PARK BLVD
From EGLINTON AVE W to RATHBURN RD
2016-11-29 07:00 2016-12-13 16:00 Daily
The northbound curb lane will be occupied due to cable placing.
CARDELL AVE @ WESTON RD
2016-11-30 09:00 2016-12-14 16:00 Daily
Northbound and southbound curb lane at Cardell Ave. due to trench work.
WESTON RD @ CARDELL AVE
2016-11-30 09:00 2016-12-14 16:00 Daily
The northbound and southbound curb lanes will be occupied due to trench, place conduit and place GLB/CSP.
RONSON DR @ KIPLING AVE
2016-11-30 07:00 2016-12-09 19:00 Daily
The northbound curb lane will be occupied due to trench, place conduit and place GLB/CSP.
OXFORD ST @ 589 OXFORD ST
At MILTON ST
2016-11-30 07:00 2016-12-09 19:00 Daily
The eastbound lane will be occupied due to construction - trench and conduit placement.
MICHAEL POWER PL
From DUNDAS ST W to RESURRECTION RD
2016-12-01 07:00 2016-12-08 19:00 Daily
The southbound lane will be occupied due to construction - pit dig and conduit repair.
NORSEMAN ST @ ISLINGTON AVE
2016-12-05 09:00 2016-12-09 16:00 Daily
The westbound lanes will be occupied due to road work.
ISLINGTON AVE @ NORSEMAN ST
2016-12-05 09:00 2016-12-09 16:00 Daily
The southbound lanes will be occupied due to road work.
EGLINTON AVE W @ MIMICO CREEK
At WILLOWRIDGE RD
2016-12-02 09:00 2016-12-20 16:00 Continuous
One eastbound and one westbound lane will be occupied, one lane at a time, due to contract city work by Peninsula Construction Inc.
CELESTINE DR
From LUDSTONE DR to SABRINA DR
2016-12-05 07:00 2016-12-10 19:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
DUNCANWOODS DR @ 2 to 6 DUNCANWOODS DR
2016-12-05 09:00 2016-12-09 16:00 Daily
One southbound lane will be occupied due to new conduit installation.
WESTON RD
From ORMONT DR to KENHAR DR
2016-12-02 09:00 2016-12-12 16:00 Daily
The southbound curb lane will be occupied due to conduit placement.
RUMIKE RD
From FINCH AVE W to LINDYLOU RD
2016-12-05 09:00 2016-12-09 15:15 Continuous
The northbound lane will be occupied due to new conduit installation by directional drilling.
LINDYLOU RD @ 120 LINDYLOU RD
2016-12-05 09:00 2016-12-09 15:15 Continuous
The westbound lane will be occupied due to new conduit to be installed by directional drilling.
DIXINGTON CRES @ 24 to 36 DIXINGOTN CRES
2016-12-05 07:00 2016-12-09 19:00 Continuous
The eastbound lane will be occupied due to installation of Y on existing conduit.
VAN DUSEN BLVD
From ALLERTON RD to SHIRES LANE
2016-12-05 07:00 2016-12-19 19:00 Daily
The westbound curb lane will be occupied due to road work.
REDGRAVE DR @ MARTIN GROVE RD
2016-12-05 07:00 2016-12-09 19:00 Continuous
The westbound lane fronting #20 Redgrave Dr will be occupied due to new conduit install from pedestal to the building.
LA ROSE AVE @ 123 to 151 LA ROSE AVE
2016-12-05 09:00 2016-12-09 16:00 Continuous
The eastbound lane will be occupied due to install for new conduit for Bell Canada.
ARCHERHILL DR @ 27 ARCHERHILL DR
2016-12-05 07:00 2016-12-26 19:00 Daily
The westbound curb lane will be occupied due to conduit placement.
ISLINGTON AVE @ south of FLETCHER PL
2016-12-05 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
AIKENHEAD RD @ PARAGON RD
2016-12-05 09:00 2016-12-09 16:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
BRADDOCK RD
From AQUILA CRT to JEFFCOAT DR
2016-12-03 07:00 2016-12-17 19:00 Daily
The northbound lane will be occupied due to clearing of blockages on Bell infrastructure.
BALEBERRY CRES
From BENBOW RD to THE WESTWAY
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
CHAPMAN RD
From RIDGEWOOD RD to BRENTSIDE CRT
2016-12-05 07:00 2016-12-19 19:00 Daily
The westbound lane will be occupied due to clearing of blockages on Bell infrastructure on private property.
ISLINGTON AVE @ THE WESTWAY
2016-12-05 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
KYLEMORE CRES
From WATLING ST to SUMMITCREST DR
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
LAKE SHORE BLVD W @ PALACE PIER CRT
2016-12-05 07:00 2016-12-22 17:00 Daily
The eastbound curb lane will be occupied due to Toronto Hydro work.
MACKAY AVE @ 111 MACKAY AVE
From GREENLAW AVE to VIA ITALIA
2016-12-05 07:00 2016-12-24 19:00 Daily
The eastbound curb lane will be occupied due to construction - trench, conduit placement & directional bore.
MARTIN GROVE RD
From COWLEY AVE to RATHBURN RD
2016-12-05 09:00 2016-12-26 16:00 Daily
The northbound and southbound curb lanes will be occupied due to construction - trench and conduit placement.
MCMANUS RD
From DIXON RD to DEETH DR
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound and northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
OAKDALE RD @ 500 to 400 OAKDALE RD
2016-12-05 07:00 2016-12-23 19:00 Daily
The southbound curb lane will be occupied due to construction - trench, conduit placement and GLB / CSP placement.
RATHBURN RD @ 316 RATHBURN RD
At WEST DEANE PARK DR
2016-12-05 09:00 2016-12-26 16:00 Daily
The eastbound and westbound curb lanes will be occupied due to construction - trench and conduit placement.
REXDALE BLVD
From PRECISION RD to QUEEN SB PLATE DR
2016-12-05 09:00 2016-12-16 16:00 Daily
The westbound curb lane will be occupied due to construction - trench, "y" and cable placement.
ROYAL YORK RD @ THE QUEENSWAY
2016-12-05 09:00 2016-12-09 16:00 Daily
The northbound curb lane will be occupied due to construction - pit digs, conduit repairs and cable placement.
TABER RD
From RACINE RD to BRYDON DR
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
SHERWAY GARDENS RD @ SHERWAY GT
2016-12-01 00:01 2017-08-31 23:59 Continuous
The westbound curb lane will be occupied due to new 2 storey Nordstrom (retail store) being built on top if existing U/G parking structure.
ELM ST @ 50m N of Queens Dr to Queen Dr
2016-12-06 08:00 2016-12-07 18:00 Daily
All lanes will be occupied alternatively due to coring of asphalt cores and staking borehole locations.
QUEENS DR
From ROSEMOUNT AVE to PINE ST
2016-12-06 08:00 2016-12-07 18:00 Daily
The eastbound and westbound lanes will alternatively be occupied due to coring of asphalt cores and staking borehole locations.
CORONADO CRT
From WESTON RD to ST LUCIE DR
2016-12-07 07:00 2016-12-15 17:00 Daily
Both lanes in both directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
FINCH AVE W @ WESTMORE ave
2016-12-05 09:00 2016-12-09 16:00 Daily
The westbound lanes will be occupied due to gas main relocation.
HAY AVE @ 61 HAY AVE
At CARNARVON AVE
2016-12-06 07:00 2016-12-16 19:00 Daily
The eastbound curb lane will be occupied due to trench and placing of conduit.
FIRENZA DR @ 34 FIRENZA DR
From BENRUBIN DR to MILADY RD
2016-12-05 09:30 2016-12-20 15:30 Daily
Partial lane closure on the westbound and eastbound lanes due to cable excavation for Bell Canada.
KITTIWAKE AVE @ 59 KITTIWAKE AVE
At KISKADEE DR
2016-12-06 09:30 2016-12-20 15:30 Daily
Partial lane closure on the westbound and eastbound lanes due to cable excavation for Bell Canada.
BEMERSYDE DR @ EGLINTON AVE W
2016-12-07 07:00 2016-12-28 19:00 Daily
PARTIAL LANE CLOSURE AT BEMERSYDE DR FORM EGLINTON AVE W TO 41 BEMERSYDE DR NOTHBOUND DUE TO ROAD WORK.
ISLINGTON AVE @ PRINCESS MARGARET BLVD
From PRINCESS MARGARET BLVD to RAVENSBOURNE CRES
2016-12-07 09:00 2016-12-28 16:00 Daily
PARTIAL LANE CLOSURE AT Islington Ave FORM Prince Margaret Blvd TO 45 Ravensbourne Cres TOWARDS SOUTHBOUND DUE TO ROAD WORK.
OLDHAM RD
2016-12-07 07:00 2016-12-28 19:00 Daily
Partial lane closure at Oldham Rd from 25 Oldham Rd TO 33 Oldham Rd towards east and Westbound due to road work.
RAVENSBOURNE CRES
2016-12-07 07:00 2016-12-28 19:00 Daily
Partial lane closure at Ravensbourne Cres from 70 Ravensbourne Cres TO 80 Ravensbourne Cres towards eastbound due to road work.
RAVENSBOURNE CRES @ 6 BEMERSYDE DR
2016-12-07 07:00 2016-12-28 19:00 Daily
Partial lane closure at Ravensbourne Cres from 6 Bemersyde Dr TO 11 Ravensbourne Cres towards east and westbound due to road work.
RAVENSBOURNE CRES @ 47 RAVENSBOURNE CRES
2016-12-07 07:00 2016-12-28 19:00 Daily
Partial lane closure at Ravensbourne Cres from 47 Ravensbourne Cres TO 55 Ravensbourne Cres towards north and southbound due to road work.
PRINCESS MARGARET BLVD
From PALACE ARCH DR to ISLINGTON AVE
2016-12-07 07:00 2016-12-28 19:00 Daily
Partial lane closure at Princess Margaret Blvd from Palace Arch Dr TO Islington Ave towards east and westbound due to road work.
KING GEORGES RD
From TRETHEWEY DR to PAULSON RD
2016-12-06 07:00 2016-12-15 19:00 Daily
The southbound curb lane will be occupied due to the clearing of blockages on Bell Infrastructure.
GLEN CEDAR RD @ 57 Glen Cedar Rd
From WARWICK AVE to AVENAL DR
2016-12-06 07:00 2016-12-08 19:00 Daily
The southbound curb lane will be occupied due to placing new conduit and fibre optic cable.
ROYAL YORK RD
From QUEEN ELIZABETH BLVD to SINCLAIR ST
2016-12-07 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to place cable.
THE QUEENSWAY
From VANSCO RD to ALGIE AVE
2016-12-06 09:00 2016-12-09 16:00 Weekdays
The westbound curb lane will be occupied due to placing cable.
OAKWOOD AVE @ 169 Oakwood Ave to 175 Oakwood Ave
2016-12-06 07:00 2016-12-09 19:00 Daily
One of the northbound and southbound lane will be occupied due to water service.
HELEN AVE
From WILLIAM ST to WADSWORTH BLVD
2016-12-07 08:00 2016-12-07 17:00 Daily
All lanes will be occupied alternatively due to coring of asphalt cores and staking borehole locations.
RALPH ST
From LAWRENCE AVE W to MACDONALD AVE
2016-12-07 08:00 2016-12-07 17:00 Daily
All lanes will be occupied alternatively due to coring of asphalt cores and staking borehole locations.
HAGERSVILLE CRT @ 6 HAGERSVILLE CRT
2016-12-06 07:00 2016-12-20 19:00 Daily
The westbound curb lane will be occupied due to trenching and placement of conduit.
INVERDON RD @ 30 INVERDON RD
2016-12-06 07:00 2016-12-20 19:00 Daily
The southbound curb lane will be occupied due to trenching and placement of conduit.
SIGMONT RD @ 2 SIGMONT RD
2016-12-06 07:00 2016-12-20 19:00 Daily
The southbound curb lane will be occupied due to trenching and placement of conduit.
NOTTAWASAGA CRT @ 2 NOTTAWASAGA CRT
2016-12-07 09:30 2016-12-21 15:30 Daily
One lane will be occupied in both directions due to cable excavation.
BELGATE PL @ 5 BELGATE PL
2016-12-06 07:00 2016-12-20 19:00 Daily
The westbound curb lane will be occupied due to trenching and placement of conduit.
HILLSIDE AVE @ 119 A+ B HILLSIDE AVE
2016-12-06 07:00 2016-12-08 17:00 Daily
One lane will be occupied due to sewer and water work.
EDGECROFT RD @ 130 EDGECROFT RD
2016-12-06 07:00 2016-12-07 17:00 Daily
One lane will be occupied due to sewer and water work.
KING ST @ PINE ST
2016-12-07 08:00 2016-12-09 16:30 Daily
All lanes will alternatively be occupied due to coring of asphalt cores and staking borehole locations.
MACDONALD AVE
From PINE ST to VIMY AVE
2016-12-07 08:00 2016-12-09 16:30 Daily
All lanes will alternatively be occupied due to coring of asphalt cores and staking borehole locations.
EGLINTON AVE W @ east of WESTON RD
2016-12-07 08:00 2016-12-09 16:00 Daily
The westbound curb lane front 1 Hollis St property will be occupied due to work done by Crosslinx Transit Solutions - Constructors.
WILLIAM ST
From HELEN AVE to PINE ST
2016-12-07 08:00 2016-12-09 16:30 Daily
All lanes will alternatively be occupied due to coring of asphalt cores and staking borehole locations.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
HELENDALE AVE @ YONGE ST
2016-04-04 00:01 2017-12-31 23:59 Daily
The eastbound and westbound lanes will be occupied due to staging of construction project equipment.
STEELES AVE E @ LAURELEAF RD S
2016-08-08 07:00 2016-12-31 19:00 Continuous
The westbound curb lane turning into Canadiana Dr and Laureleaf Rd will be occupied due to watermain replacement.
CORAL GABLE DR @ FLORIDA CRES
2016-08-04 07:00 2016-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to sewer maintenance.
STORER DR @ GOLDPINE CRES
2016-08-04 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer service work.
ST LUCIE DR @ GULFSTREAM RD
2016-08-04 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
RYEWOOD DR @ LAURA RD
2016-08-04 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer service work.
LAURA RD @ SNOWOOD CRT
2016-08-04 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service work.
LAURA RD @ SNOWOOD CRT
2016-08-04 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service work.
JANE ST @ FRITH RD
2016-08-04 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service work.
IMOGENE AVE
From FERNANDO RD to HABITANT DR
2016-08-04 07:00 2016-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to sewer service work.
HONEYWOOD RD @ LOMAR DR
2016-08-04 07:00 2016-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to sewer service work.
HONEYWOOD RD @ LOMAR DR
2016-08-04 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer service work.
CORAL GABLE DR @ HIBISCUS CRT
2016-08-04 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer service work.
FLORIDA CRES @ CORAL GABLE DR
2016-08-04 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
FLORIDA CRES @ CORAL GABLE DR
2016-08-04 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
WILDCAT RD @ CANARCTIC DR
2016-08-09 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service work.
CORAL GABLE DR @ HIBISCUS CRT
2016-08-04 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer service work.
CORAL GABLE DR @ FLORIDA CRES
2016-08-04 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service work.
DERRYDOWN RD @ LAMBERTON BLVD
2016-08-09 07:00 2016-12-15 17:00 Daily
The northbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
BRADY CRES @ YATESCASTLE DR
2016-08-09 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
GEORGE APPLETON WAY @ JAMES FINLAY WAY
2016-08-09 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
SORRENTO CRT @ WHITBREAD CRES
2016-08-11 07:00 2016-12-15 17:00 Daily
Both lanes in all directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
GORMAN PARK RD
From BAINBRIDGE AVE to ALMORE AVE
2016-08-17 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to sewer maintenance.
HOVE ST
From CODSELL AVE to COCKSFIELD AVE
2016-08-17 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to sewer maintenance.
BALDING CRT
From FENN AVE to MONTRESSOR DR
2016-08-18 07:00 2016-12-31 19:00 Continuous
The northbound and southbound lanes will be occupied due to new watermain construction. Traffic in both directions to be maintained.
MEDALIST RD
From BALDING CRT to FENN AVE
2016-08-18 07:00 2016-12-31 19:00 Continuous
Both lanes in both directions will be occupied due to new watermain construction. Traffic to be maintained in all directions.
OWEN BLVD
From SENECA AVE to BAYVIEW AVE
2016-08-18 07:00 2016-12-31 19:00 Continuous
The eastbound and westbound lanes will be occupied due to new watermain construction. Traffic to be maintained in both directions.
ANTIBES DR @ TORRESDALE AVE
2016-08-18 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP system) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations.
CHURCH ST @ ELM ST
2016-08-18 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to sewer rehabilitation.
THE BRIDLE PATH
From SAINTFIELD AVE to POST RD
2016-08-15 07:00 2017-06-06 19:00 Daily
The northbound and southbound lanes will be occupied due to water main and water service replacement.
ELLERSLIE AVE
From TAMWORTH RD to MCBRIDE LANE
2016-08-27 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service work.
BURR AVE @ AZROCK RD
2016-08-27 07:00 2016-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to sewer service work.
MAPLE LEAF DR @ STELLA ST
2016-08-27 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to sewer service work.
DREWRY AVE @ THERESA AVE
2016-08-29 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
MAPLE LEAF DR @ STELLA ST
2016-08-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
BLAKELEY RD @ LORRAINE AVE
2016-08-29 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
CULFORD RD @ PARSON CRT
2016-08-29 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
BURR AVE @ AZROCK RD
2016-08-30 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
WILSON AVE
From BIDEFORD AVE to AVENUE RD
2016-08-30 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
DREWRY AVE @ GRANTBROOK ST
2016-08-30 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing gravity sewers.
HILDA AVE @ DREWRY AVE
2016-08-30 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing gravity sewers.
WILSON AVE @ WALSH AVE
2016-09-06 09:00 2016-12-16 16:00 Daily
The westbound shoulder lane will be occupied due to trenchless rehabilitation of watermains.
BAYVIEW AVE
From FERNSIDE CRT to PARKVIEW AVE
2016-09-09 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
RYKERT CRES @ BROADWAY AVE
2016-09-15 07:00 2016-12-15 17:00 Weekdays
The northbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
RYKERT CRES
From RICHLEA CRCL to BROADWAY AVE
2016-09-15 07:00 2016-12-15 17:00 Weekdays
The northbound and southbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
RYKERT CRES @ BROADWAY AVE
2016-09-15 07:00 2016-12-15 17:00 Weekdays
The southbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
BROADWAY AVE @ RYKERT CRES
2016-09-15 07:00 2016-12-15 17:00 Weekdays
The eastbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
COWBELL LANE
From EGLINTON AVE E to SOUDAN AVE
2016-09-19 09:00 2016-12-30 16:00 Daily
The southbound lanes will be occupied due to facilitate hydro vac and borehole drilling.
HOLLY ST
From EGLINTON AVE E to SOUDAN AVE
2016-09-19 09:00 2016-12-30 16:00 Daily
The southbound lanes will be occupied due to facilitate hydro vac and borehole drilling.
ROEHAMPTON AVE
From YONGE ST to REDPATH AVE
2016-09-19 09:00 2016-12-30 16:00 Daily
The eastbound curb lane will be occupied due to facilitate hydro vac and borehole drilling.
GREEN VALLEY RD @ YORK VALLEY CRES
2016-09-16 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer service work.
DEERFORD RD @ DON MILLS RD
2016-09-16 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service work.
BAYVIEW AVE @ GLENELIA AVE
2016-09-16 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service work.
CUMMER AVE @ PINEWAY BLVD
2016-09-16 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to spot trenchless rehabilitation of existing sewers.
BAYVIEW AVE @ PARKVIEW AVE
2016-09-16 07:00 2016-12-15 17:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
YONGE ST
From HEATH ST W to LAWTON BLVD
2016-09-23 07:00 2016-12-15 17:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
NEWTON DR @ ROBINTER DR
2016-09-23 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lane will be occupied due to sewer rehabilitation.
ST LEONARDS AVE @ ST IVES AVE
2016-09-26 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to spot trenchless rehabilitation by DM Robichaud Associates Ltd.
GREEN VALLEY RD @ YORK VALLEY CRES
2016-09-26 07:00 2016-12-15 17:00 Daily
Both lanes in both directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections. Two way traffic to be maintained at all times.
DEERFORD RD
From DON MILLS RD to VAN HORNE AVE
2016-09-26 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections. Traffic in both directions to be maintained.
CHERRYLAWN AVE
From GOLDSBORO RD to DUNCANWOODS DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
FOXRUN AVE
From GRAVENHURST AVE to CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The eastbound lane will be occupied due to roadway crack filling.
GLENHURST AVE
From FOXRUN AVE to CHALKFARM DR
2016-09-28 07:00 2016-12-31 17:00 Daily
The southbound lane will be occupied due to roadway crack filling.
BAYVIEW AVE
From PARKVIEW AVE to KINGSDALE AVE
2016-09-29 07:00 2016-12-15 17:00 Daily
The southbound curb lane will be occupied due to sewer rehabilitation.
BAYVIEW AVE @ CUMMER AVE
2016-09-29 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
GLENTWORTH RD @ NYMARK AVE
2016-09-29 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
ANNDALE DR @ WILLOWDALE AVE
2016-09-29 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
UPPER CANADA DR @ MONTRESSOR DR
2016-10-03 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
RYKERT CRES
From THURSFIELD CRES to BROADWAY AVE
2016-10-03 07:00 2016-12-15 17:00 Daily
Both lanes in both directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections. Traffic to be maintained in both directions.
OLIVE AVE @ WILFRED AVE
2016-10-04 07:00 2016-12-15 17:00 Daily
Westbound lane will be occupied due to sewer rehabilitation.
THURSFIELD CRES
2016-10-04 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to the spot trenchless rehabilitation of existing sewers and sewer service conditions, sewer service connection replacement, service connection grouting and cleaning of existing sewers. Traffic in both directions will be maintained. There is no road closure.
GREEN VALLEY RD @ PLYMBRIDGE RD TO END OF STREET
2016-10-04 07:00 2016-12-31 17:00 Daily
Both lanes in both directions will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
BAYVIEW AVE @ ELMWOOD AVE
2016-10-04 07:00 2016-12-15 17:00 Daily
Southbound lane will be occupied due to sewer rehabilitation.
LYNEDOCK CRES @ CLIMANS RD
2016-10-05 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
MAPLE LEAF DR @ VENICE DR
2016-10-05 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
MAPLE LEAF DR @ STELLA ST
2016-10-05 07:00 2016-12-15 17:00 Daily
The eastbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
FINCH AVE W
From KEELE ST to TANGIERS RD
2016-07-22 09:00 2016-12-31 16:00 Daily
The westbound and eastbound curb lanes will be occupied due to construction.
OLIVE AVE @ WILLOWDALE AVE
2016-10-05 07:00 2016-12-31 17:00 Daily
The westbound curb lane will be occupied due to construction.
MAPLE LEAF DR @ STELLA ST
2016-10-05 07:00 2016-12-15 17:00 Daily
The intersection will be occupied due to rehabilitation of existing sewers. Traffic will be maintained in both directions.
EGLINTON AVE W
From DUPLEX AVE to YONGE ST
2016-10-11 19:00 2016-12-31 23:59 Continuous
The eastbound and westbound lanes at various locations will be occupied due to occupation for storage of materials.
LAWRENCE AVE W
From DUFFERIN ST to WR ALLEN RD
2016-10-17 00:01 2017-05-31 23:59 Continuous
Eastbound and westbound lanes will be occupied maintaining one lane of traffic in each direction at all times due to road resurfacing.
EGLINTON AVE E @ WEST of DON MILLS RD
2016-10-17 07:00 2016-12-31 19:00 Daily
The eastbound and westbound lanes will be occupied due to new temporary road realignment.
DON MILLS RD
From EGLINTON AVE E to WYNFORD DR
2016-10-17 07:00 2016-12-31 19:00 Daily
The northbound and southbound lanes will be occupied due to new temporary road realignment.
DUPLEX AVE @ ORCHARD VIEW BLVD
2016-09-19 09:00 2016-12-30 21:00 Continuous
The northbound and southbound lanes at various locations will be occupied due to occupation for storage of materials.
WEDGEWOOD DR
From MAXOME AVE to YONGE ST
2016-10-20 07:00 2017-01-11 19:00 Daily
The eastbound and westbound lanes will be occupied due to water main and water service replacement.
ELNATHAN CRES
From PLUNKETT RD to SEACLIFF BLVD
2016-10-21 07:00 2017-02-28 16:00 Daily
The westbound and eastbound curb lane will be occupied due to road work.
RUTH AVE
From MAXOME AVE to CONACHER DR
2016-10-20 07:00 2017-01-11 19:00 Weekdays
The eastbound and westbound lanes will be occupied due to watermain and water service replacement. Work hours on Saturday are from 9:00 AM to 7:00 PM.
CONACHER DR @ RUTH AVE
2016-10-20 07:00 2017-01-11 19:00 Weekdays
The northbound and southbound lanes will be occupied due to watermain and water service replacement. Work hours on Saturday are from 9:00 AM to 7:00 PM.
COMBE AVE @ HONITON ST
2016-10-22 07:00 2016-12-28 19:00 Daily
The eastbound curb lane will be occupied due to road work.
EGLINTON AVE W
From TAUNTON RD to BROWNLOW AVE
2016-10-24 05:26 2016-12-31 08:26 Daily
East and westbound curb lanes will be occupied due to boreholes drilling.
EGLINTON AVE E
From SUTHERLAND AVE to DON AVON DR
2016-10-19 09:00 2016-12-31 16:00 Daily
One eastbound or one westbound lane will be occupied as well as the southbound curb lane of Laird Dr, due to monitoring instruments for the Eglinton Crosstown Construction.
FINCH AVE W @ KEELE ST
2016-10-31 00:01 2017-02-04 23:59 Continuous
The eastbound right turn lane will be occupied due to gas main installation by NPL Canada Ltd for Enbridge Gas Distribution.
FINCH AVE W @ KEELE ST
2016-10-31 09:00 2017-02-04 16:00 Continuous
The eastbound curb lane will be occupied due to gas main installation by NPL Canada Ltd for Enbridge Gas Distribution.
KEELE ST
From FOUR WINDS DR to TORO RD
2016-11-01 12:00 2017-11-02 23:59 Continuous
One northbound and one southbound lanes will be occupied due to road work by the Toronto Transit Commission.
WYNN RD
From BETTY ANN DR to HORSHAM AVE
2016-11-01 07:30 2017-01-31 19:00 Daily
The northbound and southbound lanes ill be occupied due to Bell FTTH Project.
WILSON AVE
From KEELE ST to JULIAN RD
2016-11-16 09:00 2016-12-09 16:00 Daily
One eastbound and one westbound lane will be occupied due to flushing and CCTV camera inspection of sewer lines.
MADRON CRES
From KILLAMARSH DR to HUCKNALL RD
2016-10-28 00:01 2016-12-23 23:59 Continuous
The northbound and southbound lanes will be occupied due to basement flooding contract.
CATFORD RD
From DERRYDOWN RD to KEELE ST
2016-10-28 07:00 2016-12-23 18:00 Daily
Eastbound and westbound lanes will be occupied due to water restoration.
COUNCIL CRES @ CATFORD RD
2016-10-28 07:00 2016-12-23 18:00 Daily
Northbound and southbound lanes will be occupied due to water restoration.
DERRYDOWN RD
From CONAMORE CRES to SENTINEL RD
2016-10-28 07:00 2016-12-23 18:00 Daily
Northbound and southbound lanes will be occupied due to water restoration.
KILLAMARSH DR
From MADRON CRES to DERRYDOWN RD
2016-10-28 00:01 2016-12-23 23:59 Daily
Rolling closure due to City of Toronto Basement Flooding contract.
HUCKNALL RD
From SENTINEL RD to DERRYDOWN RD
2016-10-28 00:01 2016-12-23 23:59 Daily
One lane will be occupied due to City of Toronto Basement Flooding contract.
STEELES AVE E @ BLUFFWOOD DR
2016-11-07 07:00 2016-12-12 19:00 Weekdays
The eastbound and westbound lanes will be occupied due to direction drilling. Saturday hours will be from 9AM to 4PM.
ASSINIBOINE RD
From BOAKE ST to HAYNES AVE
2016-11-21 07:00 2016-12-31 17:00 Weekdays
The eastbound and westbound lanes will be occupied due to paving.
DON MILLS RD @ EGLINTON AVE E
2016-11-14 00:01 2016-12-31 23:59 Daily
Eastbound and southbound lanes will be occupied due to manhole construction.
PARK HOME AVE @ WEST of YONGE ST
2016-11-14 00:01 2016-12-11 23:59 Continuous
One centre and two eastbound lanes will be occupied due to tunnel construction.
DON MILLS RD E @ GODSTONE RD
2016-11-09 09:30 2016-12-21 15:30 Weekdays
The northbound curb lane will be occupied due to new conduit by directional drilling.
GODSTONE RD
From KEMPSELL CRES to DON MILLS RD E
2016-11-09 07:00 2016-12-21 19:00 Daily
The northbound and southbound curb lanes will be occupied due to new conduit by directional drilling.
KEMPSELL CRES
From GODSTONE RD to GODSTONE RD
2016-11-09 07:00 2016-12-21 19:00 Daily
Curb lanes in both directions will be occupied in due to new conduit by directional drill.
LISBURN CRES
From GODSTONE RD to KINGSLAKE RD
2016-11-09 07:00 2016-12-21 19:00 Daily
Curb lanes in both directions will be occupied due to new conduit by directional drilling.
KINGSLAKE RD
From GODSTONE RD to GLENEAGLE CRES
2016-11-09 07:00 2016-12-21 19:00 Daily
Northbound and southbound curb lanes will be occupied due to new conduit by directional drilling.
GLENEAGLE CRES @ 46 GLENEAGLE CRES
From KINGSLAKE RD to KINGSLAKE RD
2016-11-09 07:00 2016-12-21 19:00 Daily
The curb lanes in both directions will be occupied due to new conduit by directional drilling.
ALLENBURY GDNS
From KINGSLAKE RD to KINGSLAKE RD
2016-11-09 07:00 2016-12-21 19:00 Daily
The curb lanes in each direction will be occupied due to new conduit by directional drilling.
STEELES AVE W @ BATHURST ST
2016-11-17 09:00 2016-12-17 16:00 Daily
The eastbound curb lane of Steeles and the northbound curb lane of Bathurst will be occupied due to fibre optic placement.
EGLINTON AVE W @ DUFFERIN ST
2016-09-19 07:00 2016-12-31 19:00 Weekdays
One lane in each direction will be occupied due to GIMP installation.
CUMMER AVE @ SNOWCREST AVE
2016-11-22 07:00 2016-12-15 17:00 Daily
The eastbound curb lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
BESTVIEW DR @ SYDNOR RD
2016-11-22 07:00 2016-12-15 17:00 Daily
The eastbound curb lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
DREWRY AVE @ 172 Drewry Ave to Hilda Ave
2016-12-02 07:00 2016-12-07 19:00 Daily
The eastbound lanes will be occupied due to full length trenchless rehabilitation of existing gravity sewers-various locations in the city of Toronto (area bound by eglinton, Steeles, Hwy 427 and Pickering Town line).
BRAHMS AVE
From GIDEON CRT to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Daily
The southbound lane will be occupied due to directional drilling to place new conduit.
BEETHOVEN CRT
From WILLESDEN RD to WILLESDEN RD
2016-11-17 07:00 2017-01-31 19:00 Daily
One lane in each direction will be occupied one at a time due to new conduit by directional drilling.
LEHAR CRES
From RAMEAU DR to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Daily
One lane in either direction will be occupied due to new conduit by directional drilling.
LISZT GT
From FINCH AVE E to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Daily
The southbound lane will be occupied due to new conduit by directional drilling.
LOTUS CRT
From RAMEAU DR to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Daily
One lane will be occupied due to new conduit by directional drilling.
RAMEAU DR
From RAVEL RD to BRAHMS AVE
2016-11-17 07:00 2017-01-31 19:00 Daily
The eastbound and westbound lane will be occupied one at a time due to new conduit by directional drilling.
RAVEL RD
From FINCH AVE E to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Dailiy
The northbound lane will be occupied due to new conduit by directional drilling.
WILLESDEN RD
From RAMEAU DR to RAMEAU DR
2016-11-17 07:00 2017-01-31 19:00 Daily
The north lane on the north west curb to 50 Brahms Ave will be occupied due to new conduit by directional drilling.
OLD SHEPPARD AVE
From BRIAN DR to VICTORIA PARK AVE
2016-11-28 07:00 2017-02-15 19:00 Daily
The eastbound lane will be occupied due to new conduit by directional drilling.
BOWHILL CRES @ CLIPPER RD
2016-11-28 08:00 2016-12-07 17:00 Daily
One eastbound lane will be occupied due to OPM Bell maintenance.
BOWHILL CRES @ 60m East of Clipper Rd to 30m East of Clipper Rd
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
ERSKINE AVE
From YONGE ST to REDPATH AVE
2016-11-29 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to dig pit, repair conduits & place cable
FRANKLIN AVE @ 10 Franklin Ave to 14 Franklin Ave
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the westbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
FRESHMEADOW DR @ 121 Freshmeadow Dr to 127 Freshmeadow Dr
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the southbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
LAWRENCE AVE W
From VARNA DR to BAYVIEW AVE
2016-11-28 07:00 2016-12-09 19:00 Daily
The eastbound and westbound curb lane and passing lane will be occupied due to arterial utility cut repairs on Lawrence Ave East & West.
LAWRENCE AVE E @ Rear of 1252 Lawrence Ave E, on Curlew Dr
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the eastbound lanes will be occupied due to excavation of a Bell pit in residential area, to provide/maintain Bell service.
MOSEDALE CRES @ 24 Mosedale Cres to 28 Mosedale Cres
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the eastbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
PAINSWICK CRES @ 7 Painswick Cres to 11 Painswick Cres
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the eastbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
UNDERHILL DR @ 43 Underhill dr to 51 Underhill dr
2016-11-28 08:00 2016-12-12 19:00 Daily
Northbound lanes will be occupied for excavation of a bell pit in a residential area to maintain/provide Bell service.
RAILSIDE RD @ 84 Railside Rd to 90 Railside Rd
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the southbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
TAMWORTH RD @ 74 Tamworth Rd to 78 Tamworth Rd
2016-11-28 08:00 2016-12-12 19:00 Daily
Southbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
ANETA CRCL @ 10 ANETAA CRCL
2016-11-29 08:00 2016-12-13 19:00 Daily
The southbound lanes will be occupied due to road work.
DREWRY AVE @ 436 Drewry Ave to 440 Drewry Ave
2016-11-19 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
YONGE ST @ FINCH AVE E
2016-12-05 09:00 2016-12-19 16:00 Daily
The northbound curb lane will be occupied due to manhole work.
LANGDEN AVE @ CLIFF ST
2016-11-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to rehabilitation to existing sewers.
LANGHOLM DR @ CAMBORNE AVE
2016-11-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to rehabilitation to existing sewers.
LYNEDOCK CRES @ FENSIDE DR
2016-11-29 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to rehabilitation to existing sewers.
RIDERWOOD DR @ 7 to 9 RIDERWOOD DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation.
RAILSIDE RD @ 111 to 113 RAILSIDE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation.
RAILSIDE RD @ 99 to 101 RAILSIDE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation.
SUNNYCREST RD @ 36 to 38 SUNNYCREST RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation.
PINEWAY BLVD @ 166 to 168 PINEWAY BLVD
2016-11-28 08:00 2016-12-12 19:00 Daily
The southbound lane will be occupied due to excavation.
PATRICIA AVE @ 192 to 194 PATRICIA AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation.
DUNFOREST AVE @ 255 DUNFOREST AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain/provide Bell services.
BOWHILL CRES @ 107 BOWHILL CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain/provide Bell services.
WILKET RD @ 10 to 14 WILKET RD
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation.
PATRICK BLVD @ 29 to 33 PATRICK BLVD
2016-11-29 08:00 2016-12-13 19:00 Daily
The eastbound lane will be occupied due to excavation.
DUFFERIN ST
From FINCH AVE W to STEELES AVE W
2016-11-30 09:30 2016-12-07 15:30 Daily
Northbound and southbound curb and passing lane will be occupied due to borehole drilling.
AUDUBON CRT @ 9 to 15 AUDUBON CRT
2016-11-29 08:00 2016-12-13 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
CLIFFWOOD RD @ 321 to 323 CLIFFWOOD RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
YONGE ST
From CHATSWORTH DR to ALEXANDER MUIR RD
2016-11-30 09:30 2016-12-15 15:30 Daily
The northbound and southbound lanes will be occupied due to cable excavation for Bell Canada.
SENLAC RD
From LURGAN DR to FINCH AVE W
2016-11-30 09:00 2016-12-30 16:00 Daily
The northbound and southbound curb lanes will be occupied due to trench, place conduit and place GLB/CSP.
MINTWOOD DR @ 79 to 81 MINTWOOD DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
MOOREHILL DR @ 1 to 3 MOOREHILL DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
NEWTON DR @ 151 to 153 NEWTON DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of Bell pit on a residential road to maintain & provide Bell service.
MARKAY ST @ CHARRINGTON CRES
2016-11-29 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to road work.
HARRINGTON CRES @ 45 to 49 HARRINGTON CRES
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
HICKORYNUT DR @ 68 to 72 HICKORYNUT DR
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
LAWRENCE AVE E @ BLAINE DR
2016-11-30 09:00 2016-12-16 16:00 Daily
The westbound curb lane in the north east corner will be occupied due to concrete pad for bus shelters and electrical trenching.
LAWRENCE AVE E @ BLAINE DR
2016-11-30 09:00 2016-12-16 16:00 Daily
The eastbound curb lane in the south east corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
LAWRENCE AVE E @ LESLIE ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The eastbound curb lane in the south west corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
LAWRENCE AVE E @ BANBURY RD
2016-11-30 09:00 2016-12-16 16:00 Daily
The westbound curb lane in the north east corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
BESTVIEW DR @ 181 to 185 BESTVIEW DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
BONESET RD @ 14 to 16 BONESET RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
MARATHON CRES @ 70 to 72 MARATHON CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
JANE ST @ HARDING AVE
2016-12-01 09:00 2016-12-16 16:00 Daily
The northbound lanes will be occupied due to road work.
DRIFTWOOD AVE @ YORKWOODS GT
2016-11-30 07:00 2016-12-12 19:00 Daily
The northbound lanes will be occupied due to road work.
DELORAINE AVE
From BARSE ST to BATHURST ST
2016-12-01 09:00 2016-12-09 16:00 Daily
The westbound curb lane will be occupied due to road work.
OAKWOOD AVE
From EARLSDALE AVE to EARNSCLIFFE RD
2016-12-01 09:00 2016-12-14 16:00 Daily
The southbound lanes will be occupied due to road work.
RAEBURN AVE
From ARMOUR BLVD to BATHURST ST
2016-12-01 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to road work.
DON MILLS RD @ CLOCK TOWER RD
2016-12-05 06:30 2016-12-09 18:30 Daily
The northbound lanes will be occupied due to road work.
LAWRENCE AVE W @ CALEDONIA RD
2016-12-05 09:30 2016-12-16 15:30 Daily
The northbound curb lane will be occupied due to road work.
LAWRENCE AVE E @ BANBURY RD
2016-11-30 09:00 2016-12-16 16:00 Daily
The westbound right lane will be occupied due to concrete pad for bus shelters and electrical trenching.
BARMAC DR @ 500 BARMAC DR
2016-12-01 07:00 2016-12-31 16:00 Daily
Eastbound lane will be occupied due to drain and water work.
FRESHMEADOW DR @ 177 to 179 FRESHMEADOW DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The southbound lanes will be occupied due to road work.
HOUSTON CRES @ 19 to 21 HOUSTON CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The southbound lanes will be occupied due to road work.
CUMMER AVE @ SNOWCREST AVE to 626 CUMMER AVE
2016-12-05 07:00 2016-12-10 19:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
NIPIGON AVE @ 160 to 162 NIPIGON AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lanes will be occupied due to road work.
KENTLAND CRES @ BESTVIEW DR
2016-11-28 07:00 2017-11-30 19:00 Continuous
One lane will be occupied due to basement flooding protection program city contract work. One lane will be used for two-way traffic.
MAGNETIC DR @ ALNESS ST
2016-12-05 09:00 2016-12-09 16:00 Daily
The eastbound lane will be occupied due to excavation to place new conduit and cabinet on behalf of Bell Canada for Smart City project.
KEELE ST @ WHITBURN CRES
2016-12-05 09:30 2016-12-19 15:30 Daily
The southbound curb lane will be occupied due to intersection improvement.
HARRINGTON CRES
From BESTVIEW DR to MINTWOOD DR
2016-11-28 07:00 2017-11-30 19:00 Daily
All lanes, one at a time, will be occupied due to City of Toronto basement flooding protection program.
GOLDENWOOD RD
From BESTVIEW DR to SPARWOOD CRT
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
BESTVIEW DR
From KENTLAND CRES to GOLDENWOOD RD
2016-11-28 07:00 2017-11-30 19:00 Daily
The eastbound and westbound lanes will be occupied one at a time due to City of Toronto basement flooding protection program.
HOLITA RD @ CARNEY RD
2016-12-05 07:00 2016-12-13 19:00 Daily
Eastbound and westbound lanes will be occupied alternatively due to new conduit and cabinet placement.
CLINTWOOD GT @ BROADLANDS BLVD
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound lane will be occupied due to new conduit and cabinet placement.
FINCH AVE E @ BAYVIEW AVE
2016-12-05 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to new conduit and cabinet placement.
WESTON RD @ DENNIS AVE
2016-12-05 07:00 2016-12-09 17:00 Daily
The Weston rd. at Dennis ave on Southbound will be occupied due to road work.
BAYVIEW AVE @ FERNSIDE CRT
From FERNSIDE CRT to PARKVIEW AVE
2016-12-07 07:00 2016-12-14 17:00 Daily
The Bayview ave at heath st. to lawton blvd on NoBound will be occupied due to road construction.
CUMMER AVE @ PINEWAY BLVD
2016-12-07 07:00 2016-12-14 17:00 Daily
The Cummer Ave at Pineway Blvd on WestBound will be occupied due to road construction.
AUDUBON CRT @ 11 Audubon Crt to 13 Audubon Crt
2016-11-28 08:00 2016-12-12 19:00 Daily
The north side westbound lane will be occupied due to excavation of a Bell Pit on residential road to maintain/provide Bell service.
GLENELIA AVE @ 28 Glenelia Ave to 31 Glenelia Ave
2016-12-05 08:00 2016-12-19 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
PINTAIL CRES @ 40 Pintail Cres to 44 Pintail Cres
2016-12-05 08:00 2016-12-19 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
BEVERIDGE DR @ 41 Beveridge Dr to 45 Beveridge Dr
2016-12-05 08:00 2016-12-19 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
WILLESDEN RD @ 76 WILLESDEN RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
MINTWOOD DR @ 77 MINTWOOD DR
2016-12-05 08:00 2016-12-19 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
CROCKAMHILL DR @ 101 CROCKAMHILL DR
2016-12-05 08:00 2016-12-19 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
PINEWAY BLVD @ 166 PINEWAY BLVD
2016-12-05 08:00 2016-12-19 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
HOLMES AVE @ 184 HOLMES AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound curb lane will be occupied due to excavation of Bell pit.
BATHURST ST @ 5987 BATHURST ST
At FINCH AVE W
2016-12-05 07:00 2016-12-23 19:00 Daily
The northbound and southbound curb lanes will be occupied due to directional drilling and hydrovac.
ASSINIBOINE RD
From BOAKE ST to HAYNES AVE
2016-11-21 07:00 2016-12-31 17:00 Daily
The eastbound and westbound lanes will be occupied due to construction by London Paving Bros Inc.
EGLINTON AVE W
From WINNETT AVE to EVERDEN RD
2016-12-05 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to hydro-vac excavation and traffic signal pole installation.
KEELE ST
From VICTORY DR to WILSON AVE
2016-12-03 09:00 2016-12-14 16:00 Daily
The southbound curb lane will be occupied due to clearing of blockages on Bell infrastructure.
KEELE ST
From PAXTONIA BLVD to TILBURY DR
2016-11-28 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to construction - directional drill, hydro-vac, conduit and cable installation.
MONTANA AVE
From WILSON AVE to ASHTON AVE
2016-12-02 07:00 2016-12-17 19:00 Daily
The southbound lane will be occupied due to the clearing of blockages on Bell infrastructure on private property.
SHEPPARD AVE W
From WR ALLEN RD to BANTING AVE
2016-12-05 09:00 2016-12-09 16:00 Daily
The westbound curb lane will be occupied due to placing only.
YONGE ST @ 5418 YONGE ST
At KEMPFORD BLVD
2016-12-05 09:00 2016-12-23 16:00 Daily
the southbound curb lane will be occupied due to directional drilling for new conduit.
JANE ST @ CHALKFARM DR
2016-12-06 09:00 2016-12-08 16:00 Daily
All southbound lanes, alternating, will be occupied due to excavation in pits to clear blockages in the Bell Canada structure to place new cable as part of the Bell Smart city project.
MCNICOLL AVE @ 196 McNicoll Ave
2016-12-07 09:00 2016-12-07 15:00 Daily
The westbound curb lane will be occupied due to emergency leak repair.
RONALD AVE @ 10 RONALD AVE
2016-12-05 09:30 2016-12-31 15:30 Daily
The southbound lane will be occupied due to cable replacement and manhole work.
CANUCK AVE @ JOHN DRURY DR
2016-12-05 07:00 2016-12-09 19:00 Daily
the eastbound and eastbound lanes will be occupied due to construction.
SCARSDALE RD @ BOND AVE
2016-12-06 07:00 2016-12-08 19:00 Daily
The southbound lane will be occupied due to excavation and cable placement.
BATHURST ST
From ROCKFORD RD to FINCH AVE W
2016-12-05 09:00 2016-12-23 16:00 Daily
The northbound and southbound curb lanes will be occupied due to directional drilling and hydrovac.
BAYVIEW AVE @ CUMMER AVE
2016-12-07 10:00 2016-12-09 15:00 Weekdays
The northbound, southbound and westbound curb lanes will be occupied due to monitoring road wells.
JANE ST
From LAWRENCE AVE W to PATIKA AVE
2016-12-06 09:00 2016-12-19 16:00 Daily
The northbound and westbound curb lanes will be occupied due to directional drilling.
SHEPPARD AVE E
From BLUE RIDGE RD to BURBANK DR
2016-12-06 09:00 2016-12-07 16:00 Weekdays
The westbound curb lane will be occupied due to placing cable.
BOYD AVE
From PINE AVE to RALPH ST
2016-12-07 08:00 2016-12-07 17:00 Weekdays
All lanes will be occupied alternately due to road paving.
LONGMORE ST
From HILLCREST AVE to HOLLYWOOD AVE
2016-12-07 07:00 2016-12-10 19:00 Daily
The southbound west curb lane will be occupied due to installation of new Bell Conduit.
TALBOT RD @ Lorraine Dr to 100m North of Lorraine Dr
2016-12-07 07:00 2016-12-13 16:00 Daily
The northbound east curb lane will be occupied due to excavation of pits to clear blockages in the Bell Canada structure to place new cable as part of the Bell smart city project.
VERNHAM AVE @ 7 VERNHAM AVE
2016-12-07 07:00 2016-12-07 19:00 Continuous
Northbound lane will be occupied due to water and sewer service.
CAINES AVE @ 14 CAINES AVE
2016-12-07 07:00 2016-12-07 19:00 Continuous
Westbound lane will be occupied due to water and sewer service.
WHITAKER AVE @ 48 WHITAKER AVE
2016-12-07 07:00 2016-12-07 19:00 Continuous
Eastbound lane will be occupied due to water and sewer service.
DUNBLAINE AVE @ 67 DUNBLAINE AVE
2016-12-07 07:00 2016-12-07 19:00 Continuous
Eastbound and westbound lane will be occupied due to water and sewer service.
DOMBEY RD @ 82 DOMBEY RD
2016-12-07 07:00 2016-12-07 19:00 Continuous
Westbound lane will be occupied due to water and sewer service.
EMPRESS AVE @ 379 EMPRESS AVE
2016-12-07 07:00 2016-12-07 19:00 Continuous
Eastbound and westbound lane will be occupied due to water and sewer service.
CUMMER AVE @ 626 CUMMER AVE
2016-12-05 07:00 2016-12-10 19:00 Daily
The eastbound lanes will be occupied due to Full Length Trenchless Rehabilitation of Existing Gravity Sewers.
BAYVIEW AVE @ HWY 401 EXPRESS E
2016-12-07 09:00 2016-12-07 16:00 Continuous
The northbound and southbound curb lanes will be occupied underneath HWY 401 EB Express on Bayview due to bridge substructure inspection and conditions survey.
THURROCK RD
From MAGELLAN DR to MIN AVE
2016-12-07 09:30 2016-12-21 15:30 Daily
The westbound and eastbound lanes will be occupied due to road work.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
MORNINGSIDE AVE
From KINGSTON RD to ELLESMERE RD
2016-04-25 08:00 2016-12-31 16:00 Daily
The northbound and southbound curb lanes will be occupied due to overhead pole installation.
MORNINGSIDE AVE
From ELLESMERE RD to KINGSTON RD
2016-04-25 08:00 2016-12-31 16:00 Continuous
The northbound and southbound curb lanes will be occupied due to overhead pole installation.
BELLAMY RD S
From ADANAC DR to GRANARD BLVD
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer maintenance.
MARTA AVE
From ZENITH DR to SADLER DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound and northbound lanes will be occupied due to sewer maintenance.
BROOKLAWN AVE
From SUNNYPOINT CRES to SUNNYPOINT CRES
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound and northbound lanes will be occupied due to sewer maintenance.
BRINLOOR BLVD
From SERVICE RD to DUNCOMBE BLVD
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound and northbound lanes will be occupied due to sewer maintenance.
ADANAC DR @ LITTLE ROCK DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound and northbound lanes will be occupied due to sewer maintenance.
COLONIAL AVE
From ADANAC DR to LITTLE ROCK DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to sewer maintenance.
LARMERE CRT @ ZENITH DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer maintenance.
MARKANNA DR @ COLTBRIDGE CRT
2016-08-02 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer maintenance.
PARKCREST DR @ KINGSTON RD
2016-08-02 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer maintenance.
MARSH RD @ DUNLOP AVE
2016-08-02 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer maintenance.
MOIRA AVE @ KILMARNOCK AVE
2016-08-02 07:00 2016-12-15 17:00 Daily
The eastbound lanes will be occupied due to sewer maintenance.
BRINLOOR BLVD @ DUNCOMBE BLVD
2016-08-02 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer maintenance.
CLAREMORE AVE
From MEWBURN AVE to CRAIGLEE DR
2016-08-02 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer maintenance.
ADANAC DR @ LITTLE ROCK DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Both eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
ADANAC DR
From COLONIAL AVE to LITTLE ROCK DR
2016-08-02 07:00 2016-12-15 17:00 Daily
Both eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
MARKANNA DR @ COLTBRIDGE CRT
2016-08-02 07:00 2016-12-15 17:00 Daily
The northbound lane will be occupied due to spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
OAKLEY BLVD @ MILLBRIDGE GT
2016-08-03 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer rehabilitation.
NANTUCKET BLVD @ WICKWARE GT
2016-08-03 07:00 2016-12-15 17:00 Daily
Northbound lanes will be occupied due to sewer rehabilitation.
BROOKRIDGE DR
From MUNSON CRES to BIRKDALE RD
2016-08-03 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
BROOKRIDGE DR
From OAKLEY BLVD to ROSSWOOD CRES
2016-08-03 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
BROOKRIDGE DR
From LESTERWOOD CRES to DORCOT AVE
2016-08-03 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer rehabilitation.
BERGEN RD
From EXFORD DR to MERRYFIELD DR
2016-08-03 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer rehabilitation.
AMBERCROFT BLVD @ HOOD CRES
2016-08-05 07:00 2016-12-15 17:00 Daily
Both northbound and southbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers, and sewer service connections.
REVLIS CRES @ SILVER SPRINGS BLVD
2016-08-05 07:00 2016-12-15 17:00 Daily
Both directions will be occupied due to the spot trenchless rehabilitation of existing sewers and sewer service connections.
LAPWORTH CRES @ MORBANK DR
2016-08-05 07:00 2016-12-15 17:00 Weekdays
The eastbound and westbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
SATCHELL BLVD @ LAWSON RD
2016-08-02 07:00 2016-12-15 17:00 Weekdays
The southbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
SCARBOROUGH GOLF CLUB RD
From LAWRENCE AVE E to ELLESMERE RD
2016-08-08 08:00 2017-02-08 16:00 Daily
Northbound curb lane at Scarborough Golf Club Rd. will be occupied due to replacement of hydro poles.
BIRCHMOUNT RD
From SANWOOD BLVD to STEELES AVE E
2016-08-11 07:00 2016-12-15 17:00 Daily
The southbound curb lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
AMBERCROFT BLVD
From REDHEUGH CRES to FUNDY BAY BLVD
2016-08-15 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer rehabilitation.
MORBANK DR @ IVY BUSH AVE
2016-08-15 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied due to sewer rehabilitation.
BRIMLEY RD @ CHILLERY AVE
2016-08-23 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
FLINTWICK DR @ PACKARD BLVD
2016-08-23 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
SEDGEMOUNT DR @ DAVENTRY RD
2016-08-23 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
SEDGEMOUNT DR @ PANDORA CRCL
2016-08-23 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
SARATOGA DR @ STANWELL DR
2016-08-23 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
SARATOGA DR @ ELLESMERE RD
2016-08-23 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
MEADOWVALE RD @ KIRKHAMS RD
2016-08-24 07:00 2016-12-15 17:00 Daily
The southbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
BRIMLEY RD
From PITFIELD RD to GROVELEAF RD
2016-09-12 09:00 2016-12-15 16:00 Daily
One northbound and southbound lane will be occupied alternately due to cable installation.
TERRYHILL CRES
From PITFIELD RD to PITFIELD RD
2016-09-12 07:00 2016-12-15 19:00 Weekdays
One northbound and southbound lane will be occupied alternately due to cable installation. Weekend hours are from 8:00 AM to 4:00 PM.
CLEETHORPES BLVD
From TERRYHILL CRES to PITFIELD RD
2016-09-12 07:00 2016-12-15 19:00 Weekdays
One northbound and southbound lane will be occupied alternately due to cable installation. Weekend hours are from 8:00 AM to 4:00 PM.
REDBUD CRES
From TERRYHILL CRES to TERRYHILL CRES
2016-09-12 07:00 2016-12-15 19:00 Weekdays
One eastbound and westbound lane will be occupied alternately due to cable installation. Weekend hours are from 8:00 AM to 4:00 PM.
PITFIELD RD
From BRIMLEY RD to TERRYHILL CRES
2016-09-12 09:00 2016-12-15 16:00 Daily
One eastbound and westbound lane will be occupied alternately due to cable installation.
SNOWHILL CRES
From TERRYHILL CRES to TERRYHILL CRES
2016-09-12 07:00 2016-12-15 19:00 Weekdays
One northbound and southbound lane will be occupied alternately due to cable installation. Weekend hours are from 8:00 AM to 4:00 PM.
SCARBOROUGH GOLF CLUB RD
From ELLESMERE RD to PAINTED POST DR
2016-09-19 09:00 2017-03-30 16:00 Daily
One northbound and one southbound lanes will be occupied due to cable chamber excavation by Thirau Inc.
TARTAN AVE @ 8 Tartan Ave
From SANTAMONICA BLVD to CLAPPERTON AVE
2016-09-26 09:00 2016-12-31 16:00 Daily
One lane going both directions will be occupied alternatively due to directional bore conduit, dig pits, and place GLB/CSP.
IVY BUSH AVE @ BIRCHMOUNT RD
2016-09-29 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
EGLINTON AVE E
From KENNEDY AVE to TRANSWAY CRES
2016-10-03 09:00 2016-12-31 16:00 Daily
The eastbound and westbound lanes will be occupied alternatively due to storage of material- tree removal.
BEECHGROVE DR @ 51 BEECHGROVE DR
From MINUK ACRES to COPPERFIELD RD
2016-11-08 07:00 2017-06-30 17:00 Daily
The road will be reduced to one lane due to shoring installation by Graham Construction and Engineering LP.
PURVIS CRES @ BURROWS HALL BLVD
2016-10-28 09:00 2016-12-31 16:00 Daily
The eastbound and westbound lanes will be occupied due to directional bore, conduit, and dig pits by Azimuth Three Enterprises Inc.
BURROWS HALL BLVD @ 103 BURROWS HALL BLVD
From DAILING GT to PURVIS CRES
2016-10-28 09:00 2016-12-31 16:00 Daily
The eastbound and westbound lanes will be occupied due to directional bore, conduit, and dig pits by Azimuth Three Enterprises Inc.
DAILING GT
From BURROWS HALL BLVD to DAILING GT
2016-10-28 09:00 2016-12-31 16:00 Daily
The northbound and southbound lanes will be occupied due to directional bore, conduit, and dig pits by Azimuth Three Enterprises Inc.
BURROWS HALL BLVD @ 192 BURROWS HALL BLVD
From PURVIS CRES to PURVIS CRES
2016-10-06 09:00 2017-01-31 16:00 Daily
The eastbound and westbound lanes will be occupied due to directional bore, conduit, and dig pits by Azimuth Three Enterprises Inc.
PURVIS CRES @ 2 PURVIS CRES
From BURROWS HALL BLVD to BURROWS HALL BLVD
2016-10-06 09:00 2017-01-31 16:00 Daily
The northbound and southbound lanes will be occupied due to directional bore, conduit, and dig pits by Azimuth Three Enterprises Inc.
DUNSDALE SQ @ Mollard Rd to 1 Dunsdale Sq
2016-11-02 07:00 2016-12-20 19:00 Daily
The eastbound lane will be occupied due to the installation of new Bell fibre optic network.
PEBBLEHILL SQ @ DEEPDALE DR
2016-11-02 07:00 2016-12-20 19:00 Daily
The northbound lanes will be occupied due to road work.
MOLLARD RD
From HUNTINGWOOD DR to CHARTLAND BLVD S
2016-11-02 07:00 2016-12-20 19:00 Daily
The northbound and southbound lanes will be occupied due to installation of new Bell fibre optic network.
LEESWOOD CRES
From HOOKWOOD DR to CHARTLAND BLVD S
2016-11-02 07:00 2016-12-20 19:00 Daily
Both lanes in both directions will be occupied due to installation of new Bell fibre optic cable.
HUNTINGWOOD DR @ BRIMLEY RD
At CHARTLAND BLVD S
2016-11-02 07:00 2016-12-20 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new Bell fibre optic network.
HOOKWOOD DR
From PEBBLEHILL SQ to CHARTLAND BLVD S
2016-11-02 07:00 2016-12-20 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new Bell fibre optic network.
CHARTLAND BLVD S @ MOLLARD RD
2016-11-02 07:00 2016-12-20 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new Bell fibre optic network.
DEEPDALE DR @ HOOKWOOD DR
2016-11-02 07:00 2016-12-20 19:00 Daily
The eastbound and westbound lanes will be occupied due to installation of new Bell fibre optic network.
SHADY HOLLOW DR @ INGLETON BLVD
2016-10-02 07:00 2016-12-15 19:00 Daily
Northbound and southbound curb lane at Shady Hollow Dr. will be occupied due to Bell work.
EGLINTON AVE E
From MIDLAND AVE to DANFORTH RD
2016-11-07 09:00 2016-12-31 19:00 Daily
The westbound right lane will be occupied due borehole drilling.
GERRARD ST E
From KINGSWOOD RD to BLANTYRE AVE
2016-11-10 00:01 2016-12-31 23:59 Continuous
Two westbound lanes will be occupied due to road work.
COCKBURN DR @ CONFERENCE BLVD
2016-11-11 07:00 2016-12-11 19:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
ALTON TOWERS CRCL
From MCCOWAN RD to GOLDHAWK TRL
2016-11-11 07:00 2016-12-11 19:00 Daily
The eastbound curb lane will be occupied due to directional drilling.
WHITEACRES AVE
From MEADOWVALE DR to RAMBLEWOOD DR
2016-11-11 07:00 2016-12-11 19:00 Daily
The eastbound and westbound curb lane will be occupied due to hydro rebuild/installation.
KEYWORTH TRL
From CHARTERHOUSE RD to PITFIELD RD
2016-11-11 07:00 2016-12-31 19:00 Daily
The northbound and southbound lanes will be alternately occupied due to road work.
BRIMLEY RD
From ELLESMERE RD to WATERFIELD DR
2016-11-15 09:00 2016-12-16 16:00 Daily
The northbound and southbound lanes will be occupied alternatively due to road work.
CHESTER LE BLVD @ PETTIBONE SQ
2016-11-16 07:00 2016-12-23 19:00 Daily
The northbound and southbound curb lanes will be occupied due to road work for the Bell Smart City project.
CORONATION DR @ 155 CORONATION DR
2016-11-17 09:00 2017-02-20 16:00 Daily
One eastbound and westbound lane will be occupied alternatively due to directional drilling.
PETTIBONE SQ @ CHESTER LE BLVD
2016-11-16 07:00 2016-12-23 19:00 Daily
The westbound and eastbound curb lanes will be occupied due to road work for the Bell Smart City project.
BROWNSPRING RD
From SHEPPARD AVE E to PITFIELD RD
2016-11-16 07:00 2016-12-16 19:00 Daily
The northbound and southbound lane will be occupied one lane at a time due to installation of fibre optics for Bell.
PITFIELD RD
From MIDLAND AVE to MCCOWAN RD
2016-11-16 07:00 2016-12-16 19:00 Daily
The eastbound and westbound lanes will be occupied one lane at a time due to installation of fibre optics for Bell.
TIDWORTH SQ
From PITFIELD RD to PITFIELD RD
2016-11-16 07:00 2016-12-16 19:00 Daily
Both lanes in both directions will be occupied one lane at a time due to installation of fibre optics for Bell.
LAWNMERE CRES
From CHARTERHOUSE RD to KEYWORTH TRL
2016-11-16 07:00 2016-12-16 19:00 Daily
The northbound and southbound lanes will be occupied one lane at a time due to installation of fibre optics for Bell.
STONEWALL GT
From PITFIELD RD to LAWNMERE CRES
2016-11-16 07:00 2016-12-16 19:00 Daily
The eastbound and westbound lane will be occupied one lane at a time due to installation of fibre optics for Bell.
CLEETHORPES BLVD
From PITFIELD RD to TERRYHILL CRES
2016-11-16 07:00 2016-12-16 19:00 Daily
The northbound and southbound lane will be occupied one lane at a time due to installation of fibre optics for Bell.
DANCY AVE
From SILVER SPRINGS BLVD to KENNEDY RD
2016-11-21 07:00 2016-12-07 17:00 Daily
The northbound left lane will be occupied due to rehabilitation of existing sewers.
REVLIS CRES @ SILVER SPRINGS BLVD
2016-11-21 07:00 2016-12-07 19:00 Daily
The eastbound lanes will be occupied due to rehabilitation of existing sewers.
TAMORA CRT @ BELGREEN AVE
2016-11-21 07:00 2016-12-07 19:00 Daily
Eastbound lanes will be occupied due to sewer rehabilitation.
BERNER TRL
From WASHBURN WAY to NEILSON AVE
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
NAHANNI TER
From WASHBURN WAY to BERNER TRL
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
WIGGENS CRT @ NAHANNI TER
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
WASHBURN WAY
From SHEPPARD AVE E to TAPSCOTT RD
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
CHEATHAM PL @ BERNER TRL
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
HOWELL SQ @ BERNER TRL
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
SACHEMS PL @ BERNER TRL
2016-11-23 07:00 2016-12-23 19:00 Daily
Northbound lane will be occupied due to cable installation.
BLACKWELL AVE
From BERNER TRL to TAPSCOTT RD
2016-11-23 07:00 2016-12-23 19:00 Daily
Northbound lane will be occupied due to cable installation.
COXWORTH CRES @ BLACKWELL AVE
2016-11-23 07:00 2016-12-23 19:00 Daily
Eastbound lane will be occupied due to cable installation.
PHARMACY AVE
From ST CLAIR AVE E to PENAIRE ST
2016-11-23 09:00 2016-12-23 16:00 Daily
One northbound lane will be occupied due to boring, manhole install.
VICTORIA PARK AVE @ INNISMORE CRES
2016-11-28 09:00 2016-12-16 16:00 Daily
Northbound Curb lane will be occupied due to construction to replace old pipes.
HERRON AVE
From BRODERICK PL to GEORGINA GT
2016-11-23 08:00 2016-12-23 18:00 Daily
The northbound curb lane will be occupied due to Bell Fibre to the home project.
VICTORIA PARK AVE @ INNISMORE CRES
2016-11-28 09:00 2016-12-16 16:00 Daily
The northbound curb lane in the north east corner of the intersection will be occupied due to Enbridge crew cutting out leaking valve and replacing with new pipe. Possible centre lane closures.
MIDLAND AVE @ SALOME DR
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2388 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2387 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2370 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2360 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2350 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
ELLESMERE RD @ 426 ELLERSMERE ROAD
2016-11-23 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to curb lane construction under City Contract.
MIDLAND AVE @ 2330 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2250 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MIDLAND AVE @ 2240 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
ELLESMERE RD @ 451 ELLESMERE RD TO WARDEN AVE
2016-11-23 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to City Contract curb construction work.
MIDLAND AVE @ 2220 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
ELLESMERE RD @ 505 ELLESMERE RD
2016-11-23 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to City Contract curb construction work.
ELLESMERE RD @ 520 ELLESMERE RD
2016-11-23 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to City Contract curb construction work.
MIDLAND AVE @ 2045 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
ELLESMERE RD @ 780 ELLESMERE RD
2016-11-23 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to City Contract curb construction work.
MIDLAND AVE @ 2025 MIDLAND AVENUE
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
MCCOWAN RD @ SHEPPARD AVE E
2016-11-23 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to City Contract curb lane construction.
MIDLAND AVE @ HWY 401
2016-11-23 09:00 2016-12-09 16:00 Daily
The northbound curb lane will be occupied due to City Contract curb construction work.
CLEMES DR
From CENTENNIAL RD to BATHGATE DR
2016-11-28 07:00 2016-12-16 19:00 Daily
The westbound lane will be occupied due to installation of new sewers and water main for a 7 lot subdivision.
BAKERTON DR
From PORCHESTER DR to CHELWAY RD
2016-11-28 07:00 2016-12-23 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to road work for the Bell Smart City project.
BELLAMY RD N
From NELSON ST to PORCHESTER DR
2016-11-28 09:00 2016-12-23 16:00 Daily
The northbound and southbound curb lanes will be occupied due to road work for the Bell Smart City project.
PORCHESTER DR
From BELLAMY RD N to BAKERTON DR
2016-11-28 09:00 2016-12-23 16:00 Daily
The eastbound and westbound curb lanes will be occupied due to road work for the Bell Smart City project.
BLACKTOFT DR @ 50 Blacktoft dr to 54 Blacktoft dr
2016-11-28 07:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
WIGGENS CRT
From WIGGENS CRT to WIGGENS CRT
2016-11-28 08:00 2016-12-12 19:00 Daily
Eastbound traffic lane blocked due to excavation of Bell pit in a residential area to maintain and provide Bell service.
ALLANFORD RD @ 1 Allanford Rd
From BIRCHMOUNT RD to PENDER CRES
2016-12-01 09:00 2016-12-09 19:00 Daily
The westbound curb lane will be occupied due to dig pit/drill.
CATHLO ST @ 1 Cathlo St to 5 Cathlo St
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
FENWOOD HTS @ 2 Fenwood Hts to 4 Fenwood Hts
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the southbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
GARNIER CRT @ 96 Garnier Crt to 100 Garnier Crt
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the eastbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
PITFIELD RD @ 306 Pitfield Rd to 310 Pitfield Rd
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the westbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
PROGRESS AVE @ 330 Progress Ave
2016-11-28 08:00 2016-12-12 19:00 Daily
One of the westbound lanes will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
SANDRIFT SQ @ 50 Sandrift SQ to 54 Sandrift SQ
2016-11-28 08:00 2016-12-12 19:00 Daily
Southbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
BRIMLEY RD
From PROGRESS AVE to SHEPPARD AVE E
2016-11-28 09:00 2016-12-24 15:30 Daily
The northbound and southbound lanes will be occupied due to utility cut repairs.
BETHANY LEIGH DR @ 17 Bethany Leigh Dr to 21 Bethany Leigh Dr
2016-11-29 08:00 2016-12-13 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
SHEPPARD AVE E @ DEAN PARK RD
2016-11-30 09:00 2016-12-12 16:00 Daily
The eastbound lanes will be occupied due to road work.
HOLLYDENE RD @ 37 HOLLYDENE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lanes will be occupied due to road work.
HOLLYDENE RD @ 41 HOLLYDENE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lanes will be occupied due to road work.
HOLSWADE RD @ 15 HOLSWADE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lanes will be occupied due to road work.
KINGSDALE AVE @ 399 KINGSDALE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lanes will be occupied due to road work.
LAWRENCE AVE E
From BIRCHMOUNT RD to WARDEN AVE
2016-12-03 09:00 2016-12-24 17:00 Daily
The westbound curb lane will be occupied due to road work.
SEWELLS RD
From GLENHEATHER TER to DARBY CRT
2016-11-29 09:00 2016-12-09 19:00 Weekdays
The eastbound curb lane will be occupied due to excavation and cable placement. Weekend hours will be form 9:00 AM to 4:00 PM.
STANLAND DR
From BELLAMY RD S to MASON RD
2016-11-29 07:00 2016-12-09 19:00 Daily
The eastbound and westbound curb lane will be occupied due to cable installation.
PURVIS CRES @ 33 to 31 PURVIS CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation.
REIDMOUNT AVE @ 3 REIDMOUNT AVE
2016-11-29 08:00 2016-12-13 19:00 Daily
The northbound lane will be occupied due to excavation.
RAKEWOOD CRES @ 38 to 42 RAKEWOOD CRES
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation.
MCCLURE CRES @ 8 to 12 MCCLURE CRES
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation.
GATESVIEW AVE @ 12 to 16 GATESVIEW AVE
2016-11-29 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation.
HUGHES PL @ 8 to 12 HUGHES PL
2016-11-29 08:00 2016-12-13 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
GLENSTROKE DR @ 30 to 34 GLENSTROKE DR
2016-11-29 08:00 2016-12-13 19:00 Daily
The southbound lane will be occupied due to excavation of Bell pit in a residential area to maintain & provide Bell service.
WICKLOW DR @ 49 to 53 WICKLOW DR
2016-11-29 08:00 2016-12-13 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
BELLEFONTAINE ST @ 76 to 80 BELLFONTAINE ST
2016-11-29 08:00 2016-12-13 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
LORD ROBERTS DR @ 180 to 182 LORD ROBERTS DR
2016-11-29 08:00 2016-12-13 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
DAVISBROOK BLVD @ 58 to 60 DAVISBROOK BLVD
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
LONGBOW SQ @ 74 to 76 LONGBOW SQ
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane on the south side will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
HEATHERSIDE DR @ 54 to 56 HEATHERSIDE DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound lane on the south side will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
PITFIELD RD @ 310 to 312 PITFIELD RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane on the north side will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
EASTGATE CRES @ 22 to 24 EASTGATE CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
FORESTBROOK CRES @ 52 to 54 FORESTBROOK CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
GRACEMOUNT CRES @ 19 to 21 GRACEMOUNT CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
LAWRENCE AVE E @ PORT UNION RD
2016-11-30 09:00 2016-12-09 16:00 Daily
The westbound curb lane will be occupied due to blockage pit work.
DUNELM ST @ 82 TO 86 DUNELM ST
2016-11-28 08:00 2016-12-13 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell pit on a residential road to maintain & provide Bell service.
ELLINGTON DR @ 118 to 122 ELLINGTON DR
2016-11-29 08:00 2016-12-13 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain and provide Bell service.
LAWRENCE AVE E @ 2150 LAWRENCE AVE E
2016-11-30 09:00 2016-12-14 16:00 Continuous
The westbound curb lane fronting 2150 Lawrence Ave E will be occupied due to work for 2150 High-rise Condo.
BIRCHMOUNT RD
From ROLARK DR to RIDGETOP RD
2016-12-01 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lanes will be occupied due to construction - trench, placement of Y's and cable.
KINGSTON RD
From TOLLGATE MEWS to WHITECAP BLVD
2016-12-01 09:00 2016-12-09 16:00 Daily
The westbound curb lane will be occupied due to construction - pit dig, conduit repairs and cable placement.
DANFORTH RD @ ST CLAIR AVE E
2016-11-30 09:00 2016-12-16 16:00 Daily
The southbound curb lane in the north west corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
MCCOWAN RD @ LAWRENCE AVE E
2016-11-30 09:00 2016-12-16 16:00 Daily
Th4 northbound curb lane in the south east corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
MARKHAM RD @ COUGAR CRT
2016-11-30 09:00 2016-12-16 16:00 Daily
The northbound curb lane in the south east corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
MARKHAM RD @ LUELLA ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The southbound curb lane in the north west corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
RICHBOURNE CRT @ 7 to 11 RICHBOURNE CRT
2016-11-30 08:00 2016-12-15 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain and provide Bell service.
MCCLURE CRES @ 110 to 114 MCCLURE CRES
2016-11-30 08:00 2016-12-15 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain and provide Bell service.
INNISCROSS CRES @ 54 to 56 INNISCROSS CRES
2016-11-30 08:00 2016-12-15 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain and provide Bell service.
CENTRE ST @ LUELLA ST
2016-12-01 08:30 2016-12-09 17:30 Daily
All lanes will be occupied in both directions one lane at a time due to corehole work.
GRAYLEE AVE @ East of BRIMLEY RD
2016-12-01 08:30 2016-12-09 17:30 Daily
All lanes will be occupied in both directions one lane at a time due to corehole work.
DENVALE RD @ 15 to 13 DENVALE RD
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
SCARBOROUGH RD
From KINGSTON RD to WOODALE AVE
2016-12-02 07:00 2016-12-09 19:00 Daily
The southbound curb lane will be occupied due to road work.
SHEPPARD AVE E @ 4736 SHEPPARD AVE E
At MCCOWAN RD
2016-12-01 07:00 2016-12-09 17:00 Continuous
The westbound curb lane will be occupied due to utility road cut repairs.
MARTINDALE RD
From BELLAMY RD S to MCCOWAN RD
2016-12-01 08:30 2016-12-09 17:30 Daily
The westbound and eastbound lanes will be occupied due to road work.
INGLETON BLVD @ 230 to 234 INGLENTON BLVD
2016-11-30 08:00 2016-12-15 19:00 Daily
The northbound lanes will be occupied due to road work.
HORFIELD AVE
From MCCOWAN RD to RANDALL CRES
2016-12-01 08:30 2016-12-09 17:30 Daily
The westbound and eastbound lanes will be occupied due to road work.
RINTELLA CRT @ LYON HEIGHTS RD to EAST LIMITS
2016-12-01 08:30 2016-12-09 17:30 Daily
Both lanes in both directions will be occupied, one lane at a time, due to core holes.
EASTMOOR CRES @ 7 to 9 EASTMOOR CRES
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound lanes will be occupied due to road work.
MIDLAND AVE @ 725 to 727 MIDLAND AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The southbound lanes will be occupied due to road work.
DANFORTH RD @ 1284 DANFORTH RD
2016-12-05 07:00 2016-12-10 19:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
NUGGET AVE @ MARKHAM RD
2016-12-05 09:00 2016-12-14 16:00 Daily
Westbound curb lane will be occupied due to vac truck use.
SHEPPARD AVE E
From WARDEN AVE to PALMDALE DR
2016-12-01 07:00 2017-01-31 19:00 Daily
The eastbound and westbound lanes, all lanes and one lane at a time, will be occupied due to new conduit by directional drilling.
LAWNMERE CRES @ 51 to 53 LAWNMERE CRES
2016-12-01 08:00 2016-12-15 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell pit in a residential area to maintain & provide Bell service.
SILVERSTED DR @ 6-72 SILVERSTED DR
2016-12-06 08:00 2017-01-13 18:00 Daily
The Northbound and southbound curb lane will be occupied due to road work.
BLUEBERRY DR @ 27-63 BLUEBERRY DR
2016-12-06 08:00 2017-01-13 18:00 Daily
The Northbound and westbound curb lane will be occupied due to road work.
ELLESMERE RD @ MARKHAM RD
2016-12-05 09:00 2016-12-14 16:00 Daily
The westbound lanes will be occupied due to road work.
HUNTSMILL BLVD
From CHADBURY PL to ARNALL AVE
2016-12-05 07:00 2017-01-31 19:00 Daily
The northbound and southbound lanes will be occupied one at a time due to Bell Smart City project work.
DAIRY DR
From NIXON HTS to DAIRY DR
2016-12-02 07:00 2017-01-02 19:00 Daily
Both lanes in both directions will be occupied, one at a time, due to installation of fibre optics for Bell.
EDHOUSE AVE @ 6 EDHOUSE AVE
From DAIRY DR to BAMBLETT DR
2016-12-02 07:00 2017-01-02 19:00 Daily
The northbound and southbound lanes will be occupied, one lane at a time, due to installation of Fibre optics for Bell.
BAMBLETT DR @ 11 BMABLETT DR
From DAIRY DR to EDHOUSE AVE
2016-12-02 07:00 2017-01-02 19:00 Daily
The eastbound and westbound lanes will be occupied, one lane at a time, due to installation of fibre optics for Bell.
NIXON HTS @ 15 NIXON HTS
From EDHOUSE AVE to LILY CUP AVE
2016-12-02 07:00 2017-01-02 19:00 Daily
Both lanes will be occupied, one at a time, due to installation of fibre optics for Bell.
BELANGER CRES @ 3 BELANGER CRES
From EDHOUSE AVE to LILY CUP AVE
2016-12-02 07:00 2017-01-02 08:11 Daily
Both lanes in both directions will be occupied, one at a time, due to installation of fibre optics for Bell.
LILY CUP AVE
From DANFORTH RD to NIXON HTS
2016-12-02 07:00 2017-01-02 19:00 Daily
Both lanes in both directions will be occupied, one lane at a time, due to installation of fibre optics for Bell.
MCCOWAN RD @ EAST RD
2016-12-05 23:00 2016-12-12 07:00 Daily
The Mccowan Rd west bound inside lane will be occupied due to road work.
SHEPPARD AVE E
From CHICHESTER PL to PHARMACY AVE
2016-12-06 07:00 2016-12-09 17:00 Daily
The Sheppard Ave. E form Chichester PL to Pharmacy Ave on westbound will be occupied due to road work. Traffic in both directions will be maintained - Traffic control in accordance with MTO Book 7 for short duration stops. There is no road closure.
SHEPPARD AVE E
From CHICHESTER PL to PHARMACY AVE
2016-12-05 09:30 2016-12-09 15:30 Daily
The Sheppard Ave. E form Chichester PL to Pharmacy Ave on eastbound will be occupied due to road work. Traffic in both directions will be maintained - Traffic control in accordance with MTO Book 7 for short duration stops. There is no road closure.
HAVENDALE RD @ 2 Havendale Rd to 24 Havendale Rd
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane on the north side will be occupied due to excavation of a Bell Pit on residential road to maintain/provide Bell service.
IVY GREEN CRES @ 2 Ivy Green Cres to 6 Ivy Green Cres
2016-12-05 08:00 2016-12-19 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
CATHLO ST @ 1 Cathlo St to 5 Cathlo St
2016-12-05 08:00 2016-12-19 19:00 Daily
The eastbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
BOWATER DR @ 38 Bowater Dr to 40 Bowater Dr
2016-11-28 08:00 2016-12-12 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell Pit on residential road to maintain/provide Bell service.
MILLDOCK DR @ 37 Milldock Dr to 41 Milldock Dr
2016-12-05 08:00 2016-12-19 19:00 Daily
The southbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
HISTORIC TER @ 40 Historic Ter to 44 Historic Ter
2016-12-05 08:00 2016-12-19 19:00 Daily
The westbound lane will be occupied due to excavation of a Bell Pit in a residential area to maintain/provide Bell service.
ARDEN CRES @ 44 ARDEN CRES
2016-12-05 08:00 2016-12-19 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
WHISTLING HILLS DR @ 46 WHISTLING HILLS DR
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
LORD ROBERTS DR @ 182 LORD ROBERTS DR
2016-12-05 08:00 2016-12-19 19:00 Daily
The eastbound curb lane will be occupied due to excavation of Bell pit.
GUILDWOOD PKWY @ 226 GUILDWOOD PKWY
2016-11-28 08:00 2016-12-12 19:00 Daily
The eastbound curb lane will be occupied due to excavation of Bell pit.
ABBOTTSWOOD RD
From BIRKDALE RD to OAKLEY BLVD
2016-12-05 09:00 2016-12-09 16:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
CANADINE RD
From MIDLAND AVE to OAKLEY BLVD
2016-12-05 07:00 2016-12-19 19:00 Daily
The westbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
DANFORTH RD
From BARRYMORE RD to EGLINTON AVE E
2016-12-05 09:00 2016-12-31 19:00 Daily
The southbound curb lane will be occupied due to borehole drilling.
NANTUCKET BLVD
From NANTUCKET BLVD to NANTUCKET BLVD
2016-12-05 07:00 2016-12-19 19:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
PARKCREST DR
From HILL CRES to ANNIS RD
2016-12-05 07:00 2016-12-07 17:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
SHEPPARD AVE E
From CHICHESTER PL to PHARMACY AVE
2016-12-05 07:00 2016-12-09 17:00 Daily
The westbound curb and centre lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
SPAIN RD
From BERGEN RD to VAUXHALL DR
2016-12-05 07:00 2016-12-19 19:00 Daily
The eastbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
EGLINTON AVE E @ 5m West of 2000 Eglinton Ave E to 50m East of 2000 Eglinton Ave E
2016-12-06 10:00 2016-12-07 15:00 Daily
The north westbound curb lane will be occupied due to excavation of pits to clear blockages in the Bell Canada structure to place new cable as part of the Bell Smart city project.
LAWRENCE AVE E
From FLORIST LANE to MORNINGSIDE AVE
2016-12-06 09:00 2016-12-23 16:00 Daily
The eastbound curb lane will be occupied due to construction of conduit and vault.
KINGSTON RD
From ST CLAIR AVE E to GRADWELL DR
2016-12-07 09:00 2016-12-07 16:00 Daily
The eastbound curb lane will be occupied due to environmental work- monitoring existing wells.
MCNICOLL AVE @ 3391 MCNICOLL AVE
2016-12-05 11:00 2016-12-07 23:59 Continuous
The eastbound curb lane will be occupied due to broken hydrant repairs.
KENNEDY RD @ LAWRENCE AVE E
2016-12-07 09:00 2016-12-07 15:00 '
Two northbound right lanes, left lanes and right shoulder will be alternately occupied due to red light camera installation.
WINSTON CHURCHILL DR
From FERNCROFT DR to CLONMORE DR
2016-12-06 07:00 2016-12-16 16:00 Daily
The eastbound and westbound curb lanes will be occupied due to placing cable.
DANFORTH RD @ 1284 DANFORTH RD
2016-12-05 07:00 2016-12-10 19:00 Daily
The northbound lanes will be occupied due to Full Length Trenchless Rehabilitation of Existing Gravity Sewers.
MCCOWAN RD @ 615 MCCOWAN RD
2016-12-05 07:00 2016-12-14 17:00 Daily
The northbound curb lane will be occupied due to 1 borehole drilling.
BIRCHMOUNT RD
From L AMOREAUX DR to MCNICOLL AVE
2016-12-07 09:00 2016-12-08 16:00 Daily
The northbound curb lane will be occupied due to road work by Powerline Plus.
KENNEDY RD
From LANDSEER RD to TREVERTON DR
2016-12-07 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to repairs to existing Bell conduit and installation of new conduit for new cable placement.
EGLINTON AVE E @ MCCOWAN RD
2016-12-07 09:00 2016-12-07 23:59 Daily
The westbound curb lane will be occupied due to sewer manhole repairs.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
ONTARIO ST
From WELLESLEY ST E to PROSPECT ST
2016-12-07 07:00 2016-12-10 17:00 Daily
Northbound left lane will be occupied due to rehabilitation of sewer.
BEDFORD RD
From DAVENPORT RD to BERNARD AVE
2016-07-20 00:01 2016-12-31 23:59 Continuous
The southbound lane will be closed due to watermain replacement.
DUPONT ST
From KENDAL AVE to WALMER RD
2016-08-09 07:00 2016-12-15 17:00 Daily
The northbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
AVONDALE RD @ PARK RD
2016-08-26 07:00 2017-06-06 19:00 Daily
Northbound, southbound and westbound lanes will be occupied due to watermain and water service replacement.
CASTLEFIELD AVE
From KINCORT ST to DUFFERIN ST
2016-09-01 07:00 2017-02-28 21:00 Daily
East and westbound lanes will be occupied due to watermain and sidewalk construction.
ELLIS GDNS @ COE HILL DR
2016-08-27 07:00 2016-12-15 17:00 Daily
The southbound lane will be occupied due to sewer service work.
WINDERMERE AVE
From BLOOR ST W to OSTEND AVE
2016-08-27 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service work.
FALWYN AVE @ WINONA DR
2016-08-27 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service work.
RICHMOND ST W @ SHEPPARD ST
2016-08-27 07:00 2016-12-15 17:00 Daily
The westbound lanes will be occupied due to sewer service by DM Robichaud Associates Ltd.
PEEL AVE @ GLADSTONE AVE
2016-08-29 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
EDWARD ST @ BAY ST
2016-08-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
FLAMBOROUGH DR @ AMESBURY DR
2016-08-29 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto.
DUNDAS ST W @ UNIVERSITY AVE
2016-09-01 09:30 2016-12-21 15:30 Daily
The eastbound curb lane will be occupied due to preparing and splicing fibres at Bell man hole.
HURDMAN ST @ GULLIVER RD
2016-08-30 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
WELLINGTON ST W @ LN N WELLINGTON E BLUE JAYS WAY
2016-08-30 07:00 2016-12-15 19:00 Daily
Laneway will be occupied in both directions due to spot trenchless rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers.
PARKSIDE DR @ THE QUEENSWAY
2016-08-30 07:00 2016-12-15 17:00 Daily
The northbound lane will be occupied due to full length trenchless rehabilitation of existing gravity sewers.
AVENUE RD @ ST CLAIR AVE W
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
COE HILL DR @ ELLIS GDNS
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
SYMES RD @ ST CLAIR AVE W
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
WALMER RD @ BLOOR ST W
2016-09-08 07:00 2016-12-15 17:00 Daily
The spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide). Traffic in both directions will be maintained.
DUFFERIN ST
From PEEL AVE to QUEEN ST W
2016-09-12 03:00 2016-12-31 23:00 Continuous
Full road closure of Dufferin St. due to road work. For more information, please visit http://transit.toronto.on.ca/archives/weblog/2016/09/09-dufferin_q.shtml
EGLINTON AVE W
From GABIAN WAY to CROHAM RD
2016-09-01 09:00 2017-03-01 04:00 Daily
The westbound and eastbound lane and shoulder will be occupied due to Exp Services Inc. and their subcontractors will be drilling boreholes for instrumentation installation at Caledonia station within the areas outlined under road restrictions.
RYKERT CRES @ RICHLEA CRCL
2016-09-15 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to sewer service work.
HERTLE AVE @ HIGHFIELD RD
2016-09-14 07:00 2016-12-07 19:00 Daily
The eastbound shoulder lane will be occupied due to watermain rehabilitation.
HIGHFIELD RD
From KERR RD to GERRARD ST E
2016-09-14 07:00 2016-12-07 19:00 Daily
The northbound shoulder lane will be occupied due to watermain rehabilitation.
HERTLE AVE @ KERR RD
2016-09-14 07:00 2016-12-07 19:00 Daily
The southbound shoulder lane will be occupied due to watermain rehabilitation.
ATHLETIC AVE
From GREENWOOD AVE to BILLINGS AVE
2016-09-14 07:00 2016-12-17 19:00 Daily
The eastbound curb lane will be occupied due to construction.
BILLINGS AVE
From KERR RD to ATHLETIC AVE
2016-09-14 07:00 2016-12-17 19:00 Daily
The southbound curb lane will be occupied due to construction.
BERKELEY ST @ SHUTER ST
2016-09-16 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to sewer service work.
BEECH AVE @ QUEEN ST E
2016-09-16 07:00 2016-12-15 17:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
KERR RD
From GREENWOOD AVE to HIGHFIELD RD
2016-09-14 07:00 2016-12-17 19:00 Daily
Eastbound curb lane will be occupied due to watermain rehabilitation.
DUFFERIN ST
From PEEL AVE to QUEEN ST W
2016-09-12 03:00 2016-12-30 23:00 Continuous
Full road closure in both directions due to construction work done by EllisDon Construction.
COXWELL AVE
From WOODROW AVE to DANFORTH AVE
2016-09-23 07:00 2016-12-15 17:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
MYRTLE AVE @ JONES AVE
2016-09-23 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
CHESTNUT PK @ ROXBOROUGH ST E
2016-09-26 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to spot trenchless rehabilitation by DM Robichaud Associates Ltd.
MORSE ST
From QUEEN ST E to EASTERN AVE
2016-09-26 07:00 2016-12-15 17:00 Daily
Both lanes will be occupied one at a time due to spot trenchless rehabilitation of existing sewers and sewer service connections.
DANFORTH AVE @ WOODYCREST AVE
2016-09-26 07:00 2016-12-15 17:00 Daily
The eastbound turning lane will be occupied due to sewer rehabilitation.
DANFORTH AVE @ CARLAW AVE
2016-09-26 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
ROSE PARK CRES
From HEATH CRES to MOUNT PLEASANT RD
2016-02-02 07:00 2016-12-30 19:00 Daily
One curb lane in all directions will be occupied due to work done by Power Line Plus Ltd.
ST CLAIR AVE E
From FERNDALE AVE to HARPER AVE
2016-02-02 09:00 2016-12-30 15:30 Daily
The eastbound and westbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
MACLENNAN AVE
From CARSTOWE RD to INGLEWOOD DR
2016-02-02 07:00 2016-12-30 19:00 Daily
The northbound and southbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
ROSEDALE HEIGHTS DR
From SIGHTHILL AVE to HARPER AVE
2016-02-02 07:00 2016-12-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
GARFIELD AVE
From INGLEWOOD DR to ERRINGTON AVE
2016-02-02 07:00 2016-12-30 19:00 Daily
The eastbound and westbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
WELLAND AVE
From GLENROSE AVE to ST CLAIR AVE E
2016-02-02 07:00 2016-12-30 19:00 Daily
The northbound and southbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
INGLEWOOD DR
From MOORE AVE to HARPER AVE
2016-02-02 07:00 2016-12-30 19:00 Daily
The northbound, southbound, eastbound, and westbound curb lanes will be occupied due to pole work by Powerline Plus Ltd.
GERRARD ST E @ PICKERING ST
2016-10-04 07:00 2016-12-15 17:00 Daily
Eastbound and westbound lanes will be occupied due to sewer rehabilitation.
DUNDAS ST E @ BROADVIEW AVE
2016-10-04 07:00 2016-12-15 17:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
CONDOR AVE @ DAWSON AVE
2016-10-04 07:00 2016-12-15 17:00 Daily
Northbound and southbound lane will be occupied due to sewer rehabilitation.
CHATHAM AVE @ PHIN AVE
2016-10-04 07:00 2016-12-15 17:00 Daily
The eastbound and westbound lane will be occupied due to the spot trenchless rehabilitation of existing sewers and sewer service conditions, sewer service connection replacement, service connection grouting and cleaning of existing sewers. Traffic in both directions will be maintained. There is no road closure.
MOUTRAY ST @ BROCK AVE
2016-10-07 07:00 2016-12-15 17:00 Daily
Westbound lane will be occupied due to sewer rehabilitation.
MOUTRAY ST @ SHERIDAN AVE
2016-10-12 07:00 2016-12-15 17:00 Daily
One westbound lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
DOVERCOURT RD @ HUMBER ST
2016-10-13 07:00 2016-12-15 17:00 Daily
Northbound and southbound lanes will be occupied maintaining traffic in both directions due to spot trenchless rehabilitation of existing sewers and sewer service connections.
MILLWOOD RD
From VILLAGE STATION RD to OVERLEA BLVD
2016-10-17 07:00 2016-12-23 19:00 Continuous
The eastbound curb passing, and centre lanes will be occupied due to installation of Toronto Hydro concrete duct bank, shaft and cable chamber by Aecon Utilities.
BAYVIEW AVE @ EGLINTON AVE E
2016-10-19 07:00 2016-12-23 19:00 Daily
The east and west bound curb and centre lanes of Eglinton and the north and south bound curb and centre lanes of Bayview at the intersection will be occupied due to removal of existing telecom cables and placement inside trench.
PAPE AVE @ LIPTON AVE
2016-10-19 07:00 2016-12-15 17:00 Daily
The boulevard will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
EGLINTON AVE W
From BRAEMAR AVE to ORIOLE PKWY
2016-10-26 05:04 2016-12-31 08:04 Daily
One westbound and eastbound lane will be occupied due to monitoring instrument for Eglinton Crosstown construction.
QUEEN ST W
From BATHURST ST to SPADINA AVE
2016-05-09 00:01 2016-12-15 23:59 Continuous
Eastbound and westbound directions will be reduced to one lane due to watermain replacement, partial road resurfacing and road construction.
CHRISTIE ST
From ESSEX ST to FOLLIS AVE
2016-10-25 07:00 2016-12-15 17:00 Daily
Northbound and southbound lane restrictions at Christie St. due to trench rehabilitation.
WALMER RD @ LOWTHER AVE
2016-10-25 07:00 2016-12-15 17:00 Daily
The northbound and southbound lane will be occupied due to spot trenchless rehabilitation of existing gravity sewer and sewer service connections.
CHURCH ST @ MAITLAND ST
2016-11-07 07:00 2016-12-16 23:00 Daily
Northbound and southbound right lanes will be occupied due to Toronto Hydro work.
YONGE ST @ THE ESPLANADE
2016-11-07 07:00 2017-02-07 19:00 Continuous
All lanes will be occupied one lane at a time to supply and install new traffic control devices and road construction.
CHURCH ST @ MAITLAND ST
2016-11-08 07:00 2016-12-16 23:00 Daily
Two northbound and one southbound lane will be occupied due to road work at the intersection.
DUSTAN CRES @ Don Mills rd to 20m East of Don Mills rd
2016-11-07 07:00 2016-12-07 16:00 Daily
The westbound curb lane will be occupied due to re-arrangement of hydro supply to DVP LTG Kiosk.
DUPONT ST
From BEDFORD RD to AVENUE RD
2016-11-14 00:01 2017-04-28 23:59 Continuous
The westbound lanes will be temporarily closed due to water main replacement.
DON MILLS RD
From O CONNOR DR to DON VALLEY PARKWAY
2016-11-14 19:00 2016-12-31 05:00 Daily
The northbound curb lane will be occupied due to re-arrangement of Hydro supply to DVP LTG Kiosk.
BROADVIEW AVE @ QUEEN ST E
2016-11-10 07:00 2016-12-09 19:00 Daily
One southbound lane will be occupied due to water and sewer service.
O CONNOR DR @ DON MILLS RD
2016-11-14 19:00 2016-12-31 05:00 Daily
The westbound curb lane will be occupied due to road work.
DORVAL RD @ WANDA RD
2016-11-16 07:00 2016-12-23 19:00 Daily
The northbound and southbound curb lanes will be occupied alternatively due to road work for the Bell Smart City project.
INDIAN RD @ WANDA RD
2016-11-16 07:00 2016-12-23 19:00 Daily
The northbound and southbound curb lanes will be occupied alternatively due to road work for the Bell Smart City project.
SHAFTESBURY AVE @ YONGE ST
2016-12-07 07:00 2016-12-07 15:00 Continuous
One eastbound lane will be occupied due to material off loading with truck mounted crane.
WANDA RD @ INDIAN RD CRES
2016-11-16 07:00 2016-12-23 19:00 Daily
The eastbound and westbound curb lanes will be occupied alternatively due to road work for the Bell Smart City project.
AVENUE RD @ 40m SOUTH of MACPHERSON AVE
2016-11-17 09:00 2016-12-08 16:00 Daily
The northbound curb and passing lane will be occupied due to gas relocation.
SPADINA AVE @ south of BALDWIN AVE
2016-11-21 07:00 2016-12-07 17:00 Daily
The northbound parking lane and curb will be occupied due to Toronto Hydro vault roof rebuild.
O CONNOR DR @ 366 O CONNOR DR
At DON MILLS RD
2016-11-14 07:00 2016-12-31 17:00 Daily
The westbound curb lane will be occupied due to re-arrangement of hydro supply to Don Valley Parkway LTG kiosk.
CHURCH ST
From DUNDAS ST E to GOULD ST
2016-11-19 07:00 2016-12-19 23:00 Daily
The northbound curb lane and sidewalk will be occupied due to construction work done by Power Line Plus Ltd.
MILLWOOD RD
From LAIRD DR to OVERLEA BLVD
2016-11-17 07:00 2016-12-23 19:00 Daily
Eastbound lanes occupied due to hydro construction.
BERWICK AVE
From DUPLEX AVE to YONGE ST
2016-11-18 07:00 2016-12-31 19:00 Daily
The eastbound curb lane will be occupied due to borehole drilling to prepare the Geotechnical report.
PARLIAMENT ST
From LAKE SHORE BLVD E to FRONT ST E
2016-11-18 16:00 2016-12-18 23:59 '
The southbound curb lane will be occupied in relation to the Toronto Christmas Market Event. Dates: November 18-20, November25-27, December 2-4, December 9-11 and December 16-18.
VICTORIA PARK AVE
From WAKEHOOD ST to MUSGRAVE ST
2016-11-21 06:00 2016-12-21 17:30 Daily
Two southbound lanes will be occupied due to road saw cutting, removal of concrete road base, and asphalt as well as permanent road restoration I northbound and 1 southbound lane will be maintained for traffic.
BROADVIEW AVE
From SIMPSON AVE to QUEEN ST E
2016-11-21 07:00 2016-12-31 16:00 Daily
The southbound curb lane will be occupied due to road work.
QUEEN ST E
From DON ROADWAY to BROADVIEW AVE
2016-11-21 07:00 2016-12-31 16:00 Daily
The eastbound curb lane will be occupied due to road work.
AVENUE RD @ BLOOR ST W
2016-11-22 19:00 2016-12-22 06:00 Daily
The northbound and southbound centre lanes will be occupied due to overnight work done by Power Line Plus Ltd.
BLOOR ST W @ AVENUE RD
2016-11-22 19:00 2016-12-22 06:00 Daily
One eastbound and one westbound lane will be occupied due to over night work done by Power Line Plus Ltd.
CLUNY DR @ ROXBOROUGH ST E
2016-11-22 07:00 2016-12-15 17:00 Daily
Both directions will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various location in Toronto.
BATHURST ST
From CARR ST to DUNDAS ST W
2016-11-23 10:00 2016-12-07 15:00 Daily
The northbound and southbound curb lane will be occupied due to clearing blockages on Bell infrastructure.
BERKELEY ST @ DUNDAS ST E
2016-11-23 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various location in Toronto.
ONTARIO ST @ WINCHESTER ST
2016-11-23 07:00 2016-12-15 17:00 Daily
All Lanes occupied due to rehabilitation of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in toronto (City Wide).
JAMES ST @ ALBERT ST
2016-11-28 07:00 2017-01-15 17:00 Daily
The west curb lane will be occupied due to work being done for enwave steam chamber need to be rebuild. The roof needs work before it becomes a hazard to the public.
LOGAN AVE @ LAKE SHORE BLVD E
2016-11-27 07:00 2017-03-31 09:58 Daily
The southbound lane fronting #20 Logan Ave and #801 Lake Shore Blvd E on Logan, will be occupied due to replacement of sewer and permanent restorations.
WRENSON RD
From BELLHAVEN RD to BOWMORE RD
2016-11-28 07:00 2016-12-12 19:00 Daily
The southbound curb lane will be occupied due to road work.
BEDFORD PARK AVE
From JEDBURGH RD to UNSWORTH AVE
2016-11-28 07:00 2016-12-12 19:00 Daily
The eastbound curb lane will be occupied due to road work.
SAMMON AVE @ CEDARVALE AVE
2016-11-24 07:00 2016-12-15 17:00 Daily
The westbound and eastbound lanes will be occupied due to sewer service work.
DUPONT ST @ 70 DUPONT ST
From BERNARD AVE to BEDFORD RD
2016-11-28 07:00 2017-04-28 13:00 Continuous
The eastbound and westbound traffic will be reduced to one lane in each direction due to watermain replacement.
HICKORY ST
From DUNDAS ST W to DENISON AVE
2016-11-28 07:00 2016-12-07 19:00 Daily
The northbound curb lane will be occupied due to cable placement.
AVENUE RD @ 1360 AVENUE RD
2016-11-28 09:30 2016-12-31 15:30 Daily
Eastbound and westbound lanes will be occupied due to cable excavation.
BELLHAVEN RD
From DUVERNET AVE to FAIRMOUNT CRES
2016-12-05 07:00 2016-12-16 19:00 Daily
The southbound curb lane will be occupied due to dig pit, and repair conduit.
CASSANDRA BLVD
From UNDERHILL DR to VICTORIA PARK AVE
2016-11-28 07:00 2017-03-30 19:00 Daily
Eastbound and westbound lanes will be occupied due to watermain and water service replacement.
VICTORIA ST @ SHUTER ST
2016-11-29 09:30 2016-12-31 15:30 Daily
The southbound lanes will be occupied due to road work.
QUEENS QUAY E @ JARVIS ST
2016-11-30 09:30 2016-12-07 15:30 Daily
The westbound lanes will be occupied due to road work.
DOVERCOURT RD @ 101 Dovercourt Rd to 55 Dovercourt Rd
2016-11-29 07:00 2016-12-22 17:00 Daily
The northbound curb lane will be occupied due to Toronto Hydro work.
DUNDAS ST E @ Indian Grv to 150m West of Indian Grv
2016-11-29 09:00 2016-12-12 16:00 Daily
One of the westbound lanes will be occupied due to boring, trenching, vac truck use, manhole install.
BANFF RD @ EGLINTON AVE E
2016-11-29 07:00 2016-12-14 17:00 Daily
The southbound curb lane will be occupied due to rebuilding of Toronto Hydro cable chamber roof.
LOGAN AVE @ PAISLEY AVE
2016-12-07 09:00 2016-12-07 16:00 Continuous
One northbound lane will be occupied due to manhole work.
RHODES AVE
From DUNDAS ST E to GERRARD ST E
2016-12-05 07:00 2016-12-09 19:00 Daily
The southbound curb lane will be occupied due to conduit repair.
BATHURST ST
From LAKE SHORE BLVD W to EIREANN QUAY
2016-11-28 22:00 2016-12-31 06:00 Daily
The northbound and southbound lanes will be occupied due to water main construction.
HIGHCROFT RD
From EASTWOOD AVE to BEATON AVE
2016-12-05 07:00 2016-12-12 19:00 Daily
Southbound curb lane at Highcroft Rd. will be occupied due to pit digging.
CRAVEN RD
From DUNDAS ST E to GERRARD ST E
2016-12-05 07:00 2016-12-09 19:00 Daily
Northbound curb lane at Craven Rd. will be occupied due to pit digging.
AVENUE RD @ 1360 AVENUE RD
From GLENGROVE AVE to GLENVIEW AVE
2016-11-30 09:30 2016-12-14 15:30 Daily
Partial lane closure on both directions due to cable excavation.
WEST TORONTO ST @ OLD STOCK YARDS RD
2016-11-29 07:00 2016-12-15 17:00 Daily
The westbound lane will be occupied due to the spot trenchless rehabilitation (CIPP System) of existing sewers and sewer service connections, sewer service connection replacement, service connection grouting and cleaning existing sewers in various locations in Toronto (City Wide).
SPROAT AVE
From PEYTON LANE to JONES AVE
2016-12-01 07:00 2016-12-08 19:00 Daily
The eastbound curb lane will be occupied due to dig pit, repair conduit.
PEYTON LANE @ SPROAT AVE
2016-12-01 07:00 2016-12-08 19:00 Daily
The northbound curb lane will be occupied due to dig pit, repair conduit.
PALMERSTON BLVD @ HARBORD ST
2016-11-29 07:00 2016-12-15 17:00 Daily
The northbound lanes will be occupied due to road work.
CASTLEFIELD AVE @ FAIRBANK AVE
2016-11-29 07:00 2016-12-15 17:00 Daily
The northbound and southbound lanes will be occupied due to road work.
BOWMORE RD
From WRENSON RD to EASTWOOD RD
2016-12-05 07:00 2016-12-16 19:00 Daily
The southbound curb lane will be occupied due to road work.
GILMOUR AVE @ ST JOHNS RD
2016-11-30 09:00 2016-12-09 16:00 Daily
The northbound and southbound curb lane will be occupied due to road work.
ST JOHNS RD
From GILMOUR AVE to FISKEN AVE
2016-11-30 09:00 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to road work.
COLLEGE ST @ BAY ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The westbound curb lane in the north east corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
COLLEGE ST @ BAY ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The eatbound curb lane in the south west corner of the intersection will be occupied due to concrete pad for bus shelters and electrical trenching.
DUNDAS ST W @ JEROME ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The eastbound curb lane in the south east corner will be occupied due to concrete pad for bus shelters.
BOWMORE RD
From WRENSON RD to EASTWOOD RD
2016-12-05 07:00 2016-12-16 19:00 Daily
The southbound curb lane will be occupied due to conduit repair.
HAYTER ST
From BAY ST to LA PLANTE AVE
2016-12-05 07:00 2016-12-08 19:00 Daily
The eastbound right lane will be occupied due to hydro vault break out.
HILLHURST BLVD @ 203 HILLHURST BLVD
2016-11-29 07:00 2016-12-09 19:00 Daily
Eastbound lane will be occupied due to water and sewer service.
SULTANA AVE
From KHEDIVE AVE to BATHURST ST
2016-12-01 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to road work.
ST CLARENS AVE
From BLOOR ST W to PATON RD
2016-12-05 07:00 2016-12-09 19:00 Daily
The eastbound curb lane will be occupied due to road work.
MALVERN AVE
From SWANWICK AVE to GERRARD ST E
2016-12-01 07:00 2016-12-08 19:00 Daily
The northbound curb lane will be occupied due to road work.
BROADVIEW AVE @ 259 BROADVIEW AVE
2016-12-01 00:01 2016-12-09 23:59 Daily
The northbound curb lane will be occupied due to road work.
QUEEN ST W
From BATHURST ST to SPADINA AVE
2016-12-01 07:00 2016-12-17 19:00 Daily
The eastbound lanes will be occupied due to road work.
BORDEN ST @ HARBORD ST
2016-12-05 06:30 2016-12-09 18:30 Daily
The northbound lanes will be occupied due to road work.
BORDEN ST
From LENNOX ST to SUSSEX AVE
2016-12-05 06:30 2016-12-09 18:30 Daily
The northbound lanes will be occupied due to road work.
DUFFERIN ST @ MOUTRAY ST
2016-12-05 06:30 2016-12-09 18:30 Daily
The eastbound lanes will be occupied due to road work.
LOGAN AVE @ COLGATE AVE
2016-12-07 09:00 2016-12-14 16:00 Daily
The northbound lanes will be occupied due to road work.
GERRARD ST W @ UNIVERSITY AVE
2016-11-30 09:00 2016-12-16 16:00 Daily
The westbound right lane will be occupied due to concrete pad for bus shelters and electrical trenching.
MC CAUL ST @ STEPHANIE ST
2016-11-30 09:00 2016-12-16 16:00 Daily
The southbound right lane will be occupied due to concrete pad for bus shelters and electrical trenching.
CLUNY DR
From ROWANWOOD AVE to CHESTNUT PK
2016-12-05 07:00 2016-12-10 19:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
PARKSIDE DR @ 373 to 377 PARKSIDE DR
2016-12-02 07:00 2016-12-30 16:00 Daily
The northbound curb lane will be occupied due to conduit placement.
QUEEN ST W
From UNIVERSITY AVE to BAY ST
2016-12-05 10:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to utility cut repairs.
MUTUAL ST @ GERRARD ST E
2016-12-05 07:00 2016-12-09 19:00 Continuous
Northbound lane from 145 Mutual St to Gerrard St E will be occupied due to cable work.
PARKDALE RD @ GLENDALE AVE
2016-12-05 09:00 2016-12-07 15:00 Continuous
Eastbound curb lane will be occupied due to cleaning and inspection of underground chambers.
INDIAN RD
From GRENADIER RD to HEWITT AVE
2016-12-02 07:00 2016-12-30 19:00 Daily
The northbound and southbound curb lanes will be occupied due to construction - trench and conduit placement.
HOWARD PARK AVE
From INDIAN GRV to INDIAN RD
2016-12-02 09:00 2016-12-30 16:00 Daily
The westbound curb lane will be occupied due to construction - trench and conduit placement.
WILLOW AVE
From QUEEN ST E to PARK AVE
2016-12-02 07:00 2016-12-08 19:00 Daily
The southbound curb lane will be occupied due to road work.
QUEEN ST W
From UNIVERSITY AVE to BAY ST
2016-12-05 10:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to road work.
BELSIZE DR @ 279 BELSIZE DR
At HARWOOD RD
2016-12-02 07:00 2016-12-09 19:00 Daily
The eastbound and westbound lanes will be occupied due to directional drilling to install new conduit and Rogers fibre.
LAKE SHORE BLVD W @ LOWER SIMCOE ST
2016-12-06 21:00 2016-12-08 05:00 Daily
The westbound curb lane will be occupied due to road work.
TYRREL AVE
From HILLCREST DR to GREENSIDES AVE
2016-12-05 07:00 2016-12-07 19:00 Daily
The eastbound and westbound lanes will be occupied due to road work.
DUFFERIN ST @ EGLINTON AVE W
2016-12-05 07:00 2016-12-23 19:00 Daily
One lane in all directions at the intersection will be occupied due to Eglinton Crosstown LRT construction by Crosslinx Transit Solutions.
CHARLES ST E
From YONGE ST to MACY DUBOIS LN
2016-12-05 07:00 2016-12-09 19:00 Daily
The westbound curb lane will be occupied due to conduit repair and cable placement.
CRESCENT RD
From YONGE ST to CLUNY DR
2016-12-05 07:00 2016-12-08 19:00 Daily
One eastbound lane will be occupied due to Bell conduit unblock.
BROCK AVE
From BLOOR ST W to BROCK CRES
2016-12-02 07:00 2016-12-12 19:00 Daily
The northbound curb lane will be occupied due to clear blockages on Bell infrastructure.
GAMBLE AVE
From BROADVIEW AVE to HILLSIDE DR
2016-12-02 07:00 2016-12-17 19:00 Daily
The westbound curb lane will be occupied due to clear blockages on Bell infrastructure.
COXWELL AVE @ GLEBEHOLME BLVD
2016-12-06 07:00 2016-12-09 17:00 Daily
The Glebeholme Blvd. on southbound will be occupied due to road work. Traffic in both directions will be maintained - Traffic control in accordance with MTO Book 7 for short duration stops. There is no road closure.
DUNDAS ST W
2016-12-05 07:00 2016-12-09 17:00 Daily
The DUNDAS ST W form 4242 DUNDAS ST W to 4218X DUNDAS ST W on Westbound will be occupied due to road work.
KEELE ST @ HIRONS ST
2016-12-06 07:00 2016-12-09 17:00 Daily
The keele st. at Hirons st. on Northbound will be occupied due to road work.
SCARLETT RD
From LOCKHEED BLVD to RIVERLEA DR
2016-12-05 07:00 2016-12-09 17:00 Daily
The Scarlett rd form lockheed blvd to riverlea dr on southbound will be occupied due to road work.
YONGE ST
From HEATH ST W to LAWTON BLVD
2016-12-06 07:00 2016-12-09 17:00 Daily
The Yonge st. at Health st. to Lawton Blvd on NorthBound will be occupied due to road construction.
SQUIRES AVE @ 74 SQUIRES AVE
2016-11-28 08:00 2016-12-12 19:00 Daily
The northbound curb lane will be occupied due to excavation of Bell pit.
BATHURST ST @ ADELAIDE ST W
2016-12-05 09:00 2016-12-07 16:00 Daily
The southbound curb lane will be occupied due to corehole drillings.
CHRISTIE ST
From DAVENPORT RD to ASHWORTH AVE
2016-12-05 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to work done by Power Line Plus Ltd.
ADELAIDE ST W
From BATHURST ST to JOSEPH SALSBERG LANE
2016-12-05 09:00 2016-12-07 16:00 Daily
The eastbound curb lane and boulevard will be occupied due to boreholes and coreholes.
COLLEGE ST
From SPADINA AVE to ROBERT ST
2016-12-05 09:00 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to work done by Power Line Plus Ltd.
GLEN MANOR DR
From QUEEN ST E to AVION AVE
2016-12-05 07:00 2016-12-19 16:00 Daily
The northbound lane will be occupied due to construction - pit dig, conduit repair and cable placement.
JEROME ST @ 5 JEROME ST
2016-12-05 09:00 2016-12-19 16:00 Daily
The eastbound and westbound lanes will be occupied due to new conduit and fibre optic cable placement.
MAPLE AVE
From GLEN RD to SHERBOURNE ST N
2016-12-05 07:00 2016-12-08 19:00 Daily
The eastbound lane will be occupied due to construction of new Bell conduit.
LOURDES LANE
From WELLESLEY PL to SHERBOURNE ST
2016-12-02 07:00 2016-12-09 19:00 Daily
The westbound lane will be occupied due to construction - placement of "Y" and cable.
MAXWELL AVE @ ANDERSON AVE
2016-12-05 07:00 2016-12-07 16:00 Daily
The northbound curb lane will be occupied due to excavation in pits to clear blockages in the Bell Canada structure to place new cable as part of the Bell Smart City project.
MC CAUL ST @ COLLEGE ST
2016-12-05 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to placing only.
MURRAY ST @ ELM ST
2016-12-05 07:00 2016-12-16 19:00 Daily
The northbound lane will be occupied due to construction - pit dig, conduit repair and cable placement.
ONTARIO ST
From PROSPECT ST to WELLESLEY ST E
2016-12-05 07:00 2016-12-09 19:00 Daily
One northbound lane will be occupied due to the unblocking of conduit.
QUEEN ST W
From OSSINGTON AVE to GLADSTONE AVE
2016-12-05 09:00 2016-12-09 16:00 Daily
The westbound and eastbound curb lanes will be occupied due to placing only.
YORK ST
From BREMNER BLVD to FRONT ST E
2016-12-05 05:30 2016-12-17 23:00 Continuous
The southbound and northbound median lane will be occupied due to the four girders on the Go Transit/Metrolinx York St bridge requiring emergency repairs.
RICHMOND ST W @ 618 RICHMOND ST W
2016-12-05 07:00 2016-12-22 17:00 Daily
The westbound sidewalk & hoarding area on the north side will be occupied due to Toronto Hydro work.
STANDISH AVE
From DOUGLAS DR to ASTLEY AVE
2016-12-02 07:00 2016-12-10 19:00 Daily
The northbound lane will be occupied due to clearing of blockages on Bell infrastructure.
WELLINGTON ST E
From CHURCH ST to YONGE ST
2016-12-05 09:00 2016-12-09 15:00 Continuous
The westbound 2 centre lanes (on track allowance) will be occupied due to replacement of broken rails. Streetcar service has been removed from within area.
WESTMORELAND AVE
From DUPONT ST to HALLAM ST
2016-12-05 07:00 2016-12-19 19:00 Daily
The southbound lane will be occupied due to clearing of blockages on Bell infrastructure on private property.
YONGE ST
From HEATH ST W to LAWTON BLVD
2016-12-06 07:00 2016-12-09 17:00 Daily
The northbound curb lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
GOWAN AVE
From LOGAN AVE to CARLAW AVE
2016-12-07 07:00 2016-12-21 19:00 Daily
The eastbound curb lane will be occupied due to clearing blockages on Bell Infrastructure.
KEELE ST @ HIRONS ST
2016-12-06 07:00 2016-12-09 17:00 Daily
The northbound curb lane will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
COMMISSIONERS ST
From SAULTER ST S to CARLAW AVE
2016-12-07 09:30 2016-12-09 16:00 Daily
The eastbound curb lane will be occupied due to rod and roping existing hydro chambers.
CARLAW AVE
From COMMISSIONERS ST to EASTERN AVE
2016-12-07 09:30 2016-12-09 16:00 Daily
The northbound curb lane will be occupied due to rod and roping existing hydro chambers.
BOWDEN ST
From DANFORTH AVE to DEARBOURNE AVE
2016-12-05 07:00 2016-12-19 19:00 Daily
The southbound curb lane will be occupied due to conduit repairs.
SPADINA AVE
From BREMNER BLVD to BLUE JAYS WAY
2016-12-05 21:00 2016-12-09 05:00 Daily
The northbound curb lane will be occupied due to road work.
FRONT ST W @ SPADINA AVE
From SPADINA AVE to BLUE JAYS WAY
2016-12-05 09:00 2016-12-09 17:00 Daily
The westbound lanes will be occupied due to construction.
KINGSLEY AVE @ 17 KINGSLEY AVE
2016-12-06 07:00 2016-12-20 19:00 Daily
The eastbound curb lane will be occupied due to cable placement.
BRUNSWICK AVE @ leah cohen ln
2016-12-05 07:00 2016-12-09 19:00 Daily
The westbound lanes will be occupied due to construction.
LAUGHTON AVE @ 9 LAUGHTON AVE
From KINGSLEY AVE to PELHAM AVE
2016-12-06 07:00 2016-12-20 19:00 Daily
The northbound and southbound curb lane will be occupied due to placing of new conduit and fibre optic cable.
HAYDEN ST @ YONGE ST
2016-12-07 07:00 2016-12-07 15:00 Weekdays
Road will be closed due to crane hoisting.
CARLAW AVE
From DUNDAS ST E to COLGATE AVE
2016-12-05 09:00 2016-12-07 15:00 Weekdays
The eastbound curb lane will be occupied due to repairing of drain service.
PEMBROKE ST
From DUNDAS ST E to GLENHOLME PL
2016-12-07 09:00 2016-12-12 16:00 Daily
The southbound curb lane will be occupied due to the clearance of blockages on Bell infrastructure.
WILTSHIRE AVE @ 7 Wiltshire Ave
2016-12-06 07:00 2016-12-20 19:00 Daily
The northbound and southbound curb lanes will be occupied due to placing new conduit and fibre optic cable.
CHURCH ST
From KING ST E to WELLINGTON ST E
2016-12-07 09:30 2016-12-08 15:30 Daily
One of the southbound lanes will be occupied due to Bell Canada existing Duct inspection.
ADELAIDE ST E
From JARVIS ST to FREDERICK ST
2016-12-06 09:00 2016-12-16 17:00 Daily
The eastbound curb lane will be occupied due to permeant repairs to utility cuts.
KINGSTON RD @ 646 Kingston Rd
2016-12-06 09:00 2017-01-23 17:00 Daily
The north curb lane will be occupied due to Toronto Hydro chamber and extend ducts to another chamber at intersection.
JARVIS ST @ MAITLAND PL
2016-12-07 09:00 2016-12-09 16:00 Weekdays
The southbound curb lane will be occupied due to placing cable.
CLUNY DR
From CHESTNUT PK to ROWANWOOD AVE
2016-12-05 07:00 2016-12-10 19:00 Daily
The northbound lanes will be occupied due to Full Length Trenchless Rehabilitation of Existing Gravity Sewers.
DUFFERIN ST @ from ST Claire ave W to 1431 dufferin st
2016-12-07 09:00 2016-12-12 16:00 Daily
Northbound lanes will be occupied due to conduit installation and full stream permit 72365701.
DOUGLAS DR @ ST ANDREWS GDNS
2016-12-07 07:00 2016-12-23 19:00 Daily
One lane will be occupied in each direction due to Bell road work.
SHIRLEY ST
From ST CLARENS AVE to NORFOLK AVE
2016-12-06 09:00 2016-12-16 16:00 Daily
Eastbound curb lane will be occupied due to cable installation.
STRATHNAIRN AVE @ CASTLEFIELD AVE
2016-12-07 07:00 2016-12-21 19:00 Daily
Southbound curb lane will be occupied due to cable installation.
WILLIAM ST
From HELEN AVE to PINE ST
2016-12-07 08:00 2016-12-09 16:30 Daily
The westbound and eastbound lanes will be occupied due to road work.
WELLINGTON ST E
From YONGE ST to CHURCH ST
2016-12-07 09:30 2016-12-09 16:00 Daily
The eastbound and westbound curb lane will be occupied due to road work.
VIMY AVE
From LAWRENCE AVE W to MACDONALD AVE
2016-12-07 08:00 2016-12-09 16:30 Daily
The northbound and southbound lanes will be occupied due to road work.
TEMPERANCE ST @ 70 TEMPERANCE ST
2016-12-07 09:30 2016-12-07 14:00 Daily
The westbound curb lane will be occupied due to road work.
HILTON AVE
From NINA ST to MELGUND RD
2016-12-07 08:00 2016-12-07 16:00 '
The northbound and southbound lanes are closed due to emergency water service.
ABRAHAM WELSH RD
From SHEPPARD AVE W to PARROTTA DR
2016-12-07 09:00 2016-12-09 16:00 Daily
The southbound curb lane will be occupied due to conduit installation.
KING ST E
From PRINCESS ST to ONTARIO ST
2016-12-07 09:00 2016-12-07 14:00 Daily
The eastbound curb lane will be occupied due to a broken hydrant replacement.
QUEEN ST W
From BAY ST to YORK ST
2016-12-07 08:00 2016-12-09 19:00 Daily
The layby lanes will be occupied due to events for the MLS Cup Fan Experience.

Contains information licensed under the Open Government Licence – Toronto.

All future planned road restrictions which are not yet active.

Location Start Date End Date When
CLOUSTON AVE
2016-12-08 07:00 2016-12-15 17:00 Daily
The Clauston Ave. form 46 Clauston Ave to 82 Clauston Ave on westbound will be occupied due to road work.
FINCH AVE W @ HUN CRES
2016-12-09 07:00 2016-12-16 17:00 Daily
The FINCH AVE W at Hun cres will be occupied due to road work.
CARRIER DR @ WOODBINE DOWNS BLVD
2016-12-08 09:00 2016-12-22 16:00 Daily
Partial lane closure at Carrier Dr from Woodbine Downs Blvd TO Carrier Dr towards east and westbound due to road work.
WOODBINE DOWNS BLVD
From WOODBINE AVE to CARRIER DR
2016-12-08 09:00 2016-12-22 16:00 Daily
Partial lane closure at Woodbine Downs Blvd from Woodbine Downs Blvd TO Carrier Dr towards north and southbound due to road work.
DUNDAS ST W
From ROYALAVON CRES to AVONHURST RD
2016-12-10 09:00 2016-12-24 16:00 Daily
The southbound curb lane will be occupied due to dig pit, and repair conduit.
DALESFORD RD
From PENHURST AVE to WESLEY ST
2016-12-12 07:00 2016-12-16 19:00 Daily
One westbound lane will be occupied due to CSP/SGLB installation.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
JOHN ST @ JANE ST
2016-12-09 07:00 2016-12-16 17:00 Daily
The John st at Jane st on Southbound will be occupied due to road work.
JANE ST @ BLACK CREEK DR NB JANE ST RAMP
2016-12-08 07:00 2016-12-15 17:00 Daily
The Jane st. at Black Creek n on ramp towards South Bound will be occupied due to road work.
EGLINTON AVE E @ 20 Eglinton Ave E
2016-12-08 22:00 2016-12-09 09:00 Daily
The eastbound lane on the north side will be occupied due to hoisting to remove and install five louver using 350 tonnes mobile crane.
SAMBA DR
From SHEPPARD AVE W to TALENT CRES
2016-12-12 07:00 2016-12-26 19:00 Daily
The northbound curb lane will be occupied due to clearing blockages on Bell infrastructure.
STEELES AVE W @ KEELE ST
2016-12-18 07:00 2016-12-18 15:00 Daily
The eastbound lanes will be alternatively occupied due to red light camera instalallation.
IVAN NELSON DR
From ROBERT HICKS DR to HENRY WELSH DR
2016-12-09 09:30 2016-12-21 15:30 Daily
The eastbound and westbound curb lanes will be occupied due to cable excavation for Bell Canada.
YONGE ST
From GREENFIELD AVE to HOLLYWOOD AVE
2016-12-12 09:00 2016-12-16 16:00 Daily
Northbound curb lane will be occupied to place cable.

Contains information licensed under the Open Government Licence – Toronto.


Location Start Date End Date When
AMBERCROFT BLVD @ 77 Ambercroft Blvd to 45 Ambercroft Blvd
2016-12-12 07:00 2016-12-16 19:00 Daily
The northbound lanes will be occupied due to full length trenchless rehabilitation of existing gravity sewers-various locations with the city of Toronto (area bound by Eglinton, Steels, Hwy 27 and Pickering Town Line).
AMBERCROFT BLVD @ 121 Ambercroft Blvd to 99 Ambercroft Blvd
2016-12-12 07:00 2016-12-16 19:00 Daily
The northbound lanes will be occupied due to full length trenchless rehabilitation of existing gravity sewers-various locations with the city of Toronto (area bound by Eglinton, Steels, Hwy 27 and Pickering Town Line).
AMBERCROFT BLVD @ 121 Ambercroft Blvd to 99 Ambercroft Blvd
2016-12-12 07:00 2016-12-16 19:00 Daily
The northbound lanes will be occupied due to full length trenchless rehabilitation of existing gravity sewers-various locations in the city of Toronto (area bound eglinton, Steeles, Hwy 427 and Pickering Town line).
PACKARD BLVD @ HURLEY CRES
2016-12-09 07:00 2016-12-12 19:00 Daily
Eastbound lane will be occupied due to sewer rehabilitation.
ALLANFORD RD @ BIRCHMOUNT RD
2016-12-09 09:00 2016-12-16 19:00 Daily
The westbound curb lane will be occupied due to dig pit and drilling.
EGLINTON AVE E
From WINTER AVE to FALMOUTH AVE
2016-12-12 09:00 2016-12-15 16:00 Daily
The eastbound and westbound lanes will be occupied due to drilling of five borehole with monitoring wells in Eglinton Ave E and Falmouth Ave, Toronto. Monitor and collect groundwater samples from the monitoring wells.
AMBERCROFT BLVD @ 99 to 121 AMBERCROFT BLVD
2016-12-12 07:00 2016-12-16 19:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
AMBERCROFT BLVD @ 45 to 77 AMBERCROFT BLVD
2016-12-12 07:00 2016-12-16 19:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
AMBERCROFT BLVD
From TRIANGLE VILLAS DR to ELMARTIN DR
2016-12-12 07:00 2016-12-16 19:00 Daily
Northbound lane will be occupied due to sewer rehabilitation.
PACKARD BLVD @ HURLEY CRES
2016-12-09 07:00 2016-12-12 19:00 Daily
Eastbound lane will be occupied due to trenchless rehabilitation of existing gravity sewers.
VICTORIA PARK AVE
From TEMPO AVE to STEELES AVE E
2016-12-12 09:00 2016-12-14 16:00 Daily
Northbound curb lane will be occupied due to cable installation.
MCCOWAN RD @ SHEPPARD AVE E
2016-12-11 07:30 2016-12-11 14:00 Continuous
The northbound two left lanes and two right lanes will alternatively be occupied due to red light camera installation.

Contains information licensed under the Open Government Licence – Toronto.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
SHAFTESBURY AVE @ YONGE ST
2016-12-14 07:00 2016-12-14 14:00 Continuous
One eastbound lane will be occupied due to material off loading with truck mounted crane.
SHAFTESBURY AVE @ YONGE ST
2016-12-21 07:00 2016-12-21 14:00 Continuous
One eastbound lane will be occupied due to material off loading with truck mounted crane.
GREENWOOD AVE @ GERRARD ST E
2016-12-10 09:00 2016-12-14 16:00 Daily
The southeast right lane will be occupied due to manhole work.
LOGAN AVE @ DANFORTH AVE
2016-12-10 10:00 2016-12-11 19:00 Daily
All lanes will be occupied from Danforth Ave to the first laneway north of Danforth due to The Magic of Christmas Event.
LAKE SHORE BLVD E @ LOWER JARVIS ST
2016-12-12 21:00 2016-12-15 05:00 Daily
The westbound curb lane will be occupied due to road work.
LAKE SHORE BLVD
From YORK ST to LAKE SHORE BLVD
2016-12-08 21:00 2016-12-09 05:00 Daily
The westbound curb lane will be occupied due to road work.
LAKE SHORE BLVD @ SPADINA AVE
2016-12-11 21:00 2016-12-12 05:00 Daily
The westbound curb lane will be occupied due to road work.
LAKE SHORE BLVD W @ BATHURST ST
2016-12-10 21:00 2016-12-11 05:00 Daily
The westbound curb lane will be occupied due to road work.
LAKE SHORE BLVD @ BAY ST
2016-12-13 21:00 2016-12-14 05:00 Daily
The westbound curb lane will be occupied due to road work.
ADELAIDE ST W
From MORRISON ST to BRANT ST
2016-12-07 21:00 2016-12-14 05:00 Daily
The ADELAIDE ST W form Morrison St. to Brant St. on eastbound will be occupied due to road work.
RICHMOND ST W
From BAY ST to SHEPPARD ST
2016-12-08 07:00 2016-12-16 17:00 Daily
The Richmond St. W form Bay St. to Sheppard St. on Westbound will be occupied due to road work.
RICHMOND ST W
From BAY ST to SHEPPARD ST
2016-12-08 07:00 2016-12-16 17:00 Daily
The westbound centre lanes will be occupied due to spot trenchless rehabilitation of existing sewers and sewer service connections.
PAPE AVE @ LIPTON AVE
2016-12-09 07:00 2016-12-16 17:00 Daily
The boulevard at the intersection will be occupied due spot trenchless rehabilitation of existing sewers and sewer service connections.
BEDFORD RD
From PEARS AVE to CHICORA AVE
2016-12-08 09:00 2016-12-19 16:00 Daily
The northbound curb lane will be occupied due to the clearing of blockages on Bell infrastructure.
WELLESLEY ST E @ JARVIS ST
2016-12-07 23:00 2016-12-09 06:00 Daily
The intersection will be occupied due to manhole lid replacement, paid duty officer will be on scene.
BAY ST
From DUNDAS ST W to EDWARD ST
2016-12-10 09:00 2016-12-10 19:00 Weekends
The northbound curb lane will be occupied due to chamber installation.
BERTMOUNT AVE
From MALLON AVE to QUEEN ST E
2016-12-08 07:00 2016-12-22 19:00 Daily
The southbound curb lane will be occupied due to repairing conduit.
RUSHBROOKE AVE
From EASTERN AVE to QUEEN ST E
2016-12-10 07:00 2016-12-24 19:00 Daily
The northbound curb lane will be occupied due to dig pit and repair conduit.
ISABELLA ST @ JARVIS ST
2016-12-09 09:00 2016-12-09 15:00 Weekdays
The eastbound curb lane will be occupied due to red light camera installation.
BREMNER BLVD
From YORK ST to GRAND TRUNK CRES
2016-12-19 09:30 2016-12-22 15:30 Daily
The westbound curb lane will be occupied due to cable placement.
CARLTON ST @ 84 CARLTON ST
2016-12-08 09:30 2016-12-08 18:30 Continuous
The westbound curb lane will be occupied due to hydro work.
QUEEN ST W @ BAY ST
2016-12-10 09:00 2016-12-13 19:00 Daily
Eastbound and westbound curb lanes at Queen St W and northbound and southbound curb lanes at Bay St will be occupied due to cable installation.
TICHESTER RD @ LONSMOUNT DR
2016-12-08 07:00 2016-12-22 19:00 Daily
Eastbound curb lane will be occupied due to cable installation.
WELLESLEY ST E @ 50 WELLESLEY ST E
2016-12-10 00:01 2016-12-11 23:59 Continuous
Full road closure in both directions in front of #50 Wellesley St E due to tower crane installation. South sidewalk will remain opened.
PRINCE ARTHUR AVE @ ST GEORGE ST
2016-12-12 07:00 2016-12-22 17:00 Daily
The eastbound curb lane will be occupied due to Toronto Hydro vault roof rebuild.
EGLINTON AVE W @ 956 EGLINTON AVE W
2016-12-14 07:00 2016-12-16 16:00 Daily
The westbound lanes will be occupied due to road work.
OLD DUNDAS ST @ 4019-4064 OLD DUNDAS ST
2016-12-12 09:00 2016-12-16 16:00 Daily
The westbound lanes will be occupied due to road work.
ST THOMAS ST @ SULTAN ST
2016-12-12 09:00 2016-12-14 16:00 Daily
The westbound curb lane will be occupied due to construction - trench and core man hole.

Contains information licensed under the Open Government Licence – Toronto.

All currently active unplanned road restrictions which have occurred in response to events such as vehicle collisions, water main breaks or other emergencies.

There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


There are no emergency road restrictions at this moment.


Etobicoke-York North York Scarborough Toronto and East York
Location Start Date End Date When
CROSS ST
From BEACONSFIELD AVE to GLADSTONE AVE
2016-12-07 08:47 2016-12-07 14:00 '
The road is closed due to an emergency tree removal.

Contains information licensed under the Open Government Licence – Toronto.

Traffic Twitter Stream

Traffic Updates from the Ontario Provincial Police

Traffic Updates from the Ontario Ministry of Transportation

Travel news from Ontario Travel, official marketing agency of Ontario

Travel news from the Canadian Tourism Commission

Information about driving in Toronto and Ontario

Find out how to pay a parking ticket, the latest road, parking and traffic information from the City of Toronto.

Get a first car or motorcycle licence, renew an old one, browse the online driver's handbook, book a road test, register your vehicle, and more.

Here are a few helpful tips, facts and resources to help you get the most out of your Ontario travel experience.

Here are some answers to common questions about vehicle permits, licence plates and validation stickers from the Government of Ontario.

Information from the Ontario Ministry of Transportation about impaired driving, the Vehicle Impoundment program, driving safely, seat belts, child safety seats, school buses, emergency vehicles, and much more.

Information about the world's first all-electronic open access toll highway, which extends 108 kilometres east-west, just north of Toronto. Learn about the road's special features, tolls, and more.


More Commuter Coverage on CP24

Watch CP24's auto show every Sunday at 8:00 p.m. to learn about your vehicle, the car industry, and much more.

News, updates, and important information about transit systems for Toronto & the GTA.

News, updates, wait times, and traveller information about Ontario border crossings.

News, updates, important links, traveller information, and Billy Bishop arrival and departure times.